[关键词]工程管理;安全;风险评估;监控 【中图分类号】TU714【文献标识码】A[文章编号]1002-8498(2012)22-0090-05 Dynamic Tracking and Monitoring on the Safety Risk During Construction Zhao Tingsheng,Liu Xianzhi,Tang Jingjing (Sehool of Ciuil Engineering & Mechanics,Huazhong University of Science and Technology,Wuhan,Hubei 430074, China) Abstract: Construction procedures are featured with high quality and safety risks. The time-varying
method for major engineering projects. Based on control theory of project management and continuous improvement of management performance, it was proposed to use expert assessment and the safety risk check list(SRC) for tracking and monitoring safety risk during construction. Dynamic management theory was established for safety risk management in construction,from the three aspects of dynamic monitoring operation mode, organization and procedure and standardiazation of dynamic safety risk assessment. The Wuhan Erqi Yangtze River Bridge was used as a demonstration case for the empirical study of the dynamic tracking and monitoring theory. The results show that the use of dynamic management theory and method successfully controlled the safety risks within a manageable level. No accidents higher than or equal to level general occurred during its construction. Key words:project management; safety;risk assessment; monitoring 0引言现场安全评价,并从安全事故产生的根本原因及影 随着国家法规的引导及安全事故成本的日益响因素、安全文化与安全氨围、安全隐患辨识与监 增大,工程建设施工企业在安全生产上的资金投人控等方面进行了研究。
施工技术 2012年11月上 46 CONSTRUCTION TECHNOLOGY 第41卷第376期 工地定型化施工道路研究与应用 陆建飞,彭建良,邓志峰,夏伟强 (中天建设集团有限公司,浙江杭州320000) [摘要]传统工地临时道路施工资源浪费严重,而工地定型化施工道路具有成本低、工期短、环保、可循环利用等优 点,并且符合绿色施工的要求.结合工程实例,对工地定型化施工道路进行详细介绍,包括施工工艺、施工流程、关 键技术点等,并进行相应的经济效益分析.结果表明,工地定型化施工道路技术措施先进,工艺简单,具有良好的 社会和经济效益. [关键词]绿色施工;施工道路;定型化;施工技术 [中图分类号]TU733 [文献标识码]A [文章编号]1002-8498(2012)21-0046-03 Research and Application of Standardized Construction Site Road Lu Jianfei Peng Jianliang Deng Zhifeng Xia Weiqiang Zhongtian Construction Group Co.Ltd.Hangzhou Zhejiang 320000 China) Abstract:Severe wastes are involved with temporary road construction in traditional construction site.The standardized construction site road has the characteristics of low cost short construction time environmental protection and recyclability and can meet the requirement of green construction.Using actual project as examples the concept of standardized construction site road was introduced including its construction technology construction process and key technology points.Economic benefit analysis was also performed and the results show that the standardized construction site road has good social and economic benefits. Key words:green construction;construction road;standardization;construction 定型化是为保证一定范围内的最佳秩序性,对期工程及佛山岭南天地D地块公寓式酒店项目的 实际或潜在的问题开展标准化的活动,包括制定、工程应用特点,对工地定型化施工道路的施工工进 发布及实施3个过程.传统的工地临时道路施工多行以下总结. 是混凝土整体现浇而成,各种资源浪费严重,不符1.1施工工艺特点 合“低碳经济”的政策导向.而定型化道路在国外 与传统临时道路施工模式相比,定型化施工道 早已大量采用,如日本,在工地的临时道路施工中路有如下特点. 常采用整体的厚钢板作为工地临时道路的路面,并 1)制作工艺简单,原理可靠,便...
施工技术 2012年6月上 78 CONSTRUCTION TECHNOLOGY 第41卷第366期 工具式钢管支模架承载力的理论计算和试验验证 戴震青,潘金炎2 (1.亚太建设科技信息研究院,北京100120;2.江省建筑科学设计研克院,浙江杭州310012) [摘要]针对工具式钢管支模架体系的特点,深人分析了单管承载力的理论计算内容,包括工具式钢管容许承栽力 的计算,以及与中48mmx3.5mm钢管立杆的承载力的比较:详细介绍了工具式单根钢管的承载力试验情况:并重 点探讨了多杆组合的承载力试验,包括支模架试验方案的确定,对试验结果进行了分析和总结.事实表明,工具式 钢管支模架体系具有受力合理、安全可靠、提高工效的特点. [关键词]支模架;钢管;承载力;支撑;理论计算;试验 [中图分类号]TU731.2 【文献标识码]A[文章编号]1002-8498(2012)11-0078-03 Theoretical Calculation and Experimental Verification of Bearing Capacity for Tool-style Tubular Steel Formwork-supports Dai Zhenging' Pan Jinyan' (1.Asia-Pacific Institute of Construction Scitech liformation Beijing 100120.China: 2.Zhejiang Academy Of Building Research Design Hangshou Zhejiang 310012.China) Abstract:Based on the characteristics of tool-style tubular steel formwork-supports the authors analyze the theoretical calculation of bearing capacity with single tube including the calculation of allowable bearing capacity for tool-style steel tube and the parison with 48mm x 3.5mm steel tube pole;the authors introduce bearing capacity test of single tool-style steel tube and discuss bearing capacity test for multi pole assembly including the determination of test scheme for formwork-supports the test results are analyzed and summarized.Facts show that tool-style tubular steel formwork-supports system whose force is reasonable is safe the work efficiency is improved. Key words:formwork-supports;steel pipe;bearing capacity:supports;theoretical calculation;testing 模板支撑架是建筑工程施工中的...
[关键词】模板;工具式;钢结构;托架;研究;应用 [中图分类号】TU755.22 【文献标识码】A [文章编号〕1002-8498(2013)20-0069-04 Research andApplication of Tool-typeHorizontalSteel FormworkBracket Ma Rongquan,Li Dong,Zhao Yajun,Chen Junjie (China Consruction Eighth Engineering Division Co.,Lud.,Shanghai 200122,China) Abstract: Considering the drawbacks of the traditional horizontal formwork support system,such as plex operation, low labor efficiency, waste of the wood joist, high cost and low safety factor, the authors studied a new tool-type horizontal formwork stee support. Compared with the traditional system, this system has many advantages,, such as low labor intensity,high efficiency and conservation of resources. This system has been used in multiple construction projects with remarkable economic benefits and social benefits. Key words;formwork; tool-type; steel structures; bracket; research; application 1研究背景 主、次梁的间距也不同,上述国内外的水平支撑体 水平模板支撑系统是建筑工程施工中量大面 系,均不能按需调整其间距,通用性不强。
2011年11月下 施工技术 第40卷第353期 CONSTRUCTION TECHNOLOGY 83 工具式支撑系统在装配式预制构件安装中的应用 张鹏1,迟锴2 (1.北京市建筑工程研究院有限责任公司,北京100039; 2.北京建工集团有限责任公司总承包部,北京100055) [滴要]介绍了工具式支撑系统的结构特点,讲述了PC-V-GZC系统和PC-H-GZC系统各自的特点及原理.结合工 程实际,详细阐述了其在装配式预制外墙安装、预制飘窗安装和叠合楼板安装的施工工艺和安装要点,重点阐述了 装配式叠合楼板安装早拆施工工艺.工具式支撑系统是装配式结构安装专业化施工的有效尝试,符合住宅产业化 绿色施工的发展方向. [关键词]住宅工程;支撑系统;预制;构件;安装 [中图分类号]TU323 [文献标识码]A [文章编号]1002-8498(2011)22-0083-03 Application of Instrumental Supporting System in Installation of Precast Components Zhang Peng' Chi Kai? (1.Beijing Building Construction Research Institute Co.Lad.Beijing 100039 China; 2.General Contracting Department of Beijing Construction Engineering Group Co. Lid. Beijing 100055 China) Abstract:The structural features of instrumental supporting system is introduced.The characteristics and theory of PC-V-GZC system and PC-H-GZC system are described.Combined with some project construction process and key points of instrumental supporting system in installation of prefabricated external wall precast suspending window and posite floor slabs are introduced in detail.Authors put a focus on the early removal construction technology for posite floor slabs.The attempt for prefabricated structure in instrumental supporting system is effective and can meet the development direction of housing industry and green construction. Key words:houses supporting system;precast;ponents;installation 随着装配式结构施工的逐步推广和安全设计需1.1PC-V-GZC系统 求的不断提高,对预制构件安装施工机具的要求越 PC-V-GZC系统主要包括丝杆、螺套、支撑杆、 来越高,由北京市建筑工程研究院研究开发的工具 ...
2012年5月下 施工技术 第41卷第365期 CONSTRUCTION TECHNOLOCY 79 工具式吊装系统在装配式预制构件安装中的应用 张鹏1,迟错2 (1.北京市建筑工程研究院有限贵任公司,北京100039:2.北享建工集团有限贵任公间总承包都,北京100055) [摘要】介绍了工具式吊装系统的结构特点,讲述了多功能吊运钢柔和通用按驳器及预理件的组成及工作原理. 结合工程实例,阐述了其在装配式预制外墙、预制飘窗、预制楼梯、预制阳台板、预制楼板等构件安装中的应用及吊 装要点,最后得出该工具式吊装系统能够满足不同类型和规格的预制构件吊装需要,加快了施工进度,保证了吊装 施工安全与质量,提高了文明施工程度. [关键词]住宅产业化:吊装系统;预制:安装 [中图分类号]TU758 [文献标识码]A[文章编号]1002-8498(2012)10-0079-04 Application of Instrumental Hoisting System in Installation of Precast Components Zhang Peng' Chi Kai (1.Beijing Building Construction Research Institute Co.Lad.Beijing 100039.China: 2.General Contracting Department of Bejing Construction Engineering Group Co.Iad.Beijing 100055 China) Abstract:The structure characteristics of instrumental hoisting system are briefly introduced.The position and work principles of multifunctional hoisting beams mon connector and embedded parts are obtained.Combining with the project examples installation application and hoisting points of ponents including precast external walls precast suspending windows precast stair precast balcony precast floor are described.The instrumental hoisting system can meet the hoisting requirement of different kinds of ponents.The construction progress is accelerated the hoisting safety and quality are ensured and the civilized construction is obtained. Key words:residence industrialization;hoisting system;precast;installation 近年来,我国住宅产业化建设进入了一个快速发的工具式吊装系统是一种通用性强、成本低、安 发展时期,伴随着装配式结构施工对安全设计需求全可靠、拆装便捷、施工管理方便的装配式预制构 的不断提高,预制构...
2016年7月上 施工技术 第45卷第13期 CONSTRUCTION TECHNOLOGY 41 D0I:10.7672/5j52016130041 基坑工程降水回灌适宜性分级研究 王国富,唐卓华,李罡,路林海,徐帮树2 (1.济南轨道交通集团有限公司,山东济南250101;2.山东大学土建与水利学院,山东济南250061) [摘要]基坑工程开挖前后采用的降水措施除易使地下水资源短缺程度加剧外,还易使地层土体发生变形,危及邻 近建筑物的安全.回灌是把抽出的地下水回补到地下含水层,既有利于补充地下水资源,又有利于控制因降水引 发的土体变形,可最大限度地减少降水对邻近建筑物的影响.以回灌水质、建筑物距离基坑远近、风险损失等级、 含水层透水性以及基坑降水量与含水层储水量之比为评价指标,利用矩阵评价法对基坑降水回灌的适宜性进行了 分级,结果表明:矩阵评价法可以有效地评价深基坑开挖的回灌适宜性. [关键词]地下工程:深基坑:回灌:分级;矩阵评价法 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2016)13-0041-04 Suitability Classification of Groundwater Recharge in Deep Foundation Excavation Wang Guofu' Tang Zhuohua' Li Gang' Lu Linhai' Xu Bangshu2 (L.Ji nan Rail Transit Group Co. Lid. Ji'nan Shandong250101 China;2.School of Civil Engineering Shandong University Ji'nan Shandong 250061 China) Abstract:Dewatering in deep foundation excavation may intensify the shortage degree of groundwater resource as well as to cause the deformation of strata and endanger the safety of adjacent buildings.In deep foundation excavation project recharge that is inject the pumped groundwater into aquifer it could be helpful to supplement the water resource control the strata deformation and decrease the dewatering influence on adjacent buildings.Taking recharge water quality the distance between buildings and foundation excavation grade of risk loss aquifer permeability and the ratio of foundation excavation dewatering amount and aquifer water capacity as evaluation index suitability of groundwater recharge in deep foundation excava...
施工技术 2011年10月上 58 CONSTRUCTION TECHNOLOGY 第40卷第350期 基坑围护桩水平位移特性研究 禹建兵 (湖南省有色地质查局二四七队,湖南长沙410015) [摘要]在实际基坑工程中,使用大型有限元软件PLAXIS对基坑开挖阶段支护结构变形特性进行了分析,对开挖 时围护桩的水平位移变化进行了分析并得出结论:施加预应力对围护桩位移影响较大,是控制围护结构的一种较 为有效的方法;而使用Hardening-soil模型进行分析时,可以更好地描述土体卸载特性,结果也更准确. [关键词]地下工程;基坑;围护桩;位移;有限元分析 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2011)19-0058-03 Study on Horizontal Displacement of Foundation Enclosure Pile Yu Jianbing (Hu'nan Geological Mining Orgnization for Non-Ferrous Metals 247team Changsha Hu'nan 410015 China) Abstract:In foundation excavation engineering author adopts finite element software PLAXIS to simulate the deformation of supporting structure of some deep foundation excavation stage and draw a conclusion that prestressing has a greater impact on displacement of pile enclosure which is a more effeetive way to control the envelope.Using Hardening-soil model analysis to describe the characteristics of the soil unloading is better and the results are more accurate. Key words:underground;excavation;retaining piles;displacement;finite element analysis 基坑开挖引起的地表位移与变形是多种因素~可塑状粉质黏土(局部淤泥质土)夹少量砖瓦、碎 耦合作用的结果,采用常规分析方法很难反映诸多石等组成,局部为原地面耕植土,碎块含量不均,一 因素的影响,而有限元法是分析基坑变形的一种行 般为10%~20%,结构松散,局部含有机质.该层 之有效的方法.结合长沙市某住宅小区基坑工程分布不稳定,局部缺失,厚0.80~3.80m.②.粉质 实例,使用有限元软件PLAXIS模拟分析基坑开挖 黏土流塑,高压缩性.切面稍有光泽,干强度中 过程中围护桩产生的水平位移的变化状况,分析了 等,韧性中等.土质不均,局部分布.顶板埋深 施加预应力和不施加预应力状态下位移的变化情 1.30~3.40m 层厚0.60~2.30m.②-2淤泥质土 况,以及使用Hardening-soil模型时位移的变化 饱和,流塑,高压缩性.无摇振反应,刀切面稍有光 情况. 泽,干强度和韧性中等偏低.局部夹薄层粉土、粉 1工程概况 砂.灵敏度平均值S =3.29 属中灵...
[关键词]环形节点板;钢管;有限元分析;承载力;试验 [中图分类号]TU392 [文献标识码】A [文章编号】1002-8498(2014)02-0066-04 Full-scaleExperimentalStudyonSteel TubularJoints AssociatedwithAnnularGussetPlate Chen Jian',Hu Wenkan²,Guan Shijie²,Chen Yong,Shen Guohui (1.Zhongda Real Estate Group Co.,Ltd.,Hangzhou,Zhejiang 310003,China;2.Zhoushan Qiming Electric Power Design Co.,Ld.,Zhoushan,Zhejiang 316021,China;3.College ofCivilEngineering and Architeture,Zhejiang Univesity,,Hangzhou,Zhejiang 310058,China) Abstract:To gain insight into the mechanical behavior of the tubular joint associated with annular gusset plate,the studies on bearing capacity are conducted.Total 4 specimens classified into two specifications are designed and manufactured, and the full-scale experimental studies on the bearing capacity of press and tension are conducted. The finite element models are setup, whereby a nonlinear finite element analysis (FEA) is pleted. The numerical FEA results are pared with both experimental results and those puted according to the Chinese codes.A good agreement is observed between the FEA and experimental results,whereas the bearing capacity puted according to the codes is rather smaller. Key wordsannular gusset plate; steel tubular;finite element analysis;bearing capacity; test 插板节点是钢管节点的一种主要形式,另外还用在插板上,然后通过螺栓传递到环形板,并最终 有工艺相对复杂的相贯焊形式节点,近期还出现了作用于主管上。
主管与环板通过外部焊缝连接,因 球节点。
本文针对新型的环形无肋钢管节点,设计此不影响主管承载力。
并制作了X形足尺试验模型,对节点在支管轴向荷 载下的拉压承载力进行了试验研究。
并将试验结 环形节 果与理论分析进行了对比。
研究成果有助于环形 加肋型钢管节点的承载力研究。
1节点试验 如图1所示,环形板焊接在主管壁上,而支管则 支管 通过插板和环形板相连接,因此支管上荷载首先作 图1环形节点板的三维示意 *浙江省电力公司科技项目(zdk023-2011) Fig.1 3D of the annular gusset plate [作者筒介]陈健,高级工程...
[关键词】地下工程;深基坑;BP神经网络;R/S分析 [中图分类号】TU753[文献标识码]A[文章编号]1002-8498(2015)13-0056-04 ResearchonDeformationPredictionsofFoundationExcavationBasedon BPNeuralNetworkandImprovedtheRoleofR/SAnalysisMethod Pang Jiancheng',Long Ran²,Ma Jiao (1.Wuhan Huazhong Geotechnical Engineering Co.,Lid.,Wuhan,Hubei 430023,China;2.CCCC Second Highway Consultants Co.,Lud.,Wuhan,Hubei 430056,China;3.School of Earth Sciences, China University of Geosciences,Wuhan,Hubei430074,China) Abstract:In this paper, an improved BP neural network and R/S analysis method on trends of foundation excavation deformation were studied.Firstly,the difference between the cubic spline was used for Finally,R/S analysis of all samples foundation excavation deformation trends judgment was used,and pare the results of BP neural network and R/S analysis. The results showed that BP neural network and speed-resulting sequence of R/S analysis have basic agreement,deformation has continued increasing trend,but the rate of increase has a reduced tendency to prove the applicability of the R/S analysis to trends of the foundation excavation deformation. Key words:underground; deep foundation excavation; BP neural network;R/S analysis 0引言得很好的效果;徐寒等利用卡尔曼滤波法处理基坑 由于基坑工程常位于城市人口稠密、周围建筑监测数据,证明该方法在基坑变形预测中的有效 的工程事故。
施工技术 2016年10月上 30 CONSTRUCTION TECHNOLOGY 第45卷第19期 D0I:10.7672/5j52016190030 基于支持向量机的膨胀土深基坑变形预测研究 渠孟飞,谢强,李朝阳,贺建军 (西南交通大学地球科学与环境工程学院,四川成都610031) [摘要]以成都东郊某深基坑支护结构的水平位移值为研究对象,研究基于基坑监测数据的基坑变形预测对施工 的指导意义.分析预测结果表明,对于本基坑,工况未发生改变时,未来1~5周预测精度非常高,预测值可作为预 估值指导施工;工况变化时未来1~5周位移值的预测精度较低,需不断加入新近监测数据才能取得较好的预测精 度.最后指出,基坑位移的预测必须建立在对前期实测曲线严格分析的基础上,工况发生改变时的一段时间内应 密切关注监测数据的发展趋势,预测值仅供参考. [关键词]深基坑;位移:预测:支持向量机 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2016)19-0030-03 Prediction of Slope Displacement of Deep Foundation Excavation Based on Support Vector Machine Qu Mengfei Xie Qiang Li Zhaoyang He Jianjun Faculty of Geosciences and Environmental Engineering of Southwest Jiaotong University Chengdu Sichuan 610031.China) Abstract:Taking the horizontal displacement of deep foundation excavation which located at east of Chengdu as the study object the guiding significance of prediction results based on the previous monitor data is studied.The prediction results indicate that when the working condition unchanged the accuracy is very high for predicting the next 1 to 5 weeks displacements.When working condition changed the prediction accuracy of the model is lower for predicting the next 1 to 5 weeks displacements only the new monitor data was input into the model the accuracy can raise.Therefore the prediction work must be carefully used when working condition changed and it must be built on analyzing the monitoring curves in early stage. Key words:deep foundation excavation;displacement;prediction;support v...
2017年6月上 施工技术 第46卷第11期 CONSTRUCTION TECHNOLOGY 77 D0I:10.7672/5j52017110077 基于层次分析法的浅埋大跨城市隧道扁平率优化研究 武明静 (中铁十二局集团第二工程有限公司,山西太原030032) [摘要]对浅埋大跨城市隧道而言,合理的扁平率设计对于节约成本和提高结构安全性都有至关重要的作用.依 托某典型工程,提出基于层次分析法原理的扁平率优化流程.首先对该工程的地质条件进行分层概化,确定地层 及支护的物理力学参数和备选的扁平率,建立数值模型网格,利用有限差分软件模拟5种不同扁平率下隧道地层 与支护的力学响应;再通过层次分析法对影响隧道经济性、稳定性与安全性的开挖面积、地表沉降、拱顶沉降、水平 位移、支护受力特性及塑性区面积进行优化并计算其权值,最终选出最优的扁平率. [关键词]隧道工程;扁平率:优化;层次分析法;数值模拟 [中图分类号]U445.4 [文献标识码]A [文章编号]1002-8498(2017)11-0077-05 Study on Flat Ratio Optimization of Large-span Shallow Buried City Tunnel Based on Analytic Hierarchy Process WU Mingjing The 2nd Engineering Co.Lad.of China Railway 12th Bureau Group Co.Ltd.Taiyuan Shanxi 030032 China) Abstract:The design of reasonable flat ratio for large-span shallow buried city tunnel has very important effect on cost saving and structural safety improving.Based on some typical tunnel engineering the method of evaluating stability of surrounding rock called failure degree index FDI)and the flat ratio optimization flow based on analytic hierarchy process AHP)is proposed.Firstly on the basis of the hierarchy of generalized geological conditions the physical and mechanical parameters for stratum and support structure and the alternative flat ratio are determined.With the finite difference software FLAC3D. numerical model grids are built to simulate the mechanical response between stratums and support under 5 kinds of flat ratios.Then target values of excavation area ground surface settlement vault subsidence h...
[关键词]绿色建筑;风险关联关系;社会网络分析;策略 [中图分类号]TU712[文献标识码]A[文章编号]1002-8498(2016)04-0062-04 Risksand Their CorrelationsResearchof GreenBuilding Project in Our CountryBasedonSNA Wang Lin'²,MaLi',ZhangPing (1.Faculty of Infrastructure Engineering,Dalian University ofTechnology,Dalian,Liaoning116024,China; 2.SchoolofAutomotive and Building Engineering,Beihua University,Jilin,Jilin132021,China) Abstract;Green building projects are faced with more plex risk system than general construction projects.They have plex relationships between risks,the risk correlation decides the degree of risk of the whole project. From the Social Network Analysis perspective,this article researches the risk correlationofgreen building projects,buildsariskcorrelationnetworkofthegreenbuilding projectuses Pajek software which is a socialnetwork analysis tool to calculate parameters of the risk correlation network,uses themethod of k-cores bined with social network parameters to prehensive analyze and evaluate therisk correlation of green building projects.The studyhas gota1l-cores condensation risk network of the green building project.Based on the11-cores risk network,the number of nodes of the risk network has a 53%reduction and the density of the risk network has a 49.7% growth.According to the 11-cores network,to further identify the key and primary risk which can be controlled of green building project,risk management strategies are put forward. Key words:green building;risk correlation;social network analysis(SNA);s...
2012年7月上 施工技术 第41卷第368期 CONSTRUCTION TECHNOLOCY 55 基于AHP法的冲击钻孔桩施工风险评估 蒋根谋1,孙康,代选顺2 (1.华东交通大学土木建筑学院,江西南330013:2.中交三公局第二工程有限公司,北京100089) [摘要]采用事故树分析法来辨识冲击钻孔桩施工过程中存在的风险,并用AP的方法来评价各风险事故的重要 性,为冲击钻孔桩施工的重点控制提供依据.从建立层次结构模型、构造成对比较矩阵、进行一致性检验、评价分 析事故风险性、控制风险等几个方面对冲击钻孔柱施工的风险评价进行了介绍. [关键调]桩基础;冲击钻孔桩;风险分析:事故树;层次分析法 [中图分类号]TU753.3[文献标识码]A[文章编号]1002-8498(2012)130055-03 AHP-based Risk Assessment of Impact Drilling Pile Construction Jiang Genmou'.Sun Kang' Dai Xuanshun2 (1.School of Civil Engineering East China Jiaotong Unieersity Nanchang.Jiangxi 330013 China: 2.The Second Engineering Co..Led.of CCCC THEC Bejing 100089 China) Abstract:Fault tree analysis method was adopted to identify the risks in impact drilling pile construction. AHP method was then used for evaluation of the risk levels and to provide guidance for key risk controls. The authors gave an introduction to the risk assessment of impact drilling pile covering establishment of hierarchical structure model construction of pairwise parison matrix performing consistency test risk assessment and risk control. Key words piles;impact drilling pile;risk analysis;accident tree analysis:AHP 冲击钻孔桩在桥梁基础施工中是最为常见的 风险管理 一种,根据不同的地质情况,果用配制不同的泥浆 指标,冲击钻进成孔,采取水下导管法施工灌注成 风险评估 风险控制 桩.钻孔、灌注桩基础混凝土都是水下作业,具 有隐蔽性和可视性差的特点,对其进行施工控制的 风险分析 风评价 实 难度增加,因此应该从预防的角度来减少冲击钻孔 策 桩施工成本的增加,对施工过程的风险管理就显得 险估计 尤为重要.如何系统科学地分析冲击钻孔桩施工 的风险是最为核心的问题,本文将重点解决这个 图1风险管理层次结构 问题. Fig.1 Risk management hierarchical structure 1风险管理的基本概念 2冲击钻孔桩施工的风险辨识 工程项目风险管理是人们在追求可靠和安全 如果冲击钻孔桩施工过程中出...
[关键词】岩土工程;勘寨;安全;规范 [中图分类号】TU19 【文献标识码]A [文章编号]1002-8498(2010)05-0099-05 CompilationFeatures of theNationalStandardSafetyCode forGeotechnicalEngineeringInvestigation Dai Yiming (Fujian ProincialInstiuteofArchiecuralDesignandResearch,Fuzhou,Fujan350001,China) general standard,which is applicable to all industries geotechnical engineering investigation safety. It is basis for works such as the preparation of geotechnical engineering investigation outline,hazard identification,n-site jobsafetyassessment,managementof production safety.Based npilatig experiences of Safety Code for Geotechnical Engineering Investigation,the pilation background, preparation principles, main contents and main characteristics of the standard are introduced. Key words:geotechnical engineering; investigation; safety;standard 根据中华人民共和国住房和城乡建设部《2008年多种,并开展了多项专题研究,进行了广泛的案例调 工程建设标准规范制定、修订计划(第一批)》(建标查,通过研究分析,寻找勘察生产过程中各作业程序存 [2008]102号),由福建省建筑设计研究院和福建省九在的危险源。
2016年4月下 施工技术 第45卷第8期 CONSTRUCTION TECHNOLOGY 97 D0I:10.7672/8js2016080097 加劲肋厚度对焊接球节点承载力的影响分析* 戴俊辉,苏英强2,仝书敬2,王留成2,俞福利2 (1.浙江工业职业技术学院建筑工程分院,浙江绍兴312000; 2.浙江精工钢结构集团有限公司.浙江绍兴312030) [摘要]目前加劲肋厚度对焊接空心球节点性能影响的研究不多,至今没有一部结构设计规范明确提出加劲肋厚 度对焊接球节点强度的影响大小.如何经济、安全地选取加劲肋厚度是值得思考的问题.为有效评估加劲环板厚 度对焊接球承载力的影响,运用有限元软件ABAQUS建立带肋焊接空心球节点模型,提出焊接空心球内部加劲肋 的构造壁厚取值方法,同时研究了在受压和受拉情况下,不同加劲肋厚度对焊接球承载力的影响. [关键词]钢结构;焊接球;加劲肋;承载力;影响分析 [中图分类号]TU391 [文献标识码]A [文章编号]1002-8498(2016)08-0097-06 The Analysis of Stiffener Thickness Influence on Bearing Capacity of Welded Ball Joints Dai Junhui' Su Yingqiang? Tong Shujing? Wang Liucheng2 Yu Fuli2 (1.School of Civil Engineering Zhejiang Industry Polytechnic College Shaoxing Zhejiang 312000 China; 2.Zhejiang Jinggong Steel Building Group Co.Ltd.Shaoxing Zhejiang 312030 China Abstract:At present the analysis of stiffener thickness influence on bearing capacity of welded ball joints is not so much.So far there are no any specifications of structural design specify the influence degree of stiffener thickness on bearing capacity of welded ball joints.How to select the thickness of stiffener economically and safely is a question worth considering.In order to effectively evaluate stiffener thickness influence on bearing capacity of ring stiffened rib this paper applies the finite element software ABAQUS to establish the model of ribbed welded hollow ball joints.It proposes methods to construct the thickness of welded hollow ball joints.At the same time it analyzes different stiff...
2011年8月下 施工技术 第40卷第347期 CONSTRUCTION TECHNOLOGY 关于建筑工业化问题的探讨 杨嗣信 (北京建工集团有限贵任公司,北京100045) [摘要]近年来随着我国建筑业的迅猛发展,建筑工业化得到较大发展,但与发达国家相比在某些方面仍存在较大 差距.首先讲述了我国实现建筑工业化的必要性和追切性,提出我国应该在结构装配化施工、取消或减少湿作业、 扩大工厂预制范围、设备安装工程等方面进一步发展,从而有效加速我国建筑工业化进程.最后提出建筑工业化 进程中应该采取的具体措施. [关键词]工程管理;建筑;工业化;结构装配化;湿作业;工厂预制 [中图分类号]TU741 [文献标识码]A[文章编号]1002-8498(2011)16-0001-03 Discussion on Problem of Construction Industrialization Yang Sixin Beijing Construction Engineering Group Co.Lad.Beijing 100045 China) Abstract:Recently industrialization of construction in China developed rapidly with the development of construction industrialization.But pared with developed countries the condition of industrialization in China still need to be improved.The necessary and urgency to realize industrialization of construction in China is introduced.Several measures can be used to improve the speed of industrialization such as construction with structure assembly canceling or reducing construction at wet condition expanding the precast scope at factory equipment installation etc.The concrete measures should be applied at develop of industrialization of construction are put forward finally. Key words:project management;building;industrialization;structure assembly;construction at wet condition;precast at factory 1实行建筑工业化的必要性和迫切性 国家重点工程的建设任务,大大促进了建筑业的发 我国在20世纪70年代就曾提出过建筑工业化展和提高,但同时也应清醒地看到我国的建筑业与 的概念,由于当时各方面条件不具备,发展很慢.尽发达国家相比还有一定的差距,特别是在施工管理、 管如此,30年来建筑工业化随着我国建筑业的大发施工企业体制、劳动效率、经济效益和文明施工等方 展仍然有着较大的进展,诸如施工机械化、专业化、面还需要进一步提高;另外在节能减排...