首页 > 2023 ( 第 432 页)

施工技术 2017年4月上 128 CONSTRUCTION TECHNOLOGY 第46卷第7期 D0I:10.7672/sgis2017070128 深水长周期涌浪海域钢护筒施沉施工技术 郗永磊,刘勇,王振 (中交二航局第二工程有限公司,重庆401121) [摘要]中马友谊大桥地处印度洋低纬度地区,桥位附近海域波浪条件恶劣,具有周期长、波高大的特点.利用波 浪实时监测系统船舶运动姿态传感器对施工船舶进行实时监测,制定合理的船舶作业窗口指导现场作业,提高 了船舶作业工效、确保了安全生产.设置辅助平台悬臂式导向架系统,保证了钢护筒施沉的精度要求.钢护筒 施工采用起重船两点起吊翻柱、单点立桩的起重方案,工艺新颖,大幅提高了施工工效. [关键调]桥梁工程;涌浪海域;钢护筒;监测;施工技术 [中图分类号]U445 [文献标识码]A [文章编号]1002-8498(2017)07-0128-04 Construction of Steel Casing Sinking in Long Period Sea Swell Area with Abyssal Region XI Yonglei LIU Yong WANG Zhen China Communications 2nd Navigational Bureau 2nd Engineering Co.Lid.Chongging 401121 China) Abstract:China-Maldives Friendship Bridge is located in the low latitudes area of Indian Ocean.The wave condition nearby bridge site is severe presents the characteristics of long-period and large-wave height.Based on the real-time wave monitoring system and the ship motion attitude sensor on the floating crane the reasonable operation window is formulated to guide the floating crane operation at sea which has effectively improved barge construction efficiency and ensure the safety.By use of the auxiliary platform plus cantilever guide frame system the accuracy of the steel pipe casing driving is well controlled.The steel pipe casing adopts the method that one floating crane to lift and roll steel pipe casing with two fulcrums and lift steel pipe casing with the single fulcrums which innovates the construction technology and improves the construction efficiency. Key words:brid...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年10月上 施工技术 第43卷第19期 CONSTRUCTION TECHNOLOGY 57 D0I:10.7672/5gjs2014190057 深水逆作法钢板桩围堰设计与施工* 安关峰,刘添俊,张洪彬 (广州市市政集团有限公司,广东广州510060) [摘要]顺作法钢板桩围堰在目前的水利及路桥建设工程中使用较多.结合工程实践提出了深水逆作法钢板柱围 堰综合成套技术,一定程度上解决了常规的顺作法钢板桩适用的水深较浅、围堰变形大、整体稳定性偏低、施工风 险相对较高的缺点.详细介绍逆作法钢板桩围堰的设计、构造、分析以及施工工艺,并对实际工程施工过程中钢板 桩围堰的受力及变形情况进行了监测.结果表明,该技术较好地满足了工程的经济性和安全性的要求. [关键词]围堰;钢板柱;逆作法;设计;有限元分析;施工 [中图分类号]TU47 [文献标识码]A [文章编号]1002-8498(2014)19-0057-04 Design and Construction of Steel Sheet Pile Cofferdam with Inverse Method in Deep Water An Guanfeng Liu Tianjun Zhang Hongbin Guangzhou Municipal Engineering Group Guangzhou Guangdong 510060 China) Abstract:The method of steel sheet pile cofferdam with sequential construction is broadly applied in many projects of road bridge and hydraulic engineering.Comprehensive technology of steel sheet pile cofferdam with inverse construction technique in deep water is proposed which could be used to conquer weaknesses of steel sheet pile cofferdam with sequential construction such as large deformation low global stability high construction risk and restricted water depth.Design analysis and construction of steel sheet pile cofferdam with conversable construction technique in deep water are given in detail deformation and force situation of steel sheet pile cofferdam in the construction progress is monitored.The technique could preferably satisfy the requirement of safety and economy in engineering construction. Key words:cofferdams;steel sheet piles;inverse method;design;finite elem...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年4月下 88 CONSTRUCTION TECHNOLOGY 第42卷第8期 D0I:10.7672/sgjs2013080088 深水无覆盖层地层钢护筒沉放关键技术 游斌1,李维洲2 (1.中交第二航务工程局,湖北武汉430040;2.长安大学公路学院,陕西西安710064) [摘要]钢护筒施工是水上桩基施工的一个重要组成部分,也是影响桩基质量因素之一.广东佛山西樵大桥斜拉 桥主桥墩柱基施工难点是水深、流速大、无覆盖层.因此钢护筒沉放质量控制直接影响到桩基成桩的质量.针对 该水域的特点,主要介绍在钢护筒施工过程中出现的问题以及相关的应对措施,包括:钢护筒底口补强、钢护简对 接、钢护筒导向架定位、钢护简漏浆处理等. [关键词]桥梁工程;无覆盖层;钢护筒;沉放;施工技术 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2013)08-0088-02 Key Technology of Sinking Steel Protective Sleeves in Deep-water Areas You Bin' Li Weizhou? (1.CCCC Second Harbor Engineering Company Ltd. Wuhan Hubei 430040 China; 2.Highway College Chang'an University Xi'an Shaanxi 710064 China) Abstract:Construction of steel protective sleeves is important in pile foundation construction and it is also one of the factors that affect pile foundation quality.Construction of the pile foundation for Xiqiao Bridge in Foshuan Guangdong is featured with difficulties of deep water high flow speed and the absence of overburden layer.Therefore the quality of sinking the steel protective sleeve directly affects the quality of pile foundation.Taking into account the characteristics of the waters this paper introduces problems and relevant countermeasures during the construction of the steel protective sleeves including strengthening of the bottom of the steel casings connection of the steel casings positioning of the guide frame leakage treatment for the steel casting etc. Key words:bridges;without overburden layer;steel casting;sinking;construction 1工程概...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年9月上 78 CONSTRUCTION TECHNOLOGY 第42卷第17期 D0I:10.7672/gjs2013170078 深水单层钢板桩围堰设计与分析 徐辉1,李吉勇2 (1.上海建峰职业技术学院,上海201900;2.上海市基础工程集团有限公司,上海200002) [摘要]钢板桩围堰由于具有施工速度快、防水性能好、可重复利用等诸多优点,被广泛应用于各种永久性和临时 性工程,包括港口、码头、河道护岸、挡土墙、地下结构、桥梁承台围堰等工程中.某桥梁承台工程在水深近10M的 河道中,采用单层钢板桩围堰施工,应用MIDAS/Civil三维结构软件建立力学模型,对钢板桩进行强度和刚度计算, 验算钢板桩的实际受力及支护结构的稳定性,以确保支护结构的精确性和安全性.从而达到满足工程施工需要, 节省投资,缩短工期,提高社会经济效益的目的. [关键词]桥梁工程;围堰;钢板桩;设计;有限元分析 [中图分类号]U445.55 [文献标识码]A [文章编号11002-8498(2013)17-0078-03 Design and Analysis of Single-layer Steel Sheet Pile Cofferdam in Deep Water Xu Hui' Li Jiyong? (1.Shanghai Jianfeng Vocational College Shanghai 201900 China;2.Shanghai Foundation Engineering Group Co. Lad.Shanghai 200002 China) Abstract:Due to its constructional feasibility waterproof ability and repetitive usage possibilities steel sheet pile cofferdam has been widely used in a variety of permanent and temporary construction works including ports docks river bank protection retaining walls underground structure bridge bearing platform cofferdam and other projects.Based on the single-layer steel sheet pile cofferdam used for construction of a bridge pile at a depth of nearly 10m of the river this paper establishes 3D mechanical model with software MIDAS /Civil calculates the strength and inflexibility of steel sheet pile and checks the realistic load-carrying capability and stability of supporting structure to ensure its accuracy and safety which helps to meet the needs of cost control construction period deduction a...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2015年1月上 施工技术 第44卷第1期 CONSTRUCTIONTECHNOLOCY 73 DOI:10. 7672/sgjs2015010073 深开挖条件下抗拔桩承载性状分析与设计方法研究* 程炎焱',吴毅彬2 (1.华北水利水电大学建筑学院,河南郑州450011;2.中船第九设计研究院工程有限公司,上海200063) [摘要】基坑开挖不可避免地引起地基应力场变化,导致桩-土界面法向应力及抗拔桩原有受力特点发生改变。

由 于实际工程条件限制,开挖后的坑底试桩往往不具备工程条件,因此掌握大面积深开挖抗拔桩承载特性,寻求简 便、实用的下部桩身承载力测试方法便显得尤为重要。

通过数值模拟开展对4类试桩方法:常规试桩、试验试桩、 套管试桩及坑底试桩的数值分析,总结不同试桩方法下抗拔单桩荷载传递规律与其工作机理。

在此基础上对本文 提出的试验试桩方法进行参数化分析,结果表明:抗拔桩有效桩长越长,开挖面处钢筋拉力与开挖后的承载力损失 比越小。

而随着开挖深度的加大,钢筋拉力的损失比基本在10%~15%变化。

在实际工程应用中,建议可按本文 提出的试验试桩方法测试下部桩身承载力,并按10%~15%的折减考虑开挖后的最终承载力。

[关键词】地下工程;桩;抗拔桩;有限元分析;承载力;试验 [中图分类号】TU375.5 [文献标识码】A [文章编号】1002-8498(2015)01-0073-05 Design and Analysis of Bearing Behaviors of Uplift Piles DuringDeepExcavation Cheng Yanyan',Wu Yibin² (1.College ofArchitecture,NorthChinaUnitersityofWater Resources and Electrc Power,Zhengzhou, He'nan 450011,China; 2.Shipbuilding NDRI Engineering Co.,Lud.,,Shanghai 200063,China) Abstract:Bearing capacity of uplift piles would inevitably decrease owing to the change of the ground stress field and the normal stress of pile-soil interface under deep excavation.Unfortunately, due to the limitation of field conditions,it was almost impossible to field test under deep excavation.Therefore,it is important to develop a economic and replaceable test method.Here four different methods of pile load tests are simulated through the axis symmetric finite element model. Through the simulation of deep excavation, the mechanism of load transfer and settlement of the pile loaded after deep excavation are studied. Then, parametric research of pile testing used steel bar meter suggested in this paper are conducted,the results show that theeffective pile length,reinforcement meter loss ratio is small,and the excavation depth increases, the loss ratio change at the level of 10% to 15%. It is suggested that the bearing capacity of uplift piles after excavation can have a reduction in 10% to 15% in experience according to the suggested test pile used steel bar meter. Key words:underground;...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年4月上 施工技术 第40卷第338期 CONSTRUCTION TECHNOLOGY 47 深层淤泥土中高压旋喷桩浆液材料与施工工艺研究 霍受琳,陈鹏柱2,潘艳华3 (1.兰州交通大学土木工程学院,甘肃兰州730070;2.武汉地产开发投资集团有限公司,潮北武汉430015; 3.武汉和创建筑工程设计事务限公司,湖北武汉430015) [摘要]结合广州地区某工程中高压旋喷桩处理地基的方法,对桩体注浆材料、施工参数进行试验研究,提出适合 该区域深层淤泥地层的高压旋喷桩处理方法,并对高压旋喷桩成桩后的质量效果进行试验验证.研究结果表明: 对于此类深层淤泥土处理,选用矿渣水泥作为桩体主浆液材料同时辅以2%楼量的石膏作为主要外加剂材料,对增 强桩体强度、缩短施工工期极为有利;在施工工艺中应特别强调复喷工艺,项头选用2.2m喷嘴,浆液施工以22 MPa的压力成梳效果最好.此外,还提出了旋喷桩施工中常见问题的几种处理方法. [关键词]高压旋喷柱;淤泥土;浆液材料;施工参数 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2011)07-0047-03 Research of Slurry Material and Construction Technology of High Pressure Jet Grouting Pile Adopted in Deep Silt Soil Huo Manlin' Chen Pengzhu2 Pan Yanhua' (1.School of Citil Engineering Lanzhou Jiaotong University Lanzhou Gansu 730070 China; 2.Wuhan Real Estate Development and Investment Group Co.Lid.Wuhan Hubei 430015 China; 3.Wuhan He-chuang Construction Engineering Design Office Co. Lid.Wuhan Hubei 430015 China) Abstract:Based on the method of high pressure jet grouting pile used in some engineering in Guangzhou grouting materials and construction parameters of pile are analyzed.Construction method of high pressure jet grouting pile in deep silt stratum is proposed and pile quality is tested.The results show that slurry of slag cement with 2%gypsum is useful to strengthen pile intension and shorten construction period. Multiple jet technique should be emphasized and 2.2mm nozzle and presure of 22MPa are the best for pile-forming effect.Furthermore some measures for rotary jet grout...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年9月上 54 CONSTRUCTION TECHNOLOGY 第42卷第17期 D01:10.7672/8gj82013170054 深层大倾斜岩面钻孔灌注桩施工技术 陈景辉 (广东省六建集团有限公司,广东佛山528000) [摘要]结合佛山市高明君御海城国际酒店工程钻孔灌注桩施工,详细介绍了深层大倾斜岩面的处理原理,总结了 钻孔灌注桩施工方法,包括工艺流程,即发现偏孔,测量孔底倾斜岩面高低端的位置,钻引燥孔,爆破,抛填块石和 黏土,重新校核钻机及纠偏钻孔,清孔,钢筋笼制作安放,水下混凝土浇筑;最后介绍了成柱检测内容. 【关键词]地下工程:桩;钻孔灌注桩;倾斜岩面;施工技术 [中图分类号]TU753.3 [文献标识码]A[文章编号]1002-8498(2013)17-0054-02 Construction Technology of Bored Piles for Deep and Large Inclined Rock Surface Chen Jinghui Guangdong No.6 Construction Group Co.Lad. Foshan Guangdong 528000 China) Abstract:Based on bored pile construction of Gaomingjun Yuhaicheng International Hotel engineering in Foshan the author introduces treatment principle of deep and large inclined rock surface summarizes construction method of bored pile.The construction process is finding deflection hole measuring the position of high and low end of inclined rock surface at the bottom of hole drilling detonation hole blasting throwing and filling rubble and clay anew checking drilling rig and rectification for drilling hole hole cleaning making and setting reinforcement cage and underwater concrete pouring.Finally the author introduces pile inspection. Key words:underground;piles;bored piles;inclined rock surface;construction 1工程概况 角砾,厚7.80~20.10m;粉土,厚2.00~16.00m;粗 佛山市高明君御海城国际酒店工程位于高明 砂,厚3.70~29.50m;角砾,厚2.00~20.90m;粉质 区沿江路西侧.建筑面积约72000m2 拟建1栋3黏土,厚2.40~8.40m;中风化石灰岩,厚0.70~ ~28层酒店.工程采用C30钻(冲)孔灌注桩,持力 15.90m.场地钻探深度范围内揭露到岩溶、土洞等 层为中风化石灰岩层,桩端进入持力层≥1.5D(D 不良地质现象,溶洞厚0.70~7.90m 基底属于不稳 为桩径)...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年10月上施工技术 第41卷第374期CONSTRUCTION TECHNOLOGY19
深层冲击成孔振动环境影响分析
黄俊',张波² (1.北京工业大学城市与工程安全减灾教育部重点实验室,北京100124; 2.北京城建勘测设计研究院有限责任公司,北京100101)
[摘要】对郑州中心城区某场地胶结层冲击钻孔施工进行现场监测,监测内容主要有地表加速度、深部土层加速度 及土层的分层沉降。

对深层沉降及地表振动频谱进行分析,得出现场施工对淤泥质粉质黏土的扰动程度及地表振 动规律,并合理评价冲击振动对周边环境影响。

研究表明:冲击产生的振动在地表和地层内部衰减较快。

测得的 振动主频范围均在中高频端,冲击振动的波动在主频未能与建筑产生低阶共振,对建筑物的影响有限,地表沉降主 要由软弱层振陷引起,建筑物差异沉降小于规范要求。

[关键词】地下工程;冲击钻孔;振动;衰减规律;现场试验;监测;沉降 [中图分类号]TU753.3[文献标识码】A[文章编号】1002-8498(2012)19-0019-04 Environmental Impact Analysis of Vibration Induced by Deep Percussion Drilling Huang Jun', Zhang Bo² (1. The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China ; 2. Beijing Urban Construction Exploration & Surveying Design Research Institute Co. , Ltd. , Beijing 100101 , China)
Abstract :For a project in central Zhengzhou, the process of percussion drilling on deep glued layer was monitored. The major monitoring parameters included surface acceleration , deep layered acceleration and layered settlement. Based on analysis of layered settlements and surface vibration spectrum, conclusions were drawn regarding the principles of surface vibration and the degree of disturbance to mucky silty clay caused by the drilling process. The environmental impact induced by drilling construction was properly evaluated. This study shows that vibration caused by drilling decreases rapidly in surface and formation. The measured vibration frequencies are mainly in high-frequency side. Vibration caused by drilling did not resonate with building, and hence the impact on building was limited. Ground settlements were mainly caused by vibration-subsidence of soft layers. Differential settlement of the building is less than the regulatory requirements. Key words:underground; percussion drilling; vibrations; attenuation law ; tests; monitoring; settlement
冲击荷载产生的振动波从振源四周径向传播,的振动规律及振动对环境的影响。

空间高度方向及地表的影响都很大,传播距离本文针对郑州城区某场地进行的冲击钻孔施 远1。

振动对环境影响主要体现在:动荷载对...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年7月上 48 CONSTRUCTION TECHNOLOGY 第41卷第368期 深基坑钻孔灌注桩钢筋笼制作与安装 谭莹,张晓斌 (州建设集团有限公间,亲江温州325027) [摘要]阐述了深基坑钻孔薄注桩钢筋笼制作与安装的施工工艺与质量控制措施.在施工过程中,通过采用一种 自制的操作平台和定位、脱离装置,解决了钢筋笼连接、定位等施工难点,确保了桩基旅工质量.详细介绍了钢筋 笼笼顶连接与脱离装置以及地表围定与调节装置的操作要点. [关键词]地下工程;深基坑;钢筋笼;制作;吊装;质量控制 [中图分类号]TU753.3 【文献标识码]A 【文编号]1002-8498(2012)13-0048-03 Manufacturing and Installation Technology for Reinforcement Cage of Deep Foundation Excavation Bored Piles Tan Ying Zhang Xiaobin Wenahou Construction Group Co.Lad.Wenshou Zhejiang 325027.China) Abstract:The authors described the construction technique and quality control measures for the manufacturing and installation of reinforeement case of deep foundation excavation bored piles.Self- made operation platform was used and a device was developed to solve the reinforeement cage connection and positioning difficulties.The quality of the pile construction was thus guaranteed.This paper introduced the cage top connection and detachment device as well as the operation key points for the ground fixing and adjusting device. Key words:underground;deep foundation excavation;reinforeement cage;manufacture;lifting:quality control 在高层建筑工程地下室施工中,当基坑深度达顺序堆放. 到10m以上,桩孔深度达到50m以上,其深基坑钻1.2钢筋笼安装 孔灌注桩的钢筋笼制作与安装按常规做法难以满 在孔口安装时,钢筋笼采用直螺纹套筒连接, 足工程要求.如选用Ⅲ级钢连接,其焊接工艺相当在固定最后节顶笼时,先计算准确笼顶与地表距 复杂,施工质量难以得到保证,且操作时间过长;在离,再安装自制的可回收定位装置,在混凝土即将 深基坑未挖土之前钻孔桩施工对通长钢筋笼的垂 浇筑结束前,回收定位装置. 直度、连接速度、定位准确度等方面具有比较高的2主要施工工艺及操作要点 要求.通过多个施工项目实践,对这方面的技术难 2.1施工工艺流程 题进行了研究,在实践中取得良好的效果,值得在 准备工作(包括原材料试验)→剥肋滚压螺纹 类似工程中推广应用. →钢筋笼制作...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

提问日期:2023-10-20 22:33:46

提问网友:Cynicism°


请问一个项目中标金额比合同金额少5000块,签约合同价=中标单价×(1-1.4%),也就是下浮了1.4%,现在审计金额直接扣5000,还是用审计金额×(1-1.4%)?

解答网友:轻舟淡月


应该是按比例下浮,就是审计金额×(1-1.4%)

2014年4月上 施工技术 第43卷第7期 CONSTRUCTION TECHNOLOGY 1 D0I:10.7672/sgjs2014070001 深基坑逆作法施工技术应用现状与展望 张晋勋,廖秋林 (北京城建集团,北京100088) [摘要]介绍了逆作法施工的国内外现状以及逆作法的原理和主要施工方法.从降水与止水技术,土体加固技术, 土方运输,邻近建筑物保护,地下连续墙施工,中间支承柱、桩施工,监测等方面对逆作法施工关键技术进行了详细 介绍.最后介绍了逆作法技术的最新进展并进行了展望. [关键词]深基坑;逆作法;应用现状;施工技术;监测 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2014)07-0001-04 Application Status and Prospect of Top-down Method in Deep Foundation Excavation Construction Zhang Jinxun Liao Qiulin (Beijing Urban Construction Group Co.Ltd.Beijing 100088 China) Abstract:This paper introduced application status of top-down method in China and abroad as well as its principle and main construction technology.Key technologies are introduced in detail from dewatering and water stopping technology soil transportation adjacent building protection diaphragm wall construction construction of the middle column and pile monitoring and so on.At last this paper expounded the latest development of the top-down method and prospect. Key words:deep foundation excavation;top-down method;application status;construction;monitoring 0引言 作法施工技术的发展经历了20余年,在地下连续墙 逆作法是随着国内城市化进程与老城区改造施工、土方开挖与水平结构受力转换、竖向桩柱施 逐渐发展起来的深基坑支护与地下施工的新技术,工以及防水等施工技术方面取得了许多突破性进 在高层建筑多层地下室和其他多层地下结构施工,展,但仍存在诸多问题. 解决城市高楼密集区内进行基坑作业的安全问题、1逆作法施工国内外现状 缩短工程工期、降低施工临时支护成本与最大化单 逆作法工艺概念是日本1935年首次提出的,并 位土地的经济利益等方面有明显的效果,因此逆作先后施工了地下商场、地铁等地下工程.随着逆作 法在建筑施工中越来越得到广泛应用. 法地下连续墙施工机械、中间立柱施工工艺、逆作 随着国内施工建设不断发展,大中城市中心区 结构施工方法等不断完善,越来越多地应用到地 城市用地越来越紧张,在城市中心区高层建筑与地 铁、隧道、地下车库、地下室、大型地下商场以及大 下轨道、市政管线密集分布区域的旧楼改造或新建 型污水...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2014年1月上 64CONSTRUCTIONTECHNOLOCY第43卷第1期 DO1;10. 7672/ sgjs2014010064
深基坑软土地基地源热泵直埋式换热管施工技术
童仙敏 (浙江环宇建设集团有限公司,浙江绍兴312000)
[摘要]绍兴市文化中心地源热泵直埋式换热管因节地要求,需在流塑状淤泥质软土地基中施工,施工难度较大。

通过创新工艺施工,先浇筑操作垫层,再钻孔埋管,有效解决了软土地基钻机施工承载力不足、泥浆不能及时外运 与施工交叉污染的难题。

[关键词】地基:软土;地源热泵;直埋式换热管;施工技术 [中图分类号】TU753[文献标识码】A[文章编号】1002-8498(2014)01-0064-03
Source Heat Pump in Soft Soil Foundation Tong Xianmin (Zhejiang Huanyu Construction Group Co.,Lid.,Shaoxing,Zhejiang 312000, China) Abstract:Because of the limited space in Shaoxing City Culture Center,direct-buried heat-exchange pipe has to be constructed in soft soil foundations. Because of the great difficulty in the construction,a new method that construct the operation cushion first, and then to bury the pipes was adopted. This method has effectively solved the problem of lack of carrying capacity in the soft foundation and prevented cross contamination. Key words: foundations; sof soil; ground source heat pump; direct-buried heat-exchange pipes; construction 1直埋式换热管地源热泵系统原理~5层为办公及培训教室。

其中地下室占地面积 地源热泵是利用地能或地表浅层地热温度一9664㎡²,地源热泵有地埋管和机房安装2个部分, 年四季相对稳定的特性,冬季把地下土壤的热量转地埋管系统共设1340口45~50m深井,建筑物外 移到建筑物内,夏季则把地下冷量转移到建筑物侧布置804口井。

因场地限制,地下室底板下需布 内,通过完成与地热的交换达到制冷或制热效果,置孔深45m、间距约4m的地埋竖管井共536口,钻 是一种既节能又环保的绿色能源利用方式。

孔直径110mm,垂直埋管为U形PE管(Dn25),水 直埋式换热管地源热泵系统是在钻孔间置入U平管(PE管,Dn25~Dn63)在地下室底板下埋深约 的PE管连接,与地源热泵形成一个密闭的循环管管后对地基承载特性并未有任何影响。

由于地下 路,与热泵和室内散热(风机盘管)循环体系组成地室底板根据人防及防水要求不能开孔,平面布置如 源热泵系统。

图1所示。

2工程概况根据地质勘察报告,有关土层自上而下为:①, :绍兴市文化中心总建筑面积55256m²,为地上杂填土埋深0.00~0.60m;①2粉质黏土埋深 5层、地下1层的框架结构,基础形式为桩-筏基础,0.60~2.50m;②淤泥质粉质黏土、夹黏质粉土理 筏板厚500mm,基础埋深6m(局部7m)。

地面以上深2.50~4.70m;③淤泥质黏土埋深4.70~ 各层使用功能为:1~2层为阅览室,3层为藏书库,416.90m;④粉质黏土埋深16.90~23.70m;③粉 质黏土埋深23.70~33.10m;粉质黏土埋深 [作者简介]童仙敏,高级工程师,国家一级注册建造师,E-mail:33.10~36.40m;2黏质粉土埋深36.40~ TXM958@ 126.40.10m;9含碎石粉质黏土埋深40.10~ [收稿日期】2013-02-15
万方数据
2014 No.1童仙敏:深基坑软土地基地源热泵直埋式换热管施工技术65 4.0004.000下100cm,钻孔,埋管,完成后铺100cm黄砂作为缓 竖直理管水平冲保护层,缺陷是流塑状淤泥质土承载力极差,钻 埋管机无法作业。

2)方案2土方先开挖至底板垫层底面以下 100cm,再回填黄砂至垫层底,钻机在砂垫层上钻 孔,其缺点如下:①因淤泥质土承载力极低,汽车不 能行驶,约...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年8月上 90 CONSTRUCTION TECHNOLOGY 第45卷第15期 D0I:10.7672/8js2016150090 深基坑止水帷幕TRD工法与SMW工法应用分析 管锦春 (龙信建设集团有限公司,江苏海门226100) [摘要]随着城市建设的发展,超大、超深基悦已越来越多,基变形的控制难度也随之加大,在围护结构的设计和 施工中,止水帷革的择是关键向题,同时也是影响周边环境变化的童要团素.结含天津仁恒海河广场综含楼项 日深基悦止水帷的应用,对深基统TRD工法和SMW工法进行对比分析,从而总结两种止水帷幕的施工工艺特 点和优点,取得了庭好的施工效果. [关键词]地下工程;深基悦;止水帷暴;TRD法;SMW工法;应用 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2016)15-0090-03 Application Analysis of TRD and SMW Methods for Deep Foundation Excavation Waterproof Curtain Guan Jinchun Longxin Construction Group Co.Lad.Haimen Jiangsu 226100 China) Abstract:With the development of city construction the super large and deep foundation excavation has been more and more and it increases the difficulty of controlling deformation of foundation excavation.In the design and construction of retaining structure choice of waterproof curtain is key problem and is also the important factor that affeets the changes in the surrounding environment.Combined with application of deep foundation excavation waterproof curtain of Tianjin Renheng Haihe Plaza the TRD method and SMW method are contrasted and analyzed to sum up the construction characteristics and advantages of two kinds of waterproof curtain which achieves good effect. Key words:underground;deep foundation excavation;waterproof curtain;TRD method;SMW method; application 1工程概况 的不同分为11个工程地质层,34个工程地质亚层. 仁恒海河广场综合桂项目位于天津市南开区,本工程开挖范围内主要是杂镇土、黏土、粉质黏土、 该工程为框架-核心筒结构,板基础,整体地下4粉土. 展,整个地块呈L形,基开挖深度约21m 局部电 本工程周边环境复杂,地下管线较多;场地东 梯井和集水悦处开挖深度达约24m.基周边长度侧...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年3月上 施工技术 第46卷第5期 CONSTRUCTION TECHNOLOGY 35 DOI:10. 7672/sgjs2017050035 深基坑施工新技术在某污水处理厂配套管网 工程中的应用* 郭自灿 (湖北职业技术学院建筑技术学院,湖北孝感432000) [摘要】某污水处理厂配套管网工程包括污水管道及中水管道工程,共设置16个顶管深基坑并划分为3种类型。

基坑土方开挖分4种工况进行分步开挖,保证了开挖的效率和安全。

对顶管进出洞口破除的灌注桩采取加固处 理,再设置橡胶止水法兰及止水构造,保证了围护结构的整体稳定性。

基坑开挖时坑内设置疏干井,封底后至少保 留1口疏于井并与坑内排水盲沟连接,构成了坑内排水系统,提高了基坑降水的效率。

分别设置桩体深层水平位 移观测点,桩顶水平位移、竖向位移观测点、地下水位观测点等监测点位,并定期观察是否超过报警值,避免了基坑 围护结构失稳。

[关键词】深基坑;顶管;土方开挖;监测;围护结构;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2017)05-0035-06 NewConstructionTechnologyApplicationofDeepFoundation ExcavationinAccessoryPipeNetProjectof aSewage TreatmentPlant Guo Zican (SchoolfArchiture,HubeiPolyechnicInstite,Xaogan,Hubei432000,China) Abstract:The accessory pipe net project of a sewage treatment plant includes sewage pipeline engineering and reclaimed water pipeline engineering, it arranges sixteen deep foundation excavation of pipe jacking and divides into three types. There are four operating conditions for pit excavation, ensuring the excavation eficieney and safety. The destroyed cast-in-place piles which are situated in pipe jacking passageway take the reinforcement and increase by rubber water stop flange and water stop structure, ensuring the global stability of exterior-protected structure.When foundation excavation is excavated, dewatering wells are arranged in foundation excavation. It should retain one dewatering well at least after back cover and links with drainage blind ditch, constituting the drainage system of inside pit and improving the pit dewatering efficiency. It sets up many monitoring sites including the horizontal displacement observation point of deep pile body,horizontal displacement of pile top,vertical displacement observation point,underground water level observation point and so on. Moreover, the operatorsobserve hemonitoring sites alamsbeyondornotatregular intervalsavoiding theinstabilityf exterior-protected structure. Key words: deep foundation excavation; pipe jacking; earth excavation; monitor...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年10月上 施工技术 第40卷第350期 CONSTRUCTION TECHNOLOGY 61 深基坑数值模拟与现场监测分析 何本贵,刘芳2,高谦3,王秀丽 (1.林同楼国际工程咨询(中国)有限公司北京分公司,北京100101; 2.清华大学基建规划处,北京100084;3.北京科技大学土木与环境工程学院,北京100083) [摘要]以北京某深基坑工程为例,利用数值模拟和现场监测结果,对基坑的设计和施工进行稳定性评价.考虑了 地下连续墙与土体的相互作用,利用有限差分数值计算方法模拟深基坑开挖支护的动态过程,并与基坑变形监测 数据相比较,从不同角度对深基坑的开挖支护进行稳定性评判.结果表明,理论分析和实际监测结果较吻合,为本 工程的顺利实施提供了依据. [关键词]地下工程;深基坑;地下连续墙;施工模拟;监测 [中图分类号]TU413.62 [文献标识码]A [文章编号]1002-8498(2011)19-0061-03 Analysis of Numerical Simulation of Deep Foundation and On-site Monitoring He Bengui' Liu Fang? Gao Qian' Wang Xiuli' (1.Beijing Branch of T.Y.Lin International Engineering Consulting China)Co.Ltd.Beijing 100101 China; 2.Construction and Campus Planning Office of Tsinghua University Beijing 100084 China: 3.Civil Environment Engineering School University of Science Technology Beijing Beijing 100083 China) Abstract:Based on some deep foundation engineering in Beijing authors make stability evaluation on design and construction of foundation excavation according to numerical simulation and on-site monitoring.Taking the interaction of diaphragm wall and soil into consideration authors simulate the excavation step sequence by using the finite difference numerical calculation and pare with foundation deformation monitoring data.They make stability evaluation on deep foundation excavation and support from different angles.Results show that theoretical analysis and actual monitoring results agree well which make the construction smooth. Key words:underground;deep founda...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月上 施工技术 第42卷第13期 CONSTRUCTION TECHNOLOGY 1 D0I:10.7672/sgjs2013130001 深基坑支护结构和施工新技术 应惠清 (同济大学土木工程学院,上海200092) [摘要]简要介绍了我国基坑工程发展概况,重点介绍了复合土钉墙、双排桩、型钢水泥土搅拌墙等新型支护结构 以及几种施工新设备、新工艺.分析了地下结构逆作法和利用“时空效应”开挖技术的工程应用. [关键词]地下工程;深基坑;支护;逆作法;时空效应;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2013)13-0001-05 New Support Structure and Construction Technology of Excavation Engineering Ying Huiqing College of Civil Engineering Tongji University Shanghai 200092 China) Abstract:This paper introduces the development of excavation engineering in our country focusing on the new structure of posite soil nailing wall double-row-piles wall soil mixing wall and some new construction equipment and process.Engineering application about top-down method of the underground structures and earthwork excavation use of space-time effect were analyzed in this paper. Key words:underground;deep foundation excavation;supports;top-down method;space-time effect;construction 1我国基坑工程的发展概况 主,由于缺乏规范指导,工程设计施工或以经验为 20世纪90年代以来我国建筑基坑工程技术得 主,或以理论为主.而今,基坑工程满足环境保护 到长足发展.回顾这一时期基坑工程技术的发展 已成为设计施工的基本出发点.基坑工程必须高 历程,大略可分为2个阶段:第1阶段是20世纪80度重视环境保护,坚持理论和经验相结合,现已成 年代末到90年代末,是研究、探索阶段.当时我国为业界的共识. 掀起城市建设高潮,涌现了大量地下工程,但工程 早期基坑设计方法主要依据古典的土力学原 界尚缺乏大型深基坑的设计与施工经验,一线城市理,采用极限平衡法,诸如卜鲁姆法(H.Blum)、盾 开始对深基坑工程进行研究和工程实践.第2阶段恩法、相当梁法等.但这些方法与实际受力状况有 是21世纪初的10多年,这是一个发展阶段.在前 一定差异,且不能计算结构位移,因而目前已很少 10年已取得的理论和实践成果的基础上,基坑工程 采用,被弹性支点法所替代.基于有限元商用软件 技术得到了进一步发展和提升.如果说2000年前 的推广,采用有限元进行分析逐步得到应用.有限 后颁布了一批有关基坑工程的国家行业标准和地 元分析可考虑结构与土相互作用、土的弹塑性等, 方标准是我国基坑工程发展第1阶段总结的话,那 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2014年1月上 48CONSTRUCTIONTECHNOLOGY第43卷第1期 DOI:10. 7672/sgjs2014010048 深基坑承压水抽灌一体化设计及工程应用* 陆建生',潘伟强²,沈池',林长荣 (1.上海广联建设发展有限公司,上海200438;2.上海隧道工程股份有限公司,上海200082) [摘要】为控制因水位下降而引起的保护建(构)筑物的环境变形,提出了一种深基坑承压水抽灌一体化设计及运 行控制的理念。

其中“双水位"控制是一体化设计及运行控制的导向标,而抽汲出的水经一体化管路直接回灌至地 层中,可避免含水层的污染,同时相对自来水回灌大大节约了水资源。

对深基坑抽灌一体化的内涵、相关原理、组 成特点及控制要点进行了阐述。

最后以上海汉中路枢纽站为例,总结分析了深基坑抽灌一体化设计及运行控制在 该工程实践中的应用。

[关键词]地下工程;深基坑;抽灌一体化;双水位控制;设计 [中图分类号】TU473【文献标识码】A[文章编号]1002-8498(2014)01-0048-05
Deep Foundation Excavation Lu Jiansheng',Pan Weiqiang²,Shen Chi',Lin Changrong (1.Shanghai Guanglian Construction Development Co.,ltd.,Shanghai 200438, China; 2.Shanghai Tunnel Engineering Co.,Ltd.,Shanghai 200082, China) Abstract;To control the environmental deformation of buildings constructed caused by falling groundwater levels,pumping-recharge integration design and operation control concept of deep foundation excavation were put forward. Dual groundwater level control is the guidepost of integrated design and operation control,the method that pumping water by the pipeline was injected directly into aquifers can avoid contamination of aquifers, and pared with the tap water it can save the water resource. The connotation,principle,characteristics and control points of pumping-recharge integration system were discussed. At last taking the hub station of Hanzhong Road Station in Shanghai as an example, the application and engineering practice of the deep foundation excavation pumping-recharge integration design and operation control were summarized. Key words:underground; deep foundation excavation; pumping-recharge integration; dual groundwater level control; design 0引言响[6]。

控制因基坑降水而引起的工程性地面沉 在上海深基坑工程建设中,由于多层(微)承压降,最直接有效的办法是控制地下水水位,而在控 含水层的存在,采用降水的方法降低开挖土层中可制地下水位的措施中地下水人工回灌是一种相对 能引起基坑底板(微)承压水突涌含水层的地下水经济可靠的措施。

位十分必要[1]。

但随着地下水位的降低,地基中合理设置回灌井可有效维持建(构)筑物区的 原水位以下土体的有效自重应力增加,导致地基土地下水位,消除或降低基坑降水对周围环境的影 体固结,进而造成降水影响范围内的地面和建(构)响。

目前回灌作为一项预防性工程措施,受到 筑物产生不均匀沉降、倾斜、开裂等现象,危及其安多方关注,在多项技术规范[12-3]中均有提及,但是 全和正常使用(""。...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年10月上 施工技术 第42卷第19期 CONSTRUCTION TECHNOLOCY 43 DOI:10. 7672/sgjs2013190043 深基坑开挖过程中立柱受力变化规律分析* 喻军 (浙江工业大学建筑工程学院,浙江杭州310014) [摘要】在基坑开挖过程中,立柱所受水平和竖直方向力处于不断变化状态,变形比较复杂,立柱的稳定对支护结 构的安全至关重要,因此有必要研究立柱受力的动态情况。

以宁波某地铁基坑为例,基于基坑开挖的时空效应,分 析立柱的受力变化规律。

分析发现,在基坑开挖过程中,立柱先沉降后隆起,其隆起和沉降的分界点与基坑深度、 土体性质有关,也可以此作为划分深、浅基坑的依据,不仅限制了基坑底部隆起,面且提高了基坑的稳定性。

[关键词]地下工程;地铁;深基坑;立柱;侧压力 [中图分类号】TU753.1 [文献标识码]A [文章编号】1002-8498(2013)19-0043-02 AnalysisontheLawofthePillarBearingForce During Deep Excavation Yu Jun (CollegeofCivilEngineering andArchitecture,Zhejiang University ofTechnology,Hangzhou,Zhejiang310014,China) Abstract:The bearing force of the pillars changes continuously and deformationis plex.The stability of pillars is important to the safety of supporting structure and it is necessary to study the bearing condition of pillars.Taking an example as foundation excavation of some subway in Ningbo,the bearing force law of pillars was analyzed based on time and space effect of excavation. The result shows that the pillars sunk firstly and uplifted then,and the boundary is related to the depth of foundation excavation and soil properties. The deep and shallow foundation excavation is divided according to it. It was found that the pillars confined the changing bottom of foundation excavation and the stability was improved. Key words;underground; subways; deep foundation excavation; pillars; lateral pressure 基坑工程施工中,安全是施工人员首要关注的这两个摩阻力作用下,立柱被拉伸。

此外,由于分 问题,其中立柱承受上部主要施工荷载,其安全是段开挖,不同区域基坑底部的高程不同,存在侧向 基坑稳定的重要保证,立柱沉降过大或上升会引起 土压力差异。

内支撑断裂,立柱的侧向位移又会使承载力降低甚 2)立柱受到上部施工荷载的作用,基坑开挖 至断裂,影响基坑整体安全,所以在基坑施工过程 后,土体回弹,密度减小,而且土体的有效应力减 中,对立柱的受力变形进行控制十分重要。

目前, 小,侧向摩阻力减小,立柱的承载力减小,受到上部 未见考虑基坑施工过程中对立柱受力变化的研究。

施工荷载作用,立柱的变形及沉降较大。

1基坑开挖过程中立柱受力分析 1.1受力影响因素 基坑分段开挖对立柱的影响分析包括2个 首先是桩、土界面摩擦特性的影响;立柱受力 方面。

特征、承载力以及刚度的影响;基坑开挖过程中,立 1)基坑开挖土体回弹对立柱产生一个向上的 柱受到上部施工荷载及内支撑的重力作用,同时受 作用力,即上拔荷载,立柱被抬升,产生正摩阻力; 到基坑底部向上的正摩阻力,还有基坑开挖的不同 下部产生阻止立柱向上的位移,产生负摩阻力,在 水平引起的侧向土压力作用。

1.2受力模拟分析 国家自然科学基金项目(51078377):浙江省科技厅项目 室内试验和现场试验研究揭示的桩、土界面特 (2012...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2011年10月上 54CONSTRUCTIONTECHNOLOCY第40卷第350期
深基坑开挖数值模拟与锚固优化研究
袁志阳 (长春工程学院管理学院,吉林长春130021) [摘要]基于FLAC"软件,采用摩尔-库仑弹塑性模型,建立深基坑开挖支护数值模型。

分析不同开挖阶段的基坑 土体变形特性,基坑土体水平位移、地表沉降以及基坑底部隆起均随着开挖深度的增加而增大。

通过数值模拟为 施工提供科学的指导并基于混沌优化方法对基坑锚固方案进行优化,优化方案减少造价25.4%。

对锚固优化方案 中设计变量、目标函数、约束条件和优化算法的确定进行了详细介绍。

[关键调】地下工程;深基坑;锚固;数值分析;优化 [中图分类号]TU753[文献标识码]A[文章编号]1002-8498(2011)19-0054-04 SimulationofFoundationExcavationandStudyon theAnchoringOptimization Yuan Zhiyang (School ofManagement,Changchun Institute ofTechnology,Changchun,Jilin 130021,China) Abstract;Based on the software FLAC",the author sets up the simulation model of excavation and support of the deep foundation by using the Mohr-Coulomb model and analyzes the foundation excavation soils deformations under different stages. The horizontal displacement of the soils, the settlement of ground and uplifts in the bottom of the foundation increase with,the increase of the excavation depth.The numerical simulation method can provide guidance for the project construction. Based on the chaos optimization algorithm, the author optimizes anchoring scheme which reduces the cost at 25.4%.The determination of design variables, objective function,constraint condition and optimization algorithm in anchoring optimization scheme are introduced. Key words:underground;deep foundation excavation;anchor;numerical analysis;optimization 当今我国基坑支护现状是基坑越挖越深、工程糊集理论和层次分析法,建立优化设计思路,优化 地质条件越来越复杂、周围建筑物越来越密集、支设计方案并且对结构细部的设计计算进行优化,对 护费用越来越高。

深基坑的开挖和支护便成了一基坑支护进行优化;文献[4]引人非线性遗传算法, 个突出问题。

模拟生物进化过程,对基坑支护进行优化,寻求目 深基坑支护工程中,支护结构与土体相互作标函数最优解。

用,不断调整自身受力和变形,使基坑土体保持稳传统的优化方法普遍存在对输人参数敏感,迭 定或失稳,这是一个力学机理很复杂的过程。

目前代收敛速度慢,容易陷人局部极小值等问题。

本文 很多基坑工程设计主要依靠经验和工程类比法,在采用有限元数值方法对长春国际金融中心深基坑 这种情况下,采用有限元数值模拟和分析,对于深工程进行数值模拟,并利用混沌优化算法对基坑锚 基坑支护设计理论和安全施工有很积极的意义。

固进行设计优化计算。

一个优化的深基坑支护结构设计既要保证支1工程概况 护结构施工过程和周围环境安全,又要在满足安全1.1基坑建设规模 前提下节约造价。

深基坑支护设计优化问题是高长春国际金融中心项目总规划用地面积 度复杂的非线性问题,文献[3]运用多目标决策模3.6km”,周围均有建筑物,复杂的环境给基坑支护 与施工带来很大困难,基坑设计深度19.8m。

[收稿日期]2011-04-14[作者简介]袁志阳,长春工程学院管理学院讲师,长春市同志...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2017年4月下 32 CONSTRUCTION TECHNOLOGY 第46卷第8期 DOI:10. 7672/sgjs2017080032 深基坑开挖对临近建筑物相互影响效应分析 彭志雄,周元刚 (中国地质大学工程学院,湖北武汉430074) [摘要】以武汉某深基坑工程为研究对象,利用FLAC软件对基坑开挖进行模拟,分析预测了基坑变形规律,对比 分析桩体水平位移和地表沉降计算与监测结果,可知二者变化规律基本一致,验证了数值模拟结果的可靠性。

基 于该模型,得到了增加围护桩的刚度对减小支护结构水平位移和临近建筑的沉降是一种行之有效的措施,增加钢 支撑的刚度一定程度上了提高了基坑的稳定性。

同时,围护结构最大侧移值和地表最大沉降值之间的关系大致可 以用直线y=kx来拟合,可以结合设计方案,预估地表最大沉降值,具有一定的实用意义。

[关键词】深基坑;变形;监测;数值模拟;分析 [中图分类号]TU753 [文献标识码】A [文章编号]1002-8498(2017)08-0032-04 AnalysisonInteractionBetweenDeepFoundation Excavation andAdjacentBuildings PENG Zhixiong,ZHOU Yuangang (College of Engineering,China Universty of Geosciences,Wuhan,Hubei 430074,China) software is used to simulate the excavation of foundation excavation, and the deformation law of foundation excavation is analyzed and predicted. Compared with the calculation and monitoring results of pile body horizontal displacement and ground settlement, it can be known that the changes of the two laws are basically the same, which verifies the reliability of the numerical simulation results. Based on this model, it is obtained that increasing the stiffness of retaining piles is an effective measure to reduce the horizontal displacement of retaining structure and the settlement of adjacent buildings,and the stability of foundation excavation is improved to a certain extent by increasing the stiffness of steel support. At the same time, the relationship between the maximum lateral displacement of the retaining structure and the maximum surface settlement can be fitted with a straight line y = kx,and it can be bined with the design scheme to estimate the maximum surface subsidence value, which has a certain practical significance. Key words:deep foundation excavation;deformation;monitoring; simulations;analysis 0引言 临近建筑物的存在是基坑工程所面临最普遍 随着城市建设的大规模发展,建筑规模逐渐向的问题。

有研究表明,深基坑开挖对于浅基础建 高空和地下发展,深基坑的开挖逐渐受到人们的重筑物影响较明显,特别是一些砖砌体房屋在严重情 视。

城市深基坑工程往往处于建筑物、道路和地下况下会开裂、倾斜,影响其正常使用2。

而对于桩 管线等设施的密集区,施工场地狭小,深基坑工程基础的高层建筑,由于其自重大并将上部荷载直接 的开挖必将改变周围土体原有的应力场,导致支护...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)