DL/T 5429-2009 英文版 电力系统设计技术规定

附件大小:0.35MB
附件格式:1个直链文件,格式为pdf
所属分类:电力能源
分享会员:
分享时间:
最后更新:
资源简介/截图:

ICS 27.100
F 21
Record No. J927—2009
Electric Power Industry Standard of the People's Republic of China
P DL / T 5429 — 2009
To replace SDJ 161 — 1985
Technical Code of Design for the
Electric Power System
Issue Date: JuIy 22, 2009 implementation Date: December 1, 2009
Issued by National Energy Administration of the People's Republic of China

DL/T 5429-2009,电力系统,英文版,设计技术,DL/T 5429-2009 英文版 电力系统设计技术规定

1 Scope
This code specifies the basic requirements for the design of electric power system, including power demand forecast, design of power source and grid schemes, calculation of power flow, phase modulation and voltage regulation, system stability, short-circuit current, power frequency over-voltage and secondary arc current, as well as the comparison of various schemes in terms of economy.
This code is applicable to design of electric power system of 220 kV and above (primary part), to the study on special topics of electric power system, the design for connecting power plants, substations and converter stations to the system, the feasibility study on power generation, transmission and transformation projects as well as preliminary design of system part.

2 Normative References
The following normative documents contain provisions which, through reference in this text, constitute provisions of this code. For dated references, subsequent amendments (excluding the contents of errata) to, or revision of, any of these publications do not apply.
However, parties to agreements based on this code are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies.
DL 755 Guidelines for Safety and Stability of Power Systems
SD 325 Technical Guidelines for Voltage and Reactive Power of Power Systems (trial)
Provisional Regulations for Economic Analysis of Electric
Power Projects, issued by the former Ministry of Water Resources and Electric Power (Dianjizi [82] No.44)

3 General
3.0.1 The design of power systems shall follow the industrial policy, development guiding principle and various technical and economic policies of the electric power industry and shall be market-oriented, on the grounds of safety and stability and in line with the fundamental principle of optimal allocation of energy resources such that the design is scientifically demonstrated, technically advanced and economically viable.
3.0.2 The design of an electric power system shall be based on power industry planning, grid planning, and transmission system planning of the power plants. The detailed development scheme shall be further studied and proposed while taking into account the overall conditions of the electric power system.
3.0.3 The layout of the power sources and power grid shall be considered reasonably when designing the power system to ensure that the power generation, transmission, transformation projects and reactive power supply can be built in a coordinated manner and lay a foundation for design of relay protection, design of power system safety automatic control devices, communication design, dispatching automation, and design of electric power system of a lower rated voltage level.
3.0.4 The safe and stable operation of an electric power system prerequisites a reasonably designed grid structure. While ensuring the safe and stable operation of the system and satisfying the demands for power market development, the design shall consider all the factors comprehensively to achieve a reasonable layout of the power grid such that the weak links can be eliminated, the main grid can be strengthened, the power grid at the sending end can be simplified and the anti-disturbance ability of the power grid can be improved.
3.0.5 The design of the power system shall provide the basis for study on special topics of power system, the design of connecting power plants, substations and converter station into the system, feasibility study on power generation, transmission and transformation projects, the system part of the preliminary design as well as the next stage of system design.
3.0.6 The specific tasks of designing an electric power system are to:
1 Analyze and propose the level, distribution, composition and characteristics of the electric power demand.
2 Balance the electric power and energy, and further demonstrate the reasonable range served by the power system and associated networking schemes, power source building schemes as well as system peak regulation scheme.
3 Demonstrate the grid construction schemes, including voltage level, grid structure, and transitional measures.
4 Carry out electrical calculation on the power grid, and then propose the technical measures for ensuring voltage quality and safety and stability of the system.
5 Propose the commissioning time of power generation,transmission and transformation projects and reactive power supply,quantity and main specifications of major equipment, and perform investment estimation.
6 Propose the special topics requiring further study.
The above tasks can be carried out in a targeted manner by stages according to the specific conditions, while taking into account the situations comprehensively.
3.0.7 The design level year of the electric power system should be in conformity with the planning year of national economy and society development, generally being taken as a year after around five years from now on, and a year after 10-15 years from now on for future outlook.

资源链接请先登录(扫码可直接登录、免注册)
十年老网站,真实资源、每天更新、会员免费畅享!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:芳华
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)