2015年4月下施工技术 第44卷第8期CONSTRUCTIONTECHNOLOCY67 DOI:10. 7672/sgjs2015080067
大同美术馆钢结构施工监测技术
殷永艺,王军,司坤 (中冶天工上海十三冶建设有限公司,上海201999)
[摘要】根据大同美术馆整体滑移施工全过程有限元分析结果,制定了对本工程钢结构施工过程和运营阶段关键 部位的应力-应变和位移的监测方案。
详细介绍了测点布设、监测系统组成以及监测系统的运行等内容,提出了合 理的监测预警体系。
[关键词]钢结构;施工监测;应力;应变;变形 [中图分类号】TU758:TU394[文献标识码]A[文章编号]1002-8498(2015)08-0067-04 MonitoringTechnologyofSteelStructureConstruction inDatongArt Gallery YinYongyi,Wang Jun,Si Kun (CMTCC Shanghai Shisanye Construction Co.,Lad.,Shanghai 201999,China) Abstract:By simulation analysis for the whole slide construction process in Datong Art Gallery, monitoring scheme was made for stress-strain and displacement of key parts in steel structure construction process and operation stages. The monitoring points seting,position and operation of the monitoring system are described in detail.Furthermore,a reasonable early warning system was proposed, which provided reference for similar steel structure monitoring. Key words:steel structures;monitoring;stresses;strain;deformation 1工程概况间主桁架组成,主桁架之间设置次桁架,形成空间 大同美术馆位于大同市新城区,建筑占地面积桁架结构体系。
主桁架最大跨度达90m,桁架两端 10003.4m²,总建筑面积32238.5m²,是大同市全新根据需要设置柱或剪力墙作为桁架支座。
本工程 建设的文化广场内四大文化建筑之一。
大同美术设计使用年限50年,防火等级一级,抗震设防烈度 馆效果如图1所示。
7度。
地上钢结构部分施工采用整体滑移方案,过程 中需对大跨度桁架进行一系列影响结构内力及变 形发展的施工工艺。
为保证施工过程及施工完毕 后结构的承载能力、运营状况和耐久性能满足设计 要求,评价其安全性能,并对其施工期间、运营阶段 结构损伤进行评估,有必要采用适合的监测技术形 成一套完善的工程施工监测系统。
图1大同美术馆效果2施工及运营阶段有限元分析 Fig.1 Datong Art Gallery rendering基于大同美术馆的结构特点和施工方法,建立 该建筑物由地下混凝土结构和地上钢结构组相应的有限元模型。
充分考虑结构设计图纸与实 成,地下2层,地上零层。
地下部分为钢筋混凝土框际工程建造中结构参数的偏差,选用尽量接近真实 架-剪力墙结构,展厅主体与功能用房在首层位置采状况的结构参数,对施工工况进行全过程模拟分析 用连桥连接,跨度大约63m;地上部分由4个锥形空计算。
通过施工过程的正装分析和倒装分析,确定 [作者筒介]股永艺,高级工程师,E-mail:yinyongyi@vip.163.施工过程中各控制点的竖直及水平方向的初始值, [收稿日期]2014-04-09预测各施工过程中关键部位和构件的变形和内力。
万方数据
68施工技术第44卷 根据大同美术馆钢结构施工过程的特点,将监4.600 测方案分为3个阶段:①屋盖钢结构现场拼装与卸180×6 载阶段:②屋盖钢结构滑移阶段:③钢结构运营阶测点测点测点
支撑架 段。
确定各阶段监测内容,屋盖钢结构现场拼装与HW250×225×14×14测点11.400 卸载阶段:①结构和支撑体系的变形;②杆件的内12.000
60000066000 力。
屋盖钢结构滑移阶段:①结构最大变形点的位a 1,4轨道 移,应力比最大杆件的内力;②结构滑移前进的速4.600 度及运动状态;③结构重要杆件...