天津一汽丰田基坑支护设计与施工
吴金伟,李佐良,裴相臣 (中国水电基础局有限公司,天津301700) [摘要]介绍了一个开挖深度为5.1m、地下1层的深基坑设计方案,旨在对深基坑的设计和施工提出一些创新。
研 究表明:墙后土的时空效应有利于基坑的安全;围护结构与基础结构同时施工应避免基坑区域内土体的应力集中; 目前基坑的计算参数比较保守,按照既定的施工顺序施工可以确保安全。
[关键词】深基坑;支护;设计;施工工序 [中图分类号]TU753.6[文献标识码】A[文章编号]1002-8498(2015)21-0064-04 Design and Construction ofFoundationExcavationSupporting in FTRD Tianjin WuJinwei,Li Zuoliang,Pei Xiangchen (Sinohydro Foundation Engineering Co.,Lad.,Tianjin 301700,China) Abstract:This paper introduces a deep foundation excavation design scheme that the excavated depth is 5.1m.Some innovations in design and construction are put forward. The research shows that the time space effect of earth behind of wall is beneficial to the safety of the foundation excavation; the soil stress concentration should be avoided when the retaining structures and infrastructure are under construction; the calculation parameters of foundation excavationis conservative,so the construction sequence ensures the safety of construction. Key words:deep foundation excavation; supports;design; construction process 天津滨海新区位于环渤海经济圈的中心地带,上26700m²,地下9065m²,建筑基底面积7020m², 近年来的深大基坑和超高层建筑更是屡见不鲜。
地上4层,地下1层,地上主体结构高度19.8m,基 但该区处于海陆过渡相的三角洲沉积和浅海相沉坑周长约460m。
行政设计楼设计±0.000标高为大 积的软土地带,主要特点是含水率高,厚度比较沽高程3.600m,现场场地标高为大沽高程3.200m, 大,黏性土和粉土相间互层(。
这种深厚的软土层基坑开挖深度5.1~6.6m。
基坑周边环境平面如图 给深基坑的设计、支护、施工都带来了一定的技术1所示。
难度。
此类基坑主要解决止水防渗及空间土压力y 07* 不平衡的问题,本文结合一汽丰田技术开发有限公实验楼整车试制车间 司(FTRD)研发基地建设项目行政设计楼基坑设计洪排 实例,探讨此类基坑设计的方法以及施工注意事项。
春河:预留二期用地 1工程概况华80387行政设计楼
用地界限865 一汽丰田技术开发有限公司(FTRD)研发基地新业二街 建设项目位于天津市开发区西区。
主要包括实验 楼+整车试制车间、行政设计楼和造型楼。
本次基坑设计的行政设计楼临近的北侧是实图1行政设计楼基坑周边环境平面 验楼、东侧是造型楼,其建筑面积35765m²,其中地Fig.1The foundation excavation surrounding environment of the building 2工程地质条件 [作者筒介】吴金伟,副主任,高级工程师,E-mail:271361742@2.1地层分布及土质特征 [收稿日期]2015-01-07本场区地表以下50m范围内,地基土按成因及 万方数据
2015 No.21吴金伟等:天津一汽丰田基坑支护设计与施工65 时代可分为11层;按土的物理力学特征可分为233.2支护结构形式选择 个亚层,部分亚层呈透镜体状分布。
场区地层主要根据《建筑基坑支护技术规程》JGJ120一 分布如下:①第四系全新...