2013年2月上施工技术 第42卷第3期CONSTRUCTIONTECHNOLOGY51 DOI:10. 7672/sgjs2013030051 京广中心装修改造工程钢构件拆换技术*
张俊,王良波,柳鹏,郑文科,张鹏 (中建三局第二建设工程有限责任公司,湖北武汉430074) [摘要]某工程因设计局限性及建筑布局的改变,原结构层高不能满足使用要求,需将原有结构夹层楼板拆除,并 将夹层钢梁提升700mm。
为满足建筑及结构要求,采用新增钢梁替换原结构钢梁,并将新增钢梁与原有钢柱的连 接采用钢柱外包钢板连接的拆换技术。
通过实际工程应用和监测,采用该钢构件拆换技术,能有效减小焊接变形, 确保工程质量和安全。
[关键词]改造工程;钢结构;拆换;监测;施工技术 [中图分类号]TU746.3[文献标识码]A[文章编号]1002-8498(2013)03-0051-02 Steel MembersReplacementTechnology inJingguang CenterReconstructionProject Zhang Jun,Wang Liangbo,Liu Peng,Zheng Wenke,Zhang Peng
Abstract:Due to the limitations of original design and change of building function, the original story height cannot meet the requirement. As a result, the mezzanine floor need to be demolished and the mezzanine steel beams need to be lifted by 700 mm.In order to meet the architectural and structural requirements,it was determined to replace the original steel beams. The new steel beam was connected to the original steel columns by connections with enclosed steel plates around the column.The application and monitoring show that the steel member replacement technology can effectively reduce the welding deformation and ensure the construction quality and structural safety. Key words;reconstruction; steel structures;replacement;monitoring;construction 1工程概况新增加梁刚接连接 京广中心首层由于建筑布局的改变,原有结构 层高不能满足使用要求,需将原有结构夹层楼板拆 除,并将夹层钢梁提升700mm。
a平面 2施工工艺穿孔塞焊 2.1施工方法确定新增加梁 钢构件拆换即采用新增钢梁替换原结构钢梁。
为减少钢结构施工过程中焊接对原结构的影响,新 增钢梁与原有钢柱连接采用钢柱外包钢板连接,即 钢柱外包钢板与钢柱4面塞焊连接,钢梁与外包钢 板刚接连接,待钢梁施工完成后钢板与钢柱间隙用 结构胶灌满(见图1)。
拆除原结构梁 2.2工艺流程b节点连接大样
图1拆换后钢梁连接节点 *中建三局科研项目:京广中心装修改造工程综合施工技术(ZJSJ-Fig.1 Connection joint of the steel beam 2011-08)after demolition andreplacement [作者简介]张俊,北京公司总经理,高级工程师,E-mail: @139.1)搭设操作架采用钢管脚手架或移动脚手 [收稿日期]2012-11-11
万方数据
52施工技术第42卷
0o o 500500500 -1 000+-2-22-} -1500-1500-1500
2000-2000 -2 5002 500-2 500 -3000A B C D E-3 000B C D E3 000
A A B C D 工况工况工况 a钢柱 b梁端 c梁跨中
图3梁柱测点应力变化 Fig.3The stress change of monitoring points on the beam and column 架搭设,保证架体稳定。
2 2)原有防火涂料清理将外包钢板处原有防③ ...