施工技术2015年8月下 54CONSTRUCTIONTECHNOLOCY第44卷第16期 DOI:10.7672/sgjs2015160054
武汉某项目预制装配式住宅体系施工技术
陈廷勇 (深圳建业工程集团股份有限公司,广东深圳518109)
[摘要]武汉市永清商务综合区B地块B9区工程采用剪力墙结构体系,建筑外墙设计要求采用预制装配式外墙构 件,外墙构件在预制工厂已完成外墙装饰,通过对立面方案优化设计、建筑构造设计、吊装工艺设计、连接设计、外 墙构件成型和现场安装的研究,最终使项目得以实施,完成后的建筑立面效果达到了预期的目标。

预制装配式外 墙构件外墙装饰工厂化达到了85%以上,减少了施工现场的湿作业。

[关键词]预制装配式;剪力墙;吊装;防水;连接 [中图分类号]TU756[文献标识码]A[文章编号]1002-8498(2015)16-0054-03 ConstructionTechnologyofPrecastResidenceSystem ofaProjectinWuhan Chen Tingyong (Shenzhen Jianye Engineering Group Co.,Ld.,Shenzhen,Guangdong 518109,China) Abstract:Wuhan Yongqing business plex plot B B9 engineering uses shear wall structure system. The building facade is designed to use precast wall ponents.Exterior wall ponents have been pleted exterior decoration in precast factory.Through the optimization design of facade scheme, building structure design,hoisting technology design, connection design and forming and on-site installationresearchof exteriorwallponents,the projectispleted successfully,and the expected goal is stained. Over 85% of exterior wall decoration is done in factory which reduces the wet work on the construction site. Key words:precast; shear walls;hoists;waterproofing; connection 1工程概况件附着在剪力墙结构外侧,为非受力构件。

本工程 武汉市永清商务综合区B地块B9区总承包工设计时采用了四大系列预制构件:分别是预制平窗 程位于武汉市江岸区永清片区中央(黄浦大街以外墙、预制凸窗外墙、预制阳台、预制楼梯。

预制构 北、沿江大道以西),项目北侧为B20地块纯地下室件在预制工厂生产,其中预制平窗、预制凸窗、预制 (与B9地块同时开发),东、南、西侧分别为B10地阳台外墙完成面按设计已粘贴了外墙面砖,现场装 块、B15地块、B2地块(后期开发)。

本工程建筑面配临时固定后,作为主体结构模板的一部分,待主 积为65900m²,由地下1层和地上14幢住宅楼组体结构人工支模及钢筋绑扎完成后,再浇筑结构混 成,住宅楼栋外墙平窗、凸窗、阳台、楼梯段为预制1凝土。

后期只有女儿墙、阳台内结构需粘贴外墙面 构件,预制构件与剪力墙体系组成预制构件装配式砖,部分吊装和施工过程中损坏的外墙面砖需修 建筑,其中T3,T10,T11为3幢31层建筑,其余11补。

这种产业化住宅的建设,优点是外墙上能节约 幢为5~12层建筑。

大量的人力、物力,但缺点是现在成本偏高。

随着 2结构体系与建筑特点国家产业化住宅推广及人工成本的进一步提高,产 本项目多层及高层住宅结构形式主承重为现业化住宅的建设将是今后建筑行业的发展趋势。

浇混凝土剪力墙结构,预制构件使用位置为外墙及3吊装与连接技术 阳台,除阳台、楼梯构件属受力构件外,其余外墙构3.1预制件吊装施工工艺 引测控制轴线一楼面弹预制件控制线一水平 [作者筒介]陈延勇,工程师,E-mail:chentingyong@qq.标高测量一平、凸窗及阳台预制件逐块安装、校正、 [收稿日期]2015-05-20
万方数据
2015 No.16陈廷勇等:武汉某项目预制装配式住宅体系施工...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

22施工技术2014年4月上
CONSTRUCTIONTECHNOLOGY第43卷第7期 DOI:10.7672/sgjs2014070022 武汉某工程裙楼地下室半逆作施工技术 程海寅,楼国栋,方忠民 (中天建设集团有限公司,浙江杭州310008) [摘要】结合武汉某工程实际情况,在施工中采取裙楼地下室半逆作,主楼、裙楼后顺作的施工技术。

从地下连续 墙成槽质量控制、土方开挖、高低跨处防水及支模、基坑降水、一柱一桩施工等方面对该技术进行了详细介绍。

工 程实践结果表明,该方法取得了良好的效果。

[关键词]地下工程;逆作法;地下连续墙;降水;施工技术 [中图分类号]TU753[文献标识码]A【文章编号]1002-8498(2014)07-0022-04 Construction Technology of Semi-inverseMethod of SkirtBuildingBasement of Some EngineeringinWuhan Cheng Haiyin,Lou Guodong,Fang Zhongmin (Zhongtian Construction Group Co.,Lad.,Hangzhou,Zhejang 310008,China) Abstract:Based on the engineering practice in Wuhan,construction technology of semi-inverse method of skirt buildingbasement and then constructed mainbuilding and skirtbuilding.Thispaperintroduced the technologyfromforming solt quality control,soilexcavation,waterproofing and formwork setting inhigh and lowstride,dewatering,construction ofone column withone pile.Engineeringpractice showed that this technology obtained good effect. Key words:underground; top-down method;diaphragm wall; dewatering; construction 1工程概况 武汉市老浦片商业及住宅项目工程总建筑面 积267000m²,建筑总高度139m,由3层地下室(局 部2层),6层裙楼主楼及3栋41层住宅塔楼组成。

该工程基坑面积30000m²,地下室面积86000m², 普挖深度为18.85m,基坑等级为一级。

该工程设计 ±0.000相当于绝对标高25.500m,周围场地绝对 标高为23.000m,项目如图1所示。

2工程地质条件图1工程效果图 1)根据地质勘探资料,本场地土质大致分为5Fig.1 Engineering effect 个主要工程地质层,如表1所示。

2)根据地质勘探报告,拟建场区地层属长江1水体水力联系密切,水量丰富,其上覆②层黏性土 级阶地,地下水类型主要为填土层中的上层滞水和层为相对隔水顶板,下伏粉砂质泥岩为相对隔水层 砂层中的孔隙承压水两种类型。

上层滞水主要赋底板。

勘察期间于抽水试验观测井中量测到承压 存于①层杂填土中,大气降水、地表水和生产、生活水稳定水位在地面下11.19m,相当于标高 用水渗人是其主要的补给来源,无统一自由水面,13.020m。

根据区域水文资料表明,武汉地区长江1 水量与周边排泄条件关系密切。

孔隙承压水主要级阶地砂土砾石层中的承压水水头高度年变化幅 赋存于砂层、圆砾层中,即③,④单元层中,与长江度在3.0~5.0m。

孔隙承压水历史最高水位为 21.0m。

勘察期间测得混合水位埋深1.4~2.6m, [收稿日期]2013-10-23[作者简介]程海寅,高级工程师,E-mil:@qq.相当于标高21.510~22.560m。

万方数据
2014 No.7程海寅等:武汉某工程裙楼地下室半逆作施工技术23 表1工程地质条件利用土地资源。

Table 1 Engineering geological condition5)工期相对宽松 土层顶板埋深/m厚度/m工程特性本工程业主工程款的划拨须同时满足工程节 ①杂填土1.00~松散,高压缩性点及时间节点要求,加上工期相对宽松及主楼结构 6.20 ②黏1.00 ~4.10 ~可塑,中等偏高的特殊性,经综合考虑决定采用主楼后顺作施工。

6.2011.70压缩性为节约因采用全...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2012年11月上 82 CONSTRUCTION TECHNOLOGY 第41卷第376期 武汉大学近现代文物保护建筑修缮加固技术 张向东,肖胜利,夏琪,谷洪勋,赵刚2,任克彬2 (1.河南省建设集团有限公司,河南郑州450002; 2.河南省文物建筑保护设计研究中心,河南郑州450002) [摘要]武汉大学近现代文物保护建筑建成于20世纪30年代,由26栋建筑组成,为国务院第五批全国重点文物保 护单位“近现代重要史迹及代表性建筑”.为继续利用和保护,经报国家文物局批准对其进行全面修缮加固,行政 楼和宋卿体育馆为第1批实施的修缮加固项目.重点介绍了行政楼修缮加固方案设计和宋卿体育馆施工.为近 现代早期混凝土结构和砌体结构建筑的修缮加固积累了经验. [关键词]加固;近现代文物保护建筑;修缮;施工技术 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2012)21-0082-03 Renovation and Reinforcement Technique of Modern Heritage Building in Wuhan University Zhang Xiangdong' Xiao Shengli' Xia Qi' Gu Hongxun' Zhao Gang? Ren Kebin2 (1.He'nan Province Construction Group Co.Ltd. Zhengzhou He'nan 450002 China; 2.He'nan Antique Building Protection and Design's Research Center Zhengzhou He'nan 450002 China) Abstract:Modern heritage building in Wuhan University pleted in the 1930s includes 26 buildings in the 15 places.It is approved by the State Council to be listed among the fifth group of Important Cultural Heritage Under State Protection.They will be prehensively renovated to continue to use and protect after the approval by the State Administration of Cultural Heritage.And College of Engineering and SongQing Gymnasium bee the first projects to be renovated.This paper focuses on the renovation and reinforcement scheme of the College of Engineering and construction project of the SongQing Gymnasium.This research will contribute to strengthening and reconstructing modern early-age concrete structures and masonry structures. Key words...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

2011年5月下 施工技术 第40卷第341期 CONSTRUCTION TECHNOLOGY 55 武汉保利文化广场深基坑施工技术 吴长路 (中铁建工集团北京分公司,北京100070) [摘要]武汉保利文化广场工程基坑深度大,施工现场场地狭窄,周边环境及地质条件复杂,支护结构工作量大. 详细介绍了基坑采用支护柱及立柱桩、内支撑方案、支护桩及内支撑、岩溶水降水、土方开挖等施工方案的具体要 求及步骤.并对工程进行多参数观测达到信息化监测,为工程顺利实施提供有力保证.实践证明,施工措施效果 良好,有效解决了深基坑施工过程中的难题. [关键词]内支撑;岩溶裂陈水;中心岛:施工栈桥;施工监测 [中图分类号]TU753.1 [文献标识码]A [文章编号]1002-8498(2011)10-0055-04 Construction Technology of Deep Foundation Excavation in Wuhan Poly Culture Plaza Wu Changlu Beijing Branch of China Railusay Construction Engineering Group Bejing 100070 China) Abstract:At the plex surrounding environment and geological conditions foundation excavation of Wuhan Poly Culture Plaza has the characteristics whose construction site is narrow and the quantities of foundation excavation supporting is large.The concrete demands and steps of foundation excavation construction such as supporting piles and column piles internal supporting supporting piles and internal supporting karstic dewatering soil excavation are introduced.The information monitoring is realized by the monitoring of foundation excavation parameters to guarantee the construction going successfully.The result shows that construction has a good effect and construction difficulties are solved. Key words:inner support;karst fissure water;central island;construction trestle;construction monitoring 1工程概况 物距离地下室边线最近处约18m:基坑西面与洪广 武汉保利文化广场工程地下4层,地上主楼46 商务中心地下室接壤,并与该地下室范围线相距不 层,副楼20层,裙楼8层,副楼16-20层与主楼相 到2m 最近处仅一墙相隔;基坑西北面邻近华银大 连形成主、副楼连体建筑.工程建筑面积为厦,并与该大厦地下室范围线相距约7...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

2013年9月下 施工技术 第42卷第18期 CONSTRUCTION TECHNOLOGY 15 D0I:10.7672/sgjs2013180015 武汉中心工程非落底式止水帷幕深基坑降水技术研究* 周鹏华,周杰刚,李继承,李鹏,王健 (中建三局建设工程股份有限公司,湖北武汉430064) [摘要]以武汉中心深基坑工程降水为例,介绍了非落底式止水帷幕深基坑降水技术在武汉地区长江I级阶地复 杂地质条件下的应用与效果,分析了降水对土体稳定性、土体强度的提高作用和对支护结构的有利影响,最后对降 水效果进行了评价. [关键词]高层建筑;深基坑;坑中坑;止水帷幕;深井;降水 [中图分类号]TU974 [文献标识码]A [文章编号]1002-8498(2013)18-0015-04 Research on the Composite Dewatering Technology of Waterproof Curtain and Dewatering Deep Wells in Wuhan Center Project Zhou Penghua Zhou Jiegang Li Jicheng Li Peng Wang Jian China Construction Third Engineering Bureau Co.Ltd.Wuhan Hubei 430064 China) Abstract:Taking the dewatering of deep foundation excavation in Wuhan Center project as example at the plicated geological conditions the application effect of posite dewatering technology of waterproof curtain(the diagram walls isn't insert the impermeable layer)and dewatering deep wells used to reduce groundwater level is introduced.The favorable effects of dewatering on the soil stability soil strength and enclosure structure are analyzed.The dewatering effect is estimated at the end. Key words:tall buildings;deep foundation excavation;pits in foundation-pit;waterproof curtain;wells; dewatering 0引言 防止底板突涌,保证基坑施工的顺利进行. 随着城市高层建筑的不断发展,出现了越来越 本文依托武汉中心深基坑降水工程,介绍了非 多的深基坑工程.深基坑开挖过程中,必须对地下 落底式止水帷幕深基坑降水技术的应用与效果,并 水进行有效处理,保证施工过程中基坑的安全和 分析了降水对土体稳定性、土体强度的提高作用和 稳定. 对支护结构的有利影响. 武汉地区大面积分布的是长江I级阶地(近代 1工程概况 冲积平原),地下水存在3种类型:上层滞水、潜水 武汉中心工程占地面积为28100m2 总建筑面 和承压水.通常采用竖向隔渗帷幕阻断上层滞水 积约为353800m2 主塔楼88层,建筑高度43...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

2016年3月上 施工技术 第45卷第5期 CONSTRUCTIONTECHNOLOCY 13 DOI:10. 7672/sgjs2016050013 武汉中心工程塔楼临时消防关键施工技术* 邓伟华,周杰刚,王健,李健强,武超 (中建三局集团有限公司,湖北武汉430064) [摘要】针对武汉中心工程塔楼临时消防重难点,提出一种“立面分区、分级泵送、水箱中转、重力补给”的临时消防 体系,并采用正式消防替代临时消防提高了消防安全性,通过在模架顶部设置消防水箱保证了模架消防零空档,利 用变频泵、雨水回收系统、采取合理的消防体系及临时消防与正式消防交互使用,满足绿色施工的需求,利用施工 电梯、塔式起重机、泵管架形成的多通道逃生系统解决了塔楼疏散难题,最后详细介绍了武汉中心工程临时消防安 全管理理念。

[关键词]高层建筑;临时消防体系;绿色消防系统;疏散;安全管理;施工技术 [中图分类号]TU998.1;TU892 [文献标识码]A [文章编号]1002-8498(2016)05-0013-05 Key ConstructionTechnology ofTemporaryFireProtectionSystem forWuhan CenterProject DengWeihua,ZhouJiegang,WangJian,LiJianqiang,WuCha (China Construction Third Engineering Bureau Group Co.,Ltd.,Wuhan,Hubei 430064,China) Abstract:Based on temporary fire protection difficulty of Wuhan Center tower,this paper puts forward a fire protection system including facade division,grade pumping,water tank transfer,gravity supply,and uses formal fire protection system instead of temporary fire protection system to improve fire safety, ensures the zero gaps of fire protection system by seting the water tank at the top of frame.Variable frequency pump,rain waterrecyclingsystem,rationalfire protection systeminteractionof temporary and system consists of construction elevator,tower crane and pump pipe rack,which solves the evacuation problem of the tower.Finally,this paper introduces the safety management concept of temporary fire protection system ofWuhan Center project. Key words:tall buildings;temporary fire protection system;green fire protection system;evacuation; safety management;construction 1工程概况 重机及施工电梯平面布置如图1所示。

1.1项目概况 1.2塔楼施工工艺 武汉中心工程地下4层、地上87层,建筑高度 武汉中心工程塔楼施工采用“不等高同步攀 438m,塔楼地上建筑面积272652.53m²,为巨柱框 升”施工工艺(见图2),即先施工核心筒竖向剪力墙 架-核心筒-伸臂桁架体系。

结构,后进行外框及核心筒内水平结构施工,外框 塔楼共选用2台动臂式内爬塔式起重机,分别 钢结构落后剪力墙6~12层,外框水平结构落后外 为M900D,ZSL1250,共选用5台高速施工电梯,其 框钢结构2~4层,其中塔楼竖向剪力墙采用新型模 中内筒布置1台,负责模架作业人员上下,塔楼外框 架进行施工。

东侧布置4台,主要负责外框施工人员上下,塔式起 2塔楼临时消防重难点分析 2.1特殊工艺对消防体系要求高 湖北省建设科技研发项目:武汉中心工程建造关键技术研究与 武汉中心工程塔楼建筑高度438m,超高层建筑 应用 [作者简介]邓伟华,副总经理,高级工程师,E-mail:dwh9...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2016年3月上 22 CONSTRUCTIONTECHNOLOCY 第45卷第5期 DOI:10.7672/sgjs2016050022 武汉中心工程上挂下承结构整体监控及后评价技术* 周杰刚,李健强,武超,王健,黄挡玉 (中建三局集团有限公司,湖北武汉430064) [摘要】武汉中心工程外框66层以上为逐级成型的上挂下承结构,结构施工过程中经过多次内力重分布,整个体 系形成过程中变化复杂。

通过对逐级成型的上挂下承结构施工过程中受力及变形进行监测,保证了结构施工过程 中的安全,通过与施工模拟分析进行对比,证实模拟过程偏安全考虑,结构施工状态符合设计意图,提出施工过程 模拟分析可增加符合现场实际工况的分析作为施工控制参考。

[关键词]高层建筑;上挂下承结构;监控;模拟;后评价 [中图分类号]TU974 [文献标识码]A [文章编号]1002-8498(2016)05-0022-05 Overall Monitoring and Post-evaluation Technology of the Upper Pulling andLowerCompressionStructureforWuhanCenterProject ZhouJiegang,LiJianqiang,Wu Chao,Wang Jian,Huang Dangyu (China Construction Third Engineering Bureau Group Co.,Lad.,Wuhan,Hubei 430064,China) Abstract:The outer frame above No.66 floor for Wuhan Center project is the upper pulling and lower pression structure which forms gradually,there are internal force redistributions with several times in the construction process and the whole system formed is plicated.In this paper,the authors monitor the stress and deformation in the construction process of the upper pulling and lower pression structure,which ensures the structure safety.The simulation results are conservative by parison of construction simulation analysis. The structure is in line with the design intent. And the simulation analysis of the construction process can be added to the analysis of the on-site actual conditions as a reference for the construction control. Key words:tall buildings;upper pulling and lower pression structure; monitoring; simulation; post evaluation 1工程概况 部加强桁架,整个施工过程中实现2次内力重分布 武汉中心工程塔楼地上88层,建筑总高度 (见图1)。

438m。

工程主体结构为核心筒-巨柱-伸臂桁架结构 393.900 顶部加强析架 体系,因建筑功能的特殊需求,在外框65层设置酒 87层 店大堂,限制了转换结构的高度及跨度,常规结构 无法满足设计要求。

为此,设计院提出了逐级成型 76-87层后装段卸载后浇筑 325.650 的上挂下承结构。

76层 一后装段 1.1逐级成型的上挂下承结构简介 逐级成型的上挂下承结构在66层设置转换大 -67~75层顺序浇筑 300.450 梁,顶部设置加强桁架,并在77层设置后装段,施工 66层在转换大梁卸载后浇筑 66层 过程中利用后装段处卸载实现部分结构上挂于顶 湖北省建设科技研发项目:武汉中心工程建造关键技术研究与 应用 图1逐级成型的上挂下承结构 [作者简介]周杰刚,项目经理,高级工程师,E-mail:18660299980@ Fig.1The upper pulling and lower 163. pression struc...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

2017年6月上 施工技术 第46卷第11期 CONSTRUCTION TECHNOLOGY 53 D0I:10.7672/5j52017110053 橡胶粉改性沥青老化性能研究* 刘延军12,叶志刚,张玉贞1 (1.中国石油大学(华东)化学工程学院,山东青岛266580:2.中海石油炼化有限贵任公司,北京100029) [摘要]采用3种老化试验方法模拟橡胶粉改性沥青老化过程,系统评价了在不同条件下3种橡胶粉改性沥青老 化性能的差异,并通过红外光谱分析了老化过程对橡胶粉改性沥青分子结构的影响.结果表明,橡胶粉改性沥青 在老化后软化点升高,针人度降低;不同类型橡胶粉改性沥青,老化规律基本一致,但老化后的性能存在一定差异. 红外光谱分析显示,橡胶粉改性沥青在老化前后的分子结构变化主要是基吸收峰的变化,RTFOT老化对橡胶粉 改性沥青官能团的影响比较明显.由于橡胶粉脱硫过程中已引入较多带基或羧基的极性基团,脱硫橡胶粉改性 沥青在老化前后红外图谱中的羰基吸收峰差异很小,其抗老化性能也相对较好. [关键词]公路工程:橡胶粉;改性沥青;老化性能;研究 [中图分类号]U414 [文献标识码]A [文章编号]1002-8498(2017)11-0053-04 Study on the Aging Performance of Crumb Rubber Modified Asphalt LIU Yanjun.2 YE Zhigang' ZHANG Yuzhen' (1.College of Chemical Engineering China University of Petroleum Qingdao Shandong 266580 China; 2.CNOOC Oil Petrochemicals Co.Ld.Beijing 100029 China) Abstract:Three kinds of aging experimental methods are used to simulate the aging process of crumb rubber modified asphalt.The different performance of three kinds of erumb rubber modified asphalt on aging behavior was evaluated in different conditions and the influence of aging process on molecular structure was analyzed by IR.The results show that the soft point will be enhanced and the penetration will be decreased associated with aging process of crumb rubber modified asphalt.For different kinds of erumb rubber modified asphalt the aging rule is similar and the performance is different after aging. Infrared spectra analysis showed that the change of molecular structure of crumb rubber modified asphalt a...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术2012年4月下 88CONSTRUCTIONTECHNOLOGY第41卷第363期
暴雨条件下自嵌式加筋挡土墙稳定性数值模拟分析
郭军辉",王松江',程卫国² (1.河南省电力勤测设计院,河南郑州450007:2.江苏优凝舒布洛克公司,江苏南京210005) [摘要】结合具体工程,对暴雨条件下自嵌式加筋挡土墙存在的变形、受力特征和稳定性进行了有限元数值模拟, 并与一般气候条件下进行对比。

结果表明:在暴雨条件下,墙体将产生较大的侧向变形;墙背土压力在加筋处明显 增大:挡土塔内部筋材之间局部出现拉应力区,材断裂后拉应力区明显扩大,存在墙面顿疆的趋势。

该结论在对 特大暴雨后加筋挡土墙局部破坏事故的现场调查后得到了验证。

[关键词】地下工程:自嵌式加筋挡土墙:数值模拟;稳定性 [中图分类号】TU476.4[文献标识码】A[文章编号]1002-8498(2012)08-0088-05 NumericalSimulation andAnalysis onStabilityofSelf-anchored ReinforcedRetainingWallUnderRainstorm Guo Junhui', Wang Songjiang', Cheng Weiguo² (1.He'nan Electric Power Surey &Design Intie,Zhengzhou,Henan450007,Chin; 2. Jiangsu Uni-sareblock Co., Ld.,Nanjing. Jiangsu 210005, China) Abstract;Combined with the practice project, the deformation characteristic and stability of sel-anchored reinforced retaining wall under rainstorm by means of finite element analysis is studied. The diferent stress and deformation features,displacement and mechanical properties of geogrids are pared with normal condition. The results show that the retaining wall has large deformation. Earth pressure at the back of wallincreased evidently on the places where stiffned by geogrid. There are some tension stress zones between geogrid in the reinforced retaining wall. And tension stress zones expand significantly afer the damage of geogrid. Above conclusion is confirmed by the field survey and analysis on collapse accident of the reinforced retaining wall after rainstorm. Key words:underground;self-anchoredreinforced retaining wall ( SRRW);numerical simulation; stability 0引言周世良等对饱水格栅加筋土挡墙的结构特征进 自嵌式加筋挡土墙(self-anchoredreinforced行了数值分析。

retainingwall,SRRW)因其工程造价低,施工简便且近年来,由于环境恶化等原因,极端气候颊繁 具有生态及景观效益而在公路、铁路、水利等工程出现,尤其是在暴雨条件下,墙顶地表水下渗,加筋 中大量推广应用。

在国外,自嵌式加筋挡土结构最土体内水位升高,使筋材及挡墙受力发生了改变, 早出现于20世纪60年代()。

国内也相继出现了对已建的自嵌式加筋挡土墙造成一定威胁。

据 相关报道3)。

目前,许多学者作了相关研究,Robern等统计发现,国外1984-1998年间出现 Chungsik Yoo”,CollinJames C",张波等对加筋的26起重大加筋土挡墙结构破坏事例中,其绝大部 挡土结构墙的破坏模式进行了研究。

栾茂田、刘分是在暴雨气象条件下发生的。

然面,针对暴雨对 华北等通过有限元数值模拟对土工格...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2015年1月下 38 CONSTRUCTIONTECHNOLOCY 第44卷第2期 DOI:10.7672/sgjs2015020038 无锡恒隆广场巨型门形钢结构安装技术 申士杰,刘洋,李立刚,潘炜 (中建一局集团建设发展有限公司,北京100102) [摘要】无锡恒隆广场综合发展项目裙楼有3个巨型门形钢结构,具有结构体型大、净空高、单根构件质量大、安装 难度大等特点,通过对巨型门形钢结构的分段、构件预拼装、钢柱吊装、桁架整体提升、安装测量、焊接顺序及楼板 加固等关键安装技术措施的分析和实施,确保了巨型门形桁架的施工工期、施工安全和经济效益。

[关键词】钢结构;桁架;预拼装;吊装;施工技术 [中图分类号】TU758.15 [文献标识码]A [文章编号]1002-8498(2015)02-0038-04 GiantDoor-shaped SteelStructureInstallation TechnologyofWuxiHenglongSquare Shen Shije,LiuYang,Li Ligang,Pan Wei (China Construction First Group Construction&Development Co.,Lid.,Beijing100102,China) Abstract;The skirt buildings of Wuxi Henglong Square prehensive development project have three giant door-shaped steel structure,which have large body,high clearance,large single ponent weight, difficult installation and other characteristics. Through the analysis and implementation for key measures of door-shaped steel structure member section,preassembly,hoisting the steel column,integral lifting of trusses,installation measurement,welding sequence and slab reinforcement, the giant door-shaped truss construction period, safety and economic benefits are assured. Key words;steel structures;trusses;preassembly;hoists;construction 1工程概况 无锡恒隆广场综合发展项目地处无锡市中心 型桁架1 巨型桁架2 区域,裙楼为大商业。

在大商业的3个人口处各有 一个独立的巨型门形钢结构桁架。

3个桁架顶标高 分别为44.484,43.360,47.100m,整体质量分别为 巨型桁架3 460,450,560t。

每个门形钢结构均由8根立柱支 撑,每端4根。

立柱规格为Φ800×30,p800×40的 钢管,柱内浇筑C40混凝土,顶部钢桁架的上下弦 和主要杆件的截面尺寸有H600×900×35×50, 图1桁架位置及效果 Fig.1 Trusses location H600×800×35×50,H400×600×20×20,[36c 等,材质为Q345B/C。

门形钢结构位置及形式如图 段组拼、安装,构件制作及安装精度要求高,施工难 1,2所示。

度大。

2工程特点与难点 3)焊缝质量要求高,钢管柱规格为$800×30, 1)构件质量大,净空高,塔式起重机起重能力 p800×40,钢梁板厚达到50mm,材质均为Q345级, 不足,楼板承载力有限,吊装方案及吊装设备选择 现场对接焊缝质量等级均为一级。

受限。

3主要施工方法 2)钢柱、钢梁均无法整体加工运输,需现场分 3.1施工方案确定 根据对现场环境及门形钢结构结构形式分析, [作者简介]申士杰,助理工程师,E-mail:shengshijie123@ [收稿日期】2014-03-28 立柱部分分段加工安装,结合构件安装高度和质 万方数据
2015 No.2 申士杰等:无锡恒隆广场巨型门形钢结构安装技术 39 分段线 分段线 47,100 成整体。

上弦高度约2.2m,长度约17.0m,重约 28.5t;下弦高度约2.1m,长度约18.0m,重约 41.900 24.5t。

如图3所示。

37.900 中间均为...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2015年10月下 66 CONSTRUCTION TECHNOLOGY 第44卷第20期 D0I:10.7672/sgj82015200066 无锡万象城圆润天幕钢结构施工技术* 曾范永12,赵邦会3,叶军3 (1.江苏建筑职业技术学院建筑工程技术学院,江苏徐州221116; 2.中国矿业大学力学与建筑工程学院,江苏徐州221008; 3.深圳市金鑫钢结构建筑安装工程有限公司,广东深圳518117) [摘要]无锡万象城圆润天幕钢结构为单层网壳结构,矩形杆件通过刚性节点连接而成,支撑由树形柱和铸钢件组 成.通过研究刚性节点及矩形杆件,形成特色制作方法.同时介绍钢结构网壳的地面拼装和吊装,利用SAP2000 结构分析设计软件对天幕钢结构的卸载过程进行相应的计算,制定合理的卸载方案,为整个工程的圆满完成提供 了重要保证. [关键词]钢结构;刚性节点;矩形杆件;卸载;施工技术 [中图分类号]TU758 [文献标识码]A [文章编号]1002-8498(2015)20-0066-03 Steel Structure Construction of Vientiane City Rounded Canopy in Wuxi Zeng Fanyong.2 Zhao Banghui Ye Jun' (1.Scholl of Civil Engineering Jiangsu Jianzhu Institute Xuzhou Jiangsu 221116 China; 2.School of Mechanics Civil Engineering China University of Mining and Technology Xuzhou Jiangsu 221008 China;3.Shenzhen Jinxin Steel Structure Building Installation Engineering Co.Ltd.Shenzhen Guangdong 518117 China) Abstract:The steel construction of Vientiane City rounded canopy in Wuxi is a single spatial grid structure.The rectangular bars are connected by rigid joints.Support is posed of tree columns and steel castings.By studying rigid joints and rectangular bars characteristic production methods formed.It also introduced ground steel mesh shell assembly and lifting and SAP2000 structural analysis and design software was used for the unloading process corresponding calculations of steel canopy which provided an important guarantee for the successful pletion of the whole project. Key words:steel structures;rigid joints;rectangular ba...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

2016年7月下 施工技术 第45卷第14期 CONSTRUCTION TECHNOLOGY 109 D0I:10.7672/8js2016140109 无轴式摩天轮结构成型施工过程分析* 陈恒超1,代跃强2,余流2.3 (1.遵义职业技术学院,贵州遵义563123;2.中国建筑第六工程局有限公司,天津300451; 3.天津市土木工程绿色建造与节能技术企业重点实验室,天津300451) [摘要]潍坊市白浪河大桥摩天轮工程采用创新的固定立体环状结构形式,是目前世界上直径最大的无轴式摩天 轮结构,实际工程少、施工经验不足.针对该工程独特的结构形式、复杂的施工方法,采用有限元分析软件MIDA/ GEN 根据“生死单元法”对该工程刚性轮盘结构成型过程进行施工过程跟踪模拟分析.结果表明:通过建立有限 元模型,对施工方案中各施工阶段进行预分析,给出了施工过程中的内力发展与变形规律,保证结构施工的安全顺 利进行. [关键词]钢结构;无轴式;摩天轮;成型施工;生死单元法;施工过程分析 [中图分类号]TU745 [文献标识码]A [文章编号]1002-8498(2016)14-0109-04 Analysis of Construction Process for Shaping the Non-spoke Type Ferris Wheel Chen Hengchao' Dai Yueqiang2 Yu Liu2.3 (1.Zunyi Professional Technology College Zunyi Guizhou 563123 China;2.China Construction Sixth Engineering Diwision Co.Ld.Tianjin 300451 China;3.Tianjin Corporate Key Laboratory of Green Construction Energy-saving Technology of Ciril Engineering Tianjin 300451 China) Abstract:The novel vertical ring-shaped structure was adopted in the architecture of Bailanghe Bridge Ferris Wheel in the Weifang city of which diameter is the largest in the world today.Considering the unique structure and difficulties to construct tracking the shaping process of rigid hub finite element analysis of construction process is implemented based on general structure analysis software MIDAS/ GEN adapting birth&death method.It is presented the internal force&deformation distribution during the shaping construction by employing nonlinear finite element method.Lots of data have been obtained as guideline...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2017年4月上 136 CONSTRUCTIONTECHNOLOGY 第46卷第7期 隧道内下穿区域前后50~100m的范围设置自动化监测点, 科技短文 主要包括沉降、水平位移和收敛3项指标,监测系统(见图 3)的主体由全站仪、计算机、自动变形监测软件、通信和供 无地面监测条件下富水软弱地层中盾构 电设备、仪器墩、基准点和监测点的棱镜组成,每个监测点自 下穿既有运营隧道变形控制 动化监测频率≥1次/10min。

1工程概况 3)试验段确定指导性施工参数基准值在有地面监测 杭州地铁4号线官河站一火车东站站区间下穿既有运 条件的位置设置试验段,根据地面沉降监测数据调整土仓压 营1号线隧道,下穿地层地基承载力为60~80kPa,孔隙比为 力、出土量、推进速度、总推力、刀盘扭矩、同步注浆配合比、 1.0~1.2,饱和度为95%~96%,具有高含水率、高压缩性、 同步注浆压力及同步注浆量等主要施工参数,以确定下一步 低强度、高灵敏度和触变特性的特点(见表1),在动力作用 盾构下穿既有运营隧道的指导性施工参数。

将累计沉降最 下极易破坏土体结构,使土体强度骤然降低,变形量增加。

大值控制在5mm内、沉降日变量控制在3mm内所选取的施 盾构下穿既有运营隧道垂直净距最小仅2.1m,为隧道直径 工参数作为下一步指导性施工参数的基准值,若地面覆土厚 的1/3,下穿隧道和既有运营隧道平面夹角约为22°,为小角 度、地层类型、地下水压力等条件发生变化时,应根据情况进 度斜交下穿。

地面位置为火车站地下广场,无地面监测条件 行相应调整。

(见图1)。

4)下穿段指导性施工参数确定根据试验段所确定的 2主要技术措施 指导性施工参数基准值,确定下穿段施工参数。

推进速度、 1)既有运营隧道钢环加固下穿施工前,首先对既有 出土量、刀盘扭矩、同步注浆配合比均按照基准值进行控制, 运营隧道采用钢环加固,该钢环采用20mm钢板制作成外 土仓压力、总推力、同步注浆压力及同步注浆量需进行调整, 径为2.75m,长、宽为0.5m的弧形支撑钢板,安装在管片 将土仓压力在基准值基础上降低0.02~0.05MPa,总推力在 内弧面(尽量避开环缝),防止管片不均匀沉降使管片螺栓 基准值基础上降低2000~5000kN,同步注浆压力在基准 拉断。

加固钢环(见图2)共分28块,其中标准件25块,异 值基础上降低0.02~0.04MPa,同步注浆量在基准值基础上 形件1块,基座2块;钢环每块之间通过3根直径18mm的 降低20%~30%,以此确定下穿施工的指导性施工参数。

8.8级螺栓连接,钢环通过锚栓与管片固定,底座固定点位 5)下穿施工根据步骤4所确定的指导性施工参数指 4个,其他固定点为2个;纵向加固采用[16b按纵向6道拉 导下穿施工,结合自动化监测数据进一步判断施工参数的合 结布置,具体位置以避开隧道内管线为原则布设,槽钢与 理性,若沉降或水平位移变化速率>3mm/d,或收敛变形> 钢环之间采用焊接连接。

2mm/d,则需调整施工参数,具体调整土仓压力、总推力、同 2)既有运营隧道内自动化监测系统设置在既有运营 表1土层物理力学性质参数 渗透系数 重度 峰值 峰值 静侧 建议地基承 含水量 饱和度空隙比 温度20℃ 层序 黏聚力内摩擦角 温度20℃ 压力系数 载力特征值 w/% S./% e K,/ (kN-m-) c/kPa /(∞) Kn/(cms-) K f/kPa (ems) ③砂质粉土 27.86 19.0 96 0.785 - - 3.15×10-4 5.31×10-4 0.37 180 ③.粉砂 24.70 19.3 94 0.707 3 36.5 5.19×10-4 8.27×10-4 0.36 220 ④,淤泥质黏土 47.30 17.0 97 1.335 14 10.0 1.86×10-4 1.59×10-4 0.56 65 黏土 40.20 17.5 95 1.151 16 12.0 3.19 ×10-4 5.48×10-4 0.52 70 粉质黏土 35.20 18.1 96 0.998 13 23.0 3.17x10- 3.90×10-4 0.53 80 ③黏土 40.20 17.4 95 1.164 23 14.0 2.35×10-4 2.69 ×10-4 0.51 90 ③淤泥质黏土 48.30 16.7 96 1.391 21 12.0 1.73×10-4 1.91 ×10-4 0.56 85 ①粉质黏土夹粉砂 20.50 20.0 92 0.601 53 18.5 0.46 200 100 火车东站 官河站 00 15.077m A. 6 8 23 18 000 620060006200 图1盾...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2012年4月上 38 CONSTRUCTION TECHNOLOGY 第41卷第362期 旋挖钻机成孔开放式后注浆灌注桩施工工艺 霍小妹 (山西四建集团有限公司,山西太原030012) [摘要]与其他成孔机型相比,旋挖钻机具有施工效率高、操作自动化程度高、垂直度控制好的优点.以实际工程 为例,介绍了旋挖钻机成孔和灌注桩后注浆施工的工艺特点,工艺原理,工艺流程,操作要点,注意事项和质量控制 措施.工程实践表明,灌注柱后注浆对于加固桩底沉渣及桩侧泥皮有非常好的效果,较大幅度提高了桩端、柱侧 阻力. [关键词]地下工程;柱基础;灌注桩;旋挖钻机;后注浆;施工工艺 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2012)07-0038-03 Construction Technology of Rotary Bored Pile with Open Post-grouting Huo Xiaomei China Shanxi Sijian Group Co.Ltd.Taiyuan Shanxi 030012.China) Abstract:Compared with other pore-forming machine types rotary drilling rig has advantages such as high construction efficiency high operation automation and verticality controlling easy.Based on some engineering the author introduces technological characteristics technological principle technological process operation points and quality control measures.Engineering practice shows that post-grouting of bored piles has good effect on strengthening piles and improving resistance of pile tip and pile side. Key words:underground;piles;bored piles;rotary drilling rig;post-grouting;construction 1工程概况 广的10项新技术之一. 运城恒大绿洲16~18号楼,拟建建筑物为地上3工艺原理 17层,设计采用桩基础,共布置钢筋混凝土灌注桩 1)旋挖成孔是通过钻机自有的行走功能和桅 258根,设计有效桩长36m、柱径700mm.采用旋挖 杆变幅机构使钻具能正确就位,利用桅杆导向下放 钻机成孔开放式后注浆工艺,桩端注浆量为 钻杆并将底部带有活门的桶式钻头放置到孔位,钻 1500kg 桩侧为750kg.场地土层主要为粉土、粉质 机动力头装置为钻杆提供扭矩,加压装置通过加压 黏土,稳定水位埋深为地表下6m左右. 动力头的方式将加压力传递给钻杆钻头,钻头回转 2工艺特点 破碎岩土,并直接将其装入钻头内,然后再由钻机 1)旋挖钻机成孔效率高,带有垂直度自动检测 提升装置和伸缩式钻杆将钻头提出孔外卸土,这样 调整、孔深数码显示等,整机操纵一般采用液压先 循环往复,不断地取土、卸土,直至钻至设计深度. 导控制、负荷传感,具有操作轻便、舒...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2011年10月上 64 CONSTRUCTION TECHNOLOGY 第40卷第350期 旋喷搅拌加劲桩桩-土摩阻力试验检测分析 陈先军1,刘全林2 (1.安徽理工大学土木建筑学院,安徽淮南232001;2.上海强劲基础工程技术咨询有限公司,上海200235) [摘要]通过对旋喷搅拌加劲桩桩体与土体之间摩阻力试验,得出了旋喷搅拌加劲桩高压旋喷作用使一定范围内 的土体结构发生重新组合,形成一种新型的水泥土互嵌式结构,改善了土体的力学性质,增大了周围土体的重度、 黏聚力和内摩擦角,给出了桩体与地层土体之间的摩阻力计算分析方法.通过对检测数据的反演,优化了旋喷搅 拌加劲桩桩土间摩阻力强度计算公式,对加劲桩支护结构设计中的取值具有重要意义. [关键词]地下工程;桩基;旋喷搅拌加劲桩;试验;摩阻力 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2011)19-0064-03 Analysis on Friction Resistance Test Between Jet Mixing Anchor Pile and Soil Chen Xianjun' Liu Quanlin2 (1.School of Civil Engineering and Architecture Anhui University of Science and Technology Huainan Anhui 232001 China; 2.Shanghai Qiangjin Engineering and Technology Consulting Co.Ltd.Shanghai 200235 China) Abstract:Based on friction resistance test between jet mixing anchor pile and soil the authors get that soil structure reorganizes in certain range by high pressure jet and mutual embedded structure of cement and soil forms which improves mechanical properties and increases the specific weight cohesion and internal friction angle.Meanwhile the authors propose the calculation method of friction resistance test between pile and soil.According to inversion analysis of detection data formula of friction resistance strength is optimized which is significant for value in structure design of anchor pile. Key words:underground;piles;jet mixing anchor pile;test;friction 1旋喷搅拌加劲桩桩体与土体之间摩阻力的选取 参考价值.但必须注意二者在工作性质、施工方 旋喷搅拌加劲桩桩体与地层土体之间的摩阻 法、工作时间长短等方面的差异等. 力不仅决定了旋喷搅拌加劲桩的锚固力,而且体 2)借助...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2015年8月上 102 CONSTRUCTION TECHNOLOGY 第44卷第15期 D01:10.7672/8gjs2015150102 新疆乌鲁木齐冰上运动中心制冰系统研究与应用* 徐贵娥1,成军,于建2,张赤宇2 (1.南通大学建筑工程学院,江苏南通226019;2.南通四建集团有限公司,江苏南通226300) [摘要]新疆鸟鲁木齐冰上运动中心制冰系统采用环保、高效、节能冷媒R404A 采用间接制冷的方式,乙二醇溶液 作为载冷剂,通过设计和计算,优化了冰上运动中心制冰系统参数,确定了最高制冰负荷,将制冰系统主要设备的 混凝土惯性基座浇筑在钢梁或槽钢制成的钢框架内并采用隔振器,使系统运行安全、稳定,降低了运行风险并节省 了维护成本. [关键词]制冰系统:间接制冷;优化;设计:降噪减振 [中图分类号]TU81 [文献标识码]A [文章编号]1002-8498(2015)15-0102-03 Research and Application of Ice Making System for Urumqi Ice Sports Center in Xinjiang Xu Guie' Cheng Jun' Yu Jian2 Zhang Chiyu2 (1.College of Civil Engineering Nantong Unirersity Nantong Jiangsu 226019 China: 2.Nantong Sijian Construction Group Co.Ltd.Nantong Jiangsu 226300 China) Abstract:Ice making system of Urumqi Ice Sports Center in Xinjiang uses the environmental protection high efficiency energy-saving refrigerant R404A.Through indirect refrigeration ethylene glycol solution is used as refrigerant.By the design and calculation this paper optimizes the ice making system parameters of the ice sports center and determines the maximum ice making quantity.The concrete basement of main equipment for ice-making system is poured in steel frame making of steel beam or U- steel.The mentioned measures are adopted to ensure the safety operation stability of the ice making system and reduce the risk and save the cost. Key words:ice making system;indirect refrigeration;optimization;design;noise and vibration reduction 1工程概况 新疆乌鲁木齐冰上运动中心位于乌鲁木齐南 郊农12师104团牧一场地段,包括速滑馆 (28790m2)、冰球馆(...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2015年8月上 26 CONSTRUCTION TECHNOLOGY 第44卷第15期 D0I:10.7672/8js2015150026 新疆乌鲁木齐冰上运动中心人工冰场施工技术* 刘加华,张赤宇2 (1.江苏工程职业技术学院建筑工程学院,江苏南通226007; 2.南通四建集团有限公司,江苏南通226300) [摘要]结合新疆乌鲁木齐冰上运动中心人工冰场大型冰场项目实践,从冰场地层结构施工、F2级抗冻混凝土配 制、浇筑和场地平整精度控制等环节进行设计和优化,保证工程各项指标满足现行的国际标准及国家规范的要求, 降低了运行成本和维护费用、节能环保. [关键词]混凝土;人工冰场;抗冻混凝土;平整精度;环保 [中图分类号]TU71 [文献标识码]A [文章编号]1002-8498(2015)15-0026-03 Construction Technology of Artificial Ice Rink of Urumqi Ice Sports Center in Xinjiang Liu Jiahua Zhang Chiyu2 (1.College of Ciril Engineering Jiangsu College of Engineering and Technology Nantong Jiangsu 226007 China; 2.Nantong Sijian Construction Group Co.Lid.Nantong Jiangsu 226300 China) Abstract:Combining with artificial ice rink projeet of Urumqi Ice Sports Center in Xinjiang this paper introduces the construction of ice formation structure preparation and grouting of F200 anti-freeze concrete and control of field leveling precision and other aspects of design and optimization.The construction goals can meet the current international standards and Chinese standards and reduce the operating cost and maintenance cost moreover the technology is energy saving and environmental protection. Key words:concrete;artificial ice rinks;anti-freeze concrete;leveling accuracy;environmental protection 1工程概况 新疆乌鲁木齐冰上运动中心位于新疆维吾尔自 治区乌鲁木齐县水西沟乡,农十二师104团牧一场地 段,是第十三届全国冬运会的主场馆(见图1).冰上 运动中心包括速滑馆(建筑面积28790m2)、冰球馆 (建筑面积17767m2)、冰壶馆(建筑面积7472m2). 其中,冰球馆包含2块国际标准冰壶道,冰面均为 1830m2(61m×30m);冰壶馆含4条国际标准冰壶 图1新疆乌鲁木齐市冰上运动中心建筑效果 道,每条冰壶道长45.72m×5.0m 冰...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

2017年3月上 施工技术 第46卷第5期 CONSTRUCTION TECHNOLOGY 133 D0I:10.7672/9gjs2017050133 新沈阳南站中央站房大跨度拱形平面 钢桁架施工技术 邓凯1,张乐群2,郭刚2,丁建军 (1.中铁建工集团有限公司北京分公司,北京100081;2.沈阳铁路局沈阳框纽 工程建设指挥部,辽宁沈阳110000) [摘要]新建铁路沈阳南站中央站房屋盖采用大跨度拱形平面桁架的结构形式,通过对分段吊装与双机抬吊两种 施工方案的优劣进行详细对比,最终选择了分段吊装的施工方案.通过该方案的实施,在保证施工质量与安全的 同时,缩短了工期. [关键词]钢桁架;分段吊装;拱形平面;数值模拟;施工技术 [中图分类号]TU758.11 [文献标识码]A [文章编号]1002-8498(2017)05-0133-04 Construction Technology of the Steel Truss with Large-span Arched Plan for the Central Station Building of New Shenyang Southern Station Deng Kai' Zhang Lequn2 Guo Gang? Ding Jianjun' (1.Beijing Branch of China Railway Construction Engineering Group Co.Ltd.Beijing 100081 China; 2.Shenyang Pivotal Project Construction Headquarters of Shenyang Raileay Bureau Shenyang Liaoning 110000 China) Abstract:The central station building of New Shenyang Southern Station uses the steel truss structure with large-span arched plan.After primary determination the segment hoisting scheme and double- machine lifting-hanging scheme are determined.Through detailed parison finally segment hoisting scheme is used.With the implementation of the scheme the construction quality and safety are ensured at the same time the scheme shortens the construction period. Key words:steel trusses;segment hoisting;arched plan;simulation;construction 1工程概况 沈阳南站位于沈阳市大浑南地区,三环高速南 侧、沈营街西侧,东侧与沈阳桃仙机场相邻,为沈阳 市铁路枢纽“三主一辅”客运布局的重要一环.中 央站房钢结构包含夹层、房中房及屋面桁架等.屋 顶结构标高为37.500m 高架层结构标高为 图1中央站房钢结构 8.745m 夹层结构标高为16.400m.中央站房的结 Fig.1 Steel structure of the central...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

施工技术 2016年4月上 92 CONSTRUCTION TECHNOLOGY 第45卷第7期 D0I:10.7672/8js2016070092 新方法处理高填方黄土地基的室内试验研究* 殷鹤12,黄雪峰1 2,张彭成3,周俊鹏1.2 (1.后勤工程学院军事土木工程系,重庆401311;2.后勤工程学院岩土力学与地质环境保护重庆市 重点实验室,重庆401311;3.后勤工程学院化学与材料工程系,重庆401311) [摘要]结合室内试验提出了处理高填方黄土地基新方法的工艺流程及技术要求,并揭示了其固化机理.室内试 验以石灰为改性材料、硫酸钠为辅料掺人土中,对混合土料进行压实,再对压实土样施加一定强度的外加电场处 理.养护完成后对土样进行无侧限压缩试验、高压周结试验与湿陷试验.试验结果表明:混合土料经电场处理后, 养护龄期短、抗压强度高、压缩性低,能够在低压实度条件下消除湿陷性. [关键词]地基:黄土:化学改性;外加电场:试验 [中图分类号]TU472.5 [文献标识码]A [文章编号]1002-8498(2016)07-0092-03 Experimental Study on Improved Loess High Fill Foundation by a New Method Yin He.2 Huang Xuefeng.2 Zhang Pengcheng Zhou Junpeng1.2 (1.Department of Ciril Engineering Logistic Engineering University Chongqing 401311 China;2.Chongging Key Laboratory of Geomechanics Geoenvironmental Protection Logistic Engineering Unirersity Chongging 401311 China; 3.Department of Chemistry and Material Engineering Logistic Engineering Unizersity Chongging 401311 China) Abstract:Combined with laboratory experiment this paper proposed process flow and technical requirements of a new method to improve loess high fill foundation and revealed its improving mechanism.Proper amounts of lime and sodium sulfate were added to the soil as stabilizers.Compacted the mixture and then imposed a certain intensity of electric field on it.After curing unconfined pression tests high pressure pression tests and collapsibility tests were carried out.The results show that the engineering properties of the mixture such as its unconfined pres...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)