煤制天然气装置复杂成分填料填方地基强夯处理.pdf

丘间谷,夯区,强夯,粉土区,学术文献
文档页数:4
文档大小:276.59KB
文档格式:pdf
文档分类:学术文献
上传会员:
上传日期:
最后更新:

施工技术 2013年4月上 34 CONSTRUCTION TECHNOLOCY 第42卷第7期 D0I:10.7672/8gjs2013070034 煤制天然气装置复杂成分填料填方地基强夯处理 吕和蔼,闫续屏 (辽宁大唐国际阜新煤制天然气有限责任公司,辽宁阜新123000) [摘要]煤制天然气装置对地基的变形、稳定性要求严格.针对场地实际情况,采取了相应的整平和夯实方案,并 对分层碾压法和强夯法进行了比较.通过试验,确定了强夯的总体方案,并对特殊部位和冬季施工采取了相应的 处理措施.检测结果表明,各项指标及沉降量均满足规范和设计要求. [关键词]地基;强夯;试验;检测 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2013)07-0034-04 Dynamic Compaction on Foundation with Complicated Fillings for Coal Gas Device Lu Heai Yan Xuping Liaoning Datang International Fuxin Coal-To-SNG Co.Lad.Fuxin Liaoning 123000 China) Abstract:Coal gas device has very strict requirement on the deformation and stability of its foundation. Corresponding leveling and tamping methods were selected according to the site condition and parison was made between lateral rolling method and dynamic paction method.The general scheme of dynamic paction was determined based on test results.Treatment measures were adopted for special locations and winter construction.Detection results show that all indexes and the settlement can meet the design requirements. Key words:foundations;dynamic paction;test;detection 1工程概况 4)现场堆积有120万m3的煤矸石,占用土地、 辽宁大唐国际阜新煤制天然气有限公司建设浪费资源、污染环境.煤矸石有化学性质不稳定和 的日产1200万Nm3煤制项目,厂址位于辽宁省阜 产生自燃等不良作用,对煤化工装置极为不利. 新盆地中部,场区北部为刺蚀丘陵,东部为丘间谷 3施工重点和难点 地.地势大致为西南高、东北低,最大相对高差约 1)工程项目为煤化工装置,工艺复杂,易燃易 为61.5m. 爆,对场地的沉降变形和稳定性要求严格.场地平 2场地工程特点 整时回填土的压实处理方案是保证地基安全稳定、 1)场地地形地貌复杂厂区占地范围分布有1 满足设计使用要求、保证工程工期的关键. 条大冲沟、2条小冲沟,整体地势倾斜,形成11个标 2)本工程占地总面积336.73万m2 总挖方量 高的台阶,填方量大,回填场地形成临空面,如何保 1417.5万m3 总填方量1304...

资源链接请先登录(扫码可直接登录、免注册)
十年老网站,真实资源、每天更新、会员免费畅享!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)