首页 > 2023 ( 第 420 页)

2012年1月上 施工技术 第41卷第356期 CONSTRUCTION TECHNOLOGY 61 高填方填筑体处理效果评价研究 周立新,周虎鑫,黄晓波 (空军工程设计研究局,北京100068) [摘要]在高填方工程中,湿陷性黄土作为填料,对其填筑体处理效果评价开展研究至关重要.以95%的压实度标 准,对填筑体处理效果从室内试验、K检测、载荷试验、浸水载荷试验、回弹模量、物探(面波)检测等指标进行综合 评价.处理后的填筑体得到很好的压实效果,湿陷性已完全消除,满足各项设计要求.处理效果评价说明了施工 方法和参数的合理性与有效性;试验所得相关指标可为沉降计算、边坡稳定性分析、施工质量控制提供参数依据. [关键词]填料;湿陷性黄土;强度;回弹模量;沉降 [中图分类号]P642.3 [文献标识码]A [文章编号]1002-8498(2012)01-0061-03 Study on Treatment-effect Evaluation in High-fill Project Zhou Lixin Zhou Huxin Huang Xiaobo (Air Force Engineering Design &Research Institute Beijing 100068 China) Abstract:In high-fill project by collapsible loess filling it is very important for engineering to study on treatment-effect evaluation.Based on 95%of pacting standard the authors make prehensive evaluation on the treatment-effect from indoor test Ko test load-settlement test soaking load-settlement test rebound modulus and geophysical detection.The high-filling obtains good pacting effect and clears up collapsibility which can meet design demands.According to treatment-effect evaluation the construction method and parameters are reasonable and effective.Meanwhile the parameters from test can be references for settlement calculation slope stability analysis and quality control. Key words:filling;collapsible loess;strength;rebound modulus;settlement 我国的西北黄土高原为典型的侵蚀剥蚀黄土露.由于工程建设的需要,场地内需要进行大规模 粱峁地貌,地形起伏、沟谷深切,开展工程建设必然“挖山填沟”的高填方工程.填料主要为梁上的湿 存在着深挖高填,而高填方填筑体压实质量的好坏陷性黄土(Q) 具有自重湿陷性,湿陷性中等~强 则是工程成败的关键因素.湿陷性黄土是一种特烈,试验段填方最大高度近30m. 殊的第四纪大陆松散堆...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年6月 86 CONSTRUCTION TECHNOLOGY 第39卷第6期 高原复杂地质条件下固结灌浆施工参数选定 尚晓威,邱敏 (武水电第二总队五支队,江苏常州213031) 【摘要]新疆察汗乌苏水电站是新疆开都河流城上游规划建成的第三个梯级电站,由于察汗乌苏水电站右岸溢洪 洞在开挖过程中多次出现不同程度的局部塌方,因此在固结灌浆施工前进行了固结灌浆试验,以此来调整灌浆各 项参数.结合原现场试验和补充灌浆试验,介绍灌浆设计参数以及施工顺序.通过分析灌浆注人量、平均注水率 以及单位注人量和质量检查成果,认为补充灌浆试验后的施工方法更为合理,保证了施工质量和安全. [关键词]水电站工程;高原地质条件;固结灌浆;施工质量 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2010)06-0086-02 Construction Parameters Selection of Consolidation Grouting Under Complex Plateau Geological Conditions Shang Xiaowei Qiu Min (No.5 Detachment No.2 Hydropower Force of Armed Police Changzhou Jiangsu 213031 China). Abstract:Xinjiang Chahanwusu Hydropower Station is the third cascade hydropower station in the upstream of Kaidu River in Xinjiang.It happens that different partial collapses for many times during the process of excavation at right-bank spillway in the hydropower station.Thus consolidation grouting test is done before grouting construction to adjust all kinds of parameters.Based on original on-site test and supplementary grouting test design parameters and construction sequence are introduced.The construction method with supplementary grouting test is more reasonable by analyzing injection amount average water-injection rate unit injection amount and quality check result.As a result construction quality and safety are ensured. Key words:hydropower engineering;plateau geological condition;consolidation grouting;construction quality 1工程概况 身固结灌浆的灌浆施工工艺、方法,确定灌浆孔排距、 新骚察汗乌苏水电站工程枢纽主要由建在覆盖层灌浆压力、水灰比等施工参数,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年6月下 104 CONSTRUCTION TECHNOLOGY 第41卷第367期 高原地区外墙大面积氟碳漆施工技术 顾小锐,张万维 (武警水电第二总队入支队,福建厦门361009) [摘要】拉萨主400kV换流站是目前世界上海拔最高的换流站(海拔3819m) 是国家电网公司的一号工程.根据 该工程标准高、工期紧、任务重、高缺氧等特点,为保证装修工程装饰效果,外墙装饰确定采用氟碳漆施工.重点 介绍了在拉萨换流站外墙大面积氟碳漆施工技术,包括施工工艺和要点,材料选用以及质量要求.结果表明,实体 质量和外观质量符合规范要求. [关铺词]高原地区:装饰工程:涂料:氟碳漆:施工技术 [中图分类号]TU767[文献标识码]A [文章编号]1002-8498(2012)12-0104-03 Construction Technology of Large Area Fluorocarbon Coating for Exterior Wall in Plateau Area Gu Xiaorui Zhang Wanwei No.8 Detachment No.2 Hydropower Foree of Armed Police Xiamen Fujian 361009.China) Abstract:The±400 kV converter in Lhasa is the highest altitude converter with389 meters in the world currently which is the No.1 project of State Grid Corporation of China.According to strict construction requirements of the engineering and environment conditions short construction time large work quantity and thin oxygen at high altitudes with low temperature the fluorocarbon coating is adopted in exterior wall decoration.The key points of large area of fluorocarbon coating construction technology are introduced including construction technology and points material selection and quality demands.The results show that the entity quality and appearance quality meet standards. Key words:plateau area;decoration;coatings;fluorocarbon coating:construction 1工程概况 化等多项技术指标优于普通涂料. 青藏±400kV拉萨换流站位于林周县甘曲镇朗2.1氟碳漆使用范围 塘村西侧约900m处,南距拉萨市区约18km(公路里 建筑物外墙、屋顶以及各种建材首选的耐久性 程约80km) 澎波河在站址北面2km处.该工程综合装饰保护材料. 楼及警卫传达室外墙装修采用氟碳漆.建筑外墙主 2.2性能 要采用国家电网通用的绿色、浅灰色、中灰色、...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年11月下 94 CONSTRUCTION TECHNOLOGY 第43卷第22期 D01:10.7672/sjs2014220094 高压气囊平移建筑物工程设计方法研究 李旭光,付素娟2,李佳1 (1.河北建研科技有限公司,河北石家庄050021;2.河北省建筑科学研究院,河北石家庄050021) [摘要]高压气囊平移主要应用于船舶下水、沉箱出运等工程,本文首次将其引入建筑物的平移,对该工程的方案 选择、上部结构加固设计、基础及下轨道设计、托换设计、牵引系统设计及就位连接进行了研究分析. [关键词]建筑移位;高压气囊;托换;平移 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2014)22-0094-05 Design Method Research on Building Translation by High-pressure Gasbag Li Xuguang' Fu Sujuan2 Li Jia' (1.Hebei Building Research Engineering Co.Ltd.Shijiazhuang Hebei 050021 China; 2.Hebei Academy of Building Research Shijiazhuang Hebei 050021 China) Abstract:High-pressure gasbag translation is mainly used in ship launching caissons shipment and other projects.This article brings it into the structure translation for the first time which presents the analysis on solution selection the foundation and the orbit design the underpinning design the traction system design and linking etc. Key words:building moving;high-pressure gasbag;underpinnings;translation 建筑物整体移位是根据原建筑物的结构形式、行平移尚属首例.本文以成功的实际工程为研究 整体刚度、工程地质情况、现场施工条件、经济投资背景,结合理论分析,对高压气囊平移建筑物进行 对比等多方面因素综合选定方案.其基本原理是 探讨,为今后的类似工程提供参考. 对现有建筑物进行必要的结构加固,根据托换理论1工程概况 改变其传力体系,从而使建筑物与基础或地基脱 该工程位于某国道与公路的交口,为公路转盘 离,使建筑物形成可移动的单元体,然后通过整体 内的城市景观雕塑.由于其体积较高大,存有遮挡 顶升、推拉等技术手段,使建筑物移动到新的位置. 视线的交通隐患,因此该雕塑需向东北方向平移 建筑物平移设备分为动力设备和行走机构两 117m至公园内(见图1).该雕塑为砖与混凝土的 部分.我国目前应用较多的动力设备为千斤顶(螺 混合结构,由锣鼓造型和底座两部分组成,底座外 旋、液压)、卷扬机等,行走机构以钢滚轴为主. 部周圈墙体及上部锣鼓造型为钢筋混凝土结构,底 高压气囊搬运技术在船舶下水、沉箱出运等工 座内部竖向支撑锣鼓造型墙体为370mm厚砌体结 程的应用已非常成熟,如广东省粤电惠来(靖海)电 构.结构底部为...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年3月下 12 CONSTRUCTION TECHNOLOGY 第43卷第6期 D01:10.7672/js2014060012 高压旋喷桩止水帷幕在人民日报社报刊 综合业务楼中的应用 李哲琳,白志华,刘露超,赵海军 (中国新兴建设开发总公司,北京100039) [摘要]人民日报社报刊综合业务楼深基坑止水采用在基坑外侧喷射注浆形成一道连续防水墙,连续止水帷幕和 护坡桩相结合的方法,在基坑四周封堵.经严格控制,取得了良好的施工效果,有效地控制了地下水,保证了基坑 的安全和后续施工的顺利进行.具体阐述了止水帷幕技术要求及施工方法,总结了施工质量的控制要点. [关键词]高层建筑:深基坑;止水帷幕:高压旋喷桩:施工技术 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2014)06-0012-03 Application of High-pressure Sprayed Piles with Waterproof Curtains in the People's Daily Project Li Zhelin Bai Zhihua Liu Luchao Zhao Haijun China Xinxing Construction Derelopment General Co.Beijing 100039 China) Abstract:A continuous waterproof wall is formed by grouting concrete outside of the foundation excavation in the People's Daily project the foundation excavation is sealed with the bination method of waterproof curtain and slope protection piles.By the strictly control for the construction the good construction effect is obtained and the underwater is in control.Meanwhile the foundation excavation safety and construction sequence are guaranteed.The requirement and construction method of waterproof curtain are described in detail and the control points for construction quality is summarized. Key words:tall buildings;deep foundation excavation;waterproof curtain;high-pressure sprayed piles;construction 高压旋喷桩止水帷幕是利用高压把浆液从喷2工程地质及水文地质条件 嘴喷射出,冲击破坏土层,使浆液和土体充分搅拌 根据岩土工程勘察报告,场区地势较平.场地 混合,随着注浆管的旋转和提升而形成圆柱形桩地层按成因年代分为人工堆积层和第四纪沉积层2 体,通过旋喷桩和护坡桩之间相互搭接,形成一道大类,地层岩性及其分布特征自上而下主要描述如 连续的止水帷幕,以隔断地下水进入基坑,保证基下:①房渣土、碎石填土,①,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2017年1月下 72 CONSTRUCTION TECHNOLOGY 第46卷第2期 D0I:10.7672/5gj2017020072 高压旋喷桩内插H型钢技术及在某基坑 加固工程中的应用 唐君12,闫双跃12,段启伟12,张庆云1.2,江宁1 2 (1 中国建筑科学研究院地基基础研究所,北京100013;2.建研地基基础工程有限责任公司,北京100013) [摘要]综合考虑工程地质及水文地质条件、场地施工条件、对基坑临近建(构)筑物保护等因素,采用高压旋喷桩 内插H型钢技术对事故基坑进行加固,利用高压旋喷柱的截水性能来防止泥炭(质)土的流失,同时利用H型钢的 高强度、刚度满足支护结构的承载能力和变形控制要求.实施效果和施工监测表明,采用的基坑加固方案有效、可 靠,保证了二次开挖过程中基坑及临近建(构)筑物的安全. [关键词]基坑工程;高压旋喷柱;泥炭(质)土;加固;设计;应用 [中图分类号]TU43 [文献标识码]A [文章编号]1002-8498(2017)02-0072-04 Technology of High Pressure Jet Grouting Pile Interpolated with H-shape Steel and Application in Reinforcement of an Excavation Project Tang Jun.2 Yan Shuangyue.2 Duan Qiweil.2 Zhang Qingyun'.2 Jiang Ning1.2 (1.Institute of Foundation Engineering of China Academy of Building Research Beijing 100013 China: 2.CABR Foundation Engineering Co.Lid.Beijing 100013 China) Abstract:According to the engineering geological and hydro-geological conditions site construction conditions and the protection requirements for adjacent building (structure )the technology of high pressure jet grouting pile interpolated with H-shape steel was adopted for the reinforcement of the excavation.In this reinforcement scheme the water interception performance of high pressure jet grouting pile was used to prevent erosion of the peat pcaty)soil and the high strength and stiffness of H-shape steel was used to meet the bearing capacity and deformation control requirements of the retaining and prevention structure.The implementation effect and construction monito...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年10月下 施工技术 第41卷第375期 CONSTRUCTIONTECHNOLOGY 53 高保塑超缓凝剂的研究与应用 黄波,王军,刘明,唐玉超,王婵 (中建商品混凝土有限公司,湖北武汉430074) [摘要】超缓凝剂是配制超缓凝混凝土的关键技术。

采用高分子化学方法,研制了一种混凝土用超缓凝剂,研究了 超缓凝剂对水泥浆体流动性、凝结时间、混凝土和易性及后期力学性能的影响,并结合实际工程应用对其性能进行 了探讨。

试验结果表明,超缓凝剂在低掺量(0.1%~0.5%)条件下具有良好的保塑性能,保垢3~7h;随着掺量的 提高,水泥浆体的凝结时间和保坍时间逐渐延长,高掺量(0.5%~2.0%)下达到超缓凝,对混凝土的后期强度具有 一定的增强效果,强度提高约10%。

同时,配制的超缓凝混凝土表现了优异的耐久性能。

[关键词】混凝土;外加剂;超缓凝剂;高保塑;耐久性 [中图分类号】TU528.042 【文献标识码】A [文章编号]1002-8498(2012)20-0053-05 StudyandApplicationofaNovelHigh Plasticity-maintainingSuperRetarder Huang Bo,Wang Jun,Liu Ming,Tang Yuchao,Wang Chan (China Construction Ready-mixed Concrete Co.Lad,Wuhan,Hubei 430074, China) Abstract;Super retarder is a key technology in the preparation of ultra-retarding concrete.A super retarder for concrete was developed by using polymer chemistry method.The influence of super retarder on the fluidity of cement paste,the condensation time of the cement,conerete workability and late mechanical properties were studied,and its performance was discussed bined with practical engineering applications.The test results show that the super retarder under low dosage (0.1%~ 0.5%)has good plasticity-maintaining ability and can control the slump loss for 3 ~7hours.As the dosage increased, the setting time of the cement paste and the time of slump gradually extends to achieve ultra-high retarding state with the dosage of 0.5%o ~ 2. 0%o.The concrete over 22 hours can keep the slump at 200mm or more and the slump flow can reach more than. 500mm. The super retarder has reinforcing effect on the late strength of the concrete as the final strength increased by 10%.Meanwhile, the prepared ultra-retarding concrete demonstrated excellent durability. Key words:concrete;admixture; super retarder;high plasticity-maintaining; durability 0前言 裂缝;对于夏季高温环境下施工的混凝土,超缓凝 超缓凝剂是一种新型的混凝土外加剂,不仅能 剂可以延长混凝土的运输时间,减少坍落度损失, 够长时间内(例如≥24h甚至更长时间)任意调节混 是保证混凝土泵送、浇灌和施工的有效方法。

另 凝土的凝结时间,而且对混凝土的性能无负面影 外,一定量的超缓凝剂能够保证长时间混凝土施工 响,成为近年来外加剂技术研究的热点之一。

与普 的需要,避免接槎出现“冷接头”和夜间施工,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年8月上 施工技术 第46卷第15期 CONSTRUCTION TECHNOLOGY 93 D0I:10.7672/8js2017150093 高低复合型壅水溢流堰设计与施工 罗光财,蔡甫,刘伟华,陈燚 (中建五局土木工程有限公司,湖南长沙410004) [摘要]以舞水河怀化城区段综合治理工程项目为例,通过设计和施工一种高低复合型水溢流堰,探讨塞水溢流 堰施工技术在降低河流两岸综合治理工程施工水位的实际应用,节约资源和减少对环境的负面影响,实现绿色施 工.重点介绍了复合型雍水溢流堰的施工技术措施. [关键词]水利工程;综合治理;溢流堰:设计;施工 [中图分类号]TV653 [文献标识码]A [文章编号]1002-8498(2017)15-0093-03 The Design and Construction of High-low Composite Backwater Overflow Weir LUO Guangcai CAI Fu LIU Weihua CHEN Yi (CCFEB Civil Engineering Co.Ld.Changsha Hu'nan 410004 China) Abstract:Taking the prehensive management project of the Wushui River in Huaihua City as the research carrier a high-low posite backwater overflow weir was designed and constructed.In order to reduce the river prehensive treatment project construction level construction technology of backwater overflow weir is discussed which can save resources and reduce the negative impact on the environment to achieve green construction.The construction techniques for posite backwater overflow weir are introduced in detail. Key words:water conservancy engineering;prehensive treatment;overflow weir; design;construction 1工程概况 2高低复合型壅水溢流堰设计 舞水河为沅江一级支流,发源于贵州瓦安县内 河水位较高,水位周期性变化大,如采用纵向 1100m高峰,于黔城汇入沅江,全长444km 平均坡 施工围堰止水,填筑土方数量巨大,且易污染河流. 降1.26%o.流域面积18578km2.流经城区的河 为减少修筑舞水河防洪工程施工难度,降低施工成 西、城中、鸭嘴岩区时,河水常水位标高为212.000m 本,同时为保障自来水厂正常取水生产,市民的用 左右,正常水位平均河宽105m 水深8m 流量 水不受影响,在施工段上游修建雍水溢流堰,既降 420m3/s;枯水期平均河宽70m 水深6m.历史最大 低下游水位,又保持上游水位.同时,由于周围是 洪峰流量10700m3/s 50年一遇洪水位219.4m 每 繁华的商贸区,壅水溢流堰施工场地狭...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年1月上 施工技术 第41卷第356期 CONSTRUCTIONTECHNOLOGY 87 马鞍子梁软岩隧道围岩变形规律及 支护技术模拟分析 任建喜,党超 (西安科技大学建筑与土木工程学院,陕西西安710054) [摘要】结合马鞍子梁隧道工程,采用FLAC数值模拟方法对该隧道上下台阶法施工全过程进行模拟分析,完成了 现场监测研究,与数值模拟预测的结果进行了比较,得到了软岩隧道的围岩变形规律,提出合理的支护方案。

结果 表明,该开挖方法适用于此软岩隧道,竖向位移主要集中在拱顶和拱底处,拱顶位移比较大,水平位移主要集中在 隧道两肩和两脚处。

现场监测表明:隧道开挖初期拱顶下沉与水平收敛变形速率比较大,处于不稳定状态,随时间 变形速率较小,曲线趋于稳定状态。

FLAC数值模拟预测结果与实测结果基本一致,一次支护和二次衬砌的合理间 隔时间为30d。

[关键词】隧道工程;软岩隧道;上下台阶法;数值模拟;围岩;变形;支护;监测 [中图分类号]U456.3 [文献标识码]A [文章编号]1002-8498(2012)01-0087-05 Deformation Rule and Simulation Analysis of Supporting Technology on Soft Rock Tunnel in Maanziliang Tunnel Ren Jianxi,Dang Chao (SchoolofArchitecture andCivilEngineering,Xi’anUniversity ofScience andTechnology,Xian,Shaanxi710054,China) Abstract:Combined with Maanziliang tunnel engineering,using FLAC numerical simulation method to analyze the whole process of benching tunneling method, the study on actual monitoring is pleted. Compared with the numerical simulation results, authors get the soft rock tunnel surrounding rock deformation,and suggest the reasonable supporting scheme. The results show that the excavation method is applied for the soft rock tunnel. Vertical displacement is mainly concentrated on the top and bottom of the dome and the dome displacement is relatively large.Horizontal displacement is mainly concentrated on the shoulder and foot. The actual monitoring shows that the tunnel vault settlement and horizontal state,over time the deformation rate is small and the curve tends to be stable. The FLAC numerical simulation results are basically the same as the measured results. The Reasonable interval between the first support and the second support is 30 days. Key words:tunnels; soft rock tunnels;benching tunneling method; simulation; surrounding rock; deformation;supporting;monitoring 隧道施工理论计算与现场监测成为隧道施工监测,对隧道上下台阶法施工过程进行模拟,通过 安全性保障的有利证明,通过现场对围岩与支护形与现场监测数据对比,得出上下台阶法施工对此隧 式监测,为下一步初期支护和二次支护参数调整提道目标断面开挖比较合理的结论。

供依据,把理论计算与现场监测进行对比整理,可1工程概况 以进一步优化支护方案和施工方案。

本文以马鞍马鞍子梁隧道位于桃园隧道的西北方向约8km 子...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年4月下 48 CONSTRUCTION TECHNOLOGY 第40卷第339期 马来西亚吉隆坡珍珠塔超高超大板式 预应力转换层施工技术 刘晓生,黄征,王振兴,王卫新,于宁,范乔,单文奇 (北京城建北方建设有限责任公司,北京101301) [摘要]马来西亚吉隆坡珍珠塔转换层通过采取先进的技术创新理念,优化结构转换层设计:变“梁式结构转换层” 为“板式预应力转换层”的设计方案.认真、周密、合理地进行施工部署,将施工结构转换板混凝土分②次浇筑,同 时进行模架方案设计,并通过实施过程中一系列的预控、监控、模拟试验等措施顺利实现工期、质量及成本等目标; 通过变更转换层结构设计形式既降低了施工难度,又降低了工程成本. [关键词]珍珠塔;结构转换层;施工控制;模拟试验 [中图分类号]TU973.12 [文献标识码]A [文章编号]1002-8498(2011)08-0048-03 Construction Technology of Super-high and Mass Prestressed Transfer Slab in Pearl Tower Kuala Lumpur Malaysia Liu Xiaosheng Huang Zheng Wang Zhenxing Wang Weixin Yu Ning Fan Qiao Shan Wenqi Beijing Urban Construction North Construction Co.Ltd.Beijing 101301 China) Abstract:Based on characteristics of transfer floor construction in Pearl Tower Kuala Lumpur Malaysia authors change transfer beam to prestressed transfer slab by means of adopting advanced innovative technique concept to optimize consultant's original design.By serious careful and reasonable design for construction the concrete of the transfer slab is poured by two times and construction scheme of formwork and scaffold is designed.Authors achieve original target of progress quality and cost by series of measures of pre-control monitoring and simulating test.Changing structure design scheme of the transfer floor can lower the construction difficulty as well as construction cost. Key words:Pearl Tower;transfer floor;construction control;simulation test 1工程概况 2优化设计方案 马来西亚吉隆坡珍珠塔工程为高级公寓,建筑2.1原有设计方案 面积11.3万m2 地下1层,地上43层.建筑高度 原设...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2015年10月上 施工技术 第44卷第19期 CONSTRUCTION TECHNOLOGY 117 D0I:10.7672/8js2015190117 面板式土压平衡盾构掘进参数试验研究 何占峰 (北京市南水北调工程质量监督站,北京100142) [摘要]以北京市某工程盾构施工为背景,研究了盾构施工对地层影响的主要参数,试验了不同主要参数下对地层 的影响距离和大小,同时也提出了一种新的出土量衡量方法.通过现场试掘进结合监测数据,得出对地层变形影 响最小的最佳掘进参数组合,五环路最终沉降值在无任何加固措施的情况下仅为设计控制值的50%左右. [关键词]地下工程;盾构;面板式土压平衡盾构;掘进参数;变形;试验 [中图分类号]U455.43 [文献标识码]A [文章编号]1002-8498(2015)19-0117-05 The Experimental Study on the Driving Parameters of the Panel EPB Shield He Zhanfeng Quality Surveillance Institution of Beijing Souh-North Main Canal Construction Beijing 100142 China) Abstract:Based on the shield engineering practice in Bejing this paper researched the main parameters on the formation of shield construction tested the effects of distance and size of the main parameters under different formations and also proposed a new method to measure the amount of excavated by trial excavation site bined with monitoring data obtained with minimal impact on the ground deformation optimal bination of tunneling parameters.Fifth ring road in the final settlement value of the case without any reinforeement measures is only about 50%of the designed control value. Key words:underground;shields;EPB shields;driving parameters;deformation;testing 0引言 团有限责任公司承建,输水隧洞东起来广营桥西北 随着盾构技术不断完善,盾构法施工不仅在地 侧,西至仰山桥北侧(仰山大沟东侧),隧洞由东到 铁工程得到广泛应用,在南水北调地下输水隧洞工 西从顾家桥附近由五环外进入五环内,再从北苑桥 程也得到应用.北京市南水北调东干渠工程,输水 西侧由五环内出五环,标段风险源众多,共计4个特 隧洞长约44km 全线地下隧洞均采用盾构法施工, 级、4个一级、1个二级、1个三级风险源以及多栋建 线路沿东北五环路设计,穿越沿线有大量的建筑 筑物,其中盾构过五环路掘进一级风险源具体位置 物、道路、桥梁、轨道交通、管线...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年9月下 64 CONSTRUCTION TECHNOLOGY 第44卷第18期 D01:10.7672/gjs2015180064 面向施工现场的塔式起重机安全监控信息系统研究* 倪丽莎,杨静,惠秦双 (西安理工大学机械与精密仪器学院,陕西西安710048) [摘要]由于高空作业,塔式起重机司机以及设备的管理都比较粗放,导致我国起重机事故率逐年上升.采用V 嵌入OPENGL技术,设计了面向施工现场的塔式起重机安全监管信息系统,实现了高空作业塔式起重机司机以及 设备的信息化、落地化管理;并提供基于大量数据的信息分析功能,为施工现场人与物的精细管理提供依据. [关键词]信息化;施工现场;塔式起重机;安全监控;精细管理 [中图分类号]TU61[文献标识码]A [文章编号]1002-8498(2015)18-0064-03 Tower Cranes Safety Monitoring Information System for the Construction Site Ni Lisha Yang Jing Hui Qinshuang School of Mechanical and Precision Instrumental Engineering Xi'an Unirersity of Technology Xi'an Shaanxi 710048.China) Abstract:Because of the aerial work the construction site management for the tower crane driver and equipment is more extensive and the tower erane accident rate increases year by year in our country in recent years.This article designs the safety supervision information system for tower crane in construction site by VC embedded with OPENGL technology it realizes the information and landing management for the tower crane driver and equipment.And it offers information analysis function based on a large amount of data it also offers delicacy management of people and objects in construction site. Key words:information construction site;tower cranes;safety monitoring;delicacy management 1绪论 及“人的不安全行为,物的不安全状态”两方面,塔 塔式起重机是建设房屋和桥梁的主要运输工 式起重机黑匣子的主要应用对象是塔式起重机司 具,由于工作重心高、起重载荷大、运行速度快,且 机,本文设计了面向施工现场塔式起重机安全管理 工作过程中频繁启动、制动,产生较大的动载荷,塔 的信息系统,与塔式起重机黑匣子配合使用,实现 式起重机工作中蕴藏较多的危险因素;同时,塔式 了对高空作业塔式起重机监控的落地化,司...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年10月上施工技术 第41卷第374期CONSTRUCTION TECHNOLOGY27
静压锚杆桩在某工程结构托换中的应用
刘家新,曹勇²
[摘要】以某增建地下车库工程为例,介绍了静压锚杆桩托换技术的应用。

针对实际情况与原结构设计存在的问 题进行了设计参数调整。

由于增建结构在施工期间需要继续使用,在施工过程中采取了有效的控制措施,针对各 个施工环节容易出现的问题进行了有效处理。

监测结果表明,各项数据均在规范要求范围内。

[关键词]桩基础;结构托换;锚杆桩;设计参数;引孔;注浆;监测;变形 [中图分类号】TU753.3【文献标识码]A[文章编号】1002-8498(2012)19-0027-04 Application of Steady Pressed Anchor Pile in Structure Underpinning of Some Project Liu Jiaxin', Cao Yong² (1. Yangzhou Jianxing Engineering Construction Supervision Co. , Ltd. , Yangzhou, Jiangsu 225008,China; 2. Yangzhou Construction Engineering Quality Inspection Station, Yangzhou, Jiangsu 225009 , China)
Abstract: Based on some underground garage project, this paper introduced the application of underpinning technique with steady pressed anchor pile. According to the problems between actual situation and primary structural design, design parameters were adjusted. Because the structure is used in construction, effective control measures were adopted in the whole construction. Monitoring result shows that the data can meet the standard requirement. Key words: piles; structure underpinning; anchor piles; design parameters; guiding hole; pouring; monitoring; displacement
一结构托换是指利用其他受力构件临时性代替-0.400m标高处柱间设置钢筋混凝土连系梁,裙房 原地基基础或其他结构构件承载,待新承载的结构1层及基础混凝土强度等级为C30,下设C10混凝 构件完成施工,拆除临时受力结构构件或原基础土垫层。

裙房与主楼主体结构之间未设置变形缝。

后,即完成结构托换,其中共有两次托换过程。

目建筑场地类别为Ⅲ类,场地抗震设防烈度7度,设计 前基础工程的结构托换常采用两种形式:静压锚杆地震加速度0.15g,设计地震分组为第一组。

桩和灌注桩等劲性结构托换。

计划在裙房建筑位置增建1层约2800m”地下 静压锚杆桩属于桩式托换技术,是既有建筑物室作为停车库使用,新建地下室底板埋深4.95m。

地基加固工程中较常用的加固技术之一,其原理是:裙房基础布置如图1所示,图中承台部位均为需托 将压桩架通过锚杆与建筑物原基础连接,利用建筑换增建地下室的部分。

主楼及裙房2,3层在加固和 物自重作为压桩反力,用千斤顶将桩分段压人地基增建地下室施工期间需继续正常使用。

中,从而使新增的静压桩分担部分荷载。

本工程场地土层分布自上而下依次为:1素填 1工程概况土层厚1.4~2.9m,主要为该综合楼施工回填土, 中国工商银行扬州分行办公楼主楼为26层框填土时间约为13年;②粉土稍密~中密状态,层 架结构,设有1层地下室,地下室底板埋深7.6m,采厚1.5~3.4m,力学强度中等,地基承载力特征值 用桩基础。

裙房为3层框架结构(局部4层),柱距faα=150kPa;③粉砂中密~密实状态,层厚6.4~ 7500mm×7500mm;采用柱下独立基础(天然地10.0m,力学强度较高,f=180kPa;④黏土勘测 基),基础埋深分别为2.2,2.6m和4.2m,在未揭穿该层,最大揭示厚度14.20m,力学强度高,fak [收稿日期】2012-03-13=...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2015年4月下 56CONSTRUCTION TECHNOLOGY第44卷第8期 DOI:10. 7672/sgjs2015080056
靖江市体育中心钢结构工程施工创新技术
贾尚瑞,邢遵胜,豆德胜 (浙江精工钢结构集团有限公司,浙江绍兴312030)
[摘要】通过靖江市体育中心钢结构施工过程,详细介绍了施工过程中的张弦桁架索球节点施工技术、螺栓球网架 提升施工吊点设计、抗拔滑移支座节点以及焊接球抓取方式4个方面常见的施工方法及其存在的缺陷,并通过改 进措施,避免了上述缺陷,降低了施工原因对结构产生的不利影响,同时也提高了工程施工效率,节约了施工成本。

【关键词]钢结构;张弦桁架;滑移支座;螺栓球;焊接球;创新 [中图分类号]TU758【文献标识码】A[文章编号]1002-8498(2015)08-0056-04 ConstructionInnovativeTechnologyoftheSteelStructure ProjectofJingjiangSportsCenter Jia Shangrui,XingZunsheng,Dou Desheng (Zhejiang Jinggong Steel Building(Group)Co.,Ld.,Shaoxing,Zhejang 312030,China) Abstract;Through the steel structure construction process of Jingjiang Sports Center, the mon construction methods and its defects about the construction technology of the cable ball joint of truss string, the lifting point design of bolt ball grid lifting construction, the pull-out sliding bearing joint, and the way to grab welding ball are introduced in detail.Also through improvement measures, the above defects is avoided and the adverse effects to structure arising from the construction is reduced. Moreover, the efficiency of construction projects is improved and the construction cost is saved. Key words;steel structures; truss string; sliding support; bolt ball; welding ball; innovation 1工程概况螺栓球为主要节点的双层网架结构,如图2b所示; 靖江市体育中心位于靖江市滨江新城,地处于配套用房钢结构主要由屋面H型钢梁及角钢支撑 靖江市三大区域的交汇点,总规划用地面积318亩组成,如图2c所示。

(1亩=666.67m²),总建筑面积约95000m²,是集2施工创新点 体育馆、游泳馆、室外平台及配套用房为一体的综2.1体育馆张弦桁架索球施工 合性公共建筑,如图1所示。

体育馆屋面有6福张弦桁架,张弦桁架形式如 配套用房图3所示,单福桁架长约74m,位于标高25.000m 处。

安装时,将桁架从中部分成2段,地面拼装、高 平台空原位对接,拉索的预应力施工在桁架高空对接完 成后进行。

游泳馆张弦桁架撑杆与拉索通过索球连接在一起,索 体育馆球与撑杆之间通过锥头管焊接在一起。

拉索施工 图1结构三维轴测图时,首先将拉索在地面展开,在拉索两端用钢丝绳 Fig.1 3D axonometric drawing of the structure通过卷扬机牵引提升到桁架2个端头上;索球的施 其中体育馆钢结构是由屋面6福张弦桁架和桁工一般有以下2种方式,一种为在地面先将索球与 架四周钢梁组成,如图2a所示;平台及游泳馆是以拉索连接完毕,待拉索提升到位后,在高空将索球 与撑杆焊接;另一种方式是先将索球的上半球与撑 [作者筒介]贾尚瑞,工程师,E-mail:jiashangrui88@163.杆焊接,待拉索提升到位后,再将索球的下半球与 [收稿日期]2014-05-19上半球用螺栓连接起来。

第1种索球安装方法,需
万方数据
2015 No.8贾尚瑞等:靖江市体育中心钢结构工程施工创新技术57
槽中自动旋转到预定位置...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2015年4月下 施工技术 第44卷第8期 CONSTRUCTION TECHNOLOGY 53 D0I:10.7672/sgjs2015080053 靖江市体育中心体育馆张弦桁架拉索施工技术 贾尚瑞,邢遵胜1,罗斌2 (1.浙江精工钢结构集团有限公司,浙江绍兴312030;2.东南大学土木工程学院,江苏南京210096) [摘要]通过靖江市体育中心体育馆张弦桁架施工,总结了张弦桁架施工过程的总体流程方案,详细介绍了拉索开 盘、拉索安装、拉索张拉等关键施工技术,特别是拉索张拉,分别从群索张拉顺序的选择、支撑胎架对张拉索力的影 响、张拉工装和设备、张拉调整措施以及张拉监测等方面做了较全面的说明. [关键词]体育馆;钢结构;张弦桁架;索;安装;张拉 [中图分类号]TU758 【文献标识码]A[文章编号]1002-8498(2015)08-0053-03 Construction of the Truss String Cable for Gymnasium of Jingjiang Sports Center Jia Shangrui' Xing Zunsheng' Luo Bin2 (1.Zhejiang Jinggong Steel Building Group)Co.Ltd.Shaoxing Zhejiang 312030 China; 2.College of Ciwil Engineering Southeast University Nanjing Jiangsu 210096 China) Abstract:Through the construction of the gymnasium of Jingjiang Sports Center the overall flow program of truss string construction process was summarized.The key construction technologies of cable opening cable installing cable stretching were introduced in detail especially the cable stretching which prehensively illustrates from the sequence select of group cable stretching the effect of supporting frame to cable force tensioning tools and equipment tensioning adjustment measures tensioning monitoring and so on. Key words:gymnasiums;steel structures;truss string structure;cables;installation;tensioning 1工程概况 靖江市体育中心体育馆是下部为混凝土结构、 屋盖为钢结构的大型体育馆,其东西方向长约 140m 南北方向长约100m 座位总数6615个,总建 筑面积27844m2;屋盖钢结构主要由6张弦桁架 和屋面钢梁组成.如图1 2所示. 2结构特点 张弦桁架跨度约74m 高度从22.7~24.1m不 图1结构三维轴测图 等,断面为倒三角形式,其结构形式如图3所示;桁 Fig.1 3D axonometric drawing of the s...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年7月下 施工技术 第43卷第14期 CONSTRUCTIONTECHNOLOGY 103 DOI:10. 7672/sgjs2014140103 靖江体育中心游泳馆钢结构网架施工过程仿真分析 贾尚瑞,邢遵胜,徐德号,娄峰 (浙江精工钢结构集团有限公司,浙江绍兴312030) [摘要]靖江市体育中心游泳馆钢结构是由标高不等的两块双层网架结构连接而成,在施工中采用了累积提升和 高空原位拼装相结合的施工技术。

通过对游泳馆网架的非线性施工过程仿真分析,验证了该施工技术的可行性; 同时也系统地介绍了仿真分析的工程应用价值和仿真模拟中的注意事项、参数设置等。

[关键词]钢结构:网架;提升;非线性;数值模拟 [中图分类号】TU311.41;TU758 [文献标识码]A [文章编号]1002-8498(2014)14-0103-04 SimulationoftheConstructionProcessoftheSteelSpaceTruss StructureintheNatatoriumofJingjiangSportsCenter Jia Shangrui,Xing Zunsheng,Xu Dehao,Lou Feng (Zhejiang Jinggong Steel Building Group Co.,Lad.,Shaoxing,Zhejiang 312030,China) Abstract:The steel space truss structure in the natatorium of Jingjiang Sports Center is posed of two .pieces double space truss structure with different elevation, and it applies the construction of accumulation promotion and high-altitude in-situ assembling. Nonlinear finite element analysis of the construction process verified the feasibility of this technique, also the engineering application value and thematters of attention,parameter setting of the simulation analysiswere introduced systematically. Key words;steel structures; space truss;lifting; nonlinear; simulation 1工程概况 靖江市体育中心游泳馆网架钢结构是以螺栓 球为主的双层网架;整个网架结构由一块面积约 体育馆 6200m的水平网架和一块面积约920m的倾斜网 架连接组成。

网架顶标高21.00m,厚2~3.3m不 游冰馆 等,构件以圆管89×4为主;网架底部共50个支 座,其中三角格构柱10根,方形格构柱4根,其余均 a三维轴测图 为混凝土柱支座。

结构如图1所示。

综合考虑现场场地条件和网架结构特点以及 经济方面因素,本工程采用部分提升和部分原位拼 网架结构 装的施工方法。

如图2所示,游泳馆网架钢结构总 体施工分为3个施工区域,区域1采用累积提升法, 游泳馆钢结构 区域2采用整体提升法,区域3采用满堂脚手架原 位拼装法。

总体施工顺序为先累积提升区域1,再 格构柱 整体提升区域2,区域3与前两个区域施工同时进 b结构分解 行,待区域1和区域2提升安装完毕,最后卸载区域 图1网架结构示意 3脚手架。

Fig.1 Space truss structure 由于提升过程中网架受力状态及边界条件等 与原结构设计中不同,同时累积提升施工工艺较复 [作者简介]贾尚瑞,工程师,E-mail:jiashangrui88@163. 杂,故需要采取计算机仿真分析的手段,对施工过 [收稿日期]2013-07-18 万方数据
104 施工技术 第43卷 区域2 区域1 区域3 图2网架施工分区 Fig.2Construction division for the space truss 图3区域1网架分块 Fig.3The space truss division for area 1 程进行模拟分析。

整个游泳馆网架结构的施工关键步骤如下。

2施工过程仿真分析的意义 原设计方法都是以峻工后的整体结构作为分 1)搭设游泳池、看台脚手架和地面拼装支撑系 统,地面拼装区域1网架后,提升区域A网架。

析对象...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年6月上 施工技术 第41卷第366期 CONSTRUCTION TECHNOLOGY 105 青岛高新区创业中心工程单元式幕墙设计与施工 吴书义,王胜,董成 (青建集团股分公司,山东青岛266071) [摘要]单元式幕墙是通过单元板块的相互插接形成等压腔来确保幕墙水密、气密等各项性能的新型建筑围护结 构,青岛创业中心工程大面积采用了该体系,取得良好的效果.结合该工程幕墙的设计特点、不利点的设计计算及 单元板块的组装、转接件的安装,单元板块的吊装等施工技术进行了闹述,并介绍了施工过程中的质量控制要点. [关键词]幕墙:设计:施工技术;质量控制 [中图分类号】TU228;TU767.5 [文献标识码]A [文章编号]1002-8498(2012)11-0105-05 Design and Construction Technology of Unit Curtain Wall of the Innovation Center Project in Qingdao High-tech Park Wu Shuyi Wang Sheng Dong Cheng (Qingjian Group Co.Ld.Qingdao Shandong 266071.China) Abstract:Unit curtain wall is a new building envelope which assures water tightness air tightness and other properties through constant pressure cavity formed by unitized panels inserted to connect each other. Innovation Center project adopted this system on a large scale and had gained good effects.This Paper bined with the curtain wall design characteristics and drawback design calculation of this project discusses the construction technology on assembly of unitized panels installation of switchover pieces lifting of unitized panels.And it introduces the main points of quality control under construction.Some experiences used for reference are provided for the construction of unit curtain wall. Key words:curtain walls;design;construction;quality control 单元式幕墙是指将各种幕墙构件和饰面材料高110m;B楼19层,高94.2m;C楼10层,高 在车间内加工完成,并依据设计要求组装成一层或52.2m:D楼5层,高43.8m.4座塔楼错落有致,塔 多层楼高的整体板块,然后运至施工现场进行整体楼之间由裙房互相连通,是集行政、办公、科研于一 吊装,与建筑结构上预先设置的挂接件精确连接,体的综合性建筑.本工程外立面装饰以玻璃和铝 并根据主...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年9月下 施工技术 第46卷第18期 CONSTRUCTION TECHNOLOGY 19 D0I:10.7672/5j52017180019 青岛海上嘉年华冰宫乐园空间异形网格析 架体系施工技术 陈斌12,樊文杰3,郭文豪4 (1.湖南大学土木工程学院,湖南长沙410082:2.建筑安全与节能教育部重点试验室(湖南大学), 湖南长沙410082;3.浙江精工钢结构有限公司,浙江绍兴312030; 4.武汉理工大学土木工程与建筑学院,湖北武汉430070) [摘要]青岛海上嘉年华工程冰宫乐园钢结构由单曲平面桁架交叉组成空间异形网格钢罩,整体是一个不规则、不 等高的异形体,呈“豌豆”状.冰宫钢结构造型复杂,大部分桁架为弧度较大的异形桁架,钢桁架类型多,安装定位 难.通过采用分段分块吊装,内场外场结合吊装,合理布置支撑圆管,有效的焊接工艺,严格的防腐蚀措施,保证了 结构安装的精度,提高了施工质量和效率,节约了材料,保障了施工安全. [关键词]钢结构;安装;桁架;分块吊装;定位;施工技术 [中图分类号]TU758.11[文献标识码]A [文章编号]1002-8498(2017)18-0019-03 Space Shaped Grid Truss System Construction Technology of Qingdao Maritime Festival Ice Palace Park CHEN Bin'.2 FAN Wenjie GUO Wenhao (1.College of Civil Engineering Hu'nan University Changsha Hu'nan 410082 China;2.Key Laboratory of Building Safety and Efficiency of the Ministry of Education Hu'nan University Changsha Hu'nan 410082 China;3.Zhejiang Jinggong Steel Building Group Co.Ld.Shaoxing Zhejiang 312030 China;4.School of Ciril Engineering and Architecture Wuhan University of Technology Wuhan Hubei 430070 China) Abstract:Qingdao Maritime Festival project Ice Palace Park steel structure is a cross-shaped steel mesh cover consisted of crisscross type steel structure truss system which is posed of single plane truss in space a whole structure is irregular high-shaped body and the shape is a‘pea' In this projeet.for the steel structure type of the Ice Palace is plex and most of the trusses are large are shaped and the types of steel trusses are various the installation l...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年8月上 施工技术 第45卷第15期 CONSTRUCTION TECHNOLOGY 57 D0I:10.7672/8js2016150057 青岛某新城售楼处网架结构施工监测与可靠性分析* 张纪刚,孙思博,张春巍,韩永力,孙海超 (青岛理工大学土木工程学院,山东青岛266033) [摘委]介骨岛菜新城售棒处网架结构施工过程中出现的向题及施工方法,进了卸我过程中的仿真分析与健 康监测.针对种轻大面积弹体多点支撑的网架结构特点,设计网架的监测方亲,包监测条件、测点布置与监 测方法.与MIDAS/GEn有限元件的理论分析结果进行对比,轮证该结构在面重荷载下的吊装容金性.同时,进 行整个卸载过程的理论据与监测数据的对比分析.最后,针对网架结构施工过程存在的施工偏差对其进行了可 靠性分析. [关键词]铜传构;网架;有限元分析;监测;可性 [中图分类号]TU356 [交献标识码]A [交章编号]1002-8498(2016)15-0057-05 The Erection Monitoring and Reliability Analysis of Space Truss Structure for the Sales Office of One New City in Qingdao Zhang Jigang Sun Sibo Zhang Chunwei Han Yongli Sun Haichao (School of Ciuil Engineering Qingdao Technological University Qingdao Shandong 266033 China) Abstract:The construction method of space truss structure of sales office is introduced which located at one new city of Qingdao and unloading simulation and monitoring for the space truss structure were done.For the particularity of space truss structure of this large-area monomer multipoint support bining with the characteristics of the space truss structure the monitoring scheme of space truss structure was designed including monitoring conditions arrangement of measuring points and monitoring method pared with the analysis results of the theory of finite element software MIDAS/Gen to verify the safety of the structure under the gravity load.The parisons between theoretical data and monitoring data during the whole process of unloading were done a certain reference was provi...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2010年6月 施工技术 第39卷第6期 CONSTRUCTION TECHNOLOGY 119 青岛大剧院装饰铝板安装对钢结构变形影响分析 李建国,王怀信2,杨兴富3 (1.青岛地下铁道总公司,山东青岛266022;2.青岛国信大剧院有限公司,山东青岛266071; 3.上海建工(集)总公司,上海200120) [摘要]基于青岛大剧院屋盖钢结构工程,建立计算模型,在不同荷载组合下,对龙骨和装饰铝板分别进行分析计 算.结果表明,龙骨和装饰铝板荷载所引起的变形较大,约占全部荷载变形量的一半.在施工中,根据计算分析结 果,采取相关技术措施,把差异沉降降到最小,满足设计建筑效果的要求,取得了较好的效果. [关键词]青岛大剧院:钢结构:计算分析:变形 [中图分类号]TU745.3 [文献标识码]A[文章编号]1002-8498(2010)06-0119-03 Effect Analysis of Decorating Aluminum Panel Installation on Steel Structure Deformation in Qingdao Grand Theatre Li Jianguo' Wang Huaixin? Yang Xingfu3 (1.Qingdao Subway General Co. Qingdao Shandong 266022 China;2.Qingdao Guoxin Grand Theatre Co. Lad.. Qingdao Shandong 266071 China;3.Shanghai Construction Group Shanghai 200120 China) Abstract:Based on the steel roof engineering of Qingdao Grand Theatre calculation model is built. Under different load binations keel and decorating aluminum panel are respectively analyzed and calculated.The results show that the deformation caused by keel and decorating aluminum panel is bigger than half of total load deformation.The differential settlement can be reduced to minimum by adopting corresponding technology measures according to calculation results during the construction.Thus it can meet the design demands of architecture effect.And good effect is achieved. Key words:Qingdao Grand Theatre;steel structure;calculation and analysis;deformation 1工程概况 青岛大剧院屋盖钢结构主结构为x向,主构件间 距为8.4m y向主构件为间距8m的“井”字形空间钢 桁架.其中规定钢结构中南北方向构件为y向,垂直 于y向即东西方向的构件为x向.桁架构件采用矩 形、方形截面钢管和热轧H型...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)