2014年7月下 施工技术 第43卷第14期 CONSTRUCTION TECHNOLOGY 197 D0I:10.7672/8gjs2014140197 超长无脊大波屋面瓦在某光伏产业厂房中的应用 李家宏 (上海宝冶集团有限公司,上海200941) [摘要]以海南汉能光伏有限公司一期250MW薄膜太阳能电池生产项目主厂房屋面工程为例,根据工程的特点及 现场的实际情况,重点阐述了该厂房钢屋面系统经过深化设计,采用了超长无脊大波屋面瓦施工技术,结果表明, 该技术的采用,不但施工进度有了明显提高,而且屋面的防雨、排水效果得到了有效保障. [关键词]屋面;屋面瓦;支架;保温棉;施工技术 [中图分类号]TU765 [文献标识码]A [文章编号]1002-8498(2014)14-0197-03 Application of Super Long and No Ridge Large Corrugated Tile in a Workshop Li Jiahong (Shanghai Baoye Group Co.Ltd.Shanghai 200941 China) Abstract:Taking the main workshop project of 250MW thin film solar cell production project of Hanneng Photovoltaic Co.as an example according to the actual situation and characteristics it is indicated that through detailed design the construction of super long and no ridge large corrugated tile is used.The application shows that by using this technology not only the construction progress has been significantly improved but the roof waterproof drainage has gotten effective protection. Key words:roofs;roof tile;supports;heat insulation cotton;construction 1工程概况 微晶工艺设备预留区,②~⑩轴/~®轴为 本工程位于海口市综合保税区,主厂房东西长 PECVD区,⑩~⑤轴/①~①轴为60t超纯水站, 360m(①~轴),南北宽113m(~W轴),屋面 ~5轴/①~①轴为玻璃清洗区,6~9轴/④~0 高10.736m 檐口高8.5m 其中:①~⑤轴/④~W 轴为原料仓库,⑥~⑤轴/④~©,⑤~①轴为辅助 轴为1层混凝土框架结构,⑥~30轴/①轴为1 用房.主厂房平面布置如图1所示. 层钢结构(超长无脊大波瓦部分,⑥~30轴长192m 2工程特点和难点 ①~R轴宽89m) ~8轴/①~①轴为1层钢结 1)海南地区降雨充沛,全岛年平均降雨量在 构,30~8轴/①~⑧轴为1层混凝土框架结构,3 1600mm以上.并且5~10月是雨季,雨季总降雨 ~0轴/④~W轴为1层混凝土框架结构,⑥~ 量1500mm左右,占全年降雨量的70%~90%,台 轴/④~©,~W轴为2层混凝土框架结构. 风多,因此,对屋面的防雨、防渗漏质量要求高. 主厂房共分10个不同功能...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2017年1月上 18CONSTRUCTIONTECHNOLOGY第46卷第1期 DOI:10. 7672/sgjs2017010018 超深淤泥质软土中预应力管桩施工质量控制 技术研究与应用
李松晏,梁森²,王斌²,张明² (1.中国建筑第四工程局有限公司,广东广州510665;2.中建四局第一建筑工程有限公司,广东广州510656) [摘要]淤泥质土流动性强、剪切效应明显,桩基施工质量保证难度大,极易造成偏桩、断桩。

结合某工程首开区桩 基工程实例,阐述了在超深淤泥质土进行桩基施工时会产生的一系列质量问题。

并结合分层挖土、纠偏、灌芯等技 术手段,给出对不合格桩的处理办法,使成桩质量达到国家规范要求。

[关键词]地基;软土;桩基础;管桩;质量控制;纠偏 [中图分类号】TU758.11【文献标识码】A[文章编号】1002-8498(2017)01-0018-03 ResearchandApplicationofPrestressedPipePileConstruction QualityControlUnderUltra-deepSoftSoilFoundation Li Songyan',Liang Sen²,Wang Bin²,Zhang Ming² (1.China Construction Fourth Enginering Division Co.,Ltd.,Guangzhou,Guangdong510665,China; 2.TheFirst Construction Co.,Lid.of China Fourth Construction Bureau,Guangzhou,Guangdong510656,China) Abstract:Muddy soil has obvious effect of flow and shearing,which makes pile foundation engineering dificult. Furthermore, prestressed pipe piles are made deviated and broken easily. In this paper, the quality problems encountered in pile foundation construction in soft soil are illustrated on the base of the first residential district,and some treatment methods such as excavation by layer,deviation correction and PHC core grouting are given to deal with unqualified piles in order to reach state standard demand. Key words;foundations; soft soil; piles; pipe piles; quality control; deviation correction 0引言 预应力管桩由于其施工工艺简单、工期短、成 桩质量可靠等特点,被广泛应用于对工期要求较严 格的工业与民用建筑、路桥、码头等工程。

但在江 浙沪地区、广东省部分地区,因地质条件较差,淤泥 层较厚,在管桩施工过程中往往会出现偏桩、断桩图1首并区效果 等质量问题。

本文从施工角度出发,阐述在超深淤Fig.1Effect of the first residential district 泥质土中进行预应力管桩施工会产生的主要质量预应力管桩具有强度高、自重小、成本低、施工 问题,并结合工程实例,给出解决成桩质量问题的快捷等特点,是对工期要求较高工程的首选桩型。

具体处理措施。

本工程所取得的宝贵经验值得类但由于其中空壁薄,抗剪和抗弯能力较差,无法承 似工程借鉴。

受较大水平力,在施工时由于挤土效应,容易产生 1工程概况水平推挤而出现裂纹、偏桩甚至断桩的情况。

某工程首开区总建筑面积为74000m²,包括本工程塔楼部分采用PHC600(AB)桩,其中10 10~13号楼4栋塔楼和商铺,4栋塔楼层数为29~号塔楼122根,11号塔楼101根,12号塔楼123根, 31层,如图1所示。

13号塔楼118根,桩长为45~50m。

根据岩土工程
勘察报告,本场地属于珠江三角洲冲积平原地貌单 [作者简介]李松晏,博士,工程师,E-mail:230555680qq.元,场地浅部分有较厚淤泥、淤泥质土层,该土层呈 [收稿日期】2016-07-11;[修订日期】2016-09-22...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年7月上 28 CONSTRUCTION TECHNOLOGY 第45卷第13期 D01:10.7672/js2016130028 超深块石回填地质条件下超长桩施工技术 胡刚,李欢,康鑫,彭先奇 (中天建设集团有限公司,浙江杭州310008) [摘要]依托重庆中航MyTown工程,针对超深中风化块石回填土质条件下超深钻孔灌注桩施工难题,通过对旋挖 钻机、钻头、钢护筒拼接等的改进优化,采用全回转钻机协同旋挖钻机、全钢护筒跟进施工技术,解决了回填地质条 件下40~80m柱的成孔、成桩技术难题. [关键词]桩基础;钻孔灌注桩;钢护筒;回填土:施工技术 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2016)13-0028-03 Construction Technology of Extra-long Bored Piles in Extra-deep Block Stone Filling Stratum Hu Gang Li Huan Kang Xin Peng Xianqi (Zhongtian Construction Group Co.Lad.Hangzhou Zhejiang 310008 China) Abstract:Based on Chongqing Zhonghang MyTown building project in view of the construction problems of extra-long bored piles in extra-deep block medium weathered stone filling stratum through the improvement of rotating drill bit and steel casing using the full-circle boring machine with auger drill work together and the technology of steel casing which solved the hard technological problem of 40 ~80 m pile in extra-deep block stone filling stratum. Key words:piles;bored piles;steel casing;back-filing;construction 1工程概况 土层渗透系数大,无法进行泥浆护壁,需采用干法 中航MyTown工程项目位于重庆市渝北区,地作业,且土层稳定性差,孔壁的稳定性难以保证,清 下1层,地上14~16层,6幢主楼,建筑面积约18 孔困难,选用合理的护壁措施是保证孔壁稳定的关 万m2.工程所处原地貌为1条深沟,上宽约80m 键技术. 深度约85m 剖面形状呈倒三角形,后采用周边开挖 3)土层块石含量大,且上部回填段存在大粒径 后的土石方进行回填,以中风化为主,最深处达 孤石,桩基施工时易引起钻进不进尺、孔倾斜偏移、 68.8m 经3年的沉降期.工程采用钻孔灌注桩基 发生卡钻等问题. 础,桩基共1105根,设计直径为1.0 1.2 1.5m 桩 4)块石回填地质条件下,旋挖过程中钻头的磨 长17~73m 其中超过40m的桩有333根,60m以上 损率较高,钻齿更换的频率对施工效率影响很大, 的有56根,均需穿过块石回填土层进入基岩持 合理优化钻头、降低钻头磨损率、提高破岩效率对 力层. 成本控制和工...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年10月上 20 CONSTRUCTION TECHNOLOGY 第45卷第19期 D01:10.7672/sjs2016190020 超深地下连续墙护壁泥浆优化 赵民1,乌效鸣,吴迪1,魏林春2,王志华2 (1.中国地质大学(武汉)工程学院,湖北武汉430074; 2.上海隧道工程股份有限公司,上海200137) [摘要]武汉轨道交通7号线秦园路工作井采用地下连续墙支护结构,最大墙深59m 成槽过程中需要穿越最大厚 度达42m的粉细砂层,施工难度大.在研究地下连续墙护壁泥浆功能和机理的基础上,对现有泥浆配方以及泥浆 性能进行优化,以节约施工成本.采用多种措施对泥浆质量进行严格控制,以保证施工顺利进行. [关键词]地下工程:地下连续墙;泥浆:配合比:优化 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2016)19-0020-03 Cement Slurry Optimization of Ultra-deep Diaphragm Wall Zhao Min' Wu Xiaoming' Wu Dil Wei Linchun2 Wang Zhihua2 (1.Faculty of Engineering China University of Geosciences Wuhan Hubei 430074 China; 2.Shanghai Tunnel Engineering Co. Ltd.Shanghai 200137 China) Abstract:The diaphragm walls which the largest depth is 59 meters were used in the Wuhan Rail Transit Line 7 issue of Qinyuan Road well.It passed through a silt layer 42m thick and the construction was difficult.Based on the studies of the function and mechanism of protecting walls of cement slurry in the construction of diaphragm walls the existing slurry formulations were optimized to save construction costs. To ensure the successfully of construction some measures were adopted to control the quality. Key words:underground;diaphragm wall;slurry;mix proportion;optimization 0引言 围地基土的孔隙内部后,由于不再受到扰动而形成 在地下连续墙施工中,泥浆护壁成槽施工已经凝胶,并将槽孔孔壁表层一定范围内的土孔隙填 成为最主要的一种成槽方式,在泥浆护壁成槽施工 满,改变了土原有结构状态,加大了土体的稳定性. 中,泥浆质量的优劣是保证地下连续墙顺利施工及 2)形成槽壁泥皮优良的膨润土泥浆形成薄 质量的关键.武汉轨道交通7号线一期八标段秦园 而韧的泥皮,密度大,抗渗性高. 路工作井采用地下连续墙作为支护结构.地下连 3)静液压力的作用槽内的泥浆面通常高出 续墙厚1.5m 标准幅宽6m 墙体最大深度59m 在 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年6月下 施工技术 第45卷第12期 CONSTRUCTIONTECHNOLOGY 57 DOI:10.7672/sgjs2016120057 超早强灌浆料黏结性能与抗裂性能试验研究* 张晓平,陈谦²,孙长征3 (1.中国山东国际经济技术合作公司,山东济南250098;2.山东圣输财贸职业学院建筑 工程学院,山东济南250098;3.沈阳建筑大学土木工程学院,辽宁沈阳110168) [摘要】针对3组预埋钢筋和1组对比素加固材料组成的共12个加固材料试块进行室内拉拔试验,综合对比分析 表明加固材料强度和锚固长度是影响钢筋平均黏结力的重要因素,钢筋的埋置深度不同,主要表现出钢筋拔出、钢 筋拉断和钢筋拔出同时根部材料隆起等3种破坏形式,并基于理论分析推导获得试块拉拔试验中平均黏结力计算 公式。

对比掺外加剂灌浆料、未掺外加剂灌浆料和普通混凝土的抗裂性能,结果表明,一定掺量外加剂相互作用及 纤维的阻裂作用,可明显减少其塑性收缩开裂,开裂指数相对较小。

[关键词]建筑材料;灌浆料;拉拔试验;微观形貌;抗裂;性能 [中图分类号】TU52[文献标识码】A[文章编号】1002-8498(2016)12-0057-04 Super-earlyStrengthGroutingMaterialBondingPerformanceand Anti-crackingPerformance Test ZhangXiaoping',ChenQian²,Sun Changzheng” (1.China Shandong Economic&Technical Cooperation Group Lud.Ji'nan,Shandong250098,China;2.Architecture Engineering Institute,Shandong ShenghanFinance andTrade Vocational College,Ji'nan,Shandong 250098,China; 3.Schoolof CivilEngineering,ShenyangJianzhuUniversityShenyang,Liaoning110168,China;) Abstract:The authors conducted a pull indoors test on 3 groups embedded steel test block and a parison prime reinforcementmaterial specimen,prehensive parative analysis showed that the strength and anchoragelength of the reinforcement materials are the important factors affecting the average bond strength of steel bars. The different steel bar embedment depth mainly showed three failure modes, pulled out of the steel bars,reinforced pull off,pull out while the roots of reinforced material uplift. Based on theory analysis,the author deduced the formula of the block average bond. Anti cracking performance parison of super-early strength grouting materials,not mixing admixtures grouting materials and mon concrete showed that certain dosage of admixture interaction and crack resistance of the fibers can significantly reduce itsplastic shrinkage cracking,cracking indexisrelatively small. Key words;materials;grouting material; drawing test;microstructure; anti-cracking;performance 钢筋混凝土结构的耐久性问题是工程界普遍试验,并着重研究了UHTCC的干燥收缩和早期抗 关注的一个间题,而水泥基材料的黏...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年3月上 施工技术 第43卷第5期 CONSTRUCTION TECHNOLOGY 13 D0I:10.7672/5js2014050013 超早强灌浆料耐火性能试验研究* 张晓平1,孙长征12,赵同峰1 3,陈谦1 (1.沈阳建筑大学土木工程学院,辽宁沈阳110168:2.沈阳建筑大学建筑设计研究院,辽宁沈阳110015; 3.辽宁省交通高等专科学校道路与桥梁工程系,辽宁沈阳110122) [摘要]通过研究不同比例铝酸盐水泥与普通硅酸盐水泥的超早强耐火灌浆料在不同温度下燃烧30min后的残余 强度,分析超早强灌浆料的耐高温机理.结果表明,铝酸盐水泥与普通硅酸盐水泥的比例为1:7时,超早强灌浆料 的经济效益好,在1000℃高温燃烧30min后,残留54.7%的抗压强度.超早强灌浆料的残留抗压强度与温度有较 好的拟合关系. [关键词]灌浆料;耐火性能:水泥;测强曲线;试验 [中图分类号]TU528.53 [文献标识码]A [文章编号]1002-8498(2014)05-0013-03 Study on Fire-resistance Performance Test of the Super Early Strength Grouting Material Zhang Xiaoping' Sun Changzheng.2 Zhao Tongfeng.3 Chen Qian' (1.School of Civil Engineering Shenyang Jianzhu Unirersity Shenyang Liaoning 110168 China: 2.Architectural Design Research Institute Shenyang Jianzhu Unitersity Shenyang Liaoning 110015 China; 3.Department of Road and Bridge Liaoning Provincial College of Communications Shenyang Liaoning 110122 China) Abstract:The authors analyzed residual strength of super early strength grouting material at different temperatures after burning 30 minutes with the different proportion of aluminate cement and ordinary portland cement and analyzed high temperature resistance of the super early strength grouting material. The results showed that the proportion of aluminate cement and ordinary portland cement was 1:7 economy benefit of super early strength grouting material was good and residual pressive strength was 54.7%in the1000℃high temperature after burning30 minutes.In addition residual pressi...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2017年4月上 76 CONSTRUCTIONTECHNOLOGY 第46卷第7期 DOI:10. 7672/sgjs2017070076 超强真空降水技术在基坑疏干降水中的 深化设计及施工控制* 赵乃志",张苏俊,陈桂凤 (1.扬州工业职业技术学院建筑工程学院,江苏扬州225127;2.江南大学环境与土木工程学院,江苏无锡110168) [摘要】针对上海浦东新区某基坑工程的开挖深度大、潜水含水层土体含水量高、周边环境复杂的特点,在对基坑 疏干降水进行渗流数值分析和抽水试验的基础上进行深化设计,确定采用超强真空降水技术,该技术增加了降水 井单井涌水量且减缓了水力漏斗坡度,降水效果明显增强。

可以使降水井数量显著减少进面减少基坑土方开挖, 降低人工操作强度。

采用降水与回灌同时进行的技术方案。

采用降压井运营风险控制系统,在实际施工中对风险 控制效果显著。

[关键词]基础工程;降水;深化设计;施工技术 [中图分类号】TU473 [文献标识码]A [文章编号】1002-8498(2017)07-0076-04 SuperVacuumDewateringTechnologyDetailedDesignand ConstructionControlinDeepFoundationDewatering ZHAO Naizhi²,ZHANG Sujun',CHEN Guifeng (1.School of Civil Engineering,Yangzhou Polytechnic Institute,Yangzhou,Jiangsu 225127,China; 2.School of CivilEngineering,Jiangnan University,Wuxi,Jiangsu 110168,China) Abstract;Based on an excavation in Shanghai Pudong with a large depth,high soil moisture content and plex surroundingenvironmentfoundationexcavation dewatering and seepage numericalanalysiswere conducted to use super vacuum dewatering.This technique increases the precipitation single well inflow funnel and slowed the hydraulic gradient,precipitation enhancement effct is obvious.Rainfall can reduce the number of wells in turn,can significantly reduce the foundation earth excavation,reduced surrounding environment of the foundation excavation dewatering. Using step-down wells operational risk control system,the construction risk is controlled to ensure the smooth progress of the project and have achieved good results. Key words:foundations;dewatering;detailed design; construction 1工程概况 设备落深区基坑开挖深度为28.06m;连廊电梯井区 本项目位于上海浦东新区竹园商贸地块,浦东 域基坑开挖深度为27.10m。

整个基坑可分为塔楼 新区杨高南路378号。

地块东邻规划中的竹林路,顺作区、纯地下室逆作区及金融剧院区。

其中塔楼 西侧为张家浜河,南邻杨高南路和立交桥,北侧是 顺作区由上交所塔楼顺作区、中金所塔楼顺作区及 规划开发的商贸区。

基坑为超大型深基坑,总面积 中国结算塔楼顺作区组成。

基坑总平面如图1 约48860m²,基坑总延长950m,上交所、中金所、中 所示。

国结算区域基坑开挖深度分别为27.90,27.90, 2地质条件及疏干降水风险分析 27.10m。

纯地下室普遍区域开挖深度为26.50m; 本工程基坑开挖范围内需要疏干的土层主要 为第②层粉质黏土、第③夹层黏质粉土、第③层淤 *江苏省高校自然科学基金资助项目(16KJB560024):江苏省高等 泥质粉质黏土、第④层淤泥质黏土和第层粉质黏 职业院校专...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年1月下 施工技术 第42卷第2期 CONSTRUCTION TECHNOLOGY 17 超大面积焊接球网架柔性提升技术* 董康,陈海洲2,王玉岭2,谢刚奎2,张其林3 (1.上海飞机制造有限公司,上海200436;2.中国建筑第八工程局有限公司,上海200120; 3.同济大学土木工程学院,上海200092) [摘要]针对中国商飞部装厂房3万m焊接球屋盖的施工,提出了柔性整体提升技术.对柔性整体提升过程进行 了数值模拟和分析,分析了施工提升不同步对结构受力的影响,对实际工程施工过程进行了监测.数值模拟与工 程实践证明了提出的柔性整体提升技术具有充分的安全性和明显的经济性. [关键词]钢结构;网架;提升;数值模拟;监测 [中图分类号]TU758 [文献标识码]A [文章编号]1002-8498(2013)02-0017-03 Flexible Lifting Technique for Super Large Solder Ball Space Truss Roof Dong Kang' Chen Haizhou Wang Yuling? Xie Gangkui Zhang Qilin' (1.Shanghai Aircraft Manufacturing Co. Ltd.Shanghai 200436 China: 2.China Construction Eighth Engineering Division Co.Lid Shanghai 200120 China; 3.School of Ciwil Engineering Tongji University Shanghai 200092 China) Abstract:The flexible overall lifting technique is put forward for the construction of the 30 000m2 COMAC roof which is made of solder ball space truss structure.The numerical simulation is carried out and the effect of unequal lifting on structural behavior is analyzed.The monitoring system is designed and installed for the forces and deflections of the structure during construction.Numerical analysis and engineering practicing show that the flexible overall lifting technique is with sufficient safety and obvious advantage in economy. Key words:steel structures;space truss;lifting;simulation;monitoring 1工程概况 约2400t.如图1所示. 中国商用飞机有限责任公司,简称中国商飞 (Commercial Aireraft Corporation of China Ltd. 简称 COMAC)部装厂房是其总装制造中心的重要厂房之 一,也是最大的厂房.部装厂房屋面采用焊接球网 架结构,长297m 宽111.2m.其中网架跨度96m ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年11月下 102 CONSTRUCTIONTECHNOLOGY 第42卷第22期 DOI:10. 7672/sgjs2013220102 超大面积深基坑降水及土方开挖技术* 艾杰,陈浩,牟岚,李慧 (中建二局第三建筑工程有限公司,北京100070) [摘要】金融街(南开)中心工程,其基坑面积及土方开挖量大,施工场地狭小,施工周边环境复杂,降水及土方开挖 施工困难。

通过在第1道内支撑上设置栈桥作施工道路,解决土方开挖及地下结构施工的交通运输问题;分区分 段进行降水、土方开挖,降低了施工难度、加快了施工进度;基坑施工过程中实行全方位的基坑监测,保证了超大面 积深基坑施工安全。

[关键词】地下工程;基坑;降水;监测 [中图分类号】TU753.6 [文献标识码]A [文章编号]1002-8498(2013)22-0102-04 ConstructionofSuper-largeandDeepFoundationExcavation DewateringandSoilExcavation Ai Jie, Chen Hao,Mu Lan,Li Hui (The ThirdConstructionEngineeing LimitedCompanyofChinaConstructionSecond Engineering Bureau Ltd.,Beijing100070,China) Abstract:Combined with actual project, the construction of foundation excavation is difficult because of large area and soil excavation,narrow construction site,plex environment,et al.By setting trestle on the first inner support as the construction road, the problems for soil excavation and transportation are resolved,the dewatering and soil excavation by zoning and segmentation reduced the construction difficulty and quicken construction pace. By the omnidirectional monitoring on foundation excavation, the safety of foundation excavation is ensured. Key words:underground;foundation excavation;dewatering;monitoring 1工程概况 南区基坑围护采用Φ900mm@1100mm钻孔灌 金融街(南开)中心工程位于天津市南开区,占 注桩,桩长19.0m,三轴搅拌桩止水惟幕采用 地面积79598.6m²,建筑面积为440674.54m²,建 Φ850mm@1200mm,有效桩长16.0m。

围护桩顶设 筑用地分为东北区(北区)与西南区(南区),南区为 置一道“十”字形内支撑。

北区基坑围护采用桩长 10栋6层、3栋11层的多层住宅楼,北区为2幢分 20.0m的Φ1100mm@1300mm、21.0m的Φ 别为37层和44层的高层住宅楼,1幢44层、1幢23 1200mm@1400mm的钻孔灌注桩,采用有效桩长 层、1幢29层写字楼,2幢4层、1幢3层的商业楼, 31.0m的Φ850mm@1200mm三轴搅拌桩。

北区除 各拟建建筑均有2层地下车库,并与外扩2层地下 在围护桩顶设置1道内支撑外,在-7.550m处设置 车库相连通,共同构成本场地内的大型地下车库。

第2道钢筋混凝土内支撑。

内支撑平面如图1 基坑面积约70148.07m”,呈不规则哑铃形,基 所示。

坑周长1569.37m,其中南区基坑均深10m,北区坑 2工程地质条件 深11.7~14.6m,北区高层写字楼局部坑深达 2.1.地质条件 17.1m,现地表建筑标高为-0.500m。

根据金融街(南开)中心工程《岩土工程勘察报 告》,基坑开挖深度范围之内以粉土、粉质黏土等为 中建二局科技立项课题:深基坑支护及开挖对周边近距离建筑物 主,基底位置上、下为较厚的粉土层。

南北区典型 影响的控制 [作者简介]艾杰,天津分公司常务副总经理,高级工程师,E-mal: 的工程地质剖面如图2所示。

892072091@qq. 2.2水文条件 [收稿日期】2013...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年4月下 90 CONSTRUCTION TECHNOLOGY 第43卷第8期 D01:10.7672/sjs2014080090 超大面积洁净厂房管道整体安装技术 陈宗科1,龚应波2,陈晓波1,李博1 (1.中建三局机电工程有限公司,湖北武汉430064;2.中建三局集团 有限公司北京公司,北京100097) [摘要]对第8.5代薄膜晶体管液晶显示器件(TFT-LCD)项目的超大面积洁净厂房管道采用整体安装进行分析和 总结.针对本工程大型管道工期紧、资源投人大、作业空间高、交通组织困难、机械投入量多等施工作业特殊的环 境,从管道整体吊装施工方法、机械设备选择、吊装先后顺序等方面采取措施,为超大面积洁净厂房管道整体安装 控制提出可靠的技术方案,从而有效地保证了管道之间焊接对口平直度、焊接外观平滑、无焊瘤的质量要求. [关键词]安装;洁净厂房;管道;焊接 「中图分类号1TU811 [文献标识码]A [文章编号]1002-8498(2014)08-0090-03 Integral Installation Technology for Super-large Area Clean Workshop Chen Zongke' Gong Yingbo? Chen Xiaobo' Li Bo' (1.The Mechanical and Electrical Engineering Co.Ltd.of CCTEB Wuhan Hubei 430064 China; 2.China Construction Third Engineering Bureau Group Co.Ld.Beijing) Beijing 100097 China) Abstract:For super-large clean workshop pipeline in some TFT-LCD project the authors analyze and summarize integral installation technology used in the pipeline installation.On the special construction working surrounding of tight construction period large cost high working space hard traffic organization and many machines authors take a series of measures such as integrate hoisting method machine and equipment selection and hoist sequence to guarantee quality requirements of pipeline welding. Key words:installation;clean workshop;pipeline;welding 1工程概况 层高达14.3m 高空作业工效低,危险系数大. 第8.5代薄膜晶体管液晶显示器件(TFT-LCD) 3)专业分包多,机电空间管理协调难度大 项目总建筑面积713885.8m2.其中,1号阵列厂房 本工程机电专业分包达53个,根据合同要求, 建筑面积约27万m2 其中洁净区16万m2 办公区 空间管理的协调由机电分包负责,在短短的几个月 和支持区11万m2 涉及大小管道28余万m 时间完成如此大体量的工作,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年1月下 20 CONSTRUCTION TECHNOLOGY 第42卷第2期 超大面积屋盖柔性提升系统的有限元分析及试验研究* 张晓勇,陈海洲,王玉岭,谢刚奎1,张其林2 (1.中国建筑第八工程局有限公司,上海200120;2.同济大学土木工程学院,上海200092) [摘要]对中国商飞(C0MAC)部装厂房3万m2焊接球屋盖的柔性整体提升施工工艺进行了数值模拟分析,对柔 性提升系统进行了试验研究.柔性提升工艺可在保证施工安全的前提下实现最少的替换结构件用钢量以及最短 的施工工期.结果表明在1.54倍设计荷载作用下,下吊点测点的荷载-应力曲线是线性变化并且不超过材料屈服 强度,表明下吊点完全处于弹性状态;同时指出柔性提升装置具备充分的安全可靠性. [关键词]钢结构;网架;柔性提升;数值模拟;试验研究 [中图分类号]TU311.41 [文献标识码]A [文章编号]1002-8498(2013)02-0020-03 Analysis and Experiment on Flexible Lifting System of Super Large Space Truss Roof Zhang Xiaoyong' Chen Haizhou' Wang Yuling' Xie Gangkui' Zhang Qilin2 (1.China Construction Eighth Engineering Division Co.Ltd.Shanghai 200120 China; 2.School of Civil Engineering Tongji University Shanghai 200092 China) Abstract:The numerical simulation analysis is applied on the flexible overall lifting process of the 30 000m2 super large space truss roof of COMAC installed plant and the experiment is also conducted on the lifting system.The flexible overall lifting technique can realize the minimum weight of the replaced steel members and the shortest construction period in condition of the construction safety.The simulation and experimental results show that under 1.54 times design loads the loads and stress curve of the monitoring points of the upper hanging point are linear and it don't exceed the yield strength which shows that the upper hanging point is under elastic state.Meanwhile the flexible lifting equipment has excellent safety and reliability. Key words:steel structu...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年4月下 6 CONSTRUCTION TECHNOLOGY 第45卷第8期 D0I:10.7672/8js2016080006 超大长径比钻孔灌注桩超重钢筋笼施工关键技术* 余地华,叶建2,侯玉杰2,汪浩,刘磊2 (1.中建三局集团有限公司,湖北武汉430064; 2.中建三局集团有限公司工程总承包公司,湖北武汉430064) [摘要]以天津高银117大厦超大长径比钻孔灌注桩钢筋笼施工为例,对钢筋笼安装制作、连接及吊装等方面进行 研究.该技术保证了钢筋笼的安装制作快速准确,以及吊装过程钢筋笼保持稳定、不变形,在规定时间内准确下放 到位,不影响桩孔的稳定,顺利完成浇筑.基于天津高银117大厦工程实践,该技术的应用不仅保证了施工质量而 且大大节约了成本,对超长桩的施工有很好的工程推广及应用价值. [关键词]高层建筑;地下工程;钻孔灌注桩;钢筋笼;安装;施工技术 [中图分类号]TU974 [文献标识码]A [文章编号]1002-8498(2016)08-0006-03 The Key Construction Technology of Super Heavy Reinforcement Cages of Cast-in-place Bored Pile with Super Large Length Diameter Ratio Yu Dihua' Ye Jian2 Hou Yujie2 Wang Hao' Liu Lei2 (1.China Construction Third Engineering Bureau Group Co. Ltd.Wuhan Hubei 430064 China; 2.General Construction Company of CCTEB Group Co.Ltd.Wuhan Hubei 430064 China) Abstract:Based on the construction of super heavy reinforcement cages of cast-in-place bored pile of Tianjin Gaoyin 117 Building the reinforcement cage installation connection and hoisting were researched.The technology ensured that the installation of reinforcement cage was quick and accurate and reinforcement cage remained stable and had no deformation during the lifting process.The reinforcement cage was put in place accurately in set time.It didn't affect the stability of the pile hole and finished concrete pouring successfully.Based on engineering practice of Tianjin Gaoyin 117 Building the technology proved not only to ensure the construction quality but also save the cost.It has a very...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2015年6月下 32CONSTRUCTIONTECHNOLOGY第44卷第12期 DOI;10. 7672/sgjs2015120032
超大型结构底板大体量灌浆施工关键技术研究
申屠辉宏,瞿海雁,朱红兵,赵思远,邵新宇,周焱平 (中建钢构有限公司,广东深圳518040)
[摘要]针对超大型结构底板大体量灌浆技术进行了研究,首先分析大体量灌浆施工的重点及难点,并基于以上重 点及难点提出大体量灌浆施工的技术要点。

在此基础上结合北京某超大型结构底板二次灌浆施工,总结出大体量 二次灌浆的施工流程。

[关键词]高层建筑;底板;灌浆;施工技术 [中图分类号】TU755.6[文献标识码]A[文章编号]1002-8498(2015)12-0032-04 Study onKey Construction,Technologyof Large-size GroutingofSuper-largeStructureSlab Shentu Huihong,Qu Haiyan,Zhu Hongbing,Zhao Siyuan, Shao Xinyu,Zhou Yanping (China Construction Steel Structure Co.,Ltd., Shenzhen,Guangdong 518040,China) Abstract:The lager-size grouting technology of super-large structures is researched.The construction emphasis and difficulties of large-size grouting have been analyzed firstly,and then some construction technologies have been proposed. After that,a construction progress of large-size grouting has been concluded,, and used in the basement grouting of a super-large structure in Beijing. Key words:tall buildings; slabs; grouting; construction 0引言料施工技术的研究较为少见,仅有的文献也是针对 灌浆料是一类由水泥、外加剂和矿物掺和料等老旧工程维修加固等问题”,灌浆体量较小而难以 原材料按照一定的配合比形成的建筑材料"。

灌反映大体量灌浆施工时的难点。

浆料与水混合后具有可流动、微膨胀、较高的早期随着超大型结构的使用日益广泛,其巨型钢底 和后期强度、不泌水等性能,因此广泛应用于建筑板所需要的二次灌浆体量越来越大,由此造成的施 工程中基础底板灌注、地脚锚栓孔的回填锚固、大工过程中的重点及难点也逐渐凸显。

型设备的垫板灌浆等领域。

本文针对超大型结构底板大体量灌浆技术进 建筑物基础底板灌注是灌浆料传统的应用领行了研究。

首先分析了大体量灌浆施工的重点及 域。

为保证建筑物的底板构件与混凝土基础筏板难点,并基于以上重点及难点依次提出大体量灌浆 之间具有良好的连接性能,施工过程中,往往在建施工的技术要点,在此基础上结合北京CBD地区某 筑物底板和混凝土基础筏板之间预留一定高度的超大型结构底板灌浆施工过程,总结得出大体量灌 后浇缝隙,待建筑物底板全部安装完毕后,通过灌浆的施工流程。

本文的研究成果可为同类工程的 浆料二次灌注填充后浇缝隙,保证建筑物底板和混施工过程提供参考价值。

凝土基础筏板的可靠连接。

由此可见二次灌浆是1大体量灌浆施工工艺 衔接建筑主体结构与混凝土基础筏板的关键技术。

1.1大体量灌浆施工的重点及难点 目前针对灌浆料的文献主要集中在灌浆料的与中小规模的底板灌浆相比,超大型结构底板 材料性能领域,不少学者通过试验研究了灌浆料的灌浆具有灌浆体量大、施工环境复杂等特点,由此 流动度、强度、黏结性等重要参数"。

但针对灌浆造成施工过程中的诸多难点,具体可以分为以下 [作者筒介】申屠辉宏,副总经理,高级工程师,E-mail:shenth@几点。

[收稿日期]2014-10-111)大体积灌浆过程的施工区域较大,某些工程
单个区域的灌浆面积甚至达到70m~以上,因此对
万方数据
2015 No.12申屠辉宏等:超大型结构底板大体量灌浆施工关键技术研究33 灌浆料的流动度要求较高。

普通灌浆料的流动度体的超高层建筑。

项目主塔楼为筒中筒结构,内框 为100~200mm,难以满足大体量灌浆的施工要求。

筒为型钢混凝土核心筒,外框筒由巨型支撑和巨...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年3月 70 CONSTRUCTION TECHNOLOGY 第39卷第3期 贝克曼梁弯沉车弯沉测定的影响因素分析 严二虎 (交通部公路科学研究院,北京100088) 【摘要]贝克曼梁弯沉仪测定路面弯沉一直以来是我国公路工程路面弯沉检测和竣工、交工验收的标准方法,提高 其测量精度对路面弯沉评价的公正性和合理性具有重要意义.弯沉车荷载以及后轴轮胎的类型、胎面花纹、层级、 轮胎压力和轮胎尺寸对贝克曼梁方法测定路面弯沉均有影响,在轮胎因素中轮胎的宽度对弯沉测定结果影响最 大.现场测试规程中对弯沉车的荷载等进行了规定,但是对测定车轮胎要求相对不足,分析认为需要对弯沉车的 后轴轮胎也应提出要求.针对目前工程上弯沉车选择的随意性,提出了弯沉车选择的建议. [关键词]道路工程;贝克曼梁;轮胎;弯沉;路面 [中图分类号]U416.2 [文献标识码]A[文章编号】1002-8498(2010)03-0070-04 Effect Factor Analysis of Benkelman Beam Deflection Measuring Device on Pavement Deflection Yan Erhu Research Institute of Highway Ministry of Communications Beijing 100088 China) Abstract:The Benkelman beam deflection method has been a standard method to test deflection of pavements for highway engineering pavement construction control and quality inspection and quality acceptance.So it is very important for the fairness and reasonableness of pavement evaluation to improve its measurement accuracy.The single axle load tire type tire tread pattern tire ply tire pressure and tire sizes all affect the measuring result and the tire size is key factor.The requirements of deflection measuring devices in the field test methods of subgrade and pavement for highway engineering but nothing about tires.Now it is still arbitrary to select deflection truck so it is necessary to add the requirements of rear tires.Based on the field test and model analysis propositional requirements of deflection measuring devices are put forward. Key words:highway engineering;Benkelman beam;tire;defl...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年12月下 90 CONSTRUCTIONTECHNOLOGY 第42卷第24期 DOI:10. 7672/sgjs2013240090 许昌高铁车站主体结构钢筋直螺纹连接质量控制 李建民 (许昌市腾飞市政工程集团有限公司,河南许昌461000) [摘要]介绍了许昌高铁车站主体结构钢筋直螺纹连接施工的重点及难点,从面制定出相应的施工工艺流程及检 验程序,并提出质量控制的主要措施。

同时根据钢筋直螺纹连接存在的质量问题,进行施工要素分析研究并制定 相应对策,保证了钢筋连接质量。

[关键词]高铁;车站;主体结构;钢筋;连接;质量控制 [中图分类号]TU755.3 [文献标识码]A [文章编号〕1002-8498(2013)24-0090-03 QualityControlofSteelStraightThreadConnectionfor MainStructureofXuchangHigh-speedRailwayStation Li Jianmin (Xuchangshi Tengfei Shizheng Engineering Group Co. ,Lid. ,Xuchang,He'nan 461000,China) Abstract:The construction difficulties and emphases of steel straight thread connection for main structure of Xuchang high-speed railway station are introduced,and the corresponding construction process and inspection procedure are formulated,then the main measures of quality control are put forward.Based on the quality questions about the steel straight thread connection,the construction factors are researched and the corresponding treatments are obtained,so the steel connectionquality are guaranted. Key words;high-speed railway; stations;main structure;reinforcement; connection;quality control 1工程概况 筋直螺纹连接合格率,确保工程质量,公司特成立 许昌高铁车站站前广场及地下空间位于许昌 了QC小组,并制定了钢筋直螺纹连接施工工艺流 市东区烟琊郭村,分为地面层和地下1层,车站总长 程及检验程序(见图1)。

363.1m,宽117.3m,结构层高4.2~5.0m。

顶板覆 施工准备 土厚700~1500mm,站前广场地面部分面积 不合格 84142m²,地下空间面积为37976m²,总投资估算为 钢筋、套筒进场 验、试验 理工程师 24.670万元。

不合格 不合格 许昌高铁车站主体采用现浇混凝土框架-剪力 钢筋加工 自检 墙结构,钢筋采用直螺纹连接,直螺纹数量大,后期 不合格 施工的明开区间的主筋也采用主筋连接,而根据项 目部前期钻孔桩钢筋笼施工质量情况看,钢筋直螺 滚压丝头 自检 纹连接质量问题最普遍且不易控制,质量波动明 不合格 显,所以钢筋直螺纹连接质量是钢筋工程控制的重 钢筋连接 自检 点及难点,同时根据设计文件及《滚扎直螺纹钢筋 连接接头》JG163-2004的要求,钢筋直螺纹连接接 进入下道工序 头一次合格率不得小于95%,而我项目部合格率平 均值为90.8%,远远达不到设计及规范要求,严重 图1钢筋直螺纹连接施工 影响了主体结构质量及施工进度,为更好地控制钢 工艺流程及检验 Fig.1 Construction process and inspection of [作者简介]李建民,高级工程师,E-mail:292903707@qq. steel straight thread connection [收稿日期】2013-08-21 万方数据
2013 No. 24 李建民:许昌高铁车站主体结构钢筋直螺纹连接质量控制 91 2工程重点与难点 3)由于直螺纹连接一次合格率较低,常常发生 1)由于本工程为许昌市的重点项目,所以确保 返工现象,造成滞工,从而降低了本工序的工作效 工程质量意义重大。

率。

从现场情况看,现场施工进度主要受直螺纹加 2)根据以往类似工程经验...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年6月下 74 CONSTRUCTION TECHNOLOGY 第42卷第12期 D01:10.7672/sgj92013120074 西藏气候建筑工程影响及预防措施 秦宇,韩慧,齐根辉 (武警水电第二总队八支队,福建厦门361009) 【摘要]在西藏复杂多样的高原气候中,建筑工程受到诸多环境因素影响.结合当地工程建设实际情况,从空气水 分含量、温度变化、风暴等几方面简要分析了建筑工程受到不利因素影响的原因.最后分别针对各种气候环境探 讨了诸如调整工期时间、采取特殊有效的养护方法、增加各种防护方式等应对措施. [关键词]气候;建筑工程;混凝土;影响;预防措施 [中图分类号]TU7 [文献标识码]A [文章编号]1002-8498(2013)12-0074-03 The Influence and Preventive Measures of Tibet Climate on Building Engineering Qin Yu Han Hui Qi Genhui No.8 Detachment No.2 Hydropower Force of Armed Police Xiamen Fujian 361009 China) Abstract:In Tibet area plicated and various plateau climate influences the building engineering. Combing with the practice conditions of local building construction this paper analyzes some influence factors of climate to building construction from the aspect of water content of air temperature change and storm.Based on various plateau climate some countermeasures are put forward such as adjusting construction time using effective curing method and adding some preventive methods. Key words:climate;buildings;concrete;influence;preventive measure 1西藏气候特点 季”,也叫“风季”,一般是从10月下旬到次年的5 西藏高原复杂多样的地形地貌和大气环流的月,在这个季节里,整个西藏降水量皆很少,气候相 影响,形成了独特而且复杂多样的高原气候.除呈当干燥;冬季的降雪主要集中在11月到次年2月, 现西北严寒干燥,东南温暖湿润的总趋势外,还有在个别地方如阿里地区、一些海拔4000m以上的高 多种多样的区域气候和明显的垂直气候带.空气山,有时4 5月也下雪.但是固体水对空气湿度影 稀薄、含氧量少、气压低是其最大环境特点.由于响很小,所以总体来说即使在降雪量较大的冬季, 海拔高,所以空气稀薄洁净、尘埃和水汽含量少、大 还是不能摆脱气候干燥的大环境. 气透明度高,阳光透过大气层时,太阳辐射能量损 水泥在凝固的过程中是一个需要充足水分来 失少,所以光照充足、辐射量大,是全国太阳辐射量完成良好化学反应的过程,无论是混凝土结构,还 最多的地方.西藏气压低、温度年变化小而日变化 是砌体砂...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年10月下 施工技术 第43卷第20期 CONSTRUCTIONTECHNOLOGY 29 DOI:10. 7672/sgjs2014200029 西藏会展中心管桁架钢结构屋盖施工技术* 韩向科,刘明路',孙从永',孙伟",司坤',王馥琴,贾文彬",苏波² (1.中冶天工上海十三冶建设有限公司,上海201999; 2.江苏大学土木工程与力学学院,江苏镇江212013) [摘要】西藏会展中心工程地处高海拔、低含氧量的拉萨地区,由于屋盖空间形状复杂,高度、跨度大及杆件数量较 多,采用常规的安装方法都不理想。

通过比选,提出了屋盖外围部分采用组合单元吊装,屋盖内部部分采用整体提 升技术。

此方法有效地降低了高空作业量,提高了施工效率,工程实践证明提出的施工技术具有充分的安全性和 明显的经济性。

[关键词]钢结构:管桁架;液压同步提升;温差;施工技术 [中图分类号]TU758.11 [文献标识码】A [文章编号]1002-8498(2014)20-0029-04 SteelTubeTrussStructureRoofConstructionofTibet ConventionandExhibitionCenter Han Xiangke',Liu Minglu',Sun Congyong',Sun Wei',Si Kun', WangFuqin',Jia Wenbin',Su Bo² (1.CMTCC Shanghai Shisanye Construction Co.,Lid.,Shanghai 2019,China; 2.Faculty of Civil Engineering and Mechanics,Jiangsu University,Zhenjang,Jiangsu 212013,China) Abstract:Tibet Convention and Exhibition Center project,due to its location of high altitude,low oxygen levels in the Lhasa area, and the plexity of roof shape,height,large span and lots of pipes,is difficult for the conventional construction methods.Through parison,a construction plan of the outer part of the roof lifting by bining unit,the internal part of roof by integral lifting technology is established.This method reduces the high operation effectively,improves the efficiency of the construction, the finally construction result shows that the proposed construction technology is with Key words: steel structures;tube truss;hydraulic synchronizing lifting;temperature difference;construction 1工程概况 m。

如图1所示。

西藏会展中心位于拉萨市东郊,地面高程 3657.22~3658.89m,由会展中心1号馆兼会议中 心(建筑面积16159.90m²)、会展中心2号馆(建筑 面积19720.60m²)及配套车库等附属设施组成,建 筑总面积约37407.10m²,钢结构总安装量约 9200t,由下部梁柱结构约5000t及上部屋盖结构 约4200t组成,钢材材质为Q345C。

钢结构屋盖由 图1西藏会展中心效果 平面管桁架组成,最大桁架跨度76.5m,之间采用单 Fig.1 Effect diagram of Tibet Convention and 福次桁架连接,整个屋盖桁架支承在四周框架柱 Exhibition Center 上。

工程建筑高度1号馆为28.4m,2号馆为29.3 2施工难点 *国家自然科学基金青年基金();江苏省博士后基金 1)地处高海拔、低含氧量的拉萨地区,高空作 (1301048C) 业难度大。

[作者简介]韩向科,工学博士,工程师,E-mail:hanxiangke@ [收稿日期]2013-12-24 2)屋盖为空间曲面管桁架结构,形状复杂,空 万方数据
30 施工技...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2010年8月 施工技术 第39卷第8期 CONSTRUCTION TECHNOLOGY 129 西安咸阳机场T3A航站楼大型钢管柱安装技术 卜延渭,范永辉 (陕西建工集团机械施工有限公司,陕西西安710032) [摘要]西安成阳机场T3A航站楼主楼为钢结构和钢筋混凝土混合结构,40根钢管混凝土柱为主楼屋盖结构的支 撑柱.综合考虑土建工程施工工艺和总体施工计划安排,决定采用分两段跨内吊装的施工方案.重点介绍了钢管 柱制作过程中下料尺寸预放量、端部铣平、钢管矫正等工序,以保证钢管的几何尺寸和精度:以及钢管柱安装过程 中,定位螺栓安装、钢管柱对接、钢管柱测控等工艺,取得了良好的效果. [关键词]西安成阳机场;钢管混凝土柱;吊装;制作;安装 [中图分类号]TU758.15 [文献标识码]A [文章编号]1002-8498(2010)08-0129-04 Installation Technology of Large Steel Tube Column in T3A Terminal Building of Xi'an Xianyang Airport Bo Yanwei Fan Yonghui Shaanxi Construction Engineering Group Mechanized Construction Co.Lad.Xi'an Shaanxi 710032 China) Abstract:Main building of T3A Terminal Building of Xi'an Xianyang Airport is mixed structure with steel and reinforced concrete and there are forty concrete filled steel tube columns as support columns of main building roof.By considering the construction technology of civil engineering and total construction plan prehensively the construction scheme of hoisting in span through two segments is adopted.The process of reservation of blanking during steel tube fabrication is introduced in detail to assure the geometry size and precision as well as the milling flat at ending and correetion of steel tube.Besides the location bolt installation docking and measurement and control of steel tube column are also indicated during installation of steel tube column.It has gained excellent effects. Key words:Xi'an Xianyang Airport;concrete filled steel tube;hoisting;fabrication;installation 钢管柱结构...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年10月下 施工技术 第42卷第20期 CONSTRUCTIONTECHNOLOGY 39 DOI:10.7672/sgjs2013200039 西宁某体育馆钢屋盖卸载模拟分析及现场监测* 王秀丽,梁宝祥 (兰州理工大学土木工程学院,甘肃兰州730050) [摘要]大跨度钢屋盖施工过程中受力情况与成型后是不同的,需考虑施工过程中结构体系的变化。

结合西宁海 湖体育中心体育馆屋盖支撑卸载工程的施工特点,给出其支撑卸载的总体方案,并对其结构位移及关键杆件的应 力进行实时监测;同时,应用ANSYS有限元软件分析其卸载过程,确定卸载过程中关键杆件应力和结构变形的变 化范围,并与实测数据对比分析。

结果表明,结构屋盖支撑卸载后各测点的竖向高程均符合设计要求,其关键杆件 的内力相对其卸载前的应力变化不大,且杆件的应力随卸载过程的进行变化都比较平缓,符合设计要求。

【关键词】钢结构;屋盖;卸载;数值模拟;监测 [中图分类号]TU758.11;TU311.41 [文献标识码】A [文章编号】1002-8498(2013)20-0039-05 UnloadingSimulationAnalysisandtheFieldMonitoringfor XiningGymnasiumSteelRoof Wang Xiuli,Liang Baoxiang (School of Civil Engineering,Lanzhou University of Technology,Lanzhou,Gansu730050,China) Abstract;The change of the structural system must be considered in the construction process as the force raises the overall plan and monitors the structural displacement and the stress of the key joints in real time bining with the characteristics of the unloading engineering of Xining Gymnasium roof support. At the same time, the variation of the key rods' stress and structural deformation is confirmed and pared with the measured data using the software of finite element software ANSYS. The results show that the vertical altitudes accord with the design demands after unloading the roof support,the change of the stress in key rods is small paring with that before unloading,and the change of the stress of all rods is slow during unloading. Key words:steel structures;roofs;unloading; simulation;monitoring 0引言 程,一般可以分为两个过程:前期的安装成型过程 随着我国经济实力的增强和社会发展的需要,: 和后期的卸载过程。

当主体结构安装完工后要拆 大跨度空间钢结构在工程中得到了广泛应用。

空除支撑,即卸载。

卸载过程的受力状况直接影响到 间结构的日益多样化和复杂化推动了施工新方法、 成型结构的初始内力、变形,使用阶段的性能甚至 新技术的发展。

一些大型的复杂空间结构在安装使用寿命。

因此除了关心前期的安装成型过程之 过程中设置临时支撑以及在结构安装完成后拆除 外,对于后期的卸载过程也是不能忽略的,如果对 临时支撑的施工方法得到了快速发展。

大型复杂 其受力性能认识不足,设计分析理论欠缺研究,就 空间结构施工过程中的一个重要问题是如何计算 会导致施工阶段的工程质量事故和倒塌事故的发 并分析卸载(拆撑)过程中永久结构和临时结构的 生。

所以,对大型钢结构在施工过程中进行结构健 相互作用,保证卸载施工的安全顺利进行。

康状况的实时、在线监测,建立完善的监测、诊断分 大跨空间结构的施工是一个分阶段的施工过 析系统对于结构卸载、加载受力状态分析及施工安 全具有重要意义。

国内专家学者对此也已经进行 *国家自...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年8月上 施工技术 第42卷第15期 CONSTRUCTION TECHNOLOGY 23 DOI:10. 7672/sgjs2013150023 西宁曹家堡机场T2航站楼钢结构安装技术 薛鹏飞,卜延渭,段文歌 (陕西建工集团机械施工有限公司,陕西西安710032) [摘要]西宁曹家堡机场T2航站楼钢结构工程具有气候环境恶劣、现场条件极为有限、桁架结构复杂、倾斜钢柱安 装难度大、结构稳定性差等特点。

根据工程总体施工计划和工程特点,屋盖钢结构采用分段拼装、原位安装的施工 方案。

重点介绍了起重机械配置方案、支撑格构架设计方案、钢柱和析架的吊装方案、测量控制方案。

实践证明, 所采取方案保证了析架安装满足要求。

[关键词]机场;桁架;吊装;支撑格构架;测量 [中图分类号】TU758.11 【文献标识码】A [文章编号】1002-8498(2013)15-0023-04 Installation Technology of Steel Structure in T2 Terminal Building ofXiningCaojiabaoAirport Xue Pengfei,Bo Yanwei, Duan Wen'ge (Shaanxi Construction Engineering Group Construction Machinery Co.,Lad.,Xi'an,Shaanxi710032,China) Abstract;Steel structure engineering of T2 terminal building in Caojiabao Airport in Xining city has many difficulties such as harsh climatic condition,limited construction site,plex truss structure,inclined steel column and poor structure stability.The construction plan for roof steel structure is in site installation and segmental assembly.This paper mainly introduces the configuration scheme of hoisting machinery, design plan of lattice frame for supporting, hoisting plan of steel column and truss, and plan of measurement control. It proves that the truss is successfully installed. Key words;airports; trusses; hoists; supporting lattice frames; measurement 1工程概况 部标高为7.880m,钢柱与地面分别呈67°,68°和 西宁曹家堡机场是青海省唯一的二级机场,也7 71°。

主桁架和托架结构下弦杆相贯节点、V形变截 是青藏高原上重要的空中交通枢纽。

它位于西宁面箱形柱脚节点均采用铸钢节点,钢柱底部支座和 市东北角互助县境内,T2航站楼分为A段连廊、B桁架支座节点采用球形铰支座。

段主楼和C段指廊3部分,总建筑面积43950m²,2工程重点与难点 其中主楼东西长156m,南北宽77m。

整个工程结构 1)本地区气候条件恶劣,工程地处青藏高原, 为钢筋混凝土框架和钢结构形式。

海拔高度为2200m,最大日温差20℃,最低气温 主楼钢结构总量约为2700t,投影面积计算尺 -23.8℃;年大风日约150d,年最多沙尘暴日数 寸为172.0mx91.4m。

屋盖为管桁架结构,横向由 86d,最大风速8级,具有海拔高、昼夜温差大、风沙 14福平面主桁架和2福平面边桁架组成,纵向由 大等不利因素。

150福平面次桁架和15福平面托架组成,桁架下设 2)现场施工场地有限,主楼周边高架桥、指廊 吊顶龙骨(见图1)。

主桁架间隔2个轴距和3个轴 等混凝土结构与钢结构同时施工,吊装机械无站位 距,在跨中设置变截面箱形立柱。

主桁架截面高度 工作面。

1.562~7.217m,顶部标高24.600~30.382m,跨度 3)桁架均为平面桁架,桁架规格类型多达 为37m和40m。

整个桁架系统支撑于V形变截面 37种,结构复杂。

主桁架矢高最大为7m,长度为 箱形柱上,变截面钢柱支撑于混凝土柱上,钢柱底 91m,圆管杆件及节点达99根。...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)