BSIBS*2790 921624b690272634T BRITISHSTANDARD BS 2790 : 1992
Specificationfor
Design andmanufactureof shellboilersofwelded construction
tubes de fumee de construction soudfe Conception et construetion des chandilsres geschweiRten Dampfikesseln mit Koestrulction und Herstelung von Sp6cifieotions Ummentelung
NO CYOPYING IN ANY FORMI WTTIRT WRITEN PERMINNRN FIRXOI BNI STANDARDS
Sun Feb 07 11:20:40 2010 Copyright by the British Standards Institution
Committeesresponsibleforthis BritishStandard
The preperation of this British Standard was entrusted by thePressure Vessel Standards Policy Committee (PVE/-) toTechnical Committee PVE/16 uponwhieh the following hnrlies were representerd:
Association of Shell Bollermakers Associated Offices Technical CommitteeBritish Combustion Equipment Manufaoturer'Acociation British Steel IndustryDepartment of Health Department of the Environment (Property Services Agency)Engineer Surveyors’ Section of the MsfIndependent Engineering Insurers' Committee Health and Safety ExecutiveLloyd's Register of Shipping
direction of the Prere Veel This Brltish Standand having been prepared under thewaes published under the Standands Pollcy Commtee authority of the Standards aga eao pe pmng1 Jauary 1992
Amendments issued since publieation
Amd. No. Date Text affected
ISBN 0 580 20075 2
E 992220 699h29 26 0622*58 158 B52790:18092Issue 1 January 1992Summary of peges No. ofPreliminary peges: shoets 5 (title page mittees responsible summary f pages contents freword]Section one: Section two: 2 (pages 2/1 to 2/3) (pages 1/1 to 1/3)Section three: 28 2 (pages 3/1 to 3/55)Section five: Section four: 2 9 (pages 4/1 to 4/4) (pages 5/1 to 5/17]Section six: 1 (page 6/1)Section eight: Section seven: 1 2 (page 7/1) (pages 8/1 to 8/3)Section nine: 1 (pages 9/1 to 9/2)Appendix A: Appendix B: 15 1 (page B/1 to B/30) (page A/1)Appendix C: 6 (pgos C/1 to C/12)Appendix D: Appendix E: 1 1 (page E/1) (pages D/1 to D/2)Appendix F: 2 (pages F/1 to F/3)Concludiing pages: Enquiry Cases 4 (publlcatlons referred to badk cover)
ContentsPage PageForeword Committees responsible Inside front cover vi Section six.Inspetionand presure testing 6.1 Inspectors 6/1Specification 6.2 6.3 Pressure tests Inspection during construetion 6/1 6/13eution une. Geerl 1.1 Scope 1/1 Section seven. Documentation and marking1.2 1.3 References Definitions 1/1 1/1 7.1 Drewing docuenta nd date ahect 7/11.4 Interpretation Responsibilities 1/2 7.2 7.3 Marking Certificates 7/1 7/11.5 1.6 Terminology and symbols 1/2 1/2 Section eight. Safety valves fittings and mountings1.7 Information and reguirements to be agred and to be documented 1/2 R.1 8.2 Water-level gauges Safety vshet 8/1 8/1Section two. Materials 8.3 Water-level alarms fuel cut-outs and sind qsn 8/22.1 2.2 General Selection of materials 2/1 2/1 8.4 8.5 Connectingpipesforwater-levelfittings Pressure gauges 8/2 8/22.3 2.4 Forming of plates Material specifications 2/1 2/1 8.7 8.6 Boiler feecwater valves Boller blowdown and drain mountings 8/2 8/22.5 Eleveted temperature properties 2/1 68 8.8 Boiler main stop valves Vent pipes 8/3 8/3Section three. Design Section nine. Automatiecallv controlled steam and hot water boilers3.1 3.2 Design criteria Cylindrical shells under internal pressure 3/1 3/2 9.1 General 9/13.3 3.4 Dished and flanged ends Openings in cylindrical shells 3/3 S/E 9.2 9.3 Automatic controls tor steam boilers Automatic controls for hot water bollers 9/1 8/13.5 pensating platesto cylindrical shells Fillet welds attaching pads and 3/6 Appendicss A Information to be supplied by the A/13.6 3.7 Openings and branches Access and inspection 9/E 3/7 Durchaser to the manufacturer Typical examples of acceptable3.9 Tubes and tube plates Stays stiffeners and supported surfaces 3/13 8/E C weld details Calculation of tubc plate temperetures B/1 C/13.10 Furnaoesface cmonentswetback reversal chambers and fireboxes of D E Boileroperation Remendations for access and internal D/1eylindrical form subjoet to oxternal pressure 3/14 Example ofacalcultion carred outin inspection E/1Section four.Workmanship and construetion F accordance with appendix G of BS 6500: 1991 to determine the shell stresses for ain fabrication other than welding 4 1 Plate identifiostion 4/1 boller with leg supports F/14.2 4.3 Cold forming of plate Cutting of forgings 4/1 4/1 Tables4.4 4.5 Reinforcing plates Cylindrical shells 4/1 4/1 1.1.1 Carbonand carbonmanganese steels Limits of application 1/14.6 4 7 End plates and tube plates Plain tubes and stay tubes 4/1 4/1 2.5(1) temperature properties with speeified minimum elenated 2/24.9 4.8 Access and inspection openings Setings for mountings 4/2 4/2 2.5(2) Carbonand carbonmanganese stees4.10 Horizontal cylindrical furnaces Fireboxes and reversal chambers 4/3 4/3 without specifled elevated temperature properties 2/24.11 4.12 Cross tubes and stays 4/4 2.5(3) properties specified elevated temperature Values of E formaterisls without 2/3in welding Setion five.Workmanship and construetion 3.8.1.3 Breathing space 3/10 3/95.1 General 5/1 3.8.2.6 3.8.8.6 Weld attachments Value of constant 3/125.2 5.3 Design Materials 1/9 5/1 3.9.1 Minirmum thickness of tubes under external pressure 3/135.4 Heat treatment Fabrication and welding approval 5/2 5/6 3.9 4 1 under internal pressure Minimam thieknass nf straight tubes 3/135.6 5 7 Non-destruetive testing Acceptance criteria for weld defects 8/9 5.4.7(1) Number of test specimens for weld uonanpoud pue jeaoudde aunpaooudnon-destructive testing revealed by visual examination and 5/12 5.4.7(2) Bend test requirements control tests 5/3 5/4
Copyright by the British Standards InstitutionSun Feb 07 11:20:46 2010
992220 0622*59 158BS 2790 : 1992 Issue 1 January 1992P Page5.5.1.1(1) Remended preheating tempera- 3.10.1.2 Second moments of area / andectionsbarsandforins tures for thermal-cutting of plates 9/9 3.10.1.9 2 Furnace stiffeners for plain and cross-sectional area F 3/505.5.1.1(2) Remonded preheating tempera- tures for welding of plates sections 3.10.1.9.3 Bowling hoops corrugated sections 3/53 3/545.6.2.2.1 bers and forginga Extent of radiographicorultrasonic 5/7 3 10.3 Attachment of firoboxes to shells 99/25.7 Acceptance levels testing for butt welds 5/13 5/9 5.4 6 1.3 5 4.7.4 Transverse bend test specimen Cutting up of the test plate 5/15 5/158.9 Minimum open vent pipe size E/8 5.4.7.5 5.4.7.7 Side bend test specimen V-notch test oiece 5/16 5/16Figures 3.1(1) Wet back boiler 3/17 5.7.2 B(1) Plate preparatinforbutt-welded Assessment of inelusions 5/173.1(2) 3.1(3) Semi-wet back boller Dry haek boiler 3/18 3/18 longitudinal end Glrcunferential seams B/33.1(4) 3.1(5) Reverse fired boiler Vertical bolier 3/18 3/19 B(2) B(3) Crass seams in end plates Attachment of unflanged flat end B/33.1(6) diameter and permissible heat input Relationship between furnace 3/21 R(4) plates or-tube plates to shell Attschment of ond plstes or tube B/43.2.5.2 3.3(1) Design of saddle supports Typical dished ends 3/24 3/22 firebox wrapper plates plates to reversal chamber or B/53.3(2) Chepe fector Openings in ends 3/26 3/25 B(5) Attechment of furneces to end plstes or reversal chamber tubeplates B/73.3(4) 3.4.4 Limits of reinforcement Compensation of welded branch up 3/26 B(6) Attachment of furnaces to flanged end plates B/8to one-third of the diameter of the boiler.shell 3/27 B(7) Typical method of attachment of sh drop-out tubc 0/83.5 Welding of manhole frames and pensating plates 3/28 B(8) B(9) Foundation ring Fusion welds of cross tubes B/10 B/103.6.2(1) Welcing detail for manhole frame in flat end plate 3/29 B(10) firehole opening Typical method ot attechment of B/1.13.6.2(21 Compensationforelloticalmanholes and inspection openings in flat end R(11) B(12) Stanrlnrd welet praparatinn detalls B/12 B/133.6.2(3) Compenation for branch in flt plates 6Z/ ( B/14 B/15Tvpical arrangement of end plate on end plate 3/30 B(14) ()8 Set-on branches B/16 B/173.8.1(1) Typical arrangement of end plete on multitubular boiler 3/31 B(18} B(16) B(17) B/18 B/193.8.1(2) Cornish boiler 3/32 B(10) Set-in branohos (partial penetration Weld details for set-ln branches B/203.8.1(3) Typical arrangement of end plate on a Lancashire boiler 3/33 B(20) Set-in branehes (full penetration weld) (pjM B/213.8.2(1) 3.8.2(2) Use of sub-circles (twin furnace) Use of sub-circles (single furnaoe) 3/35 3/34 B(21) B(22) Set-in branches (full penetration B/22382(3) 3 8.2(4) Detorminstion of factory Example of a gusset stay that 3/38 B(23) Set-in branches (full penetration asvmmetrical welds) B/24 B/23impinges on themain circle other than at a tangont 3/37 D(24) welds welded from one side only1 Forged branch connections B/253.8.2(5) Attachment of firebox and reversal chamber stays 3/38 B(26) B(25) Set-on branches with added B/263.8.2(7) 3.8.2(6) Attachment of bar stays with washers Access opening for wet back boilers 3/39 3/41 B(27) pensation rings Set-in branches with added B/263 8 2(0) girders to reversal chambers Typical methods of fitting welded 3/41 B(28) enmpensation rings Butt-welded studded connections B/27 B/283.8.3 3.8.5.1 Bar stays for therear plate of wet Flat end platos of a vertical boiler 3/44 8(29) B(30) Uval manhole frame Fllet-welded studded connections B/29 B/303.8.8 3(1) back reversal chambers Attachmant of walded gusset staye 3/45 3/46 C(1) Radlationcoeffcentforblack exchangn (F = 1)3.8.8.3(2) Typical details for welded and pinned gusset stays 3/47 C(2) Determinationofoverallexchange factor F /3.8.8.4 3.9.2(1) sAesxu fepe Typical attachment of stay tubes 3/47 3/48 C(3) Ratiu Ag/Ag for cylindricl chamber diameter D length C/63.9.2(2) Tvpical attachment of plain tubes 3/49 C(4) Basis convactioncoefficlent C/7
Copyright by the British Standards InstitutionSun Feb 07 11:20:47 2010