2013年1月下施工技术 第42卷第2期CONSTRUCTION TECHNOLOGY23
超大面积屋盖提升支撑用格构柱整体稳定性分析* 韩淼兵",王玉岭',张晓勇',陈海洲',张其林²
【摘要】针对中国商飞部装厂房3万㎡²焊接球屋盖的整体提升施工工艺,对提升工艺中最关键的提升架和格构柱 建立了整体分析模型,对整个系统的稳定性进行了计算分析。
计算结果表明,格构柱最大应力仅为个别应力集中 点,对柱整体没有影响。
通过对细部有限元分析可以看到,有些部位应力水平较高,对这些部位通过设置加劲肋进 行局部加强。
[关键词]钢结构;网架;提升;格构柱;整体稳定性;数值模拟 [中图分类号]TU311.41[文献标识码]A[文章编号]1002-8498(2013)02-0023-02 Overall Stability Analysis of the Latticed Column as Support of Lifting Han Miaobing',Wang Yuling',Zhang Xiaoyong',Chen Haizhou',Zhang Qilin² (1.China Construction Eighth Engineering Division Co.,Lad.,Shanghai 200120,China; 2.School of Civil Engineering,TongjiUniversity,Shanghai 200092,China) AbstractThe integrated numerical model for lifting frame and laticed column is established,which are the key pairt of the lifting system for the COMAC installed plant with 30 000m².The overall stability of the integrated system is analyzed. The simulation results show that the biggest stress of the latticed column is individual and has no influence on integrity.And through detailed simulation analysis,local strengthening with stiffening rib is applied on the parts with high stresses. Key wordssteel structures; space truss; lifting;laticed column; overall stability; simulation 中国商用飞机有限责任公司(Commercial Aircraft Corporation of ChinaLtd.,简称 COMAC)部 装厂房是COMAC总装制造中心的重要厂房之一, 也是最大的厂房。
部装厂房采用焊接球网架结构, 长297m,宽111.2m。
由于部装厂房的屋盖面积较大、标高较高,因 此最适合的施工方案就是采用地面组装、整体提升图1格构柱布置 的方案。
提升过程中格构柱加提升架的整体稳定Fig.1 Latticed column arrangement 性是确保施工安全的最基本保障。
如图1所示。
如图2所示。
1有限元模型和分析计算通过计算得到:同步提升时,杆件最大轴力 由于现行规范中无双肢格构柱加提升架整体1520kN;不同步提升时,杆件最大轴力1910kN。
结构的稳定计算,因此对格构柱加提升架建立了整1.2格构柱验算过程 体有限元分析模型,包括杆系模型和实体模型两整个格构柱单肢受压,受压肢是最危险单元。
类,分别进行了稳定验算与极限强度计算。
由于柱子下端埋人混凝土基础3.5m,因此对该格构 1.1杆系计算模型和分析结构柱的约束取下端为固定约束。
平面外无支撑,对于 杆件采用梁单元,提升架柱顶端施加竖向竖向单元的面外计算长度统一取柱子全长的2倍。
荷载1300kN,水平向荷载100kN,实体有限元模型其中最危险的一个单元的强度验算结果为:长 细比入=97<123.8;轴力应力比0.613;弯矩应力比 中国建筑第八工程局科技立项(2011-15)[作者简介】韩森兵,高级工程师,事业部副书记,E-mailhmb_23@0.143;压弯整体稳定应力比0.756;剪切强度应力 163.比0.012。
杆系有限元分析计算结果表明,该柱在 [收稿日期]2012-12-10
...