120 施工技术 第39卷 6000 在钢筋混凝土现浇结构中柱的纵向钢筋因位置难以固 科技短文 定会出现位移,柱筋偏移处理方法:若偏移较小可按1:6的 坡度将偏移钢筋冷扳调正.若偏移较大可在柱筋位置钻孔 钢筋施工中存在的问题及建议 采用植筋胶植筋的方法. 1人为配筋错误 3配筋率较大结构中节点区钢筋安装 1)框架结构梁柱节点柱,在梁高范围内柱箍筋不加密或 1)板式梁下支托箍筋节点处理在一些石油化工装置 不放置箍筋03G101-1图集中规定梁高范围内柱箍筋为加 中由于设备较重,在设计梁时按板考虑,导致粱的截面比柱 密区.《高层建筑混凝土结构技术规程》JG3-2002规定:底 的截面大,梁下支托的宽度同柱的截面.03G101-1中要求 层柱刚性地面上、下各500mm范围箍筋加密.解决框架梁 框架梁加腋构造如图3所示. 柱节点处箍筋加密区安装困难的方法:计算出框架节点处梁 图集上做法不适合某些 高范围内箍筋的数量,将箍筋全部集中在框架柱梁高范 工程梁下腋箍筋的做法.解 围内的中间部位,然后安装框架梁上部及下部钢筋.最后把 决办法:梁链筋在支托的范围 集中在柱节点梁高范围内中间的箍筋按箍筋加密区的间距 内按主梁的高度制作.在梁 安装,如图1所示. 支托位置适当增加多肢复合 箍筋,增加的箍筋顶部安装在 主梁的底部钢筋上,增加雅筋 间距同主梁箍筋间距. 图3框架梁加腋构造 2)料仓类构筑物斜梁与Fig.3 Haunch structure 框架主梁交接处箍筋安装 of frame beam 图4为某料仓框架顶层主梁 面集中框架柱酒 b安装果上、下部钢第 c柱安装 与斜梁的布置.斜梁与主梁同高,根据主梁与斜梁的钢筋位 图1梁柱节点处箍筋安装步骤 置关系,斜梁钢筋应安装在主梁受力钢筋内侧,由于斜梁与 Fig.1 Installation steps of stirrup in 主梁相交的长度L值较大,此范围内有主梁箍筋,斜梁额筋 beam-column joints 安装存在很大困难.在此范围内如不设置箍筋是不合理的. 2)抗震屋面框架梁纵向钢筋的锚固根据规范及 处理办法:在L范围内设置垂直于斜梁主筋方向的拉钩,拉 03G101-1图集要求,受拉钢筋抗震最小锚固长度必须达到 钩胶数同斜梁多肢复合筋肢数,拉钩间距同斜梁箍筋间 距.箍筋理论计算时A为配置在同一截面内箍筋各肢的全 E 框架梁、柱节点附近,梁上部在负弯矩作用下钢筋受拉, 按受拉钢筋错圆,如钢筋在端部节点内的水平锚固长度不够 部截面面积.此种处理办法基本符合箍筋理论计算的原理. 3)配筋率较大的 时,应在节点区内的远侧向下弯曲做弯锚.柱截面尺寸足够 大的情况下,抗展屋面框架梁纵向钢筋错固的正确做法:梁 框架梁柱节点钢筋安 的上、下部钢筋都必须伸至对边再弯.下部钢筋弯锚长度 装近年来随着石 油化工行业的不断发 满足15d 上部钢筋弯锚长度必须达到梁底,当梁下加肢时 展,设备不断增重. 弯锚长度伸至腋的根部位置且梁上部钢筋与柱钢筋的搭接 长度满足多1.5l 承载设备的混凝土构 筑物梁、柱的配筋率 3)剪力墙水平钢筋铺固图2为错误做法.这种做法 剪力墙的水平钢筋两锚固在墙的保护层里,若因某种原因 相对来说也比较大. 梁钢筋在下料时如考 图4某料仓框架顶层 保护层脱落后,水平钢筋在两端暗柱内失去锚固. 虑不周到,很容易导 主梁与斜梁的布置 4)框架梁箍筋的制作 致梁的弯错钢筋与柱Flg.4 Layout of main beam and 多肢复合箍筋的正确做法应 为大箍套小箍的形式. 的钢筋并排,形成“钢sk...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年10月下 施工技术 第42卷第20期 CONSTRUCTIONTECHNOLOGY 77 DOI:10. 7672/sgjs2013200077 钢筋悬挂式钢木组合模板施工技术 刘海峰,马怀章,郭玮,汪仲琦,孟军 (中建八局第三建设有限公司,江苏南京210046) [摘要】针对钢筋混凝土核心筒体钢结构外框架现浇混凝土楼板,采用钢筋悬挂式钢木组合模板体系,代替传统 钢管扣件式模板体系,从而减少了周转材料的使用量,降低了施工成本,减轻了劳动强度,施工质量得到了控制. 重点介绍了钢筋悬挂式钢木组合模板工作原理、结构组成以及制作、就位、安装等施工工艺. [关键词]模板;钢木组合模板;钢筋支座;施工技术 [中图分类号]TU755.2 [文献标识码]A [文章编号]1002-8498(2013)20-0077-03 Construction of the Reinforcement Suspended SteelandWoodCombinationFormwork Liu Haifeng Ma Huaizhang Guo Wei Wang Zhongqi Meng Jun (TheThird Construction Co.,Ld.,of China Construction Eighth Engineering Division, Nanjing Jiangsu 210046 China) Abstract:According to the reinforced concrete core tube and outer steel frame,the cast-in-situ concrete slab applies reinforcement suspended steel and wood bination formwork to instead of traditional fasten- style formwork system.This system can induce the reusable material decrease construction cost,reduce labor intensity,and so on. The work principle,position and construction techniques of fabrication, location and installation of suspended steel and wood bination formwork are introduced in detail. Key words:formwork; steel and wood bination formwork;reinforcement supports;construction 目前我国高层、超高层结构形式多为钢(骨)筋 该工程标准层结构平面八角为弧形结构造型, 混凝土核心筒体钢结构外框架现浇混凝土楼板. 框架柱为内灌自密实混凝土圆管钢柱,楼面梁为H 针对外框钢梁间距较为均衡、楼板跨度较小等特 型钢梁,框架部分属全钢结构.本工程标准层结构 点,钢筋悬挂式钢木组合模板应运而生.因其摒除 如图1所示. 了传统钢管扣件式模板体系,减少周转材料的使用 量,大大降低了施工成本,减轻了工人劳动强度,实 现人性化施工;材料流水线生产,施工质量易于控 制.钢筋悬挂式钢木组合模板逐步走向市场,并已 经初具规模,取得了良好的技术、经济效果. 1工程概况 某工程为1幢34层(局部36层)写字楼,标准 层层高4.15m,外框混凝土楼板厚度120mm,总建筑 a平面 b三维 面积约9.5万㎡²,主体结构为钢框架-混凝土核心 图1标准层结构示意 简结构体系,标准层平面结构呈中字形,外围框架 Fig.1Standard layer structure 柱通过楼面钢梁与筒体连接,楼面梁与钢柱有正交 2楼面模板工程施工方案确定 和斜交两种连接方式,标准单层外框楼面混凝土施 本工程标准层楼面次梁间距主要有4200mm 工面积约2700m². 和4500mm,楼面模板体系原设计为传统的钢管扣 [作者筒介】刘海峰,工程师,E-mail:402509150@qq. 件式脚手架支模方式,为加快施工进度、降低工程 [收稿日期】2013-01-08 造价,拟采用钢筋悬挂式钢木组合模板系统. 万方数据
78 施工技术 第42卷 该模板系统支撑楼面的H型钢梁两端,利用钢 为保证模板拆除安全,钢支撑应间隔拆除,拆 筋支座悬挂在楼面结构钢梁翼缘上,钢支撑上表面 除工作需在钢支撑两端采用移动工作支架. 附有固定木方的U形构件,木方上方铺装15mm厚 3钢筋悬挂式钢木组合模板系统施工工艺 木模板. ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年11月上 施工技术 第42卷第21期 CONSTRUCTION TECHNOLOGY 113 D01:10.7672/sgjs2013210113 钢筋套筒灌浆连接技术研究与应用进展 韩超,郑毅敏2,赵勇1 (1.同济大学土木工程学院,上海200092;2.同济大学建筑设计研究院(集团)有公司,上海200092) [摘要]钢筋套筒灌浆连接是一种性能可靠、施工方便的机械连接技术,主要适用于装配式混凝土结构.评述了钢 筋套简灌浆连接接头的构造、工作机理、试验验证标准以及施工工艺,讨论了配置套简筒灌浆连接的预制构件的试验 研究进展.最后对该项技术的研究及应用提出了建议. [关键词]混凝土;装配式混凝土结构;钢筋;套简连接;研究 [中图分类号]TU755.3 [文献标识码]A [文章编号]1002-8498(2013)21-0113-04 Research and Application Development of Grout Sleeve Splicing for Reinforcement Han Chao' Zheng Yimin2 Zhao Yong' (1.College of Civil Engineering Tongji University Shanghai 200092 China; 2.Architectural Design Research Institute of Tongji University Group)Co.Lad.Shanghai 200092 China) Abstract:Grout sleeve splicing is a convenient and reliable method for reinforcement connecting and it is mainly applicable in precast concrete structure.The structure working mechanism standard test method and construction technology of grout sleeve splicing are summarized.Experimental studies of the specimen with grout sleeve splicing and relevant conclusions are discussed and suggestions are put forward. Key words:concrete;precast concrete structures;reinforeement;sleeve connection;research 0引言 国家及我国台湾地区的多家公司致力于套筒灌浆 预制构件的连接节点是装配式混凝土结构理接头的研发,取得了多项专利,使其获得广泛应用. 论上的薄弱环节,而纵向钢筋的连接又是预制构件近年来,随着装配式结构在国内的再次兴起,套筒 连接的关键.现浇混凝土结构中常用的纵向钢筋灌浆接头在我国内地也开始应用,而且正在修订的 连接方式有绑扎搭接、焊接连接以及机械连接等, 行业标准《装配式混凝土结构技术规程》(征求意见 由于装配式混凝土结构的连接部位较小,采用这些 稿)对套筒灌浆接头的设计、施工提出了要求,另 传统的钢筋连接方式不便于施工.20世纪60年 外行业产品标准《钢筋连接用套筒灌浆料》、《钢筋 代,余占疏(Alfred A.Yee)在美国发明了钢筋套 连接用灌浆套筒》也已编制...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年5月上 64 CONSTRUCTION TECHNOLOGY 第42卷第9期 DOI:10. 7672/sgjs2013090064 钢筋-沥青复合隔震层设计与施工* (上海机电设计院,上海210033) [摘要】针对多层砖混结构抗震性能差的特点,介绍了钢筋-沥青复合隔震层技术,该技术造价低,施工简便。

通过 在基础与结构主体之间设置沥青隔震层,大大延长建筑物基本自振周期,从而达到隔震、减震的目的。

详细介绍了 设计步骤及施工方法,包括隔震原理与组成,并通过计算,确定合理的减震系数和构造措施。

[关键词】隔震技术;钢筋;沥青;设计;施工技术 【中图分类号】TU318【文献标识码】A 【文章编号]1002-8498(2013)09-0064-03 Design andConstruction ofReinforcedAsphalt CompoundIsolationLayer Shang Qing (Shanghai Elerical and Mechanical Design Institute,Shanghai 210033, China) Abstract: Considering the poor seismic performance of brick struetures,this paper introduces the reinforced asphalt pound seismic isolation technology. This technology has the characteristics of low cost and easy construction. By setting reinforced asphalt pound isolation layer between the foundation and the main structure, the natural vibration period of the building can be significantly increased to achieve the objective of isolation and reduction of seismic action.The design procedure and the construction methods are introduced in detail.Isolation principle and system position are also introduced. The seismic action reduction coefficient and structural methods are decided by calculations. Key words;isolation technology;reinforcement; asphalt; design; construction 基础隔震技术是结构抗震的有力措施(,是震显得更为重要。

从目前的理论和实践效果来看, 目前国内外最成熟、应用最广泛的防震技术,已被 采用叠层橡胶隔震是一种较为成熟的方法,但相对 列人《建筑抗震设计规范》GB50011-2011中(。

较高的造价阻碍了这种技术在广大农村地区的推 该技术是在基础与主体结构之间设置一道隔震 广使用。

湖南大学提出钢筋-沥青隔震层技术”,由 层”,将建筑物上部结构与基础隔开,依靠隔震层 于造价低、施工简单,已开始在全国村镇地区推广。

的变形吸收、消耗地震波传给结构的能量,减少地 1钢筋-沥青隔震层隔震原理与构造组成 震直接对上部结构的作用;隔震层大大延长了建筑 1.1隔震原理 物基本周期,避免与场地发生共振,从而达到隔震、 单质点结构的水平振动如图1所示,结构质点 减震的目的”。

M底部剪力: 我国有70%的国土面积位于抗震设防区,是世 F=αG (1) 界上遭受地震灾害最严重的国家之一,每年地震造 式中:G是上部结构重力荷载代表值;α是与结构抗 成的损失巨大,其中遭受毁坏程度最严重的当属村 侧移度相关的一个无量纲系数(地震影响系数),它 镇地区的砖混结构建筑。

随着农村经济在国民经 与结构的自振周期T有关,且 济中的比重越来越大,村镇地区房屋建筑的抗震隔 =2π (2) 从结构加速度反应谱曲线(见图2)可知,结构自振 国家科技支撑计划(2011BAJ08B02);湖南省科技厅科技计划重点 项目:村镇住宅新型抗震节能结构关键技术研究与示范(06sk4057) 周期T越大,地震影响系数α越小。

而T与结构自 [作者简介]尚舞,工程师,E-mail:sq_simee@ sina. 振频率成反比。...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年11月下 38 CONSTRUCTION TECHNOLOGY 第40卷第353期 钢框架组合模板V形墩施工技术 李凯,常进,范良,田云涛2,冯波2 (1.北京市市政工程研究院,北京100037;2.北京市公路桥梁建设集团有限公司,北京100037) [摘要]根据房山五渡桥工程施工难点,通过介绍钢框架组合模板的基本原理,提出采用钢框架组合模板技术进行 大体积变截面V形墩施工的方案.通过标准件和异形模板组合解决了各支墩施工中高度高、水平倾斜角度大且各 不一致的问题.详细介绍了钢框架组合模版V形墩施工流程及方法,以及混凝土的浇筑过程.此项技术取得良好 质量和经济效益. [关键词]桥梁工程;组合模板;钢框架;V形墩;浇筑 【中图分类号]TU755.2 [文献标识码]A [文章编号]1002-8498(2011)22-0038-03 Construction of Composite Formwork with Steel Frame for V-shaped Pier Li Kai' Chang Jin' Fan Liang' Tian Yuntao? Feng Bo2 (1.Beijing Municipal Engineering Research Institute Beijing 100037 China; 2.Beijing Roads and Bridges Construction Group Co.Lad.Beijing 100037 China) Abstract:The construction difficulties of Fangshan Wudu Bridge are put forward.Based on the formwork basic theory posite formwork with steel frame is adopted in the large volume V-shaped pier with variable cross-section.The problems of large construction height large horizontal inclined angle and different angle in each pier are solved by the bination of standardized steel frame and special parts. Construction process and method of posite formwork with steel frame for V-shaped pier and concrete pouring are introduced.The good quality and economical benefits are gained. Key words:bridges;posite formworks;steel frames:V-shaped piers;pouring 1工程概况 横向壁厚1.0m 中腹板厚2.0m.承台顶墩身宽 房山五渡桥位于北京市房山十渡风景区涞宝 8.0m 厚度方向高为5.0m.支点墩盖梁顶横桥向 路,跨越拒马河,是一座新型景观桥.五渡桥主桥为宽约16.9m 纵向水平宽约4.9m;由于纵坡影响,2 三角刚架悬吊连续梁组合桥,分为左、右幅,单幅桥 号支点墩高为9.6m 外倾水平角为37°;3号支点墩 宽9.5m 全长173m...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年9月下 施工技术 第46卷第18期 CONSTRUCTION TECHNOLOGY 45 D0I:10.7672/5js2017180045 钢框架-组合型钢箱形钢板剪力墙结构体系施工技术 杨士珏1,孙占利2,寿建军2,陆恺2 (1.鲲鹏建设集团有限公司,浙江杭州310053;2.浙江八达建设集团有限公司,浙江绍兴312000) [摘要]介绍了义乌市中福广场项目(B组团)工程钢框架-组合型钢箱形钢板剪力墙结构体系的施工工艺流程及 操作要点,并对钢框架组合型钢箱形钢板剪力墙结构和传统钢筋混凝土框架剪力墙结构从结构优势、品质优势、 造价优势、工期优势、施工优势、劳动优势、节能环保及文明施工优势等7大方面进行比较阐述.该体系有利于我 国建筑业转变生产方式,符合工业化大生产模式的发展方向. [关键词]钢结构;高层建筑;钢板剪力墙;施工技术 「中图分类号1TU758.11 [文献标识码]A [文章编号]1002-8498(2017)18-0045-05 Construction of Steel Frame-posite Steel Box Steel Plate Shear Wall Structure System YANG Shijue' SUN Zhanli? SHOU Jianjun2 LU Kai (1.Kunpeng Construction Group Co.Ld.Hangzhou Zhejiang 310053 China; 2.Zhejiang Bada Construction Group Co.Ltd.Shaoxing Zhejiang 312000 China) Abstract:Construction process and main points of operation are introduced of steel frame-posite steel box steel plate shear wall structure in Yiwu Zhongfu Plaza project.Advantages are pared of structure quality cost time limit construction labor force and environmental protection with traditional reinforced concrete frame shear wall system.The practice shows that the new system is conductive to the transformation of production methods in China's construction industry adjusts to the development direction of industrialized production mode. Key words:steel structures;tall buildings;steel plate shear walls;construction 0引言 和抗剪承载力. 随着各地地标性超高层建筑的高度逐年刷新,1工程概况 底部剪力墙需要承担的竖向荷载越来越大,传统的 义乌市中福广场项目(B组团)工程位于义乌 钢筋混凝土剪力墙厚度过大、施工复杂、地震作用 市金融商务区的核心区内,2栋主楼分别为29层 较强、浪费空间,提出一种新型的钢框架组合型钢 (131.5m)和3...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2015年9月上 42CONSTRUCTION TECHNOLOGY第44卷第17期 DOI:10. 7672/sgjs2015170042
钢桁架梁拉压支座修复更换研究
刘红宇,李鸿盛,光明 (中交一公局第一工程有限公司,北京102205)
【摘要】以某悬索桥拉压钢支座在不中断交通情况下进行更换的施工实践,分析了桥梁支座质量控制的盲区,详细 介绍了桥梁支座损坏的现象和后果、桥面板复位,以及支座更换的施工技术及工艺,并进行了更换方案及可行性分 析,从面提高了桥梁的耐久性和安全性。

【关键词】桥梁工程;悬索桥;钢支座;更换;施工技术 [中图分类号]U445【文献标识码】A[文章编号]1002-8498(2015)17-0042-05 Study on Repair and Replacement of Tension and Compression Steel Bearing for Steel Truss Girder Liu Hongyu,Li Hongsheng,Guang Ming (No.1 Engineering Co.,Lad.of FHEC of CCCC,Beijing 10220S,China) Abstract:Based on replacement construction of tension and pression steel bearing of some suspension bridge without traffic interuption,this paper analyzes blind area of quality control of the bridge bearing, introduces the damage phenomena and consequences of the bridge bearing,bridge deck reduction, replacement construction technology of the bearing,analyzes replacement schemes and feasibility,which improve durability and safety of the bridge. Key words;bridges;suspension bridges;steel bearings;replacement;construction 0引言仅限于来样抽检,质量鉴定证书代表性不强或与实 在大量桥梁投人运营的情况下,桥梁支座的问际受力状况有较大差异。

题需要引起高度重视,施工各方应系统进行考虑,设计阶段对非标准支座的选择也仅限于相关 从设计、施工和试验检测、监控等方面加强控制。

规范和名录,部分结构设计未考虑梁体、支撑座在 目前国内多座桥梁支座出现不同程度的损坏,对桥外部复杂的荷载状况及应力、应变,在选择支座时 梁的安全运营造成影响,大吨位支座的更换更是需根据横向荷载和竖向荷载对支座的结构尺寸进行 要综合考虑支座、梁体、墩身结构,以及桥梁运营、了内插法选择,但未考虑尺寸缩减后结构的整体安 施工设备和人员的熟练程度,在正确分析造成支座全系数。

同时,设计单位为规避指定制定产品或生 损坏原因的基础上采取合理的方法对局部乃至全产厂家而将设计参数模糊化处理,将支座的细部构 桥的支座进行更换。

造尺寸设计交由施工单位完成,这也为支座制造质 1桥梁支座制造质量控制盲区量缺陷埋下隐患。

鉴于桥梁支座的特殊性,目前的生产模式还是施工单位和监理单位在支座厂家的选择中重 专业厂家制造,虽然桥梁支座制造产业在我国发展点考虑了该企业的资质和业绩,但对支座的深化设 的历史不长,但发展较快,相关规范和标准还不完计和验算完全交由制造单位来完成,而制造单位又 善,加之公路桥梁建设的飞速发展、建设各方追求以商业机密为由拒绝提供制造材料参数和细部图 低成本,造成专业产品制造商低价竞争,不惜降低纸造成制造图纸审核的真空。

产品的加工制造精度、使用劣质钢材或橡胶原料,2桥梁支座损坏的现象和后果 产品质量控制还是处于企业的内控体系,产品检测某大桥钢桁梁的支撑横梁处设置钢支座与桥 [作者简介】刘红字,工程师,E-mail:451755620@qq.面板连接,每一联桥面板与钢桁梁之间有23排钢支 [收稿日期】2015-03-30座,其中每一联桥面板跨中位置设置固定支座和横
万方数据
2015 No.17刘红宇等:钢桁架梁拉压支座修复更换研究43 向滑动支座,其余均为双向和纵向滑动支座,桥面板焊接成整体并与钢桁架梁的吊点处横梁焊接在 采用正交异性钢桥面板,顶板厚16mm,设有8mm一起。

厚U形加劲肋。

设置5道纵梁,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年7月下 154 CONSTRUCTION TECHNOLOGY 第45卷第14期 D0I:10.7672/8js2016140154 钢桁架支撑平台在高空大跨度 独立结构施工中的应用 宁国清 (中建三局集团有限公司东北分公司,辽宁抚顺113000) [摘要]针对高净空、大跨度结构,采用传统的钢管架支撑模板施工方法需要大量钢管和模板,工期也需被迫延长, 而高空大跨度悬臂梁支撑桁架综合施工方法可以解决这一技术难题.系统地阐述了大跨度、高净空独立结构施工 技术和工艺特点.经施工实践证明该施工工艺安全可靠,经济合理. [关键词]钢结构;独立梁;桁架;支撑平台;施工技术 [中图分类号]TU393.3 [文献标识码]A[文章编号]1002-8498(2016)14-0154-03 Application of Steel Truss Support Platform Construction Technology in High-altitude and Large-span Structure Ning Guoqing The Northeast Company of China Construction Third Engineering Bureau Group Co.Lid. Fushun Liaoning 113000 China) Abstract:For high clearance and large span structures if the traditional steel frame supporting formwork construction method was used it needs a large number of steel pipes and templates and the duration is also required to be extended.While the high and large span cantilever beam support truss construction method can solve the technical problems.In this paper the construction technology and process characteristics of large span and high headroom independent structure were systematically described.The construction practice proves that the construction process is safe reliable economic and reasonable. Key words:steel structures;independent beams;trusses;support platform;construction 1工程概况 某工程总建筑面积295015m2 其中一单位工 程标高41.500m处有1根净跨为24.4m 截面尺寸 为600mm×1700mm的无粘结预应力框架梁,其上 方有混凝土剪力墙,并在墙上仍然有一道截面尺寸 500mm×1500mm无粘结预应力梁,在其下方 7.45m处有结构.故悬空高度为34.05m 其两侧无 图1独立梁结构效果 其他结构,为独立梁.独立梁结构效果如图1所示. Fig.1 Effect of independent ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2017年7月上 62 CONSTRUCTION TECHNOLOGY 第46卷第13期 D0I:10.7672/8js2017130062 钢塑格栅在锚网支护工程中的作用机理 及其工程应用 谢翡 (山东科技大学土木工程与建筑学院,山东青岛266590) [摘要]针对钢塑格栅锚网支护技术的可行性,通过理论分析、现场工程试验和数值模拟的综合研究方法,深人全 面地对钢塑格栅错网支护技术的作用机理以及在工程中的应用进行了研究,研究结果表明:①通过研究钢塑格栅 错网支护机理,阐述了钢塑格栅错网支护的必要性,解释了钢塑格栅在调整岩土体应力和协调岩土体变形方面发 挥的作用,同时提出了钢塑格栅错网支护“让压”原理;②通过对错网支护方式的研究,揭示不同支护条件下对数值 模拟结果的影响,得出了无支护和钢塑格栅锚网支护时产生的深基坑变形量;③通过数值模拟与现场监测数据对 比,验证了数值模拟结果,证明了在错网支护工程中钢塑格栅作为支护材料的可行性. [关键词]基坑;支护;钢塑格栅;错网;作用机理:监测 [中图分类号]TU599 [文献标识码]A [文章编号]1002-8498(2017)13-0062-05 The Mechanism of Steel Grating in Anchor Net Support Engineering and Its Engineering Application XIE Fei (School of Civil Engineering and Architecture Shandong Uniersity of Science and Technology Qingdao Shandong 266590 China) Abstract:In the light of the feasibility of the technology of grid anchor net support based on the theoretical analysis the prehensive research method of the field engineering test and numerical simulation steel grating anchor net supporting mechanism and application in engineering are studied. Research results show that:①Study on steel grating anchor net supporting mechanism expounds the steel grating anchor net support supporting the necessity explains the plastic grille in the adjustment of the rock and soil should force and the coordination of rock and soil deformation plays a role at the same time the steel grating anchor net supporting‘crush’principle;②Through revealing the different support conditions on the numerical simulation results of the im...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年3月下 88 CONSTRUCTION TECHNOLOGY 第40卷第337期 钢制防屈曲约束支撑的开发 牧野俊雄,西川宏之,一户康生2,福田浩司2 (1 住金关西工业株式会社,东京日本:2.友金属工业株式会社,东京日本) [摘要]作为消能减震部件,要求防屈曲约束支撑的海回曲线稳定.开发了两块腹板式钢制防屈曲约束支撑$UB- H和螺栓组装式钢制防屈曲约束支撑SUB-X.结合开发试验,提出了SUB的结构设计公式.静态和动态荷载试验 证明,SUB具有较高的安全性和精度,大型试验证明SUB在高轴力状态下也具有良好的滞回性能. [关键词]钢制防属曲约束支撑:累积塑性变形;屈服强度;循环荷载 [中图分类号]TU352.1 [文献标识码]A[文章编号]1002-8498(2011)06-0088-03 Developing of Steel-unbuckling-brace Toshio Makino'.Hiroyuki Nishikawa' Yasuo Ichinohe? Kouji Fukuda2 (1.Sumikin Kansai Industries Co.Ld.Tokyo Japan:2.Sumitomo Metal Industries Co.Led.Tokyo Japan) Abstract:As energy dissipation ponent the unbuckling-brace should have stable hysteresis curves. The steel-unbuckling-brace short for SUB are developed as SUB-H with two wehs and SUB-X with bolts assembled.Combing with the developing experiments formulas for structural design are proposed.Static and dynamic load tests show that the SUB has excellent safety and precision and large-scale test proves the good hysteretic behavior of SUB. Key words:steel-unbuckling-brace;cumulative plastic deformation:yield strength;cyelic load 防屈曲约束支撑通过使用约束材料来增加芯材 问隔材料 的刚度,使得受压时芯材不屈曲,保证滞回曲线的稳 定.具有稳定滞回曲线的消能部件已在工程中应 钢板芯材 用.芯材的约束可以有多种方案,从其形状、 质量、经济性、可施工性、质量稳定性、工期等因素考 防屈曲约束材 间隔材料 虑,两块腹板芯材的防屈曲支撑性能较好,已实现商 品化.但是,这种形式不能满足防锈性高的要求,又 开发了先镀锌处理,再用螺栓组装的类型. 钢板芯材 防屈曲约束材 1钢制防屈曲约束支撑的形状和材料 a SUB-H 图1以组装图形式给出了SUB产品的最终形 高强螺栓 状,包括两块腹板式SUB-H和螺栓组装式SUB-X. 角钢芯材 SUB-H为焊接组装,有多种钢板强度和板厚, 可自由设计约束材料.为避免钢材间接触时产生摩 电问隔材料 擦,对约束材料施加轴力,中间夹入橡胶垫片.组装 十字形截面 约束材料时,橡胶垫片应与焊接部分预留一定距离, 角钢.芯材 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年3月上 施工技术 第41卷第360期 CONSTRUCTION TECHNOLOGY 89 管桩水泥土复合基桩工程应用研究 宋义仲,程海涛,卜发东,马凤生 (山东省建筑科学研究院,山东济南250031) [摘要]管桩水泥土复合基柱是一种获得国家发明专利的新桩型,由高喷搅拌水泥土桩与同心植人的高强预应力 管桩优化匹配复合而成.结合聊城某工程实例,首先介绍了桩基设计及优化过程;然后分析了施工机械及工艺,提 出了喷浆工艺沉桩时间间隔、桩位偏差控制等关键技术;最后应用效果表明,管桩水泥土复合基桩单桩承载力、桩 位偏差均满足设计与规范要求,与同地区钻孔灌注桩相比施工效率基本相当,造价降低约35%. [关键词]桩基础;管桩;水泥土;复合基桩;承载力;施工技术 [中图分类号]TU472.32 [文献标识码]A [文章编号]1002-8498(2012)05-0089-03 Study on Engineering Application of Composite Pile Made up of Jet-mixing Cement and PHC with Core Concrete Song Yizhong Cheng Haitao Bu Fadong Ma Fengsheng (Shandong Provincial Academy of Building Research Ji'nan Shandong 250031 China) Abstract:Composite pile made up of jet-mixing cement and PHC with core concrete CPCP)is a new kind of piles which has been granted invention patent of China.The CPCP consists of external jet-mixing cement pile and PHC in the inner core.The design and optimum of CPCP is introduced at first bined with engineering application in Liaocheng.Construction equipments and process of CPCP are analyzed then.Key construction techniques such as grouting process reasonable time of sinking PHC and controlling method of CPCP offsetting are proposed.At last application effects show that bearing capacity and offsetting of CPCP can meet the requirements of design and national codes.Compared with bored piles in soft soil engineering cost of CPCP decreases by 35%with basically same construction efficiency. Key words:pile foundations;pipe piles;cement-soil;posite foundation pil...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年4月下 施工技术 第41卷第363期 CONSTRUCTION TECHNOLOGY 43 监控量测在谷竹高速宴家隧道的应用 段宝福,朱应磊,刘波2,王兆东 (1 山东科技大学防灾减灾重点实验室,山东青岛266590: 2.山末省莱芜市公路局工程二处,山末莱芜271100) [摘要】为了解腿道施工中各横断面在纵向上的变形相关性,以湖北谷竹高速宴家隧道为工程背景,对各断面拱顶 下沉值和水平收敏值进行全过程监控量测,并利用数值模拟软件ABAQUS进行数值分析.通过对实际施工过程中 监控量测和数值模拟结果的分析,总结出在纵向上各断面拱顶下沉和水平收放与围岩性质的关系,指出拱顶下沉 为控制施工的关键因素,是反映围岩稳定性和力学状态最直观的数据. [关键词]隧道:监控;数值模拟:拱顶下沉:水平收:相关性分析 [中图分类号]U455 [文献标识码】A【文章编号]1002-8498(2012)08-0043-04 Application of Monitoring and Measurement in Yanjia Tunnel of Gucheng-Zhuxi Expressway Duan Baofu' Zhu Yinglei' Liu Bo Wang Zhaodong' (1.Key Laboratory of Civil Engineering Disaster Prepentien and Mitigation SDUST) Qingdao Shandong 266590 China:2.Shandong Provincial No.2 Engineering Department of Highway Bureau o f Laiwu Laiwu Shandong2700 China) Abstract:In order to analyze the correlation of vertical deformation of the cross correlation during tunnel construction the vault settlement and horizontal convergence of all sections are measured based on Yanjia Tunnel of Gucheng-Zhuxi Expressway.Furthermore the software ABAQUS is used to analyze the vault settlement and horizontal convergence.Through analysis on the monitored and simulated data the relation of surrounding rock features with the vault settlement and horizontal convergence are summed up. Iti pointed out that the vault settlement are one of main factors for controlling construction and it is the direct data that reflecting stability of surrounding rock and mechanical state. Key words:tunnels;monitoring;numerical ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2015年1月上 施工技术 第44卷第1期 CONSTRUCTIONTECHNOLOGY 17 DOI:10.7672/sgjs2015010017 监控系统在预筑落成法中的应用* 刘志茂",刘卫军,周环宇',陈超² (1.中建三局集团有限公司技术中心,湖北武汉430070;2.中建三局第三建设工程有限公司,湖北武汉430074) [摘要]在阐述预筑落成法原理的基础上,论证了搭建监控系统的必要性,介绍了施工监控系统设计应把握的原则 和本监控系统施工应监测的内容。

硬件设计和软件设计是监控系统搭建的关键,对各类传感器的测点布设、选型, 数据采集设备和存储设备的选择,系统硬件集成和软件的设计进行了重点介绍。

监控系统运转良好,对预筑落成 法顺利实施和进一步推广发挥了较大的作用。

[关键词]预筑落成法;监控;硬件设计;软件设计 [中图分类号]TU753【文献标识码】A [文章编号]1002-8498(2015)01-0017-04 Application ofMonitoringSystemin thePre-buildSubsidence Liu Zhimao', Liu Weijun',Zhou Huanyu',Chen Chao² (1.Technology Center of China Construction Third Engineering Bureau Co.,Ltd.,Wuhan,Hubei 430070,China; 2.The Third Construction Co.,Lud.of CCTEB,Wuhan,Hubei 430074,China) Abstract:This paper describes the principle of pre-build subsidence,demonstrates the necessity to build a monitoring system,describes the contents of the principles of construction monitoring system should be designed to capture and construction of the monitoring system should be monitored. Hardware and software design is the key to build a monitoring system for all kinds of sensors measuring point layout, selection,data collection and storage devices selection,system hardware integration and software design were highlighted.Monitoring system works well for further promoting the pre-build subsidence method. Key words:pre-build subsidence; monitoring;hardware design; software design 0引言 3号倒班楼为中建钢构武汉公司职工宿舍,位 和水平网格结构之间设置可周转拆卸的临时顶托7193.53㎡²。

结构形式为钢筋混凝土框架结构,基础 桩,施工上部结构;在临时顶托桩和地下室基础梁 形式采用钻孔灌注桩,地下1层,地上6层,建筑地 形成的水平网格结构承托之间置换弹性下沉装置,上高度23.370m,地下室层高4.5m,采用“预筑落成 交替微差下沉,土方开挖根据需要进行;建筑物均 法”进行施工。

匀下移至预定标高,与工程桩嵌固;下沉过程中,地 “预筑落成法”是一项全新的施工技术,施工过 上结构同步施工,实现真正意义上的上下同时施工。

程中不可控因素多,并且缺乏相关施工经验,因此 传统建筑施工多采用先开挖基坑,待地下结构 如何保证结构在施工过程中的安全是一个严峻的 施工完成以后再修建上部结构的做法,施工周期 挑战。

施工监控是指在结构施工过程中,采用监测 长,并且部分基坑支护施工完了以后会拆除,造成 仪器对关键部位各项控制指标进行测量,用以保证 浪费,不经济环保。

“预筑落成法”可实现上下同步 施工安全,同时根据监测数据,对后续的施工方案 施工,施工周期短,并且施工过程中不用修建临时 予以调整,减少施工误差带来的影响。

“预筑落成 支护,更加绿色环保。

法”施工过程中为建筑搭建施工监控系统,可以有 1工程概况 效弥补施工经验不足的缺陷,最大程度保证结构 安全。

*中国建筑...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2010年8月 施工技术 第39卷第8期 CONSTRUCTIONTECHNOLOCY 29 焊缝收缩变形对屋盖合拢成型状态的影响研究 郭彦林,赵思远,田广宇,王小安,窦超 (清华大学土木水利学院,北京1000合找84) [摘要】大跨度屋盖钢结构安装常采用胎架支承、分段拼装、分区合拢、整体拆撑等施工方法,实际施工过程中屋盖 的安装分区及顺序、合拢分区及顺序、合拢温度、合拢时的焊接收缩变形均对结构的成型内力与变形有影响,也对 屋盖支承胎架的受力分布与大小有影响。

目前针对合找顺序以及合拢时焊接收缩变形对整体结构成型状态的影 响研究较少。

首先从模拟单个构件的焊接过程出发,研究焊缝收缩给单个构件带来的变形。

然后基于”等收缩量” 过程中胎架承受荷载的影响。

最后以深圳大运中心主体育场屋盖结构合拢分析为例,研究了合拢过程焊接收缩变 形对胎架支承内力的影响。

[关键词】屋盖合拢;焊缝收缩变形;胎架;一体化模型 【中图分类号】TU391.9 [文献标识码】A [文章编号]1002-8498(2010)08-0029-05 InfluenceStudyofWeldingDeformationon the Closure ProcessofSteelRoof GuoYanlin,Zhao Siyuan,Tian Guangyu,Wang Xiaoan,Dou Chao (School of Cisil Engineering,Tsinghua University,Beijing 100084,China) Abstract;Temporary supports are often adopted to support steel roof during the construction process, and the axial forces of temporary supports are only considered in the design state of structure currently. The influence of construction sequence,temperature at construction site, and welding shrinkage deformation due to welding on structural configuration and internal force of structure, as well as temporary supports are ignored usually. Welding shrinkage deformation of a single tube member is studied firstly, then the affection of welding is involved in analysis of integrate model of structure based on the equal deformation principle. The proposed procedure has been used in the construction analysis of Shenzhen Universiade Sports Center Main Stadium. Key words;closure of roof; welding shrinkage deformation; jig; integrate model 1研究背景 结构状态非线性发展的过程,胎架所承受的荷载不是 大跨度屋盖钢结构的施工往往采用“胎架支承,分一成不变的。

而在构件安装和区段合拢中,焊接导致 段拼装,顺序合拢,整体拆撑”的施工方案,即将结构分的收缩变形可能会引起结构内力与变形变化很大,直 为若干个区段,每个区段互相独立地在支承胎架上拼接改变胎架承受荷载的分布情况,甚至可能造成某些 装,各区域之间按照一定的合找顺序将边界上的构件部位的结构与胎架脱离、胎架荷载大幅增加。

针对这 焊接到位。

的区段连接成一个整体后,将支承胎 一情况,本文结合深圳大运中心主体育场研究了分段 架拆除。

施工中焊接收缩对于结构和胎架内力的影响,提出了 在施工过程中,结构整体刚度并未形成,只能依靠 一种模拟焊缝收缩的一体化施工分析方法。

胎架支承的自重和施工活荷载。

胎架的承载力对 首先研究了单根构件的对接焊缝收缩变形,提出 于结构施工安全起着至关重要的作用。

但是目前设计 胎架时,往往是将合拢后各区段结构的自重和施工活 [收稿日期】2010-06-25 荷载作为其下方胎架的设计荷载,不考虑合找顺序和 【作者筒介]郭...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年4月上 施工技术 第45卷第7期 CONSTRUCTION TECHNOLOGY 105 D0I:10.7672/8js2016070105 海相深厚软土综合管廊施工技术* 谭博,蔡智2,徐海洋,王述红2 (1.中建五局土木工程有限公司,湖南长沙410004;2.东北大学资源与土木工程学院,辽宁沈阳110819) [摘要]依托福建平谭万北路综合管廊试验段施工,在深厚软土地基处理技术的基础上,采用明挖法在万北路 K4750一K4850标段内施工综合管廊,综合运用了降水和观测技术.对整个施工流程及施工完毕后综合管廊 质量进行检测,结果表明,该技术满足工程要求,取得了良好的经济和社会效益,可以在整个项目区域推广使用. [关键词]综合管廊;地基;软土;降水;施工技术 [中图分类号]TU990.3 [文献标识码]A[文章编号]1002-8498(2016)07-0105-04 Construction Technology of Utility Tunnel in Marine Facie Deep Soft Clay Tan Bo' Cai Zhi Xu Haiyang' Wang Shuhong? (1.CCFEB Civil Engineering Co.Lid.Changsha Hu'nan 410004 China;2.College of Resource and Civil Engineering Northeastern University Shenyang Liaoning 110819 China) Abstract:Relying on the construction of test section of utility tunnel at Wanbei Road Pingtan Islands of Fujian province based on the technology of deep soft clay foundation treatment utility tunnel is constructed by the open-cut method at the bid section K4 750-K4 850 of Wanbei Road precipitation and observation method were used.By the detection of the quality of utility tunnel during the entire construction process and after the construction pletion the result shows that this technology can meet the requirement achieve significantly economic and social benefits and can be applied on the whole project region. Key words:utility tunnel;foundations;soft soil;dewatering;construction 0引言 上述海相深厚软土地基给市政综合管廊工程 平谭万北路(环岛西路一万顺路)市政综合管的施工带来了诸多问题,为解决这些问题,依托万 廊工程路线场地属于我国典型南部沿海区域代表 北路(环岛西路一万顺路)市政综合管廊工程段的 性的海相深厚软土地层,这种典型地层是在周...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年7月上 施工技术 第46卷第13期 CONSTRUCTION TECHNOLOGY 103 D0I:10.7672/8js2017130103 机场工程检测中固体体积率与压实度的关系研究 李英涛 (山西机械化建设集团公司,山西太原030009) [摘要]石方填筑或土石混合料在机场工程中广泛应用,其传统的压实度检测方法如灌砂法、灌水法、环刀法等在 机场工程中得到广泛应用.就机场工程检测中通过传统方法测试压实度指标与固体体积率数据进行对比,建立相 应的对比关系. [关键词]机场工程;地基;固体体积率;压实度;检测 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2017)13-0103-03 Research on Relationship Between Solid Volume Ratio and Compaction Degree in Airport Projects Detection LI Yingtao Shanxi Mechanisation Construction Group Company Taiyuan Shanxi 030009 China) Abstract:Rock filling and earth rock mixture are widely used in airport engineering as well as traditional paction degree detection methods such as sand filling method irrigation method and cutting ring method are widely used in airport engineering.This paper made parison of testing paction degree and solid volume rate data by traditional method and established the appropriate relationship. Key words:airport engineering;foundations;solid volume rate;paction degree;detection 1压实度与固体体积率的概念与关系 现场多采用灌砂法、灌水法、环刀法检测,计算 1)压实度压实度=干密度/标准干密度×出湿密度P 并根据填料的含水量计算其干密度 100%.压实度是施工质量检测的关键指标之一,表 (P) 室内通过击实试验确定出填料的最大干密度 征现场压实后的密实状况,压实度越高,密度越大, (Pms) 通过下列公式计算压实度: 填料整体性能越好. K=p/x 100% (1) 2)固体体积率固体体积率是指土中固体颗 2.2固体体积率(V) 粒的体积占总体积的百分比,是用来表征填料在施 2.2.1控制指标 工压实过程中密实程度的一个参数. 按照机场检测中的常规做法,粒径>5mm称为 3)两者关系两者均是表征填料在施工压实 粗颗粒填料,粒径≤5mm称为细颗粒填料.其中粒 后密实程度的指标.依据MH5014一2002《民用机 径>5mm的试样,按照JTGE42一2005《公路工程集 场飞行区土(石)方与道面基础施工技术规范》,石 料试验规程》中粗集料的密度及吸水率试验的方 方填筑或土石混合料填筑的压实度采用固体体积 法,求得试样的毛体积密度,然后再按照细集料的 率控制.这是因为...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年12月下 56 CONSTRUCTIONTECHNOLOCY 第44卷第24期 DOI:10. 7672/ sgjs2015240056 既有线顶进涵施工现场监测与数值模拟研究* 宋章伦",胡仲春”,王金河”,侯立波”,张卅卅",张生‘ (1.武汉理工大学资源与环境工程学院,湖北武汉430070;2.中铁十四局集团有限公司, 山东济南250014;3.河北省地矿局石家庄综合地质大队,河北石家庄050085) 【摘要】为使铁路既有线顶进涵施工开挖过程更加顺利地完成,针对施工中可能出现的安全问题,采用现场监测与 离散元数值模拟联合的方法研究分析桩侧土压力和支墩沉降变化规律。

研究结果表明:现场监测桩侧土压力最终 稳定值为6kPa,支墩沉降量最终稳定值为0.15mm。

二维离散元软件模拟结果总体反映了实测土压力和支墩沉降 的发展趋势,计算结果与现场监测结果基本一致。

离散法模拟铁路既有线顶进涵施工开挖过程是可行的,对施工 中支墩沉降的控制有一定参考价值。

[关键词】铁路;顶进涵施工;离散元模拟;监测;桩侧土压力;支墩;沉降 [中图分类号]U449.5 【文献标识码】A [文章编号]1002-8498(2015)24-0056-04 Research on the Field Monitoring and Numerical Simulation of Stabilityin theExistingRailwayJackingCulverts Construction Song Zhanglun',Hu Zhongchun²,Wang Jinhe²,Hou Libo²,Zhang Sasa',Zhang Sheng' (1.School of Resource and Environmental Engineering,Wuhan University of Technology,Wuhan, Hubei 430070,China; 2.China Railway 14th Construction Bureau Co.,Lud.Ji'nan, Shandong250014,China;3.Comprehensite Geological Team of Shijiazhuang, Geological Exploration Bureau of HebeiProvince,Shjiazhuang,Hebei050085,China) Abstract;To make the existing railway jacking culverts construction excavation process pleted more successfully, authors use the method of numerical simulation and field monitoring to analyze the change regulations of the earth pressure against the buttress and the buttress’s settlement.The research show that the buttress final setlement is 0. 15mm and the monitoring final earth pressure is 6 000Pa in the field measurement. The result of numerical simulation through the two-discrete element method roughly reflects the development tendency of the measured earth pressure and the buttress’s setlement, which coincides with the results of numerical simulation.It's feasible that using discrete element method to simulate the process of existing railway jacking culverts construction and it also has a reference value about the control of the buttress settlement. Key words:railroads; jacking culverts construction;discrete simulation;monitoring;ea...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年9月上 116 CONSTRUCTIONTECHNOLOCY 第44卷第17期 DOI:10.7672/sgjs2015170116 既有地下结构改造后支撑技术应用 陈新安,黄亮,王良波,刘德朋,徐宗研 (中建三局第二建设工程有限资任公司,湖北武汉430074) [摘要】介绍了结构改造工程中,利用既有地下室结构作为地下结构改造工程中支撑体系的一部分,加以新建环梁 与格构柱形成有效的水平支撑和竖向支撑。

新建支撑结构与原有结构之间连接的牢固性是施工过程中控制的重 点。

支撑体系形成后,既有地下室结构改造施工的顺序和方法将会影响施工的安全性和非拆除结构的完整性。

通 过对后支撑体系的合理利用,保证基坑支护结构安全的前提下缩短工期、降低成本。

[关键词]地下工程;基坑;支护;后支撑体系;环梁;改造 [中图分类号】TU753 [文献标识码】A[文章编号]1002-8498(2015)17-0116-04 StructureReconstruction (The Second Construction Co.,Lid.of China Construction Third Engineering Bureau,Wuhan,Hubei 430074,China) Abstract:Existing basement structure bees a part of supporting system in underground structure reconstruction,new ring beam and lattice column are added to form effective horizontal support and vertical support. The firmness of the connection between new supporting structure and original structure is the control emphasis. After supporting system formation,the order and method of existing basement structure reconstruction effects the construction safety and integrity of non-removal structure.Rear supporting system is reasonablely used, which shortens time limit and reduces cost in terms of ensuring supporting structure safety of foundation excavation. Key words:underground;foundation excavation; supports; rear supporting system; ring beams;reconstruction 随着国际形势的发展、旧建筑物的逐渐增多,1.1工程概况 各经济发达国家逐渐把建设的重点转移到旧建筑 天津国际贸易中心项目为停缓建工程,项目原 物的维修、改造和加固上,建筑工程加固改造业的设计由1幢高度约250m的钢结构塔楼A,1幢高度 发展越来越快,加固改造业已成为建筑业的重要组约120m的钢筋混凝土结构塔楼B及高约53m的钢 成部分。

由于拆改项目具有较大的危险性,在拆除 筋混凝土结构裙楼和3层地库组成。

地库层高分别 原结构之前需要建立有效支撑系统。

基于建筑物 为:地下1层5.3m,地下2层3.45m,地下3层 部分原结构需要保留,利用部分原结构柱加以新制 3.95m。

塔楼的地库、裙楼的地库与纯地库连为一 作的格构柱形成有效的竖向支撑体系,利用部分原 体;结构在塔楼A与裙楼之间设缝,塔楼B与裙楼 结构梁板加以新建的环梁形成有效的水平支撑体 连为一体。

停工前项目3层地库已施工完毕,A塔 系,同时形成新的支撑体系一-后支撑体系。

楼钢结构主体已施工至25层,裙楼及B塔楼地面 1既有地下结构改造工程后支撑体系施工工作 以上结构尚未施工。

原理 结构设计变更后,工程由A,B,C3栋塔楼、5层 裙楼及3层地下室组成,由于B,C塔楼结构设计改 [作者筒介]陈新安,副总工程师,教授级高级工程师,E-mail: 变及楼座移位,迫使结构功能和承载力不满足要 117253612@ 求,需要进行结构拆改和补桩。

原基坑开挖深度为 【收稿日期】2015-04-30 万方数据
2015 No. 17 陈新安等:既有地下结构改造后支撑技术应用...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年1月上施工技术 第41卷第356期CONSTRUCTIONTECHNOLOCY
换填支护法在浅埋软土基坑工程中的应用
孙军利,姚猛猛²,张同波 (1.青建集团股份公司,山东青岛266071;2.青岛理工大学土木工程学院,山东青岛266033) 【摘要】结合地勘报告对光电研发基地工程地质情况进行分析,明确了工程的特点和难点,经过对多种基坑支护方 案进行比较,合理选用了对浅埋软土边坡采用风化砂和石渣换填结合锚杆、土钉支护体系进行基坑边坡处理的施 工方案,并对该方案进行了理论分析及设计,给出了具体的施工工艺。

通过工后监测,该施工技术对处理软土基坑 的边坡效果良好。

[关键词]地下工程;基坑支护;软土;换填法;边坡稳定性;锚杆;土钉 [中图分类号】TU753【文献标识码】A[文章编号]1002-8498(2012)01-0007-04 ApplicationofReplacingandFillingSupportMethodinShallow SoftSoilFoundationExcavation Sun Junli,Yao Mengmeng²,Zhang Tongbo (1.Qingjian Group Co.,,Lud.,Qingdao,Shandong 266071,China; 2.School of CivilEngineering,Qingdao TechnologicalUniversity,Qingdao,Shandong266033,China) Abstract: Combined with geological exploration report analysis to the engineering geology condition of photoelectric r&d base,authors clear the characteristics and difficulties of project. Through paring with a variety of foundation excavation supporting schemes, authors make a reasonable choice of construction scheme that filling weathered sand to the soft soil slope and bining ballast aggregate changing with anchor, soil nailing support system for excavation slope processing, and the scheme is analyzed theoretically and designed,,finally, the concrete construction technology is got. After monitoring by work,the construction technology for the treatment of soft soil foundation excavation slope has obtained good effect. Key words:underground; foundation excavation support; soft soil; replacing and filling method; slope stability; anchors; soil nail
1工程概况范围内地层自上而下分为3层:素填土、淤泥质土~ 中科院光电研究院研发基地位于青岛高新产粉质黏土、强风化安山岩。

场地内地下水类型主要
为一个单体工程,地下2层、地上6层,基坑周长水位埋深0.10~3.00m,水位标高2.65~4.37m,地 360m、开挖深度10.5m,相对标高-10.80m,绝对标下水年变化幅度1~2m。

基于以上结构、场区、地质 高-5.3m。

场区内表面有厚度5~5.5m淤泥质土,条件及工期要求,该工程基坑施工具有以下特点与 强度低,大型机械进出困难。

场区西、北两侧临近难点。

道路,市政管网距基坑有一定距离,基坑东、南侧无1)场区上部为滨海浅滩淤泥质土,强度低、含 地下管线,有利于基坑施工,如图1所示。

场区原地水量高、土质软弱,施工机械无法行走,支护施工和 貌类型属滨海浅滩,后经人工回填改造形成,回填土方开挖困难。

时间较短。

根据工程地质勘察报告,基坑开挖深度2)基坑开挖深度为10m,但淤泥质软弱土层埋 深较浅。

上部仅有5m左右的软弱土层,其下直接 [收稿日期]2011-11-10为强度较高...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年5月下 施工技术 第45卷第10期 CONSTRUCTION TECHNOLOGY 33 D0I:10.7672/8js2016100033 技术创新在绿色施工中的研究与应用 令狐延,秦瑜1,王玉娜2 (1.中国建筑第四工程局有限公司,广东广州510665; 2.哈尔滨工业大学管理学院,黑龙江哈尔滨150001) [摘要]绿色施工是建筑施工企业科技工作和企业管理的重要手段,也是我国建筑施工企业在可持续发展形势下 的努力方向.结合中国建筑第四工程局有限公司的技术创新实践,从管理目标、体系建设、科技创新制度、主要研 发应用的创新成果等五个方面阐述了建筑施工企业在绿色施工中推行技术创新的基本做法.通过建立技术创新 体系及制度为绿色施工提供保障,实施技术创新,取得了较好的环境效益和经济效益,促进了企业管理的提质 增效. [关键词]绿色施工;技术创新;混凝土;道路;垃圾资源化 [中图分类号]TU712 [文献标识码]A [文章编号]1002-8498(2016)10-0033-05 Research and Application of Technological Innovation in Green Construction Linghu Yan' Qin Yu' Wang Yu'na? (1.China Construction Fourth Engineering Division Co.Ltd.Guangzhou Guangdong 510665 China; 2.School of Management Harbin Institute of Technology Harbin Heilongjiang 150001 China) Abstract:Green construction is an important means of scientific technological work and business administration for construction enterprises and is also the direction of China's construction enterprises under sustainable development.Based on technological innovation work of China Construction Fourth Engineering Division Corp.LTD this paper expounds the basic practices of technological innovation in green construction from five aspects as management objectives system establishment scientific technological innovation system and key R&D innovative applications.By establishing the technological innovation system to support green construction the technological innovation is implemented;achieving good environmental and economic benefits and promoting the quality ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)