答疑:如图,梁顶和柱顶是平起的,为什么不能设置支座-河南土建概算招投标预算土建算量GTJ2018
问题专业:土建,概算,招投标,预算,土建算量GTJ2018,
提问日期:2021-03-07 21:36:20
网友“zidge”提问内容:
业内专家“竹风”回复:
重提梁跨试试
问题专业:土建,概算,招投标,预算,土建算量GTJ2018,
提问日期:2021-03-07 21:36:20
网友“zidge”提问内容:
业内专家“竹风”回复:
重提梁跨试试
问题专业:土建,
提问日期:2021-03-07 20:53:19
网友“我不想玩游戏了”提问内容:
一个18-25 一个12-25 计算设置里只能设置一种 怎么才能分开给它们设置
业内专家“维达詹工”回复:
你好:剪力墙水平钢筋是不能使用电渣压力焊的。
问题专业:土建,
提问日期:2021-03-07 20:36:11
网友“黑”提问内容:
只计算设计搭接不计算非设计搭接,在广联达软件里应该怎么设置?请指教 师傅们
业内专家“维达詹工”回复:
你好:
问题专业:土建,
提问日期:2021-03-07 18:21:12
网友“上进的小预呀~”提问内容:
但是条基用大放脚画嘛?尺寸大放脚挨个标不出来啊
业内专家“维达詹工”回复:
你好:
问题专业:土建,
提问日期:2021-03-07 18:03:51
网友“16639145902”提问内容:
天沟、檐沟这俩是一样的吧
业内专家“维达詹工”回复:
你好:1、檐沟老式建筑物屋面的檐口,檐下面横向的槽形排水沟,一般会单独的安装一个可以组织排水的装置,用于承接屋面的雨水,然后把水排到地面,材料通常是竹子,铁皮,有的也会选择油毡或者铝板等。
2、天沟是指对现代建筑房屋屋面,一般采用现浇钢筋砼与屋面整体浇注,顺房屋外墙设置,低于屋面起坡,暴露无遮盖的槽型沟,有组织集聚雨水,由竖管引到地面。天沟分内天沟和外天沟,主要以外墙为界。
问题专业:土建,
提问日期:2021-03-07 18:00:54
网友“我可能盐吃多了”提问内容:
业内专家“维达詹工”回复:
你好:1800元左右
问题专业:土建,
提问日期:2021-03-07 17:09:45
网友“漸行漸逺”提问内容:
业内专家“维达詹工”回复:
你好:
内容摘抄:1、深化设计强调发现问题,反应问题,并提出合理解决方法,可以作为设计与施工的介质,立足于协调配合土建与机电以及机电各相关专业,保障设计意图的实现。2、甲方和施工单位在施工前整理思路,提前解决图纸中可能存在的问题,消化成熟后再施工,避免因变更和拆改造成不必要的损失;3、加强甲方管理,统一不同总包和班组做法,确保一次施工到位,使将来机电安装布置合理,整齐美观;4、在原施工图基础上,配合不同专业分包,对点位进行精确定位,直接指导施工;
问题专业:安装,
提问日期:2021-03-07 16:47:30
网友“lliaks”提问内容:
喷淋支管到喷头的高度怎样确定呢?
就是喷淋头到支管有一段距离,这段距离怎样确定是多少
业内专家“大家广联”回复:
这段应该在淋浴器中,不单独计算的。只计算到控制阀处就行
问题专业:土建,预算,钢筋算量GGJ2013,土建算量GTJ2018,
提问日期:2021-03-07 16:43:03
网友“羡慕飞鸟”提问内容:
业内专家“GXZ”回复:
可以在自定义库的多边形进行编辑。
内容包括:(一)成套配电柜、控制柜(屏、台)和动力、照明配电箱(盘)安装、(二)电缆桥架安装和桥架内电缆敷设、(三)电线导管、电缆导管和电线敷设、(四)灯具安装、(五)开关插座、风扇、安装、(六)避雷引下线和变配电室接地干线敷设、(七)隐蔽和吊顶内在质量、(八)存在问题
问题专业:土建,
提问日期:2021-03-07 16:33:33
网友“努力”提问内容:
业内专家“小老百姓”回复:
可以用两个单跑
本图册适用于安装公司所属各经理部、安装公司直属项目及各经理部所属施工项目。内容包括:安装公司质量管控措施、预留预埋、支架制作与安装、管道工程安装、电气工程安装、通风工程安装、机房设施安装、防腐保温、标识、成品保护标准化做法、工程创优标准化做法等十一个方面,基本涵盖了机电安装施工范围。
内容目录:
第Ⅰ部分 安装公司质量管控措施········001
㈠深化设计制············································002
㈡样板引路制············································008
㈢放线制····················································011
㈣标签验收制············································014
第Ⅱ部分 施工工艺标准化做法············016
一、预留预埋············································017
㈠管道预留预埋········································017
㈡电气预留预埋········································024
二、支架制作与安装································032
三、管道工程安装····································048
㈠管道系统安装········································048
㈡卫生器具安装········································062
㈢消防器材安装········································068
㈣设备安装················································072
四、电气工程安装····································078
㈠电气配管安装·······································078
㈡开关、插座安装···································083
㈢桥架、母线安装···································086
㈣配电箱、柜安装及配线敷设···············092
㈤灯具安装···············································098
㈥防雷接地···············································102
五、通风工程安装···································110
㈠风管制作与安装···································110
㈡风口风阀安装·······································117
㈢设备安装···············································121
六、机房设施安装···································124
七、防腐保温···········································129
八、标识···················································134
第Ⅲ部分 成品保护标准化做法···········139
第Ⅳ部分 工程创优标准化做法···········146
问题专业:土建,预算,
提问日期:2021-03-07 16:32:44
网友“730372171@qq.com”提问内容:
业内专家“钢筋撑起半边天”回复:
上边四个是伸到截面的中心线。下边是上弯15D
根据目前建筑市场的特点,由设计单位所提供图纸的深度只能达到招标图纸所显示的深度,并未达到施工图之深度,特别是大型复杂综合性工程项目和高装修的高档工程项目中,更是经常会根据现场的实际情况和客观条件的变化进行设计变更。那么这要求施工单位具有施工图或者招标图的二次设计能力,根据业主或者设计单位提供的原理图、条件图、设计变更等,结合现场实际情况、施工进度需要、选型设备的参数、土建条件的变化、装修图的要求等结合自身的特点进行施工图或招标图的二次设计,这就是我们常说的深化设计。
内容目录:
第一章 深化设计理解与运用
第二章 深化设计内容与要求
第三章 深化设计原则
第四章 深化设计组织与管理
第五章 深化图纸制作细则
内容包括:一、屋面工程安装、二、隐蔽工程安装、三、配电箱、开关、插座安装、四、卫生器具安装、五、管、电井道内安装、六、走廊、大厅平顶上器具安装、七、地下室车库、配电间设施安装、八、地下室机房、泵房设施安装、九、室外消防接合器、避雷测试点安装、十、管、电、风细部安装
机电安装是一个讲究美观的工作,它要求总体布局合理美观、状态标识清晰准确、设备运行安全稳定;机电安装也是一个讲究细节的工作,它于细微处见功力:支架管件安装标高一致,管道穿楼板套管处理细致,各类管线按功能着色,套管与饰面相平...... 这是效果图还是实景图?(以下照片由我部负责人通过网络平台,视讯会议等技术手段,以建筑专业为龙头,机电相关专业为辅助,利用节假日等时间,于天津空港国际医院、成都中石油、重庆复地三个项目进行相关学习考察)
本资料分项了中建八局在超高层建筑施工中机电专业管线综合布置经验。
内容包括:桩基简介、钻孔桩施工工艺流程、桩基检测与事故缺陷桩处理、常见事故与缺陷的原因及防治、桩基工程精细化管理、桩基安全管理措施、工程案例。
脚手架讲解案例:某砖混结构的六层住宅楼工程,要砌筑 24 墙体,需搭设脚手架。 脚手架的搭设高度为 24 m,搭设长度为 33 m,采用双排扣件式钢管脚手架搭设。 试设计此脚手架,编制脚手架施工方案。
砌筑讲解内容摘抄:
1. 砖基础的砌筑工艺
(1) 基础弹线
垫层施工完毕后,即可进行基础的弹线工作。 弹线之前应先将表面清扫干净,并进行一次抄平,检查垫层顶面是否与设计标高相符。 如符合要求,即可按下列步骤进行弹线:
① 在基槽四角各相对龙门板(也可是轴线控制桩)的轴线标钉处拉线。
② 沿线绳挂线坠,找出线坠在垫层上的投影点(数量根据需要选定)。
③ 用墨斗弹出这些投影点的连线,即外墙基础轴线。
④ 根据基础平面尺寸,用钢尺量出各内墙基础轴线的位置,并用墨斗弹出,即内墙基础轴线。
⑤ 根据基础剖面图,量出基础大放脚的外边线,并用墨斗弹出(根据需要可弹出一边或两边) 。