首页 > 2023 ( 第 379 页)

2012年4月下 施工技术 第41卷第363期 CONSTRUCTION TECHNOLOCY 95 灌浆技术在水利工程建设管理 及施工中存在的若干问题 戎雷,潘翔 (武警水电第二总队,江否南昌330029) [摘要]灌浆作为地基处理的主要手段之一,在国内得到了很大发展,在建工程中所占的比例也在增加,但在建设 管理方面还存在一些弊端.在施工管理方面也存在一些误区.结合实际经验,分析了灌浆技术在水利工程建设管 理中存在的问题及施工方面存在的误区及其解决办法,以更好地促进灌浆工程的发腰. [关键词]水电站:地基处理:灌浆:管理 [中图分类号】TV732 [文献标识码]A [文章编号]1002-8498(2012)08-0095-04 Several Problems of Grouting Technology in Management and Construction of Hydraulic Engineering Rong Lei Pan Xiang No.2 Hydropower Force of Armed Police Nanchang.Jiangsi 330029 China) Abstract:As one of main methods for foundation treatment grouting is developing in China.And the percent of grouting increases in construction.But there are some disadvantages in building management and some mistakes in construction management.Based on actual practices authors analyze the problems and mistakes of grouting technology in construction management of hydraulic engineering to promote the development. Key words:hydropower stations:foundation treatment;grouting:management 灌浆(grouting) 发展初期称为注浆(injection高坝大库成为主导设计理念.水利工程中多为较 grouting) 是将一定材料配成浆液,用压送设备将其常规施工有诺多困难的案例,其基础处理工程所占 灌人地层或继隙是指扩散、胶凝或固化,以达到加比例与分量均有所增加,大部分为采用灌浆方式进 固地层或防渗堵漏的目的.在基础处理范砖,注浆 行处理. 技术由经验方法逐步完善成为一门具有理论的技 虽然如此,很多工程师仍有重上层建筑、轻地 术.注浆技术的历史大致可分为4个阶段:原始黏下基础的思想,或有因对灌浆理论知识了解简单而 土浆液阶段(1802一1857年).初级水泥浆液注浆阶 产生的不合理的建设管理和施工管控,形成了很多 段(1858一1919年),中级化学浆液注浆阶段 误区. (1920一1969年),现代注浆阶段(1969年之后).1建设管理中存在的问题 我国对灌浆技术的应用起步较晚,但发展较快,近 1.1标段划分过多可能导致责任不清 年来某些方面已达到世界先进水平,20世纪50年 目前国内大型工程的招投标市场中,建设单位 代后期,灌浆技术在水坝的防渗和加固工程中逐渐 多会将整体工程划分为多个标段,其...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年2月下施工技术 第43卷第4期CONSTRUCTIONTECHNOLOGY63 DOI:10.7672/sgjs2014040063
海控国际广场绿色施工技术研究与应用*
洪辉,穆青山,张恩泽,武科,王冬冬,王鹏杰 (中国建筑第六工程局有限公司华东分公司,江苏南京210016) [摘要】近年来,随着能源消耗及环境污染的日益加剧,国家及地方各级企业努力推行“绿色施工、节能减排”的工 技术的研究和应用进行了详细介绍,主要包括:节能与能源资源利用、节水与水资源利用、节材与材料资源利用、节 地与土地资源保护和环境保护5个方面。

结果表明,通过绿色施工技术的应用,取得了良好的社会和经济效益。

[关键词】绿色建筑;绿色施工;节能;环保;施工技术 [中图分类号]TU712[文献标识码]A[文章编号]1002-8498(2014)04-0063-03 GreenConstructionResearchandApplication inHaikongInternationalPlaza
(Huadong Branch of China Construction Sixth Engineering Bureau Co.,Lud.,Nanjing,Jiangsu 210016,China) Abstract:In recent years,with the energy consumption and deterioration of environmental pollution increasing,green construction,energy-saving and emission reduction are promoted in China.Combined with Haikong International Plaza project,the research and application of green construction are introducedbased on the green construction stage ingreen building life cycle,including energy-saving, material-saving,water-saving, land-saving and environmental protection.The results show that good social and economic benefits are obtained by the application of green construction technology. Key words:green buildings;green construction;energy-saving;environmental protection;construction 1工程概况 海控国际广场位于海南省海口市龙华区商业 核心区,项目由主楼A座、副楼B座、C座及附属裙 房及地下机械车库组成,总建筑面积23万㎡²,是集 五星级酒店、5A级写字楼、酒店式公寓、娱乐、观光 于一体的商业综合体。

主楼地下3层,地上55层, 总建筑高度249.7m,钢筋混凝土核心筒-钢管混凝 土外框结构,是海南省在建第1高楼(见图1)。

2节能设计概况 本工程采用外墙外保温体系,节能率为50%, 建筑体形系数S=0.1,窗墙比东向0.71,西向 0.72,南向0.77,北向0.76,屋顶透明部分面积占整图1建筑效果 个屋面面积的22.93%,绿地率24%。

Fig.1 Architectural effect 在设备工程节能方面:在充分体现可持续发展筑要求的先进、成熟、可靠的技术:①采用高频率冷 理念的同时,选用最经济合理,适用于酒店、办公建冻水制冷机组;②采用大温差供冷技术及一次泵变 中国建筑股份有限公司科研课题项目:海岛环境高烈度区超高层流量系统形式;③采用变频器控制水泵转速和风机 组合结构综合施工技术研究与应用(CSCEC-2011-Z-38)转速,减少空调输配系统运行能耗;④过渡季节采 [作者筒介]洪辉,助理工程师,E-mail:380065562@q.用全新风运行,充分利用室外天然冷源;根据空 [收稿日期]2013-08-22
万方数据
t9施工技术第43卷 调系统形式,夏季对部分可利用排风进行热回收,管理部生活区浴室、盟洗室、洗衣房等处张贴 预冷新风;充分利用自然通风,节约运行费用;醒目节能提示。

办公室等场所采用细管荧光灯,生 制冷机房、空调机房的门墙、楼板均做隔声处理;⑧活区采用节能灯。

现场使用节能、高效、环保的施 空调机组、新风机组、送排风机进出风管均设工机...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年11月下 30 CONSTRUCTION TECHNOLOGY 第40卷第353期 海控国际广场塔式起重机运力分析及优化 李松 (中国建筑第六工程局有限公司华东分公司,江苏南京210016) [摘要]海控国际广场工程钢筋混凝土核心筒与钢管混凝土外框柱的安装作业均需要选用塔式起重机来进行垂直 运输工作.通过对塔式起重机的使用情况进行大量统计分析,并根据分析结果采取措施优化塔式起重机运力,促 进了工程质量和安全管理工作,并为工期目标的实现提供了有力的措施保障. [关键词]高层建筑;建筑机械;塔式起重机;运力分析:优化 [中图分类号]TH213.3 [文献标识码]A [文章编号]1002-8498(2011)22-0030-02 Analysis and Optimization for Tower Crane Capacity in HNA International Mansion Li Song Huadong Branch of China Construction Sixth Engineering Division Co.Ltd.Nanjing Jiangsu 210016 China) Abstract:The installation of reinforced concrete core tube and external frame column in HNA International Mansion need to use tower crane for vertical transportation.The using condition of tower crane is statistically analyzed to optimize the capacity.The construction quality and safety management are improved and the construction period is ensured. Key words:tall buildings;construction equipment;tower cranes;capacity analysis;optimization 1工程概况 海控国际广场工程位于海口市金贸中路,A座 建筑高度249.70m 目前是海南省在施第一高楼. 本工程结构形式为钢筋混凝土双连体核心筒钢管 混凝土外框柱、钢楼承板结构形式,地下3层,地上 54层.结构施工阶段的垂直运输采用2台TC7052 号式 外附着式塔式起重机.由于现场条件所限,1号塔 包机 2号塔式@ 式起重机大臂长度为40m 2号塔式起重机大臂长 起重机 度为45m 两台塔式起重机可以覆盖整个作业面. 钢筋混凝土核心简施工采用爬模外爬内支方式,混 凝土泵送;初期外框柱混凝土使用塔式起重机吊运; B座 楼承板混凝土采用泵送方式施工. 由于现场条件所限,A座周围不能形成循环道 路,但有3条通道可接近A座.塔式起重机施工平 图1塔式起重机施工平面布置 面如图1所示. Fig.1 Tower crane work plan 2塔式起重机工作内容分析 塔式起重机运力与结构施工工艺关系密切,施 施工工艺流程如图2所示.最初计划塔式起重机主 工工艺关系到塔式起重机的工作内容和工作量.其 要工作内容如表1所示. 3实际运力分布统计与分析 [收日期]2011-08-01 [基金项目]中国建筑工程总公司科研项目(CSCEC-2011-Z-38) 现场实施过程中,在标...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年8月下 48 CONSTRUCTION TECHNOLOGY 第43卷第16期 D01:10.7672/sjs2014160048 海岸桩基建筑物纠倾工程分析 李宇捷 (中国地质大学(北京)海洋学院,北京100083) [摘要]海岸桩基建筑物纠倾工程是一项复杂的系统工程,需要因地制宜地进行研究.讨论了海岸工程地质条件 和水文地质条件,分析了海岸桩基建筑物倾斜原因及其纠倾工程设计施工特点,通过两则实例揭示了风暴与潮汐 对桩基建筑物纠倾工程的影响,探讨了地下水、地基土、桩基础及荷载变化的相互关系,提出了及时规避台风和大 潮的措施. [关键词]海岸场地;桩基;纠倾 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2014)16-0048-04 Analysis on Incline-rectifying Engineering of Coastal Building with Pile Foundation Li Yujie (School of Ocean Sciences China Unitersity of Geosciences Beijing) Beijing 100083 China Abstract:It is a plex systematic engineering to correct the leaning coastal building with pile foundation on which the studies shall be prepared according to practical condition.The engineering geology condition and hydrogeological conditions in coastal site are discussed.Then slant reasons of coastal building with pile foundation are analyzed the design and construction characteristics of incline- rectifying engineering are put forward.The windstorm and tide influence on incline-rectifying engineering are researched by two engineering examples.The relationships of groundwater foundation soil pile foundation and time varying load are discussed and the avoidance measures of windstorm and tide are advanced. Key words:coastal site:piles;rectification 随着我国城市化进程的发展,沿海城镇逐渐向 裸露.我国的基岩海岸多由花岗岩、玄武岩、石英 滨海平原地区推进,海岸建筑随之增加.但由于海 岩、石灰岩等组成.海岸基岩强度较高,压缩性低, 岸地质条件特殊性以及设计施工等方面的原因,一 其节理与裂隙比较发育. 些海岸桩基建筑物出现了倾斜等建筑病害.海岸 砂质海岸多形成于海湾内,主要由砂砾组成, 桩基建筑物纠倾工程具有地域性强、时空效应显 平原地貌发育.其中,砾石、粗砂的抗剪...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年12月下 78 CONSTRUCTION TECHNOLOGY 第40卷第355期 海外工程的RFI编制管理 王力尚,周康,吴鸣,朱建潮,陈文刚 (中建中东有限责任公司,阿联首,迪拜) [摘要]在履行国际项目工程合同时,有可能出现技术问题,需要建筑施工承包商履行RFI报审程序.RFI即技术 问题答疑,是海外工程施工中承包商向业主,监理获取技术信息,解决工程施工过程中遇到的技术问题的主要途 径.重点对RFI的特点、适用范围、编制原理及应用流程进行闸述,并介绍了审批分类以及管理办法等.实践证 明,RFL具有良好的经济和社会效益. [关键词]管理;RFI;编制;审批分类 [中图分类号]TU713 [文献标识码]A [文章编号]1002-8498(2011)24-0078-03 Compilation and Management of Request for Information for the International General Contract Project Wang Lishang Zhou Kang Wu Ming Zhu Jianchao Chen Wen'gang (China State Construction Engineering Corporation Middle East L.L.C.Dubai UAE) Abstract:Contractors will implement process of request for information RFI)due to technical problems in international general contract project.RFI is the main way for contractors to get information from the clients and supervisors for solving the technical problems.Authors describe the characteristics application scopes pilation theory and application process of RFI as well as categories used by the engineer to evaluate RFI and management methods.The application shows that RFI for the international general contract project can gain good economic and social benefits. Key words:management;RFI request for information);pilation;categories used by the engineer to evaluate 在履行国际项目工程合同时,在业主、监理、承程施工过程中遇到的技术问题和技术难点,获取足 包商共同管理的项目施工过程中,由于设计失误、够技术信息的有效手段,并最终为工程的顺利施 忽略、错误、各专业之间脱节,设计与现场条件不工、通过竣工验收服务,为建筑服务商争取更大的 符、节点不细化、设计变更,项目进行中监理履行设经济效益.目前在各大建筑市场中得到了广泛的 计职能等原因,使项目在进行中出现技术疑问、图应用. 纸信息、节点不细化、现场与设计不符、各专业冲突2...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年4月下 施工技术 第45卷第8期 CONSTRUCTION TECHNOLOGY 47 D0I:10.7672/8js2016080047 杭州来福士广场双向异面倾斜圆管柱深化 设计与加工制作 朱福锦,聂元宗,沈洪宇,周鹏,张耀林 (中建钢构有限公司,广东深圳518040) [摘要]杭州来福士广场项目外围框架圆管柱沿曲面向不同方向倾斜,给钢结构深化设计和加工制作带来了难度. 针对光滑曲线大直径圆管柱结构特点,从深化设计源头进行合理优化以便于工厂加工制作.详细介绍了双向异面 倾斜圆管柱的深化设计建模及图纸表达方法,通过精心设计,满足加工制作要求,为项目成功实施提供了充分 保障. [关键词]高层建筑;钢结构;双向异面;圆管柱;深化设计;加工 [中图分类号]TU323.1;TU758.16 [文献标识码]A [文章编号]1002-8498(2016)08-0047-04 Detailed Design and Fabrication for Inclined Circular Pipe Column with Two-way in Different Planes of Hangzhou Raffles City Project Zhu Fujin Nie Yuanzong Shen Hongyu Zhou Peng Zhang Yaolin China Construction Steel Structure Co.Lid.Shenzhen Guangdong 518040 China) Abstract:Peripheral frame circular pipe columns incline to different direction along curves in Hangzhou Raffles City project which brings difficulties to steel structure detailed design and manufacture. According to the characteristics of smooth curve large diameter circular pipe columns reasonable optimization is done from deepening the design source for the factory manufacture.This article introduced detailed design model and drawing expression method of the two-way in different planes inclined cireular pipe columns.Through elaborate design it can meet the requirements of processing production and provides a full guarantee for successful project implementation. Key words:tall buildings;steel structures;two-way in different planes;circular pipe column;detailed design;processing 1工程概况 杭州来福士广场项目由T1 T2两栋塔楼及裙 房组成.T1塔楼60层,建筑高度250m(檐口高...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2014年7月下 88CONSTRUCTIONTECHNOLOGY第43卷第14期 DOI:10.7672/sgjs2014140038 杭州奥体博览城主体育场结构设计研究
杨想兵,傅学怡,廖新军,朱勇军,成永平,高颖,周颖,王涛 (悉地国际设计顾间有限公司,北京100013) [摘要】杭州奥体博览城主体育场看台平面近似椭圆形,外圈周长近1000m,总建筑面积约21万㎡²,拥有观众固 定座席80912座。

下部混凝土结构采用框架-剪力墙结构体系,部分框架及剪力墙端柱内置型钢,未设永久缝,结 构超长、超限。

上部钢结构罩棚最大悬挑长度52.5m,采用径向悬挑空间管桁架+环向弦支单层网壳结构受力体 系,通过上下支座支承于下部混凝土结构柱顶。

重点介绍本工程结构体系、结构构成、结构设计的关键技术难点及 相应的专项研究分析处理方法。

[关键词】体育场;钢结构;空间结构;刚度退化;节点;设计 【中图分类号】TU311;TU758[文献标识码]A[文章编号]1002-8498(2014)14-0038-06 StructuralDesignandResearchReviewontheMain StadiumofHangzhouOlympicSportsExpoCenter Yang Xiangbing,Fu Xueyi, Liao Xinjun,Zhu Yongjun, Cheng Yongping, GaoYing,ZhouYing,Wang Tao (CCDIInteationalDesignConsulantsLimited,Bejng100013,China)
shaped in plan, theouter perimeteris about 1000m,the gross area is 210000m²and it has 80912fixed audience seatsntotal.Concrete structureadoptsframe-shearwall system,andprofile steelisembedded in some offrames and shearwall.None permanent structural joints are providedof the structure,andit is therefore an out of gauge over length structure.The maximum cantilever length of steelroof is52.5m, using the structural system of radial cantilevered space tube truss bined with circumferential chord supported single-layer reticulated shell, supported on the reinforced concrete column through upper and lower bearings.The paper primarily presents the structural system,structural form,key technical difficulties andmeasuresforrelevant specialized studies and analysis. Key words:stadiums;steel structures; spatial structure; stiffness degradation; joints;design 1工程概况场北侧看台2层平台以上开口,开口宽度40~60m。

杭州奥体博览城主体育场位于钱塘江与七甲看台区上覆完整的环状花瓣造型钢罩棚,罩棚外边 河交汇处南侧,为特级、特大型体育建筑,总建筑面缘南北向长约333m,东西向约285m,覆盖宽度 积210110m²,固定观众座席共80912座。

68m,悬挑长度52.5m,顶标高60.740m。

罩棚由28 体育场外轮廊平面近似椭圆形,长轴长366m,片大、小花瓣形成的14个花瓣组构成,花瓣为整个 短轴约338m。

混凝土看台结构最大宽度约108m,造型设计的母题,以优雅又富有张力的花瓣外形为 最高点标高为42.463m。

下部混凝土结构地下1表现形式,隐喻着基地内的水系特征和丝绸文化, 层,地上6层,2层平台(标高7.800m)以上看台结将活力动感与华贵美丽完美结合,宛若一朵白莲, 构向场外倾斜。

由于建筑空间上要求体育场场内傲然挺立在钱塘江畔。

体育场建筑效果及现场施 面向钱塘江具有良好的空间渗透和视觉...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年1月下 施工技术 第45卷第2期 CONSTRUCTION TECHNOLOGY 13 D0I:10.7672/sgjs2016020013 杭州国际博览中心飘带网架结构 施工全过程分析* 王化杰12,钱宏亮1,范峰2,徐义明3,刘世豪24,张甫平3 (1.哈尔滨工业大学(威海)土木工程系,山东威海264209;2.哈尔滨工业大学土木工程学院,黑龙江 哈尔滨150090;3.中建安装工程有限公司,江苏南京430064;4.中国建筑股份有限公司,北京100037) [摘要]杭州国际博览中心飘带结构是典型的自由曲面空间结构,对施工安全和施工精度提出了很高的要求,为了 了解结构在施工过程中的响应规律,考察施工方案的合理性,对其结构施工过程关键问题进行研究,建立了整体结 构施工仿真模型,针对结构的“分条分块吊装方案”,对典型吊装单元进行了吊装分析,给出了结构分块吊装过程中 吊装单元的力学响应,并给出了吊装建议,对飘带网架拼装方案和结构卸载方案进行了施工全过程模拟,获得了结 构施工过程的力学响应规律.分析结果表明,施工过程中结构的最大应力比均在0.3以下,应力比较低,变形均满 足规范1/250的控制要求,施工过程中结构处于弹性状态,施工方案合理,研究成果可以为结构施工安全和精度控 制提供理论指导. [关键词]钢结构;网架;吊装;施工;数值模拟 [中图分类号]TU393.3 [文献标识码]A [文章编号]1002-8498(2016)02-0013-05 Construction Full-process Analysis for Streamer Space Truss of Hangzhou International Expo Center Wang Huajie'.2 Qian Hongliang' Fan Feng? Xu Yiming' Liu Shihao2. Zhang Fuping' (1.Department of Civil Engineering Harbin Institute of Technology Weihai Weihai Shandong 264209 China; 2.School of Civil Engineering Harbin Institute of Technology Harbin Heilongjiang 150090 China; 3.China Construction Installation Engineering Co. Ltd.Nanjing Jiangsu 430064 China; 4.China State Construction Engineering Co. Beijing 100037 China) Abstract:Streamer structure of Hangzhou International Expo Center was a typical free-form surface spatial structure which proposed high demands on the construction safety and precision.Key issues in construction processes were studied while simulation model of the whole structure was established in order to grasp the response pattern of...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年3月上 施工技术 第46卷第5期 CONSTRUCTION TECHNOLOGY 41 DOI:10. 7672/sgjs2017050041 机械胀裂法在边坡开挖工程中的应用 叶春琳',曹晓立²,马瑞',高文学² (1.北京市政路桥股份有限公司,北京100068;2.北京工业大学建筑工程学院,北京100124) [摘要】复杂环境下采用爆破施工会带来一系列安全隐患。

机械胀裂法利用岩石抗拉强度低的特点,以其良好的 可控性和环保性,在近年来的边坡工程中得到越来越多的应用。

基于佛山某边坡工程,以数值模拟为理论基础,通 过现场试验来验证机械胀裂法在露天工程中的可操作性。

[关键词]边坡;支护;机械胀裂法;数值模拟;施工工艺 [中图分类号]TU471*.6 【文献标识码]A [文章编号】1002-8498(2017)05-0041-02 ApplicationofMechanicalBurstMethodinSlopeExcavationEngineering Ye Chunlin',CaoXiaoli²,Ma Rui',GaoWenxue² (1.Beijng MunicpalRoad&BridgeGroupCo.Ld.Bejing100068,China;2.CollefArchitecturend Civil Engineering,Beijing University ofTechnology,Beijing100124,China) Abstract;The blasting method willlead to potential safety problems in plex environment.Mechanical burst is used in many engineering applications, because of its advantage of the characteristics of rock, besides,it has good control and environmental protection.In this paper,based on a slope project in Foshan of Guangdong,numerical simulation is researched.Mechanical burst feasibility in the project is validated by field test. Key words:slope;supports;mechanical burst; simulation; construction 0引言 作业;边坡开挖高度为10~15m。

现场施工环境如 边坡开挖工程,最根本的任务是要有效破碎岩图1所示。

石,同时控制边坡开挖过程对周边复杂环境的影 7~10m 响。

随着路基工程、边坡工程建设的发展,施工环 境日益复杂,采用传统的钻爆法施工带来一系列安 全隐患,寻求新的方法破碎岩石显得尤为重要。

基 于岩石抗拉强度远小于抗压强度的特点,机械胀裂 法在边坡开挖工程中得到推广使用,并且能够达到 安全可靠、节能环保、提高效率的目的[13]。

图1周边环境示意 本文基于佛山某边坡工程,以数值分析结果为 Fig.1 Surrounding environment 基础,通过现场岩石胀裂试验,探讨了机械胀裂法 2设备及施工原理 在边坡开挖工程中的适用性。

柱式岩石胀裂棒是一种新型劈岩装置,胀裂棒 1工程概况 机体上布置有10~14个类似于千斤顶的小活塞。

边坡开挖工程位于佛山某住宅小区施工现场 工作时,将胀裂棒安放在预先钻好的孔内,当向胀 附近,距离正在施工的建筑物7~10m,周边环境复 裂棒提供140~180MPa的超高油压时,小活塞使伸 杂,如采用钻爆法施工将对周边环境造成极大危 出直接对孔壁产生作用力,从而使岩石沿垂直于布 害,因此采用机械胀裂法进行边坡开挖。

孔的方向膨胀开,达到高效、无振动、安全破岩["]。

边坡岩石为花岗岩,岩体较为完整,适合胀裂 柱式岩石胀裂棒有2种型号,棒长分别为1.0, [作者简介]叶春琳,高级工程师,E-mail:TRDcenter@ 1.4m(见图2),选用时根据现场条件确定。

该胀裂 [收稿日期]2016-05-04;[修订日期]2016-08-16 棒的活塞间距为70mm,活塞直径为46mm,伸缩进 万方数据
42 施工技术 第46卷 程45mm。

图4现场试验钻孔排布 Fig.4Borehole configuration 图2机械胀裂棒 Fig.2Mechanical burst rods 边坡开挖时,坡体一般有2个自...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月上 施工技术 第42卷第13期 CONSTRUCTION TECHNOLOGY 61 D0I:10.7672/sgjs2013130061 机场高填方加筋挡土墙在施工中的应用 李艳威,赵志强 (北京金港场道工程建设股份有限公司,北京100071) [摘要]加筋挡土墙是填土、拉筋和面板的结合体.拉筋与土之间的摩擦力及面板对填土的约束,使拉筋和填土结 合成一个整体的柔性结构,能适应较大的变形.结合某机场场道工程实例,介绍了加筋挡土墙的施工特点和工艺 原理.详细介绍了加筋挡土墙的施工工艺流程和操作要点、加筋材料的要求、质量控制标准和控制措施. [关键词]地基处理;机场场道;加筋土挡墙;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2013)13-0061-03 Application of Reinforced Retaining Wall in Airport High Fill Construction Li Yanwei Zhao Zhiqiang Beijing Jin'gang Airport Road Construction Co. Ltd.Beijing 100071 China) Abstract:Reinforced retaining wall is bined with fillings steel bar and panel.The friction between the stretch and soil and panel filling constraints so that stretch and the filling bined into an overall flexible structure which can adapt to the large deformation.Based on airport road engineering practice this paper introduces construction characteristics and technical principle.Construction process and operation points of reinforeed retaining wall are introduced in detail as well as its quality control standard and control measures. Key words:foundation treatment;airport road;reinforced retaining wall;construction 1工程概况 3)少占土地,造型美观加筋挡土墙墙面为一 吕梁机场1号挡土墙设计长度122.52m 分段 竖直平面,不用勾缝,墙面板自然形成错落有致的 高度从23 20m到3m不等.挡土墙混凝土面板预 规则图案,又壮观又美观. 制约25000块,加筋材料采用高密度聚乙烯单向土 4)具有一定柔性,能够适应地基轻微变形,且 工格栅,铺设面积约120000m2. 抗震性强. 本工程的高填方挡土墙无论工程规模还是技 2.2加筋挡土墙的工艺原理 术难度方面,在我国的民航机场建设史上都是一个 在土体中分层加人入一定量具有较高抗拉强度 创举,对于提升行业的整体技术水平起到了较大的 和耐久性好的拉筋,拉紧锚固后,机械配合摊铺填 推动作用. 料,经分层摊铺、充分碾压,使填料与拉筋之间产 2加...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年8月上 54 CONSTRUCTION TECHNOLOGY 第40卷第346期 既有建筑托梁拔柱改造设计与施工控制 赵挺生1,丁丽萍,唐菁菁,徐福泉2,李东彬2 (1.华中科技大学土木工程与力学学院,湖北武汉430074;2.中国建筑科学研究院,北京100013) [摘要]伴随低碳理念,我国建筑业发展正在步人低投入低消耗的现代化改造、维修与加固时期.托梁拔柱作为一 种扩大柱间距较好的技改方法得到了广泛应用.由于改造过程的结构时变特性以及现场作业难度大等特点,导致 其高风险性.为此,结合既有建筑托梁拔柱改造实践,在系统探讨托梁拔柱改造施工工艺流程的基础上,基于现代 工程安全理论,分析了既有结构承载能力降低风险、设计完整结构在施工过程呈现的阶段非完整性失效风险、托梁 拔柱施工质量风险、施工过程人身伤害风险以及托梁拔柱工程使用安全风险.综合应用建筑防倒塌设计方法和建 筑加固技术,提出了既有建筑托梁拔柱改造的构造设计、极限状态设计、变形与刚度控制和结构布置防倒塌设计原 则,并建议了结构加固、托梁原位制作以及截柱卸载施工技术要点,最后介绍了单层工业厂房和多层框架办公建筑 托梁拔柱改造的实例. [关键词]既有建筑;改造;托梁拔柱;设计方法;施工技术 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2011)15-0054-06 Design and Construction Control of Existing Building's Reforming by Transfer Girder and Cut Column Method Zhao Tingsheng' Ding Liping' Tang Jingjing' Xu Fuquan2 Li Dongbin2 (1.School of Civil Engineering and Mechanics Huazhong University of Science and Technology Wuhan Hubei 430074 China;2.China Academy of Building Research Beijing 100013 China) Abstract:With the philosophy of low carbon for friendly environment and sustainable development construction industry is entering the period of rebuilding maintenance and strengthening.The transfer girder and cut column (TGCC) as a means of expanding the column space has been widely used in the reforming of existing buildings.Since the structures under reforming are time-dependent structures and construction work is of high difficulty.Consequently the reforming engineering project of existing building is of high risk.So based on the practice of TGCC ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年4月上 52 CONSTRUCTION TECHNOLOGY 第41卷第362期 挤密桩和CFG桩复合地基湿陷性黄土地区的应用 苏迎社,陈林 (1.长安大学工程设计研究院,陕西西安710064;2.深圳机械院建筑设计有限公司,广东深圳518027) [摘要]根据对挤密桩和CFG桩作用机理的分析,详细论述了在湿陷性黄土地区采用先挤密地基土,后施工.CFG 柱的多桩型复合地基处理技术.结合工程实例,详细介绍了挤密桩和FG桩复合地基的设计方法与施工工艺,并 通过复合地基检测结果的评价,表明了该方法具有降低成本、缩短工期、技术先进的优点,可在湿陷性黄土地区推 广应用. [关键词]地下工程;桩基础;挤密桩:CFG桩;湿陷性黄土 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2012)07-0052-03 Application of Compaction Pile Combining with CFG Pile Used in Collapsible Loess Area Su Yingshe Chen Lin (1.Design Research Institute Chang'an University Xi'an Shaanxi 710064 China; 2.Shenzhen Machinery Institure Architectural Design Co.Lid.Shenzhen Guangdong 518027 China) Abstract:According to analysis of action mechanism of paction pile and CFG pile authors elaborates the multi-pile posite subgrade technique which pacts the foundation soil first and then constructs the CFG pile.Based on practical project design method and construction procedures are described in detail for paction pile and CFG pile in collapsible loess area.Through the evaluation of posite subgrade detection results it indicates that the mentioned method has the advantages of cost reduction construct period shortening and technology advanced.It can be used in collapsible loess area extensively. Key words:underground;piles;paction pile;CFG pile;collapsible loess 在湿陷性黄土地区,对非自重湿陷性和自重湿土挤密桩法提高地基的密实度,从而达到对湿陷性 陷性场地,通常采用挤密桩或换填法处理地基.但黄土消除部分或全部湿陷性的作用,并改善地基的 处理后地基承载力一般≤250kPa 只能满足多层建承载力,减少地基变形. 筑地基承载力的要求,不满足高层建筑的要求,因 2)CFG桩是水...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

提问日期:2023-10-24 23:00:46

提问网友:悲催的陌生人


问题2:WDZB-BYJ-2*2.5+WDZB-BYJR-2.5工程量是一致的*3?还是说需要区分火、零地线工程量(零线地线不进开关)

2023-10-24 23:08:42 补充

问题3:要是图纸上标5根线但规格就只有WDZB-BYJ-2*2.5+WDZB-BYJR-2.5,那另外俩根加到byj还是byjr呢,求大神详解!

解答网友:大海


一、WDZB-BYJ-2*2.5(一根火线、一根零线)+WDZB-BYJR-2.5(接地线)

二、工程量最好分开计算,因为接地线(软线)价格贵一些。

三、另外2根加到(WDZB-BYJ-2*2.5)里面。

2011年2月 施工技术 第40卷第4期 CONSTRUCTION TECHNOLOGY 45 建设工程质量检测监督信息化研究 李鸿伟,牛天勇2 (1.中国矿业大学(北京)力学与建筑工程学院,北京100083;2.北方工业大学经济管理学院,北京100144) [摘要]目前,由于建筑工程质量监管方面存在很多问题,造成质量监测数据失真、监管效率低下.以构建工程质 量检测监督信息化方案为出发点,进行了信息化监督平台的框架设计,并在此基础上拼建了该信息化平台的技术 支持系统.工程质景信息化监督平台的建立不仅可以提高单个工程质量监管的效率和准确度,还可以促进整个地 区工程质量的提高,从而得到良好经济效益. [关键词]质量;检测;监督;信息化:框架 [中图分类号]TU717 [文献标识码]A [文章编号]1002-8498(2011)04-0045-03 Research on Information of Quality Inspection and Supervision in Construction Project Li Hongwei' Niu Tianyong? (1.School of Mechanies Civil Engineering China University of Mining and Technology(Beijing) Beijing 100083.China; 2.School of Economics and Management North China University of Technology Beijing 100144 China) Abstract:Nowadays more and more problems emerge from the quality supervision in construction project which lead to monitoring data fuzzy and inefficient.A information plan of construction quality supervision is put forward.On the basis of this plan the frame of the supervision information system is designed.The corresponding technical supported programs are given.The establishment of construction quality supervision information system can not only improve the efficiency and accuracy of a single project but also raise the quality level of the whole region to gain good economical efficiency. Key words:quality inspection;supervision;information;frame 1研究背景 见证、借用他人证书.②见证过程流于形式主要 1.1建设工程见证取样送检存在问题 表现为取样人员在取样时,见证人员没有认真见证 建设工程取样送检是原建设部2000年发布的 或者根本不见证;取样人员取样时忽视技术标准或 《房屋建筑工程和市政基础设施工程实行见证取样 规范要求,认为...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年5月下 施工技术 第41卷第365期 CONSTRUCTION TECHNOLOCY 95 建设工程垫资承包的风险及防范对策 李维芳 (武汉科技大学管理学院,湖北武汉430081) 【摘要]国内工程建设领域的垫资承包问题起源于国内建筑市场经济制度的建立和建筑金业市场地位的确立.承 包人在建筑市场中处于弱势地位,垫资施工面临一系列风险,垫资施工的风险防范问题也日益成为广大施工企业 应关注的间题.通过对国内垫资承包现象的深人分析和研究,从中找出承包商在垫资承包中可能通到的主要风险 及风险来源,并针对这些风险问题,从防范业主拖欠工程款、加强承包商垫资管理、完善承包垫资保障制度等方面 提出相应的风险防范对策. [关键词]工程管理:垫资承包;风险;防范措施 [中图分类号]TU723 [文献标识码]A [文章编号]1002-8498(2012)07-0095-04 Risk and Preventive Measures of Contracting with Funds in Construction Li Weifang (School of Management Wuhan University of Science and Technology Wuhan Hubei 430081 China) Abstract:Contracting with funds derived from the creation of construction market economic system and the construction enterprise market positions in China.Contractors are in a weak position in the construction market it causes a serics of risk factors from the contracting with funds so contractors should pay attention to avoid funds risks of contract construction projects.Through in-depth investigation and prehensive study the main risks and the sources of risks are analyzed and the corresponding countermeasures are put forward mainly including prevention owner defaults on construction costs strengthening management about contracting with funds improving protection system about contracting with funds. Key words:project management;contracting with funds:risk:preventive measures 垫资承包当前已成为国内外工程建设领域的内建筑市场的规范都具有重要意义. 普遍现象.日前国内建筑市场中,建设资金的短缺1垫资承包的法律效力 和建筑企业之间过度竞争的情况同时存在.因此, 垫资承包又称带资承包,指在工程项目建设过 当项目存在资金缺口时,建设单位可以凭借其买方 程中,承包人利用自有资金...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年6月下 施工技术 第41卷第367期 CONSTRUCTION TECHNOLOCY 113 建立甲(A)类脚手架结构工程设计计算体系的 技术路线及有关问题初析(3) 杜荣军 (北京中建建筑科学技术开究院,北京100076) [中图分类号]TU731.2 [文献标识码]A[文章编号]1002-8498(2012)120113-08 Establishment of Technical Route for Class A Scaffold Design or Calculation System and the Analysis of Corresponding Questions (3) Du Rongjun Beijing Building Research Institute Co.Lad.of CSCEC.Beijing 100076 China) 2.2满堂扣件架、碗扣架剪刀撑及斜杆的配置分析 2.2.1按现行标准构造规定的a 值 M.=4n2(162)2n次 1)设置规定 当L L ≤1.5m L =3~8(≤4.5m)时: 新版JGJ130和JGJ166对满堂扣件支架、满堂 6n1n2y20 碗扣支架的剪刀撑、斜杆设置规定分别示于图6一 N.=-LaL (n n21m2m3) 8.其相应的N计算式如下. 式中,ni为n1和n2中的大值. 2)满堂架有斜杆框格束N的计算式 3)a 值 a.扣件架 按计算式并取不同的L 值得到的a 值分别列 作业架和普通型模板支架: 入表17~19中. N.= 2(20.0mm2n)(H1.5m时, 载能力改变量△R与△a的比值,△R/△a越大,则架 体承载能力对斜杆的配置越敏感. 分为9级,每 级a 的改变量为5%,从C 级的<10%逐级上升到 [收精日期]...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年7月下 施工技术 第46卷第14期 CONSTRUCTION TECHNOLOGY D0I:10.7672/5j52017140001 广州白云国际机场综合交通枢纽项目基础 工程溶(土)洞处理技术* 万利民,刘勇,常龙,诸葛仲彦,杨冬 (中国建筑第八工程局有限公司广州分公司,广东广州510670) [摘要]广州白云国际机场综合交通枢纽项目所在场区溶(土)洞较发育,对其地下工程的施工质量和安全影响较 大.主要从处理原则、处理范围、处理材料及工艺、效果验证等方面,介绍了本项目基础工程中的溶(土)洞处理技 术,并从降低施工过程安全风险、改善地基承载力和地基稳定性、预防溶(土)洞进一步发育对地下工程产生不良影 响等方面考虑,建议地下工程实施前应对已发现的溶(土)洞进行处理. [关键词]基坑:隧道;双液浆:单液浆:施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2017)14-0001-03 Treatment Technology of Dissolving (Soil)Hole in Foundation Project of Guangzhou Baiyun International Airport Integrated Transportation Hub Project WAN Limin LIU Yong CHANG Long ZHUGE Zhongyan YANG Dong (China Construction Eighth Engineering Division Co.Ltd.Guangzhou Branch Guangzhou Guangdong 510670 China) Abstract:The integrated transportation hub project of Guangzhou Baiyun International Airport is located in the area where the dissolved soil cave is relatively developed which has a great influence on the quality and safety of the underground construction.This article mainly introduces dissolving (soil)hole processing technology of the foundation engineering solution from the processing principle processing processing materials and technology effect of verification and considering from the aspects of reducing the safety risk of the construction process improving the bearing capacity of the foundation and the stability of the foundation preventing the further development of the dissolving (soil)hole and causing the adverse effects on the underground engineerin...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年11月 8 CONSTRUCTION TECHNOLOGY 第39卷第11期 广州珠江新城西塔施工测量及层间垂直度控制方法 郑宝铖,叶运安 (广州市建筑集团有限公司,广东广州510030) [摘要]广州珠江新城西塔工程主体采用筒中筒结构,为超高层建筑,施工测量和层间垂直度精度控制难度较大. 较详细地叙述了超高层建筑主体施工测量方案,包括提模钢平台顶面主要轴线控制,轴线竖向引测方法和放线步 骤.关于主体建筑的主要控制轴线竖向引测及钢模板定位技术具有创新性.同时指出施工测量具体流程,分析了 层间垂直度控制及其要求,使结构各项指标符合工程要求. [关键词]垂直度控制;提模钢平台;激光垂准仪;施工测量 [中图分类号]TU198 [文献标识码]A [文章编号]1002-8498(2010)11-0008-03 Construction Survey and Control Method of Interlayer Verticality in Guangzhou Pearl River New Town West-tower Zheng Baocheng Ye Yun'an Guangzhou Municipal Construction Group Co.Ltd.Guangzhou Guangdong 510030 China) Abstract:Guangzhou Pear River New Town West-tower with a tube-in-tube structure belongs to super high-rise building.It is difficult to control the construction survey and interlayer verticality precision between the floors.The authors describe the main body of super high-rise building construction measurement schemes in detail such as the control of main axis in steel platform top surface for hoisting template the methods of axis for vertical measurement and the steps of setting out.It has innovation in the control of vertical measurement about mainly axis and steel template location.Idiographic flow of construction measurement is put forward as follow analyzing vertical precision between the floors and its requirement then the various index accord with engineering requirements. Key words:verticality control;steel platform for hoisting template;laser verticality machine; construction survey 1工程概况 广州珠江新城西塔工程...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2015年1月下 106CONSTRUCTIONTECHNOLOGY第44卷第2期 DOI:10.7672/sgjs2015020106 广州海心沙体育场大悬挑开敞式钢顶篷施工 支撑体系研究* 彭文海,吴锦伟2 (1.广东逸涛万国房地产有限公司,广东广州511458;2.广州机施建设集团,广东广州510115) [摘要】对第16届广州亚运会开闭幕式主场馆看台大悬挑屋盖钢顶篷施工支撑体系进行设计、施工全过程模拟, 并对拉索张拉过程中支撑时变结构内力进行了分析,根据施工模拟结果给出结构转换过程中支撑轴力变化曲线。

该工作一方面保证屋盖钢顶篷安装过程中的安全;另一方面为此新型复杂结构的发展提供宝贵的实体结构实践。

[关键词]体育场;钢结构;顶篷;悬挑;斜拉索;支撑胎架;数值模拟 [中图分类号]TU731.2【文献标识码]A[文章编号]1002-8498(2015)02-0106-04
CantileverSteelRoofinGuangzhouHaixinshaStadium Peng Wenhai',Wu Jinwei (1.Guangdong Yitao Wanguo Real Estate Co.,Ltd.,Guangzhou, Guangdong 511458, China; 2.Guangzhou Machine Construction Group,Guangzhou,Guangdong 510115,China) Abstract;Design and construction simulation of the temporary support for the large-span cantilever steel roof of the 16th Guangzhou Asian Games in Haixinsha stadium were conducted,time-varying structural internal force of the temporary support in the process of the stayed cable tension was also introduced. Based on the result of the construction simulation,axis force of support in the process of structure transformation was given.What is more,the work not only assures the safe of the steel roof construction, but also validates the designing and the construction method of this kind of new plicated structure. Key words;stadiums; steel structures; steel roof;cantilever; stayed cable; supporting jig;simulation 1工程概况4),如图2所示。

第16届广州亚运会开闭幕式海心沙体育场看 台屋盖结构采用大跨度悬挑拉索曲膜钢结构体系, 屋盖为开式且呈扇形布置,结构形式新颖。

看台 部分顶蓬钢结构为斜拉索+空间组合管桁架结构 体系,顶篷悬挑跨度达68m。

屋面顶篷钢结构主要 以14根钢榄杆、14福空间组合管桁架及斜拉索为 主要结构,南北长185m,东西长87m,主桁架顶部标图1海心沙体育场大跨度悬挑顶篷 高53.786m,如图1所示。

钢结构顶篷采用斜拉索Fig.1Large-span cantilever steel roof of 桁架结构体系,共有14根枪杆柱与14空间桁架Haixinsha Stadium 组成,每2组成1个单元。

每桁架上设前拉索2施工工艺概况 2根(分别为索1、索3);后背索1根(索2);栀杆柱为保证在紧张的工期下安全、可靠地完成钢顶 设2根稳定索(索5);桁架下设置抗风索1根(索篷安装,屋面顶篷钢结构安装采取“胎架点式支撑、 地面分段散拼、组合成片吊装、高空原位补缺、屋盖 *广州市重大科技专项计划-科技亚运专项行动项目(2010U1-分级张拉,大型起重机跨外综合吊装”的施工工艺, P00041) 【作者筒介]彭文海,项目经理,工程师,E-mail:pwhai@tom.更是采用了特大型750t履带式起重机进行钢顶篷 [收稿日期】2014-03-05吊装。

万方数据
2015 No.2彭文海等:广州海心沙体育场大悬挑开散式钢顶篷施工支撑体系研究107 钢...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年10月下 施工技术 第43卷第20期 CONSTRUCTIONTECHNOLOGY 33 DOI:10. 7672/sgjs2014200033 广州城市规划展览中心单向张弦预应力施工技术 许曙东,张开臣 (北京银泰建预应力工程有限公司,北京100085) [摘要]广州市城市规划展览中心城市主题模型厅屋面采用单向张弦梁结构,重屋面、重荷载是本工程的第一大特 点,撑杆下节点抗滑索的设置是本工程的第二大特点。

围绕这两大特点,对本工程的施工方法进行了说明,重点介 绍了抗滑索的设置和张弦梁上弦钢梁加工时的制作起拱。

[关键调]张弦梁;预应力;抗滑索;起拱;施工技术 [中图分类号]TU394;TU758 [文献标识码]A [文章编号]1002-8498(2014)20-0033-02 PrestressingConstruction ofSingleDirectionalBeamStringin GuangzhouUrbanPlanningExhibition Center Xu Shudong,Zhang Kaichen (Bejing Yintaijian Prestressed Engineering Co.,Lid.,Bejing100085,China) Abstract;Single directional beam string is used in the project of Guangzhou Urban Planning Exhibition Center,heavyroofandheavyloadisthefirstmajorfeatureof thisprojet,andthesecondmajoreatre is the design of application of anti-slide cable.This paper focuses on these two characteristics,and introduces the methods of the construction.The setting of anti-slide cable and steel beam processing and making arc are introduced in detail. Key words;beam string; prestressing; anti-slide cable;making arc;construction 1工程概况 广州市城市规划展览中心工程分南北两区,北 区城市主体模型厅为48.0m×40.0m大空间展示 区,屋面采用单向张弦梁钢结构体系,张弦梁共11 福。

张弦梁轴线跨度48.0m,上弦规格为口700× 400×25,撑杆规格为口300×340×12,撑杆间距 6.0m。

预应力拉索材料为碳钢拉索,分为受力索和 抗滑索两种类型,受力索采用2$5×265,抗滑索在 图1建筑效果 左右两侧各2个节间采用$5×73,中段4个节间采 Fig.1Architectural rendering 用Φ5x37,拉索破断强度fa=1670MPa,钢索外加 29640-00 00,000 00 0000600.00 双层PE保护套,张拉方式为一端张拉。

本工程效 28500抗 果如图1所示,张弦梁立面如图2所示,抗滑索局部 抗索 2.000 12 如图3所示。

3 ④ 2工程特点 图2张弦梁立面 2.1重荷载 Fig.2 Elevation of beam string 屋面层为现浇混凝土板,板厚160mm,覆土厚 取为100kN/m。

与轻屋面的张弦梁结构相比,张弦 度1m,经推算,计算时,每张弦梁上作用的线荷载 梁荷载态的变形将比初始态的变形明显增加,如果 [作者简介]许曙东,总经理,总工程师,E-mail:xushudong@ytjchina. 施工过程中的结构变形控制误差较大,将影响结构 [收稿日期】2014-05-16 的设计使用净空。

万方数据
34 施工技术 第43卷 2)吊装张弦梁,如图5b所示。

3)张弦梁与桁架高空安装就位,如图5c所示。

4)两张弦梁吊装并安装就位后,依次安装屋 抗滑索 抗滑索 面板支撑。

5)张弦梁两侧屋面支撑系统安装完成后,依次 受力索 进行第2次张拉,并紧固抗滑索,如图5d所示。

图3抗滑索局部放大 6)依次执行1)~5)工序,直至施工完毕。

Fig.3 Enlargedview of anti-slide cable 2.2抗滑索 与轻屋面张弦梁结构相比,考虑到本工程屋面 为重屋面、重荷载,因此荷载态的索力要远大于初 始态的索力(见表1),索力的增大将引起拉索直径 变小、PE护套的变薄,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)