某工程CFG桩复合地基设计及施工.pdf

CFG桩,复合地基,学术文献
文档页数:5
文档大小:2.15MB
文档格式:pdf
文档分类:学术文献
上传会员:
上传日期:
最后更新:

施工技术 2016年9月上 56 CONSTRUCTION TECHNOLOGY 第45卷第17期 D0I:10.7672/sgjs2016170056 某工程CFG桩复合地基设计及施工* 肖航,曹丹 (成都纺织高等专科学校建筑工程学院,四川成都611731) [摘要]根据北京某高层住宅地基处理实例,对比了级配换填、素混凝土换填和CF桩3种处理方案,经综合比较, 选择CFG桩复合地基处理方案.介绍了地基承载力确定、CFG桩施工技术及CFG桩复合地基承载力检测技术. 实践证明,主体结构封顶时,主体结构平均沉降在8mm以内,满足要求,且地基处理造价降低50%,经济效益显著. [关键词]地基;CFG桩;静载试验;沉降监测;设计;施工技术 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2016)17-0056-04 Design and Construction Technology of Composite Foundation with CFG Piles for Some Engineering Xiao Hang Cao Dan School of Civil Engineering Chengdu Textile institute Chengdu Sichuan 611731 China) Abstract:Taking foundation treatment of some high-rise house in Beijing as an example this paper contrasts three treatment schemes including gradation changing and filling plain concrete changing and filling CFG piles the treatment scheme of posite foundation with CFG piles is selected after prehensive parison.This paper introduces the determination of foundation bearing capacity construction technology of CFG piles and bearing capacity detection technology of posite foundation with CFG piles.Engineering practice shows that the average settlement value of the main structure is within 8mm when the main structure caps which meets the requirement the foundation treatment cost reduces 50% the economic benefit is obvious. Key words:foundations;CFG piles;static load test;settlement monitoring;design;construction 1工程概况 2地基处理方法对比选择 本工程位于北京市房山区,由4栋板式高层住2.1工程地质概况 宅楼、1栋商业配套及1层地下车库组成(见图1). 拟建场地25.0m深度范围内的地层按沉积年 本...

资源链接请先登录(扫码可直接登录、免注册)
十年老网站,真实资源、每天更新、会员免费畅享!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)