施工技术 2014年1月下 80 CONSTRUCTION TECHNOLOGY 第43卷第2期 D0I:10.7672/sgjs2014020080 电动爬模技术在筒体结构施工中的应用* 苏茂福,王雪芹2,金燕2 (1.烟建集团有限公司,山东烟台264000;2.烟台职业学院建筑工程系,山东烟台264670) [摘要]烟台来福士2万t固定桥式起重机基座施工中,对XHR-02型电动爬模进行了技术改进,采用大模板与爬 架同步爬升施工技术,爬架提升时携带大模板同时提升,而架体与导轨互爬;简体内的隔板采用高悬空支模施工技 术,成功地完成了筒体结构施工.该工程主要在施工工艺、爬模系统构造、大模板与爬架一体化构造、筒体隔板高 悬空支模施工技术等方面有所创新. [关键词]模板;电动爬模;筒体结构;起重机;施工技术 [中图分类号]TU755.2 [文献标识码]A [文章编号]1002-8498(2014)02-0080-04 Application of the Electrically Operated Climbing Formwork in Tube Structure Su Maofu' Wang Xueqin2 Jin Yan2 (1.Yanjian Group Co.Lad.Yantai Shandong 264000 China;2.Department of Architectural Engineering Yantai Vocational College Yantai Shandong 264670 China) Abstract:Compared with XHR-02 electrically operated climbing formwork the technology has been improved a lot in the base construction of 20 thousand tons fixed bridge crane from Yantai Ruffles.It uses the synchronous climbing construction technology for both large formwork and climbing frame which means when climbing frame is lift the formwork will be taken to lift simultaneously.Besides the frame body and rail-type climbs together.The spacer plate in tube structure uses high hanging formwork technology which is finished successfully in the tube structure construction.This construction technology is mainly innovated in the construction process climbing frame system structure large formwork and climbing frame integrated structure and high hanging formwork technology used in spacer plate of tube structure. Key words:f...
推荐内容/By 规范库
-
模糊PID控制在电厂过热气温控制系统中的应用.pdf
-
人体MCNP重复结构辐射计算模型可视化方法.pdf
-
三维离散纵标方法在中国实验快堆堆芯屏蔽计算中的应用.pdf
-
ACI 357.3R-14 滨水和沿海混凝土海洋结构设计与施工指南(英文版).pdf
-
预应力鱼腹梁支撑体系在异形基坑中的应用与研究.pdf
-
预应力筋张拉方法对工程造价的影响.pdf
-
预应力摩擦支撑-抱箍法在某加固工程中的应用.pdf
-
预应力张拉引起的现浇结构支架加卸载效应研究.pdf
-
预应力加固技术在某改造工程中的应用.pdf
-
顶升技术在城市桥梁改造中的应用.pdf
-
隐框式聚碳酸酯板在深圳大运会场馆中的应用.pdf
-
长螺旋钻孔后插钢筋笼灌注桩在某工程中的应用.pdf