答疑:下载的GQI打不开???-河北安装算量GQI
问题专业:安装,安装算量GQI,
提问日期:2021-03-10 16:17:29
网友“胡萝卜的糖”提问内容:
请问联想小新14-2019的电脑,下载gqi打不开,每次加载着就没了,有时候加载到百分之六十就没了,怎么办?急求解决办法!!!!
业内专家“”回复:
-
可以卸载掉重新下载
-
看一下是不是下载的版本和电脑是否匹配
问题专业:安装,安装算量GQI,
提问日期:2021-03-10 16:17:29
网友“胡萝卜的糖”提问内容:
请问联想小新14-2019的电脑,下载gqi打不开,每次加载着就没了,有时候加载到百分之六十就没了,怎么办?急求解决办法!!!!
业内专家“”回复:
可以卸载掉重新下载
看一下是不是下载的版本和电脑是否匹配
问题专业:土建,园林,
提问日期:2021-03-10 16:16:43
网友“李林泽”提问内容:
业内专家“文竹”回复:
可以识别,按提示框一步步操作即可
问题专业:市政,
提问日期:2021-03-10 16:12:47
网友“13091317603”提问内容:

业内专家“文竹”回复:
一般情况垫层在底板下面,楼梯在底板上面,不用考虑扣减楼梯所占的体积。如果楼梯穿过底板(有开口)要扣
ICS 29.240 D 14
Record No. J801—2008
Electric Power Industry Standard of the People's Republic of China
P DL / T 5076 — 2008
To replace DL/T 5076 — 1997 and DL/T 5146 — 2001
Technical Code of Exploration and Surveying for 220kV and Lower Level Overhead Transmission Line
Issue Date: June 04, 2008 Implementation Date: November 01, 2008
Issued by the National Development and Reform Commission of the People's Republic of China

1 Scope
This code specifies the basic technical requirements for exploration 220 kV and 110kV overhead transmission lines engineering.This code is applicable to the geotechnical engineering, survey and engineering hydrological exploration of 220 kV and 110 kV overhead transmission lines that are newly built and modified. The exploration of overhead transmission lines engineering at a voltage level below 110 kV may refer to the relevant requirements of this code according to the actual conditions.
2 Normative References
The following normative documents contain provisions which,through reference in this text, constitute provisions of this standard.For dated references, subsequent amendments (excluding the contents of errata) to, or revisions of, any of these publications do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative documents apply.
GB/T 20257.2 Cartographic Symbols for National Fundamental Scale Maps—Part 2: Specifications for Cartographic Symbols 1:5000 &1:10 000 Topographic Maps
GB 50007 Code for Design of Building Foundation
GB 50011 Code for Seismic Design of Buildings
GB 50025 Code for Building Construction in Collapsible Loess Regions
GB 50324 Code for Engineering Geological Investigation of Frozen Ground
GB 50139 Navigation Standard of Inland Waterway
GB 50286 Code for Design of Levee Project
GBJ 112 Technical Code for Buildings in Expansive Soil Zones
DL/T 5001 Technical Code for Engineering Survey of Fossil-fueled Power Plant
DL/T 5092 Technical Code for Designing 110 kV-500 kV Overhead Transmission Line
DL/T 5156.1—5156.5 Electric Power Engineering Exploration Drawings
3 General Provisions
3.0.1 This code is developed to unify the technical standards for exploration of 220 kV and 110 kV overhead transmission lines for the purpose of ensuring technical progress, cost effectiveness, effective investment and high engineering quality.
3.0.2 In exploration of 220 kV and 110 kV overhead transmission lines, new technologies and methods capable of accelerating the project progress and improving the exploration quality shall be proactively promoted.
3.0.3 In addition to this code, the exploration of 220 kV and 110 kV overhead transmission lines shall further comply with related national and industrial standards currently in force.
3.0.4 The exploration of 220 kV and 110 kV overhead transmission lines shall keep pace with the design working stage. Generally, it is divided into three stages: feasibility study, preliminary design and construction drawings design.
问题专业:市政,
提问日期:2021-03-10 16:10:30
网友“cxd”提问内容:
老师,这个管座下面是否还需要套个砂石垫层呢?还是这样就行了

业内专家“可遇难求”回复:
不需要。
问题专业:土建算量GTJ2018,
提问日期:2021-03-10 16:09:47
网友“阿橙”提问内容:

业内专家“钢筋撑起半边天”回复:
三个标高的板LB2
问题专业:市政,
提问日期:2021-03-10 16:09:32
网友“cxd”提问内容:
老师,环刚度是不是只有塑料管有,混凝土没有环刚度对吧?
业内专家“将军峰”回复:
问题专业:安装,园林,
提问日期:2021-03-10 16:08:27
网友“谭程文”提问内容:
请问如何理解这句话,是否需要计算工程量,如何计算长度
业内专家“蓝鲸”回复:
这个的意思就是室外灯具需要做灯具外壳的接地,敷设的-25*4镀锌扁钢就是室外的接地母线,工程量按照延长米计算,定额套用室外接地母线安装子目
回答正确请采纳并点赞,因为每一个专家都是免费服务的。
问题专业:安装,结算,安装算量GQI,
提问日期:2021-03-10 16:07:35
网友“江雪花蕊”提问内容:
电气同个回路中有16的管、20的管,识别的时候默认都是16,怎样设置可以自动区分开。使用配管规格命令后,可以自动区分,但自动更改回路名称
业内专家“蓝鲸”回复:
那是你构件设置时,设置的有问题,自动识别没有确定好管子跟导线的根数
回答正确请采纳并点赞,因为每一个专家都是免费服务的。
问题专业:土建,
提问日期:2021-03-10 16:06:19
网友“0NE”提问内容:
业内专家“钢筋撑起半边天”回复:
画出的没有注明钢筋信息面筋按C@200,底筋双向按C8-200布置
问题专业:土建算量GTJ2018,
提问日期:2021-03-10 16:05:17
网友“阿橙”提问内容:

业内专家“钢筋撑起半边天”回复:
不要,标高没有输入在括号内
ICS 29.240 P 62
Record No. J524—2006
Electric Power Industry Standard of the People's Republic of China
P DL / T 5049 — 2006 To replace DL / T 5049 — 1996
Technical Code for Exploration and Surveying of Large Crossing Overhead Transmission Line
Issue Date: May 6, 2006 implementation Date: October 1, 2006
Issued by the National Development and Reform Commission of the People's Republic of China

1 Scope
This code specifies the basic technical requirements for the engineering survey, geotechnical engineering survey, and hydrological survey of large crossing overhead transmission lines.
This code is applicable to the exploration and surveying of 220 kV-750 kV large crossing overhead transmission lines. Ⅰt can be taken as a reference for exploration and surveying of large crossing overhead transmission lines at other voltage levels.
Ⅰn the case of strain sections of lines crossing wide navigable rivers, lakes or straits with large spans (generally above 1000 m) or high towers (generally higher than 100 m) for which special consideration shall be taken in conductor selection or tower design and faults of them may severely influence navigation or are extremely difficult to repair. Under these circumstances, the lines shall be surveyed as large crossing projects.
2 Normative References
The following normative documents contain provisions which, through reference in this text, constitute provisions of this code. For dated references, subsequent amendments (excluding the corrigendum) to, or revision of, any of these publications do not apply. However, parties to agreements based on this code are encouraged to investigate the possibility of applying the latest editions of the normative documents indicated below. For undated references, the latest edition of the normative documents apply.
GB 7930 Specifications for Aerophotogrammetric Office
Operation 1:500, 1:1000, 1:2000 Topographic Maps
GB 18306 Seismic Ground Motion Parameter Zonation Map of China
GB 50007 Code for Design of Building Foundation
GB 50021 Code for Investigation of Geotechnical Engineering
GB 50025 Code for Building Construction in Collapsible Loess Regions
GB 50201 Standard for Flood Control
GB 50286 Code for Design of Levee Project
GBJ 50139 Navigation Standard of Inland Waterway
DL/T 5001 Technical Code for Engineering Survey of Fossil Fuel Power Plant
DL/T 5084 Technical Code of Hydrology for Electrical Power Projects
DL/T 5122 Technical Code of Exploration and Surveying for 500 kV Overhead Transmission Line
DL/T 5138 Technical Specifications for Aerial Photographing and Surveying of Overhead Transmission Line
DL/T 5159 Technical Code for Geophysical Exploration Electric Power Engineering
JTJ 213 Code of Hydrology for Sea Harbour
3 General Provisions
3.0.1 This code is established to unify the technical standards for exploration and surveying of large crossing overhead transmission lines, ensure that the lines are technically advanced and cost effective and the strain sections of the lines can operate safely and normally.
3.0.2 The exploration and surveying of large crossing overhead transmission lines involve engineering survey, geotechnical engineering survey and hydrological survey, aiming at providing accurate and reliable design basis and basic data for the design, construction, and operation of large crossing lines.
3.0.3 The exploration and surveying of large crossing overhead transmission lines shall be divided into three stages consisting of feasibility study, preliminary design and construction drawing design in order to accommodate the requirements of different design stages. Ⅰf the scheme for large crossing lines is definite and the conditions are simple, these stages can be combined, provided that the design requirements of all stages are satisfied. Ⅰf there are special requirements for the projects, corresponding exploration and surveying stages can be included.
3.0.4 Ⅰn the exploration and surveying of large crossing overhead transmission lines, the new technologies and equipment shall be actively promoted.
3.0.5 Ⅰn addition to this code, the exploration and surveying of large crossing overhead transmission lines shall also comply with the current related national codes and industrial standards.
问题专业:安装,
提问日期:2021-03-10 16:03:00
网友“E=mc²”提问内容:
业内专家“懂点装修”回复:
个人认为“配电室”要有高压进出才能称配电室,配电间都是低压设备。
ICS 07.040
P 11
Record No. J527—2006
Electric Power Industry Standard of the People’s Republic of China
P DL / T 5034 — 2006
To replace DL/T 5034 — 1994
Technical Code for the Hydrogeological Investigation of Electric Power Engineering
Design of Fossil Fuel Power Plan
Issue Date: May 6, 2006 implementation Date: October 1, 2006
Issued by the National Development and Reform Commission of the People’s Republic of China

1 Scope
This code specifies the contents and technical requirements for hydrogeological investigation of electric power engineering.
This code is applicable to hydrogeological investigations and water resources evaluation of water supply for thermal power plant, substation or converter station, environmental hydrogeological investigation and evaluation of ash yard, investigation and evaluation of reclaimed water utilization, mine draining water utilization, and hydrogeological investigation of dewatering for construction and other special hydrogeological activities.
2 Normative References
The following normative documents contain provisions which, through reference in this text, constitute the provisions of this code.
For dated references, subsequent amendments (excluding the contents of errata) to, or revision of any of these publications do not apply.
However, parties to agreements based on this code are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies.
GBJ 14 Allowable Concentration of Hazardous Substances in Water Intake of Biological Treatment Buildings and Structures
GB/T 1458 Water Quality-Guidance on Sampling Techniques from Lakes, Natural and Man-made
GB 5749 Standards for Drinking Water Quality
GB 8978 Integrated Wastewater Discharge Standard
GB 12999 Water Quality Sampling-Technical Regulation of the Preservation and Handling of Samples
GB 50027 Standard for Hydrogeological Investigation of Water-Supply
GB 50179 Code for Liquid Flow Measurement in Open Channels
GB 50296 Technical Standard for Water-Supply Well
CJ 3082 Discharge Standard for Municipal Wastewater
DL/T 5084 Technical Code of Hydrology for Electric Power Projects Electric Power Engineering
DL/T 5171 Technical Regulation for Hydrogeological Drilling of Electrical Power Engineering
SL 196 Code for Hydrologic Investigation
3 General Provisions
3.0.1 The water resources in electric power engineering shall be used on a reasonable, economical and well-protected basis. The use shall be coordinated with the integrated development plans for concerned river basins or regions and related water resource protection plans, in conformity with approved water allocation scheme or protocol.
3.0.2 The hydrogeological investigation and evaluation of ash yard environment shall be performed at reasonable cost and under effective protection, without affecting surrounding water and ecological environment.
3.0.3 With a comprehensive consideration of the requirements in stages such as design, construction, and operation, the hydrogeological investigation of dewatering for construction shall be carried out in a scientific way that suits local conditions and overall construction plan.
3.0.4 In hydrogeological investigations of power project, demonstrated and proven new techniques and methods shall be promoted for higher efficiency and level.
DL/T 5159 Technical Code for Geophysical Exploration
问题专业:土建,预算,
提问日期:2021-03-10 15:51:12
网友“。。。。”提问内容:

业内专家“钢筋撑起半边天”回复:
跨数对了就行。中间是跨中位置没事
问题专业:安装,
提问日期:2021-03-10 15:48:19
网友“口袋里有糖i”提问内容:
像这样消防管道从哪个阀门井开始算
业内专家“陌上花开‘’”回复:

问题专业:安装,
提问日期:2021-03-10 15:38:57
网友“任丹”提问内容:
辽宁省2017定额成品拖布池项中,是否包含地漏呢? 还是需要,套完成品拖布池项,在套一个地漏安装
业内专家“幸福像花一样”回复:
成品拖布池项中,是不包含地漏的
问题专业:安装,
提问日期:2021-03-10 15:34:47
网友“-”提问内容:
请问图纸中,一般在哪里可以看到这个套管说明。。因为好像看不到,可是套价又有,不太明白是怎么计取的
业内专家“严以律己 宽以待人.”回复:
给水管道穿楼板和穿墙需要布置钢套管 地下穿外墙布置防水套管 排水管道穿楼板布置阻火圈(阻水圈) 地下穿外墙布置防水套管
问题专业:安装,设计,安装算量GQI,
提问日期:2021-03-10 15:34:15
网友“高高”提问内容:

业内专家“yylwuhan”回复:
空调空间:设有空调的地方,
非有空调的房间:没有设空调的地方,如地下车库,设备房之类的
问题专业:安装,资料,结算,钢结构算量GJG,
提问日期:2021-03-10 15:34:05
网友“漫步人生路”提问内容:

业内专家“yylwuhan”回复:
电缆支撑架,按支架套