首页 > 2023 ( 第 461 页)

2015年10月上 施工技术 第44卷第19期 CONSTRUCTION TECHNOLOGY 113 D0I:10.7672/8js2015190113 六步双侧壁导坑施工步序优化分析 李凌宜1,董亥兴,阳文华1,阳军生2,石宇2 (1.北京市政路桥股份有限公司,北京100068;2.中南大学土木工程学院,湖南长沙410075) [摘要]依托长沙市轨道交通2号线某工程,结合现场实际,对传统的双侧壁导坑法施工步序进行优化调整设计, 在数值分析的基础上,比较2种不同的开挖步序对围岩和支护结构的位移以及工字钢内支撑的内力进行比较分 析,得到优化改进后的双侧壁导坑施工工序是可行的. [关键词]隧道工程;地铁;双侧壁导坑法;优化:数值分析 [中图分类号]U455.4 [文献标识码]A [文章编号]1002-8498(2015)19-0113-04 Optimization Analysis of Construction Process of Double Side Slope Method by Six Steps Li Lingyi' Dong Haixing' Yang Wenhua' Yang Junsheng? Shi Yu2 (1.Beijing Municipal and Highway Bridge Co. Lid.Beijing 100068 China;2.School of Ciril Engineering Central South Unirersity Changsha Hu'nan 410075 China) Abstract:Based on some project of Changsha Rail Transit Line 2 bined with the actual conditions the traditional existing double side slope method construction step sequence was optimized and adjusted. Based on the numerical analysis this paper pared the displacement of surrounding rock and support structure with two different exeavation step sequence analyzed the internal force of I-shaped section steel support.Results show that the improved double side wall pilot tunnel construction process is feasible. Key words:tunnels;subways;double side slope method;optimization;numerical analysis 0引言 围岩的扰动. 文献[14]所提到的双侧壁导坑的开挖顺序1工程概况 为:左侧壁上导坑开挖及初支→左侧壁下导坑开挖 湾镇站停车区间位于枫林路与深湾路交叉 及初支一→右侧壁导上坑开挖及初支→右侧壁下导 路口,靠枫林路北侧设置.枫林路地面现状为双向 坑开挖及初支→中导坑上部环形台阶开挖及拱部 六车道,车流量较大;湾镇为双向四车道,车流量 初支→中导坑核心土开挖,中导坑上台阶开挖一→中 较小.站前停车线区间采用明暗挖相结合的方法 导坑下台阶...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年6月上 施工技术 第40卷第342期 CONSTRUCTION TECHNOLOGY 全预制装配整体式剪力墙结构节点连接施工技术 陈耀钢1,郭正兴2,董年才,朱张峰2 (1.南通建筑工程总承包有限公可,江苏门226124;2.东南大学土木工程学院,江苏南京210096) [摘要]全预制装配整体式剪力墙结构(PC)剪力墙、柱、电梯井、阳台、空调板、雨篷等构件果用工厂化预制生产, 预留注浆管及节点钢筋;梁、板等水平构件采用工厂化预制生产叠合梁、板,预留上层钢筋及端部节点钢筋.通过 现场吊装、注浆管浆错节点观浇形成整体结构体系.述了该结构体系的技术特点、适用范围.重点介绍了NPC 现场施工的关键施工技术,包括定位放线,竖向铜筋校正,构件吊装、固定、校正,浆锚节点施工,养护等. [关键词]全预制装配整体式剪力墙;节点连接;浆错节点 【中图分类号]TU756.45 [文献标识码]A [文章编号]1002-8498(2011)11-0003-03 Joint Connection Construction Technology of the New Precast Concrete Shear Wall Structure Chen Yaogang' Guo Zhengxing? Dong Niancai' Zhu Zhangfeng? (1.Nantong Construction General Contractor Co.Ltd.Haimen Jiangsu 226124 China; 2.School of Ciuil Engineering Southeast University Nanjing Jiangsu 210096 China) Abstract:The ponents of shear wall column elevator shaft balcony air conditioning board and canopy in the new precast concrete shear wall structure are prefabricated in factory in which grouting pipe and joint steel bars are reserved.In addition the horizontal ponents such as beam and slab are also prefabricated in factory into posite beams and slabs in which upper and ending joint steel bars are reserved.Through hoisting on site cast-in-situ concrete of slurry and anchor joint the structure is formed integral system.The technology characteristics and application scope of this structure are described.Furthermore key construction technologies on site such as location and positioning correction of vertical steel bars hoisting fixation and correct...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年6月上 16 CONSTRUCTION TECHNOLOGY 第40卷第342期 全预制装配整体式剪力墙结构抗震性能研究 陆建忠1,郭正兴2,董年才,朱张峰2 (1.南通建筑工根总承包有限公司,江苏海门226124;2.东南大学土水工程学院,江苏南京210096) [摘要]为研究全预制装配整体式剪力墙结构(NPC)的抗震性能,以江苏海门中南世纪城33号楼为例,进行了1/2 模型设计与振动台试验,采用低周反复加载试验手段,掌握框架的裂缝开展、出饺顺序、破坏过程和破环形态,分析 全预制装配短肢剪力墙结构的破坏机制承载能力、变形、滞回特性、耗能能力等结构特性,并与现浇混凝土框架结 构比较.结果显示,两种结构体系性能相近. 【关键词]全预制装配整体式剪力墙;抗震性能;模拟试验 [中图分类号]TU756.45 [文献标识码]A 【文章编号]1002-8498(2011)11-0016-04 Seismic Performance Study on the New Precast Concrete Shear Wall Structure Lu Jianzhong' Guo Zhengxing? Dong Niancai' Zhu Zhangfeng2 (1.Nantong Construction General Contractor Co.Ld.Haimen Jiangsu 226124.China; 2.School of Cisil Engineering Southeast University Nanjing Jiangsu 210096 China) Abstract:In order to study the seismic performance of the new precast concrete shear wall structure taking Zhongnan Century City project for example half model design and shaking table experiment were carried out.Through low-cycle repeated loading the crack development of frame appearance sequence of articulated joint destructive process and modes are pointed out meanwhile the destructive mechanism bearing capacity deformation hysteretic properties and energy dissipation performance of the new precast concrete shear wall structure are analyzed which are pared with cast-in-situ concrete frame structure.The results show that both of the performances are similar. Key words:the new precast concrete shear wall;seismic performance;simulation experiment 全预制装配(PC)技术作为一项成熟的混凝土土叠合梁、板,通过预埋件、预留插孔灌浆、...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年6月上 施工技术 第40卷第342期 CONSTRUCTION TECHNOLOGY 全预制装配整体式剪力墙结构外墙保温技术研究 汤磊1,郭正兴1,董年才2,陈云钢1 (1.东南大学土木工程学院,江苏南京210096:2.南通建筑工程总承包有限公司,江苏海门226124) [摘要]“构件工厂化生产,施工装配式运作”是预制装配式混凝土结构的两大特点.现有的外墙保温有自保湿、内 保温和外保温3种形式,目前大力推广的是外保温.结合国内预制装配式混凝土结构的几个试点工程外墙外保温 形式,从饰面层、抹面层、保温层、错栓的运用以及防火角度、拼装过程、预制外墙板如何实现与主体结构的同寿命 等几方面述了预制装配式混凝土结构外墙保温技术的发展思路. [关键词]全预制装配整体式剪力墙;外墙保温:保湿层;技术研究 [中图分类号]TU756.4 [文献标识码]A [文章编号]1002-8498(2011)11-0013-03 Exterior Wall Insulation Technology Research of the New Precast Concrete Shear Wall Structure Tang Lei' Guo Zhengxing' Dong Niancai? Chen Yungang' (1.School of Ciuil Engineering Southeast Unicersity Nanyjing Jiangsu 210096 China; 2.Nantong Construction General Contractor Co.Lid.Haimen Jiangu 226124.China) Abstract:Factory production of ponents and assembled operation for construction are characteristics for the new precast concrete structure.At present there are three kinds of exterior wall insulation methods for self-insulation external and internal insulation in which extemal insulation is extensively used.Combined with several exterior wall extemal insulation styles of pilot projects from the aspects of the application of dedicated layer plaster layer insulation layer and anchor as well as anti-fire performance assembling process and how to assure the similar life of precast plate with main structure the development ideas for the new precast concrete shear wall structure are described. Key words:the new precast concrete shear wall;exterior wall insulation;insulatio...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年6月上 20 CONSTRUCTION TECHNOLOGY 第40卷第342期 全预制装配整体式剪力墙结构墙板 节点抗震性能仿真分析 郭正兴1,董年才2,朱张峰1 (1.东南大学土水工程学院,江苏南京210096;2.南通建筑工程总承包有限公司,江苏海门226124) [摘要]剪力墙与板节点的可靠性是保证板发挥横隔作用,使各剪力墙板、协同工作,形成空问受力体系的关键. 在已完成试验的基础上,结合有限元方法,对可能影响其抗震能力的多种参数,包括剪力墙轴压比,连接钢筋强度、 直径、数量及长度,以及板受力纵筋配筋率等,进行了详细分析和比较.指出全预制装配整体式剪力墙结构墙板节 点的抗震能力主要由连接钢筋的配置情况及其与板扰弯能力的协调作用效果决定. [关键词]全预制装配整体式剪力墙;剪力墙与板节点;抗震性能;有限元分析 [中图分类号]TU756.4;TU311.41 【文献标识码]A[文章编号]1002-8498(2011)11-0020-03 Simulation Analysis on Seismic Performance of Wall and Floor Joint in the New Precast Concrete Shear Wall Structure Guo Zhengxing'.Dong Niancai? Zhu Zhangfeng' (1.School of Civil Engineering.Southeast Unisersity Nanjing Jiangsa 210096 China; 2.Nantong Construction General Contractor Co.Lad.Haimen Jiangsu 226124 China) Abstract:Reliability of shear wall and floor joint is the key for ploor to play transverse partition effect and make coordinated working with shear wall to form spatial force system.On the basis of finished tests and bining with finite element method detailed contrast and analysis has been done on various parameters affecting the joints'seismic capacity including different axial pression ratio of shear wall the strength diameter quantity and length of connection steel bar as well as the reinforcement ratio of floor.It is pointed out that the seismic performance of wall and floor joint for the new precast concrete shear wall structure is decided by the setting situation of connection steel bars and its coordinated working with m...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年5月上 施工技术 第41卷第364期 CONSTRUCTION TECHNOLOCY 87 全预制装配整体式剪力墙结构体系空间 模型抗震性能研究 陈锦石,郭正兴2 (1.南适建筑工程总承包有限公司,江苏海门226124; 2.东南大学土木工程学院,江苏南京210096) [摘要]全预制装配整体式剪力墙结构(NPC)是适应我国“建筑工业化、住宅产业化”进程的一种新型结构体系. 对全预制装配整体式剪力墙结构1/2缩尺比例4层空间模型进行了低周反复荷载试验,试验结论如下:试件承载 力及刚度远高于规范要求及设计结果,试件屈服荷载远高于设计地震剪力,试件在中震下保持弹性,同时可满足大 震不倒的设防日标. [关键词]住宅产业化:预制装配整体式剪力墙结构;空间模型;抗震 [中图分类号]TU317 [文献标识码]A [文章编号]1002-8498(2012)09-0087-03 Seismic Performance Study on Space Model of the New Precast Concrete Shear Wall Structure Chen Jinshi' Guo Zhengxing? (1.Nantong Construction General Contractor Co.Lad. Haimen Jiangsu 226124 China; 2.School of Civil Engineering Southeast Unizersity Nanjing Jiangs栋210096,China) Abstract:The new precast concrete shear wall structure (NPC)is a new kind of structure system which adapts to the development of building and residence industrialization.Low-cycle repeated loading test of a 1/2 scale model of four-floor NPC structure is carried out.The test conclusion is that load capacity and rigid of the model is far higher than ones of code requirement and design result yielding load is much higher than design seismic shear and the test specimen also keeps elastic under moderate earthquake condition and meets the prevention requirement of no collapsing under strong earthquake. Key words:residence industrialization;the new precast concrete shear wall structure(NPC);space model:seismic 1结构体系概述 及概念进行加强,存在一定主观性和随意性,制约 对预制装配整体式剪力墙结构体系而言,其特其进一步推广、应用. 征为竖向构件的剪力墙、柱、电梯井采用预制形式, 因此,有必要通过试验了解该结构在地震作用 水平构件的梁、板采用...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年7月 96 CONSTRUCTION TECHNOLOGY 第39卷第7期 全预制装配整体式剪力墙结构住宅施工技术 张军,侯海泉,董年才,陈洪杰,郭正兴2 (1.南通建筑工程总承包有限公司,江苏南通226124;2.末南大学土木工程学院,江苏南京210096) [摘要]全预制装配整体式剪力墙结构(PC体系)技术是一种新型结构体系,其竖向构件剪力墙、柱采用预制,水 平构件梁、板采用叠合形式;竖向构件连接节点采用浆错连接,水平构件与竖向构件连接节点及水平构件间连接节 点采用预留钢筋叠合现浇连接,形成整体结构体系.以南通市海门中南世纪城33号楼为试点,介绍其施工技术. [关键词]全预制装配整体式剪力墙结构;钢筋混凝土:施工技术 [中图分类号]TU528 [文献标识码]A[文章编号]1002-8498(2010)07-0096-03 Construction Technology on Full-prefabricated Assembly Integral Shear Wall Structure Residence Zhang Jun' Hou Haiquan' Dong Niancai' Chen Hongjie' Guo Zhengxing? (1.Nantong Construction General Contractor Co.Iad.Nantong Jiangsu 226124 China; 2.School of Civil Engineering Southeast University Nanjing Jiangsu 210096 China) Abstract:Full-prefabricated assembly integral shear wall structure is a new kind of structure system i.e. NPC system of which some vertical members such as shear wall and columns are prefabricated and connected by mortar and bolt some horizontal members such beam and floor adopt overlapped style and the connection nodes of horizontal and vertical members or horizontal members is poured on-site with pre- buried steel bar.In this article the authors introduce construction technology of this system used in No. 33 building in Zhongnan Shijicheng project in Haimen Nantong city. Key words:full-prefabricated assembly integral shear wall structure;reinforced concrete;construction technology 1工程概况 点及叠合板混凝土浇筑. 江苏省南通市海门中南世纪城33号楼地下1层,3.2定位放线 地上10层,高32.50m 总建筑面积4556m2 剪力墙结 主控线经校正无误后,采用经纬仪将主控线引测 构.基础及地...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年11月上 施工技术 第42卷第21期 CONSTRUCTION TECHNOLOGY 109 D0:10.7672/sgj82013210109 全预制装配式别墅项目结构施工技术* 王力尚,余涛,王建英,朱建潮,姚宏2 (1.中建中东有限公司;2.青岛市建筑工程质量监督站,山东青岛266071) [摘要]通过介绍全预制装配式别墅项目结构施工技术的施工要点、适用范围、工艺原理和流程,阐述了相应的环 保措施、安全措施、质量控制措施等.全预制装配式体系的应用,可节约大量资源,缩短工期、减少现场施工工人和 管理人员,取得了良好的经济和社会效益. [关键词]混凝土;别墅;全预制装配式;施工技术 [中图分类号]TU758.1 [文献标识码]A [文章编号]1002-8498(2013)21-0109-04 Structural Construction Technology for Prefabricated Villas Projects Wang Lishang' Yu Tao' Wang Jianying' Zhu Jianchao' Yao Hong (1.China State Construction Engineering Corporation Middle East L.L.C.; 2.Qingdao Construction Engineering Quality Supervisory Station Qingdao Shandong 266071 China) Abstract:This paper introduces the structural construction technology of prefabricated villas projects including key points of construction scope of application process principle and procedures.It illustrated the corresponding measures in environment protection safety and quality control.Using the prefabricated systems can save a lot of resources reduce the construction period and reduce the number of workers and management staffs on site especially achieving greater economic and remarkable social benefits. Key words:concrete;villas;prefabricated;construction 0引言 承包商的压力. 当大批建设相同或类似户型的建筑物或建筑 3)通过对构件模板的构造设计,易实现建筑物 物中大量重复出现规格相同的建筑构件时,如户型 外表面凹陷花纹等特色设计风格. 简单、单一的别墅群项目建设,在设计、施工过程中 4)预制构件完成面光洁美观,如室内墙面可直 采用预制构件体系,能够实现预制构件场外批量工 接上漆,省去砌筑、抹灰等工序的同时能够增加室 厂化生产,大幅节省工程建设工期和现场劳动力等 内实际使用面积. 资源投人,取得节省工程造价的效果.近年来建筑 5)预制构件可以在远离现场的工厂车间完成, 市场扩展迅速,大规模别墅群建设项目层出...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2017年7月上 50 CONSTRUCTION TECHNOLOGY 第46卷第13期 D0I:10.7672/8js2017130050 全逆作深基坑土方开挖关键技术 高海彦,丁志录,张洪波 (中国建筑第八工程局有限公司天津分公司,天津300452) [摘要]基于中信城市广场项目的特殊开发背景,介绍了该工程逆作土方开挖施工的关键技术内容,包括出土口的 选择,土方开挖方式,板下长距离水平倒土方式等.重点针对出土口被封闭后,盖挖板下长距离水平倒土时出现的 土体液化等难题,介绍了解决难题过程中先后采取的应对措施. [关键词]深基坑;逆作法;土方开挖;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2017)13-0050-04 Earth Excavation Technology of Deep Foundation Excavation with Top-down Method GAO Haiyan DING Zhilu ZHANG Hongbo (China Construction Eighth Engineering Division Co.Ltd.Tianjin) Tianjin 300452 China) Abstract:Base on Zhongxin Plaza engineering practice this paper introduced key technologies of earth excavation with top-down method including soil outlet choice excavation way soil dumping. Countermeasures for soil liquefaction in long distance horizontal dumping after excavated mouth sealing were introduced in detail. Key words:deep foundation exeavation;top down method;soil exeavation;construction 0引言 下室为全逆作施工,基坑三面均为地下连续墙,另 近年来,我国城市建设飞速发展,地处城市中 一面为二期基坑.首开区与二期R1 R2之间基坑 心、城市主要景观带一线的建筑,因其开发建设速 完全贯通,需协同开挖;首开区与二期R3 R4之间 度直接关系城市形象的快速改观,受到了地方政府 采用支护桩分割,可分别独立施工.首开区地下连 的高度关注. 续墙兼作结构外墙,墙厚800mm、有效墙深30.9m 天津中信城市广场(首开区)工程,位于天津市 (非人防范围)/33.5m(人防范围).基坑内支撑为 海河沿岸,建筑面积约18万m2 其中地上6层,建 地下室各层结构梁板,层高均为4.2m.与二期R1 筑面积6万m2 地下3层,建筑面积12万m2 地上R2相邻范围首开区土方采用“侧向掏挖”的方式, 为框支剪力墙结构,地下为框架结构. 与二期土方协同开挖.首开区与二期R3 R4相邻 该工程地处天津市市中心海河景观带沿线,被 范围采用“地下室结构板预留出土口、分步倒土”的 列为市重点工程之一,为实现沿河面建筑立面快速 方式进行土方开挖,如图1所示. 呈现的目标,工程要求首先施工地上结构、沿河面 期R1.R2 二期R3 D栋 二期R4 幕墙及室外铺装,在此期间插人地下全逆作土方开 首开区(侧向掏挖区) 首开区...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年6月上 施工技术 第42卷第11期 CONSTRUCTION TECHNOLOGY 35 D0I:10.7672/8gjs2013110035 全自动液压滑架及倒模多层大平台作业体系的应用 汤怀,计中彦,卢道勇 (贵州省公路工程集团有限公司,贵州贵阳550008) [摘要]随着公路交通的高速发展,对桥梁施工的成本、质量、安全、进度要求越来越高.在确保安全、质量的前提 下,对如何加快高墩的施工进度进行了探索研究,在传统滑模、爬模、提升翻模、倒模优点的基础上进行改进,自行 设计了全自动液压滑架及倒模多层大平台作业体系,该作业体系具有施工速度快、安全、经济等特点,成功应用于 赫章大桥高墩施工. [关键词]模板;桥梁工程;刚构箱梁桥;桥墩;滑架;施工技术 [中图分类号]TU755.22;U448.23 [文献标识码]A [文章编号]1002-8498(2013)11-0035-04 Application of Multi-layer Large Platform Operations System for Automatic Hydraulic Sliding Framework and Reciprocal Formwork Tang Huai Ji Zhongyan Lu Daoyong (Guizhou Highway Engineering Group Co.Ltd.Guiyang Guizhou 550008 China) Abstract:Construction cost and quality and safety and progress for bridge construction are required higher and higher with rapid development of highway traffic.The authors analyze how to accelerate construction progress of high piers on the condition of ensuring safety and quality.On the basis of traditional sliding formwork and climbing formwork and lifting turnover formwork and reciprocal formwork multi-layer large platform operations system for automatic hydraulic sliding framework and reciprocal formwork is designed which has some characteristics including quick construction safety economy and so on.The operations system is used in high pier construction of Hezhang Bridge. Key words:formwork;bridges;rigid frame box girder bridges;bridge piers;sliding framework;construction 1工程概况 薄壁墩,底面最大断面为15.5m×17.5m 横桥竖直 赫章特大桥位于杭瑞高速贵州境内毕节一威向不收坡,顺桥向按60:1坡比至墩高193m处,墩顶 宁段...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年11月下 施工技术 第45卷第22期 CONSTRUCTION TECHNOLOGY 49 D0I:10.7672/5js2016220049 全断面隧道掘进机在矿井工程施工中的应用* 丁正全 (中国铁建股份有限公司,北京100855) [摘要]简要介绍了TM工法在煤矿矿山建设领域的优势及传统施工方法的缺点;分别以煤矿平酮和斜井工程为 例,详细介绍并分析了盾构机和TM两类产品的设计参数、应用难点及施工效果,并对其在矿井开拓工程领域的 发展趋势进行了展望. [关键词]隧道掘进机;煤矿矿井;TBM;盾构;平酮;斜并;施工技术 [中图分类号]TD421.5[文献标识码]A [文章编号]1002-8498(2016)22-0049-03 Application of the Full Face Tunnel Boring Machine in Construction of Coal Mine Project Ding Zhengquan China Railcay Construction Co.Lad.Beijing 100855 China) Abstract:The advantages of TBM method and disadvantages of conventional construction method in the exploiting field of coal mine were introduced briefly.Adit tunnel and inclined shaft were exampled separately this paper introduced and analyzed the design parameters difficulty in application and working effect on the both shield machine and double model TBM and the developing future of these machines in coal mine also was expected eventually. Key words:tunnel boring machine;coal mine well;tunnel boring machine;shields;adit tunnel;inclined shaft;construction 全断面隧道掘进机是一种能够同步完成隧道开拓形式主要有平酮开拓、斜井开拓、立井开拓和 开挖、排土和支护等隧道掘进作业流程的大型成套 综合开拓3.矿井开拓对煤矿工程建设的全局有 机械化隧道施工装备,主要包括硬岩隧道掘进机 重大影响,不仅关系矿井基建工程量的大小,更重 (tunnel boring machine TBM)和盾构机(shield 要的是长期决定矿井的生产条件和技术经济指标. machine)两类,分别应用于开挖面稳定性和围岩可 传统的矿井开拓主要采用钻爆法、冻结法等工 支护性较好、开挖地层硬度较高的硬岩地层和开挖 法进行施工,具有工程建设速度慢(50~150m/月)、 面自稳性差的软土或软岩隧道掘进,广泛用于城市 安全管理难度大、井巷成型质量和人员作业环境差 地铁隧道、水利电力工程隧道等国家大型隧道工程 等特点,很难满足我国大型现代化矿山工程及能源 施工[12]. 基地建设.与此相反,采用TBM或盾构工法施工安 煤矿矿井工程主要包括巷道工程、矿山地面建 全可靠、技术成熟,在隧道施工领域...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2015年1月上 施工技术 第44卷第1期 CONSTRUCTION TECHNOLOGY 61 D0I:10.7672/8gjs2015010061 全套管大直径振动取土灌注桩施工新技术* 肖勇杰1 2,许万强2,陈福全12 (1.福州大学土木工程学院,福建福州350108;2.福建省岩土与环境企业工程技术研究中心,福建龙岩364000) [摘要]介绍了全套管大直径振动取土灌注桩的施工机械及施工原理.并结合实际工程应用情况,详细阐述了该 施工技术的工艺流程、存在的间题以及处理方法.工程检测和实践效果表明,该桩型具有工效高、质量可靠及环境 影响小等优点. [关键词]桩;灌注桩;全套管;高频液压振动锤;施工技术 [中图分类号]TU473 [文献标识码]A [文章编号]1002-8498(2015)01-0061-04 A New Construction Technology of Large Diameter Cast-in-place Piles with Sleeves Driven by Vibratory Hammers Xiao Yongjie.2 Xu Wanqiang? Chen Fuquan.2 (1.College of Civil Engineering Fuzhou University Fuzhou Fujian 350108 China;2.Technology Research Center of Geotechnical and Environmental Engineering Fujian Provincial Longyan Fujian 364000 China) Abstract:A new technique for installations of cast-in-place piles with sleeves driven by high frequency hydraulic vibratory hammers is presented in this paper.Based on engineering practice the detailed construction technique construction process construction difficulties and processing methods are presented in detail.The adverse impact during pile installation on environment is negligible.The results of field tests indicate that the new method of pile installation has high efficiency and reliable quality. Key words:piles;bored piles;full-sleeve;high frequency hydraulic vibratory pile hammer;construction 0引言 处理难度大,环境污染严重;泥浆护壁留下的桩侧 灌注桩不受土层变化限制,可根据土层分布情 泥皮以及孔底沉渣,降低了桩基的侧壁摩擦力和桩 况任意变化桩长,容易适应持力层高低不平的变 底反力,导致桩基承载力降低. 化,不需要接桩和截桩,节约钢材、振动小、噪声小、 为了较好地解决以上灌注桩成桩的各种施工 承载力高,适用于高层建筑、桥梁工程及港口工程 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年2月上 施工技术 第43卷第3期 CONSTRUCTION TECHNOLOGY 109 300mm 并用振捣器捣实,浇筑时还要对称地变换浇筑方 科技短文 向,防止模板向一侧倾斜和扭转.振捣混凝土不得触动模板 及钢筋,振动棒的插人深度不应超过前一层混凝土内5cm 免支内模、定型外模倒模法烟施工工艺 倒移模板时,不得振动混凝土.筒壁施工要尽量连续进行, 1工程概况 不留施工缝,如遇不可抗力因素造成施工缝时,要对其进行 某烟肉为钢筋混凝土结构,高为105m 烟肉中心距焦炉 处理后才可继续浇筑.施工缝的处理方法为先清除松动的 中心线35m 2.500m标高处起设爬梯至顶,40.000 70.000, 石子,冲洗干净,再铺20~30mm厚的1:2水泥砂浆,然后再 100.000m标高处设钢平台,筒身35m以上每隔10m设1道 继续浇上层混凝土. 环梁,35m以下每隔11.25m设1道环梁,烟肉外径9100- 烟肉筒壁混凝土浇筑时,每5m高应取1组混凝土试 4950mm 壁厚380~180mm 内衬厚115 240mm 采用MU10 块,检验其28d龄期的强度.其他项目(如拆模强度)需要检 机制红砖、M5.0混合砂浆砌筑,隔热层厚100 150mm 采用 验时,再根据需要另作试块检验.混凝土脱模后,要对其表 水泥珍珠岩制品.烟肉顶设避雷针和信号灯,烟肉基础埋深 面进行打磨修整,保证平整顺直,修整完成后即涂刷薄膜养 8.200m 筒身采用C30混凝土,基础采用C25混凝土. 护剂养护. 2主要施工方法及顺序 4)砌体工程每步筒壁施工时先绑钢筋,后砌内衬,再 烟肉施工整体顺序为:基础施工→筒身结构(内衬)→ 铺隔热层、浇筑混凝土.内衬砌筑前,支承内衬的环形悬臂 安装、装修.本工程筒身结构施工采用专项烟肉施工技术: 上表面应用1:2水泥砂浆抹平,其水平偏差≤2cm.内衬要 免支内模、定型外模倒模法进行施工,筒身结构施工顺序:搭 分层砌筑,不允许留直槎,砂浆必须饱满,水平灰缝的饱满度 ≥90%,垂直灰缝采用挤浆和加浆法使其灰浆饱满,内衬内 内架→绑扎钢筋→砌内衬→调中→支外模(提升外模)→填 表面要认真勾缝.筒壁与内衬之间设计为填充水泥珍珠岩 充隔热层→核对验收→浇筑混凝土一→搭内架. 板保温材料,其重度<3.5kN/m3 导热系数A<0.22W/(m 3主要项目施工方法和技术措施 K).砌筑施工时要做好防雨及防温度骤变的措施,内衬的 1)钢筋工程钢筋按项目部统一安排在现场指定地点 灰缝厚度要符合要求,其表面的局部凹凸面不平,沿半径方 加工制作.进场的钢筋均要有相应规格的有效材质证 向不得超过30mm 内衬的滴水板砌筑后要重点做好保护, 明文件.烟卤筒壁竖向钢筋采用电渣压力焊,竖向钢筋与环 防止被碰坏. 状筋绑扎连接.钢筋的保护层用高强度等级水泥砂浆垫块 5)脚手架及垂直运输本工程不设外架,只在烟卤内 加以控制,其偏差不准超过10mm和-5mm.钢筋的规格、 随施工筒身结构高度用钢架管搭设满堂内架,中心留出上料 下料尺寸、搭接长度及接头均应符合规范及设计要求.级 空间,纵向钢筋及混凝土从烟肉内部吊运至施工作业面,环 钢筋的末端应弯钩,Ⅱ级钢筋可不弯钩,钢筋的弯钩应背朝 向钢筋使用作业面上设置的临机进行吊运到位,人员上下利 保护层.绑扎接头的钢筋接头要在中间及两端分别绑扎;钢 用烟卤外部的爬梯,离作业面较近、强度暂时不够的高度范 筋的接头应交错放置,同截面内钢筋绑扎接头根数不应多于 围内设置施工用软梯. 钢筋总数的25%,焊接接头的根数不应多于钢筋总...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年6月下 110 CONSTRUCTION TECHNOLOGY 第41卷第367期 健康住宅声环境要求与隔声施工技术 王军强1,黄新2 (1.江苏建筑职业技术学院,江苏徐州221116;2.龙信建设集团有限公司,江苏海门226103) 【摘要]对于健康住宅、生态住宅和3A住宅等高品质住宅,声环境符合设计要求是高要求住宅的必要条件.住宅 的隔声设计与施工在住宅领域刚刚起步,住宅隔声施工关健技术措施研究尚存在技术瓶颈和应用难题.项目围绕 健康住宅的声环境要求,结合高品质住宅试点项目,分类提出了楼板、墙体、窗户等的隔声施工技术方案和措施,并 在工程实践中进行试点和检测. [关键词]住宅工程;隔声;施工;声环境 [中图分类号]TU761.19 【文献标识码]A【文章编号]1002-8498(2012)12-0110-03 Sound Environment Requirements and Sound Insulation Construction Technology of Healthy House Residence Wang Junqiang' Huang Xin2 (1 Xuzhou Instinute of Architectural Technology Jiangs特221008,China; 2.Longxin Construetion Group Haimen Jiangsu 226103 China) Abstract:For the healthy housing ecological residence and 3A residential housing sound environment ply with the design requirements of the residence is necessary condition.Sound insulation of housing design and construction in the residential area has just started key technical measures of residential sound insulation construction existed bottleneck and application problems.Based on sound environment requirements for health house bined with high quality residential projects the thesis proposed sound insulation construction technical solutions and measures for floor wall body and window of the healthy house and the construction practice and the test were done. Key words:residence;sound insulation;construction;sound environment 随着人们生活水平的提高,对住宅提出了更高3096一2008;②《建筑隔声评价标准》GB/T50121一 要求,已由安全、适用逐步走向舒适、健康.健康住2005:③《社会生活环境声排放标准》GB22337一 宅、生态住宅、高品质住宅等高要求住宅将成为住2008...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年3月上 施工技术 第46卷第5期 CONSTRUCTIONTECHNOLOGY 129 DOI:10. 7672/sgjs2017050129 偏心钻跟管钻进法在边坡预应力锚索成孔 施工中的应用 侯振',徐宇光²,江泽侯3 (1.云南建投第一水利水电建设有限公司,云南昆明650217;2.昆明通泰置业有限公司,云南昆明650501; 3.云南建投基础设施有限公司,云南昆明650217) [摘要]以普洱市孟连县东密水库工程导流泄洪输水隧洞出口边坡预应力锚索成孔施工为实例,详细介绍了偏心 钻跟管钻进施工方法,系统总结了该方法的施工设备、操作要点及注意事项,并对实施过程中存在的不足提出了一 些改进建议。

该方法可有效解决边坡卸荷裂隙带在施工中难以成孔的技术难题,提高了钻进效率,成孔后锚索装 人顺畅,操作简单,设备配套要求低。

[关键词]隧道工程;边坡;预应力锚索;成孔;偏心钻;施工技术 [中图分类号】TV554 【文献标识码]A [文章编号〕1002-8498(2017)05-0129-04 ApplicationofEccentricDrillwithPipe-followingDrillingMethod inDrilling Construction ofPrestressed AnchorCableinSlope Hou Zhen',Xu Yuguang², Jiang Zehou3 (1.Yunnan No.1 Water Resources and Hydropower Construction Co.,Ltd.,Kunming,Yunnan 650217,China; 2.Kunming TongtaiReal Esate Co.,Ld.,Kunming,Yunnan 650501,Chino;3.Yunnan Construction Investment Infrastructure Co.,Lud., Kunming,Yunan 650217, China) Abstract;Based on driling construction of prestressed anchor cable in the slope at the exit of diversion- spillway water conveyance tunnel of Dongmi Reservoir in Menglian county of Pu’er City,this paper introduces eccentric drillwithpipe-following drillingmethod including construction equipment,operation points and points for attention,puts forward some improvement suggestions in construction. This method can solve the technical problem of unloading fractured zone drilling in slope,improve drilling efficiency, smoothly install anchor cable,the operation method is simple,the requirement of equipment matching is low. Key words:tunnels;slope;prestresed anchor cable;drilling; eccentric drill;construction 1工程概况 坡面大部分为灰、紫灰色泥岩、泥质粉砂岩、粉细砂 东密水库是一座以坝区城乡生活和农业灌溉若 岩互层,节理裂隙较为发育;同时设计文件推测该 供水为主,兼顾县城工业供水的中型水库,总库容边坡深层存在卸荷裂隙带。

为2293.13万㎡”,位于云南省普洱市孟连县。

工程 导流泄洪输水隧洞出口边坡为曲面形岩土混 主要建筑物有导流泄洪输水隧洞、大坝、溢洪道和合高边坡,边坡最大高度为41m,最大长度为108m, 渠道。

导流泄洪输水隧洞出口边坡原始地形较陡,共分为4级。

边坡布置情况如图1所示。

其中,第 发育有2个坍塌体,开挖完成后揭露的边坡基第三、四级(1111.000m高程以上)、第三级(1096.000~ 四级坡面土石混合体,局部扰动后有小规模塌、1111.000m高程)、第一级(1066.000~1081.000m 掉块;第二级坡面为层状反倾结构岩土混合边坡, 高程)边坡采取锚杆+钢筋网+喷射混凝土封闭的 综合支护形式;第二级(10...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年4月下 100 CONSTRUCTION TECHNOLOGY 第43卷第8期 D01:10.7672/sgjs2014080100 什祁市某已建住宅楼工程墙体裂缝控制 胡兴福1 2 (1.武汉理工大学管理学院,湖北武汉430700;2.四川建筑职业技术学院,四川德阳618000) [摘要]什邡市某6层砖混结构住宅楼,主体完工4个月后底层局部墙体出现裂缝.经分析,该建筑局部地基为软 土,其含水量大、渗透性差,原设计采用的振冲法处理效果差,从而导致局部地基承载力不足、地基沉降量大且不均 匀.针对墙体裂缝原因,采用灰土桩加固软土地基,同时采用钢筋混凝土梁加固基础,加固效果良好. [关键词]地基:沉降;加固;裂缝;控制 [中图分类号]TU398.5 [文献标识码]A [文章编号]1002-8498(2014)08-0100-03 Crack Control for Walls in an Existing Residential Building in Shifang Hu Xingfu.2 (1.School of Management of Wuhan University of Technology Wuhan Hubei 430070 China; 2.Sichuan College of Architectural Technology Deyang Sichuan 618000 China) Abstract:Cracks were emerged from partial ground-floor walls of a six-floor residential building with a masonry-concrete structure in Shifang 4 months after the main body had pleted.According to analysis it was soft soil in the local foundation of this building with large water content and poor permeability the vibroflotation reinforcement effect was poor from the original design resulted in insufficient carrying capacity of local foundation and large and uneven of the foundation settlement amount.Based on these reasons favourable effects of foundation stabilization are arisen from consolidated soft soil with lime-soil piles and reinforced foundation by applying reinforced concrete beams. Key words:foundations;settlement;strengthening;cracking;control 1工程概况 匀沉降,且未达到稳定.表1为几个代表性观测点 四川省什邡市某6层砖混结构住宅楼,采用碎2011年9月5日至2013年3月2日的沉降值.一 石桩复合地基、砖砌条形基础,基础埋深1.5m.该单元地基沉降最大处为房屋西南角(2...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年8月下 施工技术 第42卷第16期 CONSTRUCTION TECHNOLOGY 41 D0I:10.7672/sgjs2013160041 人防已建工程平战转换改造技术研究 魏俊荣,华瑞平2,孙博3,林家炜4,张小伟5 (1.海军指挥学院营房处,江苏南京210016;2.南京军区司令部工程科研设计所, 江苏南京210016;3.南京军区空军勘查设计院,江苏南京210018; 4.解放军96528部队工程科,北京102202;5.解放军65056部队,辽宁铁岭112000) [摘要]人防工程面临大量的已建工程的改造问题,采用平战转换措施对于人防工程的建设和发展具有重要意义. 由于人防工程的现状特点,工程平战转换,特别是已建工程的平战转换改造尚存在许多理论和实践的问题需要进 一步深入研究,包括人防的规划、抗力标准、平战转换的战术技术要求、新技术的应用以及已建工程改造措施的推 广应用等问题.结合国内工程改造加固的理论与实践,提出并介绍了适合于人防已建工程的平战转换改造加固的 主要技术措施. [关键词]加固;改造;人防工程;施工技术 [中图分类号]TU927 [文献标识码]A [文章编号]1002-8498(2013)16-0041-05 Strengthening Technology Research on Peacetime and Wartime Function Transformation of Civil Defence Fortifications Wei Junrong' Hua Ruiping? Sun Bo Lin Jiawei" Zhang Xiaowei (1.Naval Commanding Academy Nanjing Jiangsu 210016 China:2.Engineering Design Institute of Nanjing Military Region Nanjing Jiangsu 210016 China;3.Survey and Design Institute Nanjing Military Region Air Force Nanjing Jiangsu 210018 China;4.Engineering Department of Unit 96528 PLA Beijing 102202 China;5.Unit 65056 PLA Tieling Liaoning 112000 China) Abstract:Peacetime and wartime function transformation technology has the great importance in the construction and development of the civil defense engineering with respect to massive modification of the built civil defense engineering.There are many further issues to study in civil defense planning resisting force criterion peacetime and wartime function transformation technology a new technology application and built civil defense engineer...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年3月下 施工技术 第43卷第6期 CONSTRUCTION TECHNOLOGY 99 D0I:10.7672/5js201406099 人民日报社报刊综合业务楼项目优化管理 常燕,郭理修,张小妮,韩春莲 (中国新兴建设开发总公司,北京100039) [摘要]通过深人分析人民日报社报刊综合业务楼工程的施工重点和难点,详细介绍了工程创优管理策划、项目质 量流程化、标准化创优管理、各项管理制度的有效实施和科技创新管理、绿色节能示范等方面的具体管理措施. [关键词]项目管理;标准化;流程化;绿色施工 [中图分类号]TU71 [文献标识码]A [文章编号]1002-8498(2014)06-0099-04 Optimal Project Management of the People's Daily Project Chang Yan Guo Lixiu Zhang Xiaoni Han Chunlian China Xinxing Construction Derelopment General Co.Beijing 100039 China) Abstract:The construction emphasis and difficulties of the People's Daily project are analyzed in depth. This paper introduces the management measures of professional management planning of the construction quality optimization of the quality control procedure standardization of the actives encouraging excellence effeetive conduction of regulation management with ereative technology demonstration of green energy saving methods and so on. Key words:project management;standardization;streamlining;green construction 1工程概况 人民日报社报刊综合业务楼是人民日报社建 社以来最重大的建设项目之一,建成后将成为新的 区域中心,作为地标建筑与CCTV大楼遥相呼应. 本工程包括报刊综合业务楼(A区)、图书馆及学术 交流中心(B区)部分,地下3层,地上32层,总建筑 面积135797m2 建筑高度180m.开工日期为2010 年11月30日,计划竣工日期为2014年2月,总工 期1164d.图1为本工程建成后效果. 2工程重点及难点分析 图1工程效果 2.1超高层钢结构工程施工难度大,科技含量高 Fig.1 Rendering 1)建筑造型复杂、结构超高主楼高度为 层钢管柱质量约为18t 核心筒内目字形钢柱单层质 180m 地上结构造型复杂,外筒钢结构柱为扭转不 量达8t 其他箱形柱质量也非常大,施工中需合理布 规则布置,楼板以曲面形式渐变,结构施工难度大. 置塔式起重机,保证钢结构正常吊装就位. 尤其是3个突出部位格构柱造型及节点构造非常复 3)钢管柱混凝土浇筑主楼结构设计14根 杂,每层柱角度和位置均发生变化,对钢结构加工 b1100mm钢管混凝土柱,钢管柱每3层整体安装 及安装要求高. (高度达1...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年3月下 96 CONSTRUCTION TECHNOLOGY 第43卷第6期 D01:10.7672/js2014060096 人民日报社报刊综合业务楼钢结构安装进度管理* 贾玉斌 (中国新兴建设开发总公司,北京100039) [摘要]钢结构安装的进度管理是高层钢结构项目管理的一项极为重要的工作,通过介绍人民日报社报刊综合业 务楼铜结构工程安装过程,分析总结了影响高层钢结构安装进度的主要因素,并提出了相应管理及对策以及施工 过程中对施工进度计划的修正等一系列措施,有效地保证了结构工期. [关键词]高层建筑;钢结构;项目管理;安装;进度 [中图分类号]TU71[文献标识码]A [文章编号]1002-8498(2014)06-0096-03 Steel Structure Installation and Schedule Management of the People's Daily Project Jia Yubin China Xinxing Construction Development General Co.Beijing 100039 China) Abstract:Schedule management of steel structure construction is an extremely important part of project management of the high-rise steel structure.By introducing the People's Daily project steel structure installation process the main factors that influence the progress of the installation of high-rise steel structure are analyzed and summarized and the corresponding management strategies are proposed the construction time limit is effectively ensured. Key words:tall buildings;steel structures;project management;installation;schedule 1工程概况 构施工期间,编制怎样的钢结构施工进度计划并 人民日报社报刊综合业务楼主楼工程(以下简如期完成,采取怎样的进度管理措施进行保证尤 称日报社)结构形式为纯钢结构框架体系,结构高为重要. 度为180m 其中外框由3棍桁架格构组合柱与143钢结构安装进度的制定 根内灌混凝土的圆形截面钢柱组成.核心筒由48根3.1项目工序分析 箱形截面钢柱和2根日字形截面钢柱组成,核心筒 编制项目的施工进度计划必须对项目的结构 与外框通过形截面钢梁相互连接,为提高结构的进行分析,系统地剖析整个项目的工序组成,对项 抗震性能,每层核心筒内柱-柱之间设有28根抗震 目进行分解,形成一个树状图,哪些工序必须线性 屈曲约束支撑.整个工程共计钢构件2万多件,高 展开,哪些工序可以同时展开,从而明确各个工序 强螺栓40多万套,压型钢板8万多m2 栓钉50多 之间的逻辑关系和工作关系,形成合理的施工流 万套,焊缝长度1万m. 水,保证每个工序都有人工作.日报社钢结构项目 2钢结构安装进度管理的地位与作用 安装顺序为:竖向构件安装→核心筒水...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年3月下 30 CONSTRUCTION TECHNOLOGY 第43卷第6期 D0I:10.7672/sgjs2014060030 人民日报社报刊综合业务楼深基坑监测技术方案分析 潘建伟,李哲琳,王勇 (中国新兴建设开发总公司,北京100039) [摘要]在分析人民日报社报刊综合业务楼工程基坑特征的基础上,确定了基坑变形监测技术方案,总结了基坑监 测基准点、工作点及监测点的埋设要求,满足了工程对监测方法、频率、精度等的要求,同时对观测数据处理进行了 描述.通过有效的监测方案保证了基坑边坡、周边建筑物和道路、管线始终处于安全受控状态. [关键词]高层建筑:监测;深基坑:位移;沉降 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2014)06-0030-03 Analysis of Monitoring Programme for Deep Foundation Excavation in the People's Daily Project Pan Jianwei Li Zhelin Wang Yong China Xinxing Construction Derelopment General Co. Beijing 100039 China) Abstract:Based on the characteristics of deep foundation exeavation of the People's Daily project the monitoring scheme for the foundation excavation is obtained and the laying requirements of the monitoring reference point operating points and inspecting points are summarized to meet the project requirement at the method precision frequency aspect meanwhile the monitoring data treatment is also described. The safety of foundation excavation slope surrounding buildings roads pipelines is controlled by the effeetive monitoring. Key words:tall buildings monitoring;deep foundation excavation;displacement;settlement 1工程概况 3.1桩顶水平位移监测 人民日报社报刊综合业务楼工程主要由报刊 3.1.1基准点布设 综合业务楼、图书馆及学术交流中心组成,报刊综 拟在建筑区影响范围外布设3个永久性位移观 合业务楼地下3层,地上32层. 测基准点G1~G3 在基坑周围布设8个位移工作基 基坑南侧有民4,民5,民6,民11楼;基坑北侧 准点(编号分别为J1~J8).且埋设在距离工程 有民20甲、民20乙、老干部活动中心、机械工业学 100m以外,通视良好,穿越冻土层,不易被破坏而且 院招待所;基坑东侧有北区食堂、5号楼,基坑西侧 位置稳定. 为金台西路. 3.1.2监测点布设 本工程开挖深度约为20m 属于深基坑工程,采 位移监测点布设在护坡桩桩顶和冠梁上,基坑...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)