CONSTRUCTIONTECHNOLOGY第43卷第7期 DOI:10.7672/sgjs2014070022 武汉某工程裙楼地下室半逆作施工技术 程海寅,楼国栋,方忠民 (中天建设集团有限公司,浙江杭州310008) [摘要】结合武汉某工程实际情况,在施工中采取裙楼地下室半逆作,主楼、裙楼后顺作的施工技术。
从地下连续 墙成槽质量控制、土方开挖、高低跨处防水及支模、基坑降水、一柱一桩施工等方面对该技术进行了详细介绍。
工 程实践结果表明,该方法取得了良好的效果。
[关键词]地下工程;逆作法;地下连续墙;降水;施工技术 [中图分类号]TU753[文献标识码]A【文章编号]1002-8498(2014)07-0022-04 Construction Technology of Semi-inverseMethod of SkirtBuildingBasement of Some EngineeringinWuhan Cheng Haiyin,Lou Guodong,Fang Zhongmin (Zhongtian Construction Group Co.,Lad.,Hangzhou,Zhejang 310008,China) Abstract:Based on the engineering practice in Wuhan,construction technology of semi-inverse method of skirt buildingbasement and then constructed mainbuilding and skirtbuilding.Thispaperintroduced the technologyfromforming solt quality control,soilexcavation,waterproofing and formwork setting inhigh and lowstride,dewatering,construction ofone column withone pile.Engineeringpractice showed that this technology obtained good effect. Key words:underground; top-down method;diaphragm wall; dewatering; construction 1工程概况 武汉市老浦片商业及住宅项目工程总建筑面 积267000m²,建筑总高度139m,由3层地下室(局 部2层),6层裙楼主楼及3栋41层住宅塔楼组成。
该工程基坑面积30000m²,地下室面积86000m², 普挖深度为18.85m,基坑等级为一级。
该工程设计 ±0.000相当于绝对标高25.500m,周围场地绝对 标高为23.000m,项目如图1所示。
2工程地质条件图1工程效果图 1)根据地质勘探资料,本场地土质大致分为5Fig.1 Engineering effect 个主要工程地质层,如表1所示。
2)根据地质勘探报告,拟建场区地层属长江1水体水力联系密切,水量丰富,其上覆②层黏性土 级阶地,地下水类型主要为填土层中的上层滞水和层为相对隔水顶板,下伏粉砂质泥岩为相对隔水层 砂层中的孔隙承压水两种类型。
上层滞水主要赋底板。
勘察期间于抽水试验观测井中量测到承压 存于①层杂填土中,大气降水、地表水和生产、生活水稳定水位在地面下11.19m,相当于标高 用水渗人是其主要的补给来源,无统一自由水面,13.020m。
根据区域水文资料表明,武汉地区长江1 水量与周边排泄条件关系密切。
孔隙承压水主要级阶地砂土砾石层中的承压水水头高度年变化幅 赋存于砂层、圆砾层中,即③,④单元层中,与长江度在3.0~5.0m。
孔隙承压水历史最高水位为 21.0m。
勘察期间测得混合水位埋深1.4~2.6m, [收稿日期]2013-10-23[作者简介]程海寅,高级工程师,E-mil:@qq.相当于标高21.510~22.560m。
万方数据
2014 No.7程海寅等:武汉某工程裙楼地下室半逆作施工技术23 表1工程地质条件利用土地资源。
Table 1 Engineering geological condition5)工期相对宽松 土层顶板埋深/m厚度/m工程特性本工程业主工程款的划拨须同时满足工程节 ①杂填土1.00~松散,高压缩性点及时间节点要求,加上工期相对宽松及主楼结构 6.20 ②黏1.00 ~4.10 ~可塑,中等偏高的特殊性,经综合考虑决定采用主楼后顺作施工。
6.2011.70压缩性为节约因采用全...