首页 > 2023 ( 第 111 页)

施工技术 2017年9月下 26 CONSTRUCTION TECHNOLOGY 第46卷第18期 D0I:10.7672/5j52017180026 安顺市体育中心体育场大跨度悬挑结构 卸载方案研究 王泽曦12,罗杰2,肖建春2,马克俭2 (1.成都基准方中建筑设计有限公司贵阳分公司,贵州责阳550001; 2.贵州大学空间结构研究中心,贵州贵阳550003) [摘要]采用SAP2000结构分析软件对安顺体育中心体育场大跨度悬挑结构进行模拟和分析,得到不同的卸载方 案对卸载过程和卸载完毕后屋盖杆件及屋盖施工的影响结果.对比卸载过程中和卸载完毕后最大卸载位移量、最 大反力及卸载完毕状态与设计状态应力比,分析较为合理的卸载方案. [关键词]钢结构;屋盖;卸载;有限元分析;施工方案 [中图分类号]TU398 [文献标识码]A[文章编号]1002-8498(2017)18-0026-04 Research on Unloading Scheme for the Large Span Cantilever Structure of Anshun Sports Center Stadium WANG Zexi.2 LUO Jie2 XIAO Jianchun2 MA Kejian2 (1.Chengdu JZFZ Architectural Design Co.Ltd.Guiyang Branch Guiyang Guizhou 550001 China; 2.Space Structure Research Center of Guizhou Unirersity Guiyang Guizhou 550003 China) Abstract:The large-span cantilever structure of Anshun Sports Center Stadium in Anshun is simulated and analyzed by SAP2000 structure analysis software.The influence of different unloading schemes on the roof bars and construction which is in the unloading process and after unloading pletion is obtained. The reasonable scheme of unloading sequence which is got through paring the maximum unloading displacement maximum counter-force in the unloading process and after unloading pletion and the stress ratio between the unloaded state and the design state. Key words:steel structures;roofs;unloading;finite element analysis:construction schemes 1工程概况 安顺市体育中心大跨度钢结构体育场为管桁 架结构,宽200m 长250m.屋盖采用折板型悬挑空 间桁架结构体系,由80主桁架和9环向次桁架 组成.主桁架最小悬挑长度为19m 最大悬挑长度 为39m 主桁架中间高、两边低,高差为23m 最高点...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

38CONSTRUCTIONTECHNOLOGY施工技术2012年12月下
第41卷第379期
安哥拉某住房项目地基处理方案 及地基土渗透性现场试验研究 高涛 (北京城建勘测设计研究院有限责任公司,北京100101) 【摘要】收集并分析了安哥拉共和国罗安达省的区域工程地质、水文地质以及气象水文资料。

对该工程场地内上 部棕红色粉砂土层进行了大量现场和室内试验研究,得出了矿物组成、物理力学指标、颗粒级配、水敏性、湿陷性等 试验成果,为确定采取回填碾压地基处理方案提供了足够的参数。

另外,介绍了对上部含粉土粉砂地层进行了模 拟大气降水的渗透性试验,以研究该地层原状土及碾压后土层的渗透性;试验结果表明,模拟降雨量大于当地平均 降雨量的情况下,经过12h连续模拟降雨,在原状土和经压实的土层中人渗最大深度分别为1.35m和1.2m。

结合 该工程基础埋深情况,最浅的基础埋深为1.4m渗人深度无法达到基底以下,大气降水人渗不会对之产生影响。

[关键词】地基处理;渗透性;模拟试验;降雨量 [中图分类号】TU472[文献标识码】A[文章编号]1002-8498(2012)24-0038-04 FoundationTreatmentandFieldTestofFoundationPermeability for aHousingProjectin theRepublic of Angola GaoTao (Bejing Urban Construetion Exploration & Sureying Design Institute Co.,Ld.,Beijing 100101,China) Abstract:The data of regional engineering geology,hydrological geology and meteorological hydrology in Luanda of Republic of Angola are collected and analyzed. A large number of field tests and indoor foundation. Test results were obtained for the mineral ponents,physical and mechanical index,grain position,watersensitivity and collapsibility,which provided sufficient parameters for the backfilling and rolling treatment. Besides,simulated rainfall test was performed to study the permeability of the silt soil before and after the rolling treatment. The resuts show that when the simulated quantity of rainfall is larger than the average local value, after a continuous simulated rainfall of 12 hours, the infiltration depth reached 1.35m for undisturbed soil and 1. 2m for the rolled soil. The shallowest foundation base for the current project is 1.4m. Therefore, the foundation base of this project will not be affected by the local rainfall. Key words:foundation treatment; penetration; simulation test;quantity of rainfall 0引言性和遇水软化的特性(即水敏性),由于未对该层进 经调查,在安哥拉共和国(TheRepublicof行适当处理,大气降雨入渗到地基土中,造成的地 Angola)罗安达省(Luanda)范围内,出现过多起建基不均匀沉降是引起建筑物开裂的主要原因。

(构)筑物墙体开裂、地面裂缝的事故,比如在安哥1工程概况 拉共和国罗安达省警察学校和安哥拉罗安达医院,该项目建设场地位于安哥拉共和国首都罗安 还有其附近的一些基地房屋,都出现过类似情况。

达省南部,距离罗安达市区约20km。

建设场地东西 经分析,作为地基...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年2月下 40 CONSTRUCTION TECHNOLOGY 第43卷第4期 DOI:10. 7672/sgjs2014040040 大高度顶升工程水平漂移问题研究* 边智慧"3,李旭光²,付素娟” (1.天津大学建筑工程学院,天津300072;2.河北建研科技有限公司,河北石家庄050021; 3.河北省建筑科学研究院,河北石家庄050021) [摘要]以武当山遇真宫宫门顶升工程为例,对顶升工程中产生水平漂移问题的原因进行分析,得出当由多个顶升 点产生的水平分力在顶升托盘平面上的平面汇交力系不平衡时,会导致顶升建筑产生向合力方向的水平漂移。

另 外顶升工程下部支撑体系受力变形也会导致顶升建筑产生水平位移。

针对此类问题提出相应的纠偏方法。

【关键词】顶升:水平漂移:千斤顶;支撑;纠偏 [中图分类号】TU746.3 [文献标识码】A [文章编号]1002-8498(2014)04-0040-03 Research ofHorizontalDriftforLargeIntegral LiftingHeightProjects Bian Zhihui'3,Li Xuguang²,Fu Sujuan? (1.School of Architecture and Civil Engineering,Tianjin University,Tianjin300072, China; 2.Hebei Academy of Building Research,Shijiazhuang,Hebei 050021,China; 3.HebeiBuilding Research Engineering Co..Lud.,Shijiazhuang,Hebei050021,China) Abstract:This paper take Yuzhen Palace gates jacking project as an example, and the causes of horizontal drif during the jacking engineering is analyzed. Obtained the jacking construction would produces the horizontal drift in the force direction when a plurality of horizontal ponent generated by jacking points can not balance in the lifting pallets plane. In addition, the lower support system of the jacking engineering deformation in the force will lead to horizontal displacement of jacking construction. For such problems, the rectification methods after horizontal drift are given. Key words:lifting; horizontal drift; jacks; supports; rectification 既有建筑物的结构顶升作为一种改造建筑物水位持续高出堤内8~19m,库水将会向防护区内渗 功能的有效手段,为既有建筑物改造开创了新的局 漏,致使防护区内地下水位升高,遇真宫面临被水 面。

实践证明,与既有建筑拆除后新建相比,结构 淹没的危险。

经过围堰保护,迁移保护与顶升保护 顶升改造具有投资少、工期短、效益高等明显优势。

的方案论证对比后,决定对遇真宫山门及两翼琉璃 随着建筑物顶升高度的增加,水平漂移问题会使建 墙体、东西宫门选择原地顶升的保护方案,通过整 筑物偏离下部顶升基础,偏离严重时将导致建筑 体顶升能够最大程度地保留文物古建筑原貌,是对 不均匀变形,甚至发生倾覆等工程灾难,所以必须 文物古建筑实施完整保护的有效技术手段。

该工 严格监测并控制,保证顶升过程中建筑的安全。

程对遇真宫山门及宫门进行整体顶升15m,顶升高 1工程概况 度为世界之最。

山门结构重约为5000t,宫门结构 湖北省武当山遇真宫位于湖北省武当山旅游 重约1200t。

经济特区武当镇东4km处。

其中遇真宫为武当山 2大高度顶升实施方案 九宫之一,为世界文化遗产、国宝文物武当山古建 本工程在结构四周制作灌注桩,作为结构顶升 筑群的重要组成部分。

反力基础;在建筑底部人工盾构制作混凝土转换 丹江口水库作为南水北调工程中线工程的源 层,作为结构顶升刚性托...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年3月上 施工技术 第46卷第5期 CONSTRUCTION TECHNOLOGY 29 D01:10.7672/sgj82017050029 大连近海回填区某项目基坑内支撑施工难点 与解决方案* 刘镇 (大连职业技术学院建筑工程学院,辽宁大连116035) [摘要]某项目位于大连市东港商务区,基坑总面积约19000m2 开挖深度16.9-19.4m 基坑支护采用咬合柱加3 道内支撑模式.该项日周围环境复杂,水文地质条件恶劣,给施工带来很大困难.施工过程中通过对该项目施工 难点的透彻分析,制订了详尽的施工方案,合理进行施工总体部暑,优化内支撑施工组织方案,并针对不良的水文 地质条件,提出降排水及撑下淤泥处理的具体办法,顺利完成工程施工.经基坑监测数据及现场巡视,基坑本体及 周围环境未发现异常. [关键词]基坑;近海回填区;内支撑;施工方案;降排水;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2017)05-0029-06 Difficulties and Solutions of Some Foundation Excavation Internal Supports in Offshore Backfilled Area of Dalian Liu Zhen (School of Architecture and Civil Engineering Dalian Vocational Technical College Dalian Liaoning 116035 China) Abstract:The construction area of an engineering is in East-port Business region of Dalian.Its foundation excavation area is about 19 000m2 and excavation depth is about 16.9 ~19.4m.To support the foundation excavation there are secant piles with three internal supports.The plex surrounding environment along with harsh hydrogeological conditions brought great difficulties to the construction. Through a thorough analysis on difficulties of the construction this paper develops a detailed construction plan which includes construction overall deployment internal support organization plan drainage methods and sludge treatment under supports so that the construction can be pleted successfully. Monitoring data and on-site inspections show that the foundation excavation itself and surroundings are safe. Key words:f...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年4月上 施工技术 第41卷第362期 CONSTRUCTION TECHNOLOGY 67 大连沿海地区某基坑工程支护及阻水技术 郑昌晶,于振辉,赵锡山,张恒 (河北省地矿局秦皇岛矿产水文工程地质大队,河北秦皇岛066000) [摘要]针对大连沿海地区回填地层极为复杂的工程地质条件及海水影响,通过工程实例,介绍了基坑支护、阻水 及开挖设计.经过方案比选,确定了搭接柱列式挡土墙和帷幕注浆的方案,并对其关键技术进行控制,保证了基坑 施工和周边建筑物的安全,降低了成本,缩短了工期.同时针对帷幕注浆及钻孔灌注桩施工过程中出现的问题,如 塌陷、径缩、漏浆、偏岩、溶洞等给出了防治措施. [关键词]基坑;沿海地区;支护;阻水;施工技术 [中图分类号]TU753.1 [文献标识码]A [文章编号]1002-8498(2012)07-0067-04 Supports and Water Resistivity Technology for Some Foundation Excavation in Coastal Area Dalian Zheng Changjing Yu Zhenhui Zhao Xishan Zhang Heng Mineral Resources Hydrogeology and Engineering Geology Team in Qinhuangdao of Hebei Bureau of Geology and Mineral Qinhuangdao Hebei 066000 China) Abstract:According to the extremely plex geological conditions and seawater impact of coastal backfill strata in Dalian through practice engineering the authors describe the design of foundation excavation supports water resistivity and digging.By parison and selection of schemes the technique of lapping column-style retaining wall and curtain grouting is applied which can save cost and reduce period.Meanwhile the key techniques are controlled to assure the safety of foundation excavation construction and around buildings.Furthermore according to the problems occurring in construction of curtain grouting and bored piles such as collapse reducing diameters mud leakage rock deviation and karst cave corresponding prevention measures are put forward. Key words:foundation excavation;coastal area;supports;water resistivi...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年2月 32 CONSTRUCTION TECHNOLOGY 第40卷第4期 大连国际会议中心关键施工技术 周光毅,刘进贵,刘桂新,唐家如,仇春慧,张强 (中国建筑第八工程局有限公司大连分公司,辽宁大连116021) [摘要]大连国际会议中心造型奇特,结构复杂.首先介绍了工程特点、难点,闹述了具体施工技术,从钢结构节点 深化设计、宽翼缘箱形空间弯扭钢柱制作及安装、复杂劲性核心简施工、管桁架盖安装、钢结构合拢、临时支撑架 卸载及焊接质量控制等方面对结构施工关键技术进行介绍.实践表明,工程满足施工质量要求. [关键词]钢结构:深化设计;合拢;卸载:施工技术 [中图分类号]TU758 [文献标识码]A [文章编号]1002-8498(2011)04-0032-05 Key Construction Technology of Dalian International Conference Center Zhou Guangyi Liu Jin'gui Liu Guixin Tang Jiaru Chou Chunhui Zhang Qiang Dalian Branch of China Construction Eighth Engineering Division Co.Lad.Dalian Liaoning 116021 China) Abstract:Dalian International Conference Center is designed with peculiar modeling and plex structure.The engineering characteristics and difficulties are introduced.The concrete construction technologies are put forward such as the detailed design of steel structure joints the production and installation of the flexural-torsional steel box columns with wide flange the construction of core tube the roof assembling with pipe truss the steel structure closure the temporary supporting unloading and welding quality control etc.The result shows that good quality is achieved. Key words:steel structure;detailed design;closure;unloading:construction technology 1工程概况 大连国际会议中心总建筑面积146819m2 地下 1层,地上4层,建筑高度58m 主要功能为举办各 种大型国际会议和歌剧演出(见图1).大连国际会 议中心造型独特,结构异常复杂,17个竖向核心筒 体用钢桁架连接,在15.3m标高处形成会议中心平 台,在该平台周边设置7个500人以上各种功能会 议厅、多功能厅;在建筑物中心设置一座与钢平台部 图1大连国际会议中心 分脱离的1800座歌剧院;在各会议厅屋面上设置小 Flg.1 Dallan International Conference...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年5月上 20 CONSTRUCTION TECHNOLOGY 第41卷第364期 大连北站大跨度张弦桁架施工技术 王玉生,高良2,黄利顺2 《1.中铁建工集团有限公司北京分公司,北京100070;2.浙江精工钢结构有限公司,浙江绍兴312030) [摘要]大连北站屋架主体为跨度72m的预应力张弦桁架结构,主桁架间距为21.5~28.45m.由于桁架跨度及间 距均较大,张拉过程中容易出现整体稳定性差及结构构件横向失稳现象.通过合理的张拉施工工艺有效地保证了 单福桁架3根拉索张拉同步性,同时采用特殊的插板节点处理以及合理的张拉施工顺序,很好地解决了预应力张 拉施工过程中的一些难点问题. [关键词]火车站;钢结构;屋架:张弦桁架;张拉;插板;节点 [中图分类号]TU758.11 [文献标识码]A [文章编号]1002-8498(2012)09-0020-03 Construction Technology on a Large-span Truss String Structure in Dalian North Railroad Station Wang Yusheng' Gao Liang Huang Lishun2 (1.Beijing Branch China Railway Construction Engineering Group Beijing 100070 China; 2.Zhejiang Jinggong Steel Building Co.Ld.Shaoxing.Zhejiang 312030 China) Abstract:The roof of Dalian North Railroad Station is a 72m-span prestressed truss string structure whose distance is about 21.5m to 28.45m.Because of large span and distance of main trusses so their. whole stability is poor during tensioning.By using reasonable tensioning construction process the stretching synchronism of the three cables in one truss is effectively ensured.Meanwhile some difficulties during the prestressed tensioning construction are well resolved by application of special plug plate connections and rational stretch-draw construction sequences. Key words:railroad stations;steel structures;roofs;truss string structures;tension;plug-plate;joints 1工程概况 大连火车北站位于哈大线终点,地处辽东半岛 南端的辽宁省大连市,是连接海陆空运输的枢纽 (见图1).该站房屋架主体为预应力钢结构张弦桁 架结构(-⑤轴),张弦主桁架跨度为72m 主桁 图1大连北站 架间距为21.5-28.450m 共9福.由于主桁架间 Fig.1 Dalian...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年8月上 施工技术 第42卷第15期 CONSTRUCTIONTECHNOLOCY 81 DOI:10. 7672/sgjs2013150081 大跨高位重型起重机钢梁整体吊装技术* 金燕,苏茂福²,姜威 (1.烟台职业学院建筑工程系,山东烟台264670;2.烟建集团有限公司,山东烟台264000) [摘要]烟台来福士20000:固定桥式起重机的横梁是目前世界上跨度最大、起重量最大、起升高度最高的起重机 钢梁。

施工中采用“预留吊装凹槽、地面整体组装、液压同步提升、液压滑移就位”的施工工艺使钢梁吊装成功。

在 总结施工难点的基础上,介绍了基座设计、基座施工、整体组装、液压提升、滑移就位、计算机同步控制技术及钢梁 稳定保证措施。

[关键词]钢梁;起重机;吊装;整体提升;滑移;就位 [中图分类号]TU758.13;TU758.11 [文献标识码]A [文章编号]1002-8498(2013)15-0081-04 EntireHoistingTechnologyofLarge-span HeavyCraneGirderatHigh-altitude JinYan',Su Maofu²,Jiang Wei (1.Civil Engineering Deparment,YantaiVocational College,Yantai,Shandong 264670,China; 2.Yanjian Group Co.,Ltd.,Yantai,Shandong 264000,China) Abstract;The 20 thousand tons fixed bridge crane girder in Yantai Ruffles Offshore Co.,Ltd. owns the largest span, the biggest hoisting weight and the highest hoisting height over the world nowadays.In the construction,it takes several technologies to make sure hoisting successful, such as reserving the hoisting grooves, integral erection on the ground,hydraulic synchronizing hoisting and hydraulic slipping in position.Basedon the construction dificulties,thispaperintroducebase designandconstruction,entire assembling,hydraulic hoisting, slipping and positioning,synchronization controlling with puter and stability ensuring measures for the steel girder. Key words:steel girder; cranes;hoists;entire lifting;slipping;positioning 1工程概况 为18.6mx4.5m,梁长129m。

每根钢梁下设2个基 上分别建造上、下船体后,再采用万吨固定桥式起力墙厚度0.6~2.5m,基座地面以上高105.0m,地 重机实现一步合拢。

这种建造模式能使传统的海面以下13.8m。

单根钢梁设计起重量为10000t,自 工项目建造周期缩短近6个月,是当今世界上最经 重4163t,最大跨度125m(见图1)。

济、最安全、最快捷的大合拢方式。

烟台来福士2万 t固定桥式起重机的建成使这种建造模式成为可 能,它标志着世界船舶及海洋工程建造模式实现了 YANTAIRAFFLES.. 革命性创新,具有里程碑意义。

烟台来福士“泰山”号2万:桥式起重机采用 10000t+10000t固定高低双梁结构,起升高度分别 为113m和83m,钢梁截面均为双箱形钢结构,尺寸 山东省教育厅科技计划项目:H型钢钢框架支撑体系中设竖向支 撑处的梁柱节点研究(J08LA555) 图1起重机钢梁整体效果 [作者简介]金燕,硕士,副教授,高级工程师,E-mail:jyiy24@ Fig.1 Crane girder [收稿日期】2013-04-07 万方数诺
82 施工技术 第42卷 2施工难点 1)4163t重、跨度超过百米的单根钢梁提升到 百米以上的高度,且精度要求高,需进行吊装方案 讨论。

如果采用分段吊装、分别就位,则高空安装 量大、高空作...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2017年3月下 110CONSTRUCTION TECHNOLOGY第46卷第6期 DOI:10. 7672/sgjs2017060110 大跨梭形桁架预应力拉杆施工过程分析及监测
高勇刚,赵楠,孟祥冲,彭磊,贺印,李松茂 (中建钢构有限公司,广东深圳518040) [摘要]大跨空间结构预应力拉杆的施工通常有地面拼装、高空补装以及高空补张拉,预应力张紧工程的控制也是 钢拉杆施工的重点和难点。

现有施工过程采用分批反复张拉,采用有限元分析施工过程,寻找一次张拉即可以满 足最终所需张拉目标的张拉方案。

使用ANSYS有限元计算分析软件模拟分析了拉杆的整个施工过程中的内力变 化情况,全过程分析张拉顺序,最终张拉方案的确定以及施工过程中对钢拉杆的检测并对有限元模型结果与实测 数据对比。

[关键词]钢结构;桁架;预应力拉杆;监测;施工技术;有限元分析 [中图分类号]TU745.2[文献标识码]A[文章编号〕1002-8498(2017)06-0110-05 ConstructionWholeProcessAnalysisandDetectionfor Pre-stressedRods ofLarge-spanTruss GaoYonggang,Zhao Nan,Meng Xiangchong,PengLei,He Yin,Li Songmao (China Construction Steel Structure Co.,Lid.,Shenzhen,Guangdong 518040,China) Abstract;The construction of large span space structure with pre-stressed rod includes the construction on the ground, at the upper and the high altitude.Existing construction process usually pulls rods in batches repeatedly. In this paper, with the finite element analysis of the construction process, to find a way to meet the needs of the end of the final required state at one pull. Using ANSYS finite element analysis software to simulate the internal force changes in the whole construction process,the whole process analysis of the tension sequence, the final tension scheme and the construction process of the steel rod detection and parison of the results of the finite element model and measured data. Key words:steel structures;trusses;pre-stressed steel rods;monitoring;construction;finite element analysis 0引言工作[3-5]。

建筑钢拉杆是一种新型的建筑结构构件,具有已有研究表明由于施工设备、经济技术等因 强度高、韧性好、轻巧美观、安全方便的特点。

尤其素,采用分批张拉不可避免,施工阶段的受力体系 是在大跨度钢结构体系中的应用,不仅能节省钢由于钢拉杆不断参与工作发生变化,已张拉的钢拉 材,更能增加空间的通透性。

钢拉杆在建筑结构中杆拉力也是不断变化的。

故为满足预应力张拉控 已经不再只是连接件,更重要的是承受拉应力,在制目标,需对整个结构进行施工阶段的力学模拟, 钢结构中起着举足轻重的作用。

确定合理的张拉顺序(6"。

张拉顺序不同,后张拉 对于大跨空间钢结构,钢拉杆的施工通常有地杆件对已张拉杆件内力的影响也不相同,为保证张 面拼装、高空补装以及高空补张拉等过程2。

为了拉精度,应选用影响小的张拉顺序[10-13]。

多次反复 提高钢拉杆的性能,在设计钢拉杆时都要考虑预张张拉对现场施工要求较高,故本文采用有限元分析 力的因素,而预应力张紧工程的控制又是钢拉杆施施工过程,寻找一次张拉即可以满足最终所需张拉 工的重点和难点。

具体而言,在钢拉杆的施工过程目标的张拉方案。

中,张拉及相应的监测往往...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年4月下 施工技术 第43卷第8期 CONSTRUCTION TECHNOLOGY 49 D0I:10.7672/5js2014080049 大跨张弦桁架预应力张拉控制准则修正* 董越,梁存之,冯大斌,张强,朱莹,陈茜 (中国建筑科学研究院建研科技股份有限公司,北京100013) [摘要]结合长江航道科研试验新基地一期工程6号模型试验大厅屋盖主体结构120m跨张弦桁架张拉施工成型, 提出了张弦桁架张拉施工误差修正方法.实测结果表明:按修正后的张拉控制准则指导张弦桁架张拉施工效果良 好,精度高,最大的张拉偏差仅为1.5%. [关键词]钢结构;张弦桁架;预应力;张拉控制;误差修正 [中图分类号]TU758.166 [文献标识码]A [文章编号]1002-8498(2014)08-0049-03 Modification for Prestress Stretching Criterion of Large-span Truss String Structure Dong Yue Liang Cunzhi Feng Dabin Zhang Qiang Zhu Ying Chen Qian China Academy of Building Research CABR Technology Co.Ld.Beijing 100013 China) Abstract:In this paper a method was presented on the modification for construction errors of truss string structure based on the practical project of model test hall for Yangtze river channel.The result of detection shows that it works well to guide the construction of truss string structure with modified criterions of prestress stretehing the biggest error is only 1.5%. Key words:steel structures;truss string structure;prestress stretching control;errors modification 0引言 合,可能出现力已到而形未到或者力未到而形已到 张弦梁结构最初由“弦通过撑杆对梁进行张 的情况.因此,实际工程中为确保预应力在张弦结 拉”这一基本形式而得名.一般性的理解,张弦梁 构体系中的准确建立,需对引起施工误差的原因进 结构的基本受力特征是通过张拉下弦高强度拉索 行分析.通过对第1张弦梁试张拉的实测数据, 使得撑杆产生向上的分力,导致上弦构件产生与外 对结构的等代张拉刚度及节点质量等进行修正,进 部竖向荷载作用下相反的内力和变形,从而降低上 而重新确定合理的张拉控制准则. 弦构件的内力,减少结构的变形.张拉是否到位对 1误差修正原理 结构的形态和内力等都影响巨大,因此预应力的合 理论上,控制拉索索长(即调节端长度)是在张 理建立是张弦结构施工的关键.预应力钢结构张 弦结构体系中准确建立预应力的最有效方式,该方 拉施工的控制项目包括“力”和“形”两大类,其中 式与设计者的计算分析思路最为吻合.但索力对 “力”控包括索力、支座反力和关键构件内力等; 拉索索长误差敏感,文...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年10月下施工技术 第42卷第20期CONSTRUCTIONTECHNOLOCY25 DOI:10. 7672/sgjs2013200025
大跨度钢结构安装工艺的选择
许立新,遇瑞 (上海宝冶集团有限公司,上海200941)
[摘要]我国大跨度钢结构自20世纪五六十年代开始建造并不断发展,其结构形式逐渐趋向多样化,在进行大跨 度钢结构施工前,必须根据结构体系、场地条件及吊装机械性能等因素,选择可行的安装工艺,从而保证大跨度钢 结构施工过程的安全性及经济性。

结合多个大型项目的工程施工实例,对目前普遍采用的几种安装工艺的特点及 适用性进行介绍和阐述。

[关键词]钢结构;大跨度;安装;施工工艺;影响因素 [中图分类号]TU758.11[文献标识码】A[文章编号]1002-8498(2013)20-0025-03 The Installation Technology Selection for Large-span Steel Structure Xu Lixin, Yu Rui (Shanghai Baoye Group Co.,Lad.,Shanghai 200941,China ) Abstract;In our country,large-span steel structures have begun to be built and develope since the fiftieth and sixtieth of the 20th century. Its structural style tends to the diversification gradually.Before the construction of large-span steel structure,installation technology must be chosen according to the structural system, condition factors and mechanical properties etc. It will ensure safety and economy of construction process of the structure.In this paper, many projects of steel structure construction are taken as examples to introduce the characteristics and applicability of several monly used installation methods. Key words;steel structures;large-span; installation; construction; influence factors
0引言纳了7种安装方法:高空散装法、分条分块吊装法、 我国大跨度钢结构自20世纪五六十年代开始滑移法、单元或整体提升(顶升)法、整体吊装法、折 建造并不断发展,其结构形式逐渐趋向多样化,从叠展开式整体提升法、高空悬拼安装法等,可以进 最初的网架、网壳结构发展到空间管桁结构、张弦一步归纳为高空散装、分条(分块)安装、滑移安装、 结构、索膜结构等。

目前大跨度钢结构被广泛应用单元或整体安装4类。

于文化体育场馆、会议展览中心、车站机场的候车1.1高空散装 厅航站楼、工业厂房等的屋盖结构。

对于大跨度钢高空散装是将小拼单元或散件(单根杆件及单 结构施工,一般都有多种安装工艺可供选择,而每个节点)直接在设计位置进行拼装的方法,有全支 一种安装工艺都有其自身的特点和适用性,在进行架法和悬挑法两种。

全支架法多用于散件拼装,而 安装工艺选择时需综合考虑结构体系、场地条件、悬挑法则一般用于小拼单元在高空的拼装。

由于 起重机械性能、安全质量、施工进度及施工成本等小拼单元或散件是在高空进行拼装的,因此在施工 影响因素。

过程中无需使用大型的吊装设备,但由于高空作业 1大跨度钢结构安装工艺量大,需要大量的支架材料和设备。

而对于大悬挑 《钢结构工程施工规范》GB50755-2012将大的空间钢结构,则可以进一步减少甚至不用临时支 跨度空间钢结构按照结构特点和现场施工环境,归撑,就在高空悬拼安装。

采用高空散装施工时,应着重注意以下几方面 [作者简介]许立新,教授级高级工程师,E-mail:xulixin321@问题:①应根据结构的具体形式,确定合适的拼装 126.顺序,并注意控制和减小几何尺寸的累积误差;② [收稿日期】2013-08-05为了保证结构总拼后的总体偏差在标准允许范围
万方数据
26施工技术第42...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年10月上 98 CONSTRUCTION TECHNOLOCY 第40卷第350期 大跨度连续箱梁悬臂施工温度效应研究 曹立波',赵晓龙²,刘姗姗 (1.中铁十二局集团第二工程有限公司,山西大原030032; 2.上海市政工程设计研究总院(集团)有限公司天津分院,天津030042) [摘要]以松花江大桥工程为例,针对该工程的施工监控,结合该桥所处的地理环境对寒冷地区的混凝土桥梁温度 进行现场监测及试验,对寒冷地区的混凝土桥梁结构温度场及温度效应进行研究。

在施工监控中采用了立模标高 的相对高差形式来消除温度效应的影响。

通过对监测与试验数据的分析,得出了一些有意义的结论,并介绍了消 除温度对线形控制影响的有效方法。

[关键词]桥梁工程;箱梁桥;悬臀;监测;温度测量 [中图分类号]U446.2 [文献标识码】A [文章编号】1002-8498(2011)19-0098-04 Study on TemperatureEffect of Cantilever Construction Monitoring for Long-span Continuous Box Girder Bridge Cao Libo',Zhao Xiaolong²,Liu Shanshan (1.The 2nd Engineering Co.,Lud.ofthe 12th Bureau Group of China Railwy,Taiyuan,Shanxi 030032,China; 2.Tianjin Brahch,Shanghai Municipl Engineering Design Instiute(Group)Co.,ld.,Tianjin030042,China) Abstract;Based on construction monitoring of the Songhua River Bridge, which is located at cold areas in China, the temperature field and temperature effects are monitored and tested. Relative height difference of formwork erection elevation is adopted to eliminate the influence of temperature effect in construction. Through the analysisof the monitoring and testing data,some significant conclusions are obtained and the effective ways to reduce the influence of temperature on linear control are introduced. Key words;bridges;box girder bridge;cantilever;monitoring;temperature measurement 本文结合哈尔滨松花江大桥的温度现场监测及 温度监测仪选用JMT-36C型温度传感器,读数 试验,对寒冷地区的混凝土桥梁结构温度场及温度效 仪采用配套的JMZX-300X综合测试议,箱内外空气 应进行研究。

松花江大桥位于哈尔滨绕城高速公路 温度的监测采用PD系列长期数据记录仪。

上,具体桥跨为90.8m+138mx3+90.8m,如图1所 1.1.2根部截面温度测点布置(3] 示,阶段分部为0号8m,1~6号2.5m,7~11号3m, 在每个墩的两侧都反对称布置温度传感器,每 12~15号3.5m,16~20号4m,合龙段2m。

个截面布置3个温度测试点,以测出温度沿主梁截 138 面高度的梯度变化。

测点布置如图2所示。

34号墩 39号 35号墩 36号墩 37号壤 38号增 图1桥梁跨度布置(单位:m) 图2温度测点布置 Fig.1 Layout of bridge span( unit;m) Fig.2 Layout of temperature survey points 1温度监测与试验 1.1.3 0号块温度测点布置[4] 1.1温度监测 0号块温度传感器主要是用于测量实际浇筑混 1.1.1测试仪器 凝土的水化热,测量混凝土浇筑后的最高温度。

具 [收稿日期]2011-03-14 体布置如图3所示。

[作者简介】曹立波,中铁十二局集团第二工程有限公司工程师,山 1.1.41/4跨截面温度测点布置(3] 西省太原市小店区人民南路19号030032,电话:18...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年2月 施工技术 第40卷第4期 CONSTRUCTION TECHNOLOGY 大跨度空间结构健康监测应用研究 张其林,陈鲁2,朱丙虎,李大林 (1.同济大学土木工程学院,上海200092:2.上海同济建设工程质量检测站,上海200092) [摘要]重点介绍大跨度结构健康监测用传感器系统的应用和研究现状.提出大跨度空间结构健康监测的方法与 原理,并结合工程实例对各种监测方法进行说明.分别对钢构件,索、膜面应力情况和焊接裂纹进行监测,并得出 相应监测结果.最后研究了大跨度钢结构的风荷载效应监测、风压和风振监测.介绍相关的传感器原理技术和工 程应用,并提出有待研究的若干问题. 【关键词]大跨度空间结构;健康监测;应用研究 [中图分类号]TU391 [文献标识码]A[文章编号]1002-8498(2011)04-0003-06 Application and Research of Health Monitoring in Large Span Spatial Structure Zhang Qilin' Chen Lu? Zhu Binghu' Li Dalin' (1.School of Civil Engineering.Tongji University Shanghai 200092 China: 2.Shanghai Tongji Construction Qualiry Inspection Station Shanghai 200092.China) Abstract:The application and research status of the health monitoring sensors in large span spatial structure are introduced emphatically.The method and principle of health monitoring for large span spatial structure are put forward.Then bined with the engineering practice the method of health monitoring is illustrated.Some ponents stress of the steel structure are monitored such as steel members cable membrane surface etc.Then the welding cracks are monitored.The monitoring results are obtained finally.The health monitoring about wind effect wind pressure and wind-induced vibration of the large span spatial structures are researched.The monitoring items corresponding sensors and methods as well as some engineering applications are presented.The further problems to be investigated and solved are listed. Key words:large span spatial stru...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年12月下 108 CONSTRUCTION TECHNOLOGY 第43卷第24期 D0I:10.7672/sgjs2014240108 大跨度空间管桁架施工技术 李凯 (天津二十冶建设有限公司,天津300301) [摘要]以某公司120方/年矿渣微粉工程一—水渣堆场厂房为例,介绍了空间倒三角管桁架的工程特点及难点、 结构加工方法及施工流程,详细论述了单福管桁架关键工序的制作工艺及吊装采取的技术措施,闹述了单福管術 架安装顺序及注意事项.工程实践表明该技术取得了良好的经济效益和社会效益. [关键词]钢结构;大跨度;管桁架;施工技术 [中图分类号]TU745.2.[文献标识码]A [文章编号]1002-8498(2014)24-0108-04 Construction of Large-span Spatial Pipe Truss Li Kai Tianjin MCC20 Construction Co.Ltd.Tianjin 300301 China) Abstract:Taking the 1.2 million tons/year GGBS project-water slag yard plant as an example the engineering characteristics and difficulties of inverse triangle pipe truss are introduced and structure processing method and construction process are put forward.The key working procedure of the production process and technical measures taken in the hoisting for single unit pipe truss are described in detail.The installation sequence and attentions of single unit pipe truss are introduced.Engineering practice shows that the technology has obtained good economic benefits and social benefits. Key words:steel structures;large-span;pipe truss;construction 1工程概况 2)节点采用管管相贯形式,焊接空间不足,且 山西中阳钢铁有限公司120万/年矿渣微粉工桁架上下弦杆需要大弧度顶弯,相贯接口需精准加 程—水渣堆场厂房结构下部为钢筋混凝土基础,工,对结构的加工和组对要求高. 上部由15福空间倒三角管桁架搭设,呈半圆形,远 3)拼装胎架的搭设精度直接关系着管桁架能 观犹如一道道彩虹.水渣堆场厂房尺寸为:否组对成功,上下弦端点及中点位置、相贯节点位 127.5m×55m 圆弧最高点至地面为30.5m.杆件 置、抗风桁架与屋架的相交节点、檩托、系杆端板、 为高频焊管,节点类型为相贯焊接节点.倒三角管支撑耳板等重要控制点均需使用全站仪在胎架上 桁架中弦杆最大规格为168×8.0,腹杆最大规格给予明确标记,对提高安装精度和速度起到决定性 为$114×4.0,结构立面形式为圆弧形,断面形式为作用. 等腰倒三角形,截面尺寸为2500mmx1500mm.3结构加工...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年9月下 116 CONSTRUCTION TECHNOLOGY 第43卷第18期 D0I:10.7672/5j52014180116 大跨度空间双曲线钢管桁架屋盖安装技术 李纲 (天津市建工工程总承包有限公司,天津300000) [摘要]东丽体育中心体育馆钢桁架屋盖设计新颖、造型独特、跨度长达136.322m 施工难度较大.结合工程实际 概况,介绍钢桁架的拼装、焊接、卸载控制及变形监测等主要施工方法.结果表明:该施工技术切实可行,保证了施 工质量和结构安全,同时取得了良好的经济效益和社会效益. [关键词]钢结构;桁架;空间结构:施工技术 [中图分类号]TU758 [文献标识码]A [文章编号]1002-8498(2014)18-0116-03 Installation of Large-span Hyperbolic Roof with Steel Pipe Truss Li Gang Tianjin Construction Engineering Main Contraction Co.Ltd.Tianjin 300000 China Abstract:The gymnasium of Dongli Sports Center has the characteristic of new style special structure and has a large span of 136.322m so the construction is very difficult.Combining with actual conditions of this project the main construction method including the truss assembly welding unloading control and deformation monitoring are introduced.The result shows that the construction technology is reliable the construction quality and structures safety is guaranteed meanwhile the good economic benefit and social benefit is obtained finally. Key words:steel structures;trusses;spatial structures;construction 1工程概况 华北地区跨度最大的体育建筑之一,其造型独特, 天津市东丽区体育馆工程位于天津市东丽区 构件尺寸巨大,存在大量的扭曲构件,其设计、加工 先锋路与外环线交口处,该工程建筑面积为 制作及安装的复杂性前所未有,具有极大的挑战 23153m2 建筑物高度为29.15m 是2013年东亚运 性.体育馆大跨度结构如图1所示. 动会的主要比赛场地之一,其屋盖系统采用钢结构 管桁架体系.屋顶呈蝴蝶形,平面尺寸为99.5m× 96.5m.主桁架呈拱状,由上弦系和下弦系桁架组 成,约150m长,净跨136.322m 上、下弦系桁架均 是三角管桁架;其余结构由16榀副桁架和4环桁 架组成,均采用三角管桁架,4榀环桁架为空间双曲 a效果图 线形式. 该工程钢结构安装工程量约为1000t 钢材主 22 要为Q345B直缝焊管,规格为351x×10 168× 6.5 325×18,102×4 180×8,d...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2016年3月下 74CONSTRUCTIONTECHNOLOGY第45卷第6期 DOI:10. 7672/sgjs2016060074
大跨度操作平台在采光顶施工中的应用
曹亚军,车志岩,谢超 (中建三局装饰有限公司,广东深圳518035)
[摘要】成都银泰中心项目商业裙楼采光顶系统造型特别,施工难度较大,在屋面采光顶洞口位置首先纵横两个方 向搭设工字钢梁,并在工字钢梁上焊接钢方管作为结构次梁,然后在钢方管上满铺双层木跳板和防水油布,形成一 个可供采光顶幕墙安装的操作平台,待采光顶安装完成后,通过将主钢梁向外侧加长并增加配重,最终使用卷扬机 和滑轮支架将操作平台顺利拆除。

采用钢梁搭设施工平台总投人少,安装成本低,确保了高空作业安全,并在采光 顶幕墙施工的同时,不影响内装饰施工。

[关键词]安装工程;采光顶;大跨度;操作平台;施工技术 [中图分类号】TU767.5【文献标识码】A[文章编号]1002-8498(2016)06-0074-04 ApplicationofLarge-spanOperationPlatforminthe Construction ofLightingRoof CaoYajun,CheZhiyan,XieChao (Decoration Co.,Lud.ofChinaConstruction3rd Engineering Bureau,Shenzhen,Guangdong518035,China) Abstract:The lighting roof modeling of mercial podium for Chengdu Yintai Center is special,and the construction is difficult.Firstly,steel I-shaped beam is erected at the level and longitude direction,and the steel square tube is welded on the I-shaped beam as secondary beam,then the double layer wood springboards and tarpaulins are layered on the square tubes,so the operation platform is formed for the lighting roof installation. When the installation of lighting roof is finished,the main stel beam is lengthened and increasing the counterweight,then the operation platform is demolished with the hoisters and pulley scaffolds. The construction platform has lots of advantages, including low construction investment,low installation cost,high safety of working at high altitude,and the inner decoration is not influenced when the lighting roof constructs. Key words:installation;lighting roof;large-span;operation platform;construction 1工程概况 成都银泰中心位于成都市高新区南部新城,总 建筑面积约75.9万m²,商业面积约43.4万㎡²。

项 目定位为大型商业综合体项目,建成后将成为成都 市乃至中国西南地区最高端商业中心,成都银泰中 心项目工程体量大、造型复杂、品质要求高,是成都 市标志性建筑之一(见图1)。

本项目商业裙楼包含1,2,3号3个采光顶,投图1成都银泰中心项目 影面积1281m²,展开面积1700m²,采光顶底部距Fig.1 Chengdu Yintai Center 下面楼板高度约39m,其中2号采光顶洞口纵向跨2施工难点和措施确定 度26m,横向跨度36.5m(见图2)。

如若采取满堂脚手架进行采光顶部位施工,需 从1楼搭设至屋顶,脚手架高度达39m,脚手架搭设 [作者简介]曹亚军,工程师,E-mail:123722413@qq.工作量极大,危险性极高,经济实用性差。

因此,我 [收稿日期】2015-11-16司采用直接在结构洞口上搭...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年1月下 施工技术 第42卷第2期 CONSTRUCTION TECHNOLOGY 13 大跨度异形钢管拱桁架空间结构施工技术* 陈安英,王静峰,郑海堂2,邢文彬 (1.合肥工业大学土木与水利工程学院,安徽合肥230009; 2.中铁四局集团钢结构有限公司,安徽合肥230022) [摘要]合肥滨湖国际会展中心登录大厅为大跨度异形钢管拱桁架空间结构.根据工程特点和施工技术关键点, 采用工厂结合现场制作单元构件,采用有支撑胎架高空分段吊装安装、同步对称卸载方法进行屋盖结构施工.通 过安装工况分析,确定了整体安装流程,研究了桁架梁吊装及合拢技术要点;通过比较分析,优化了卸载施工方案. 在施工技术分析基础上,对施工全过程进行了数值模拟及施工监测,结果表明分析结果与现场监测值吻合较好. [关键词]钢结构;桁架;安装;支撑胎架;卸载;监测 [中图分类号]TU391.3;TU758.1 [文献标识码]A [文章编号]1002-8498(2013)02-0013-04 Construction of Large-span Special-shaped Steel Pipe Arch Space Truss Chen Anying' Wang Jingfeng' Zheng Haitang2 Xing Wenbin' (1.College of Civil Engineering Hefei University of Technology Hefei Anhui 230009 China; 2.Steel Structure Co. Lad.of CTCE Group Hefei Anhui 230022 China) Abstract:Taking a project in Xinjiang as an example this paper introduced the installation of a large- span and large-tonnage steel transfer truss which was unable to be constructed using ordinary large-scale machines.Making full use of symmetrical characteristics of the truss at high altitude the installation was finished by self-bearing sliding and hoisting.Specifically the transverse truss was used as a sliding bracket and the longitudinal truss blocks slid on it to the specified locations.Then the longitudinal truss columns that were already positioned were used as supports above which the hoisting steel strand jacks were fixed.These steel strand jacks were then used to lift the longitudinal trusses to their design altitudes to finish the installation. Key words:steel...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年7月下 施工技术 第41卷第369期 CONSTRUCTIONTECHNOLOGY 159 大跨度多层曲面焊接球网壳结构质量控制要点 李永红,樊云鹏 (中建六局工业设备安装有限公司,天津300451) [携要】大跨度多是他面煤按球节点网壳结构是空间结构交装第工的难点。

等工过程中,如何合理、有效地预控网 架的整体工程质量,是确保工程顺利进行的关键。

简明介绍了工过程中的工程质量控制要点:优化组合,减少杆 件对接数量:过程观赠,控制安装累积误差;跟踪焊接,预控焊接收缩量及变形。

该控制要点的成功运用,表明其具 有实用性及可操作性。

[关键词]钢结构;网壳:焊接球;累积误差:质量控制 (中图分类号】TU328 [文献标识码】A [文章编号]1002-8498(2011)14-0159-03 Key Points for Large-span Multi-layer Curved SurfaceShellStructurewithWeldedBall Joints Li Yonghong,Fan Yunpeng ( China Construction 6th Enginering Buredu Industrat Equipmeat ntallation Co. , Ezd. , fissjn30045t, Chna) Abstract: It is diffeult for instalation of large-span multi-layer curved surface welding ball shell structure.During construetion,how to control the integral engineering quality reasonably and effciently is the key point to ssure sucesful project. The key point of engineering quxlity control are introduced, which include optiemuizing posite panents and ceducing bar welding quantity, observstion during construction and controling accumulated errors, trscking welding process and controlling welding shrinkage and deformation. These points are practical and operational. Key words:steel struetures; shells; welding ball; accumulated error; quality control 目前我国的空间网架结构形式多种多样,各种 总重约为1200t,如图1所示。

造型新颖、大跨度的网架结构层出不穷。

相对而 言,多层甚至超多层的大跨度网架,因其施工难度 较大,国内比较少见。

本文从已施工完成的东营黄 .187 11.8537 148 000 13.839 河口模型厅海域A厅整体3层、局部5层网架的工 程实践,对大跨度多层曲面焊接球网壳结构工程质 图1海域A斤空间网亮制面示章(单位:m) 量控制要点进行一些探讨。

Flg.1 Prohle of spatial shel (unit: m) 1工程概况 与同类型结构相比,本结构形式相对复杂。

所 黄河口物理模型试验厅项目海域A厅屋盖,采 有材料全部采用Q235-B。

焊接球数量2413个,规 用整体3层、局部5层焊接球节点钢网架,属于空间 格Φ260mm×6mm-6l200mm×40mm;杆件数量 大跨度多层曲面焊接球节点网壳结构。

11Q5a件,钢管规格88.5mmx4g-480mmx 该网架平面投影星圆环形,圆心角为49°;结构 20mm共计35种。

2008年8月23日.遵照“变形协 断面星多层拱顶状。

内弧标高为13.203m,7个支 调、卸载均衡”的原理,用28个32t液压千斤顶,成 撑点;外弧标高为7.187m,17个支撑点。

屋面最大 功地完成了主体结构的同步整体卸载落位施工。

标高26.57m.跨度148m。

建筑面积22667m²,结构 经实测,各项指标均符合规范要求,工程质量达标, [收目]2011-12-26 得到了业主及监理单位的一致认可。

实践表明,该焊接球网架的施工难度很大。

施 07)子课题:中建股份公司资助项目(CSCEC-2007-Z402) [作者商介]李水红,总工程...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年9月 108 CONSTRUCTION TECHNOLOGY 第39卷第9期 大跨度复杂造型钢网架拔杆提升系统设计 蒋涛,付长春2,张同波2 (1 青岛市建筑工程质量监督站,山东青岛266071:2.建集团份公司,山东岛266071) [描要]岛体育中心湖泳跳水馆工程采用焊接空心节点网架,室内邮分采用梅构式拔杆提升方法,室外部分采 用分快吊梨高空对基方法.大跨度钢网架拔杆提升系统包括杆基础、塔、天澡、穆定系统和提升系洗5部分. 传莓情况,理布里拔杆,并采用有限元件对格构式拔、独立武拔杆及杆部熊换梁强度和藕定性进粉 计算分析,得出了杆提升系说的布置、构道设计计算的原和要点. [关键词]网架结构:杆:提升系统:布重:升算分析 [中分类号]TU758.11 [献杉识福]A [支章编号]1002-8498(2010)09-0108-03 Design of Pulling Bars Lifting System for Large-span Complicated Grid Structure Jiang Tao' Fu Changchun㎡,Zhang Tongbo2 (1.Qingdao Prorincial Engineering Quality Superrision Station Qingdao Shandong 266071 China: 2.Qingjian Group Co.Lad.Qingdao Shandong 266071 China) Abstract:Welded hollow spherical joints grid structure is used in Qingdao Sports Center Swimming Diving Hall.Thus lattice pulling bars are selected for lifting of indoor part and method of lifting at several parts and assembling at high altitude is adopted for the grid structure.The pulling bars lifting system includes pulling bars foundation tower frame I-shaped beam stable system and lifting system. Combining with loading conditions the pulling bars are reasonably arranged.Furthermore the strength and stability of lattice pulling bars independent pulling bars and bottom transfer beam are calculated with finite element software and the principle and key points of layout structure and design are gained. Key words:grid structure:pulling bar:lifting system:layout:calculation and analysis 1工程概况 杆件为d377×28 最小规梅杆件为60×3;焊接球 青岛体育中心游泳跳水馆工程总建筑面积重量约为5...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年3月 52 CONSTRUCTION TECHNOLOGY 第39卷第3期 大跨度上行式移动模架高空拼装技术研究 程晔,周翠英,杨凌2 (1.中山大学工学院,广东广州510275;2.中铁大桥局集团有限公司,湖北武汉430050) [摘要]深入研究MS62.5m大跨度上行式移动模架安装技术,根据工程现场实际条件,详细比较了高空拼装方案 与整体提升方案优劣,最终选择了高空拼装方案并制定了详细的实施方案.该方案在珠江黄埔大桥北引桥 MSS62.5m大跨度移动模架安装工程顺利实施.实践表明在特定的条件下,高空拼装方案在大跨度移动模架拼装 施工具有自身特点和优势. [关键词]移动模架;高空拼装;整体提升;临时墩 [中图分类号]TU731.2;U445[文献标识码]A[文章编号]1002-8498(2010)03-0052-04 High-altitude Assembling Technique for Large-span Movable Scaffolding System Using Upper Slide Shuttering Formwork Cheng Ye' Zhou Cuiying' Yang Ling2 (1.School of Engineering Sun Yat-sen Unicersity Guangzhou Guangdong 510275 China; 2.China Zhongtie Major Bridge Engineering Group Co.Lud.Wuhan Hubei 430050 China) Abstract:The high-altitude assembling technique for large-span Movable Scaffolding System (MSS62.5m)using upper slide shuttering formwork is researched thoroughly.Based on the practice engineering the merits and demerits of two programs are pared with each other and the high-altitude assembling scheme is chosen at last.The detailed high-altitude assembling scheme is made and put into action in the northerm approach of Zhujiang Huangpu Bridge.It is proved by the practical engineering that the high-altitude assembling scheme has own advantages. Key words:movable scaffolding system;high-altitude assembling:integral lifting;temporary pier 移动模架系统(movable scaffolding system简称系统(立柱、支承机构及台车)、主梁系统(主梁和导 MSS)是一种自带模板,可在桥位间自行移位,逐孔完梁、吊架及挑梁)、辅助系统(15t起吊装置、前支腿)、 成箱梁现浇施工的大型制梁设备,其相当于提供了1模板系统(底模板、侧模板、吊杆)等部分,整机钢结构 个移动...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)