2016年12月上 施工技术 第45卷第23期 CONSTRUCTION TECHNOLOGY 167 D0I:10.7672/5js2016230167 破窗效应建筑安全管理中的应用 王仪斌,朱易举,卢俊麟,敖春兵 (中建钢构有限公司,广东深圳518040) [摘要]建筑施工生产安全事故源于人的不安全行为、物的不安全状态和管理缺失,该行为发生后不能及时制止、 处理,便引发破窗效应.修复“破窗”是落实隐患整改、控制安全形势的有效安全管理手段.详细介绍了建筑业安 全形势及原因分析,以及破窗效应在安全管理中的应用. [关键词]建筑业;破窗效应;安全管理:应用 [中图分类号]TU714 [文献标识码]A [文章编号]1002-8498(2016)23-0167-03 Application of Broken Window Effect in Safety Management of Construction Industry Wang Yibin Zhu Yiju Lu Junlin Ao Chunbing China Construction Steel Structure Co.Lad.Shenzhen Guangdong 518040 China) Abstract:The safety accident of construction es from people's unsafe behavior unsafe state of things and lack of management.If the behavior can not be stopped and processed in time it will lead to broken window effect.Repairing broken windows is the implementation of the rectification and safe management means which can effectively control the safety situation.This paper introduces security situation and cause analysis in construction industry the application of broken window effect in safety management. Key words:construction industry;broken window effect;safety management;application 1建筑业安全形势及原因分析 安全管理水平发展相对滞后,造成建筑业的高速发 1.1建筑业安全形势分析 展与安全管理水平缓慢提高严重不匹配、不协调, 国际劳工组织的统计数据表明,2008年全球有 导致近年来生产安全事故有所抬头.据国家住房 统计上报的重大生产安全事故总数约349000起,和城乡建设部发布的数据显示,从2003年至2012 其中建筑业的安全生产事故约59000起,占事故总 年,全国建筑业事故起数和死亡人数呈现逐年下降 数的17%左右1.据国家统计局数据显示[2],我国 趋势(见图1).但是,2013年共发生生产安全事故 2013年各类生产安全事故共死亡69434人,亿元国524起.死亡670人,比2012年增加37起,死亡人数 内生产总值生产安全事故死亡人数为0.124人.其 增加46人,分别上升7.6%和6.87%...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年7月上 72 CONSTRUCTION TECHNOLOGY 第44卷第13期 D0I:10.7672/sgjs2015130072 破碎状流纹斑岩大坝岸坡U形基槽爆破技术研究 杨毅 (安徽水安建设集团股份有限公司技术中心,安徽合肥230601) [摘要]大坝岸坡为流纹斑岩,节理、裂隙纵横交错,岩体呈破碎状,风化也较为严重,需要开挖较大的深度,形成U 形基槽.针对大坝岸坡基槽开挖的难点展开技术研究,将基槽划分成不同的爆破区域,采取建基面预裂爆破与主 爆区大体积爆破相结合的开挖方法,解决了岸坡形基槽开挖难题,既提高了建基面的平整度,又降低了单方石方 爆破用药量,取得了较好的技术经济效果. [关键词]大坝;爆破;基槽;起爆网路;残留率 [中图分类号]TV642.2 [文献标识码]A [文章编号]1002-8498(2015)13-0072-03 Study on Blasting Technology for U-shaped Foundation Trench on Dam Abutment Slope Composed of Fractured Rhyolite Porphyry Yang Yi Technology Center Anhui Shuian Construction Group Co. Ltd.Hefei Anhui 230601 China) Abstract:The dam abutment slope is posed of fractured and weathered seriously rhyolite porphyry with criss-crossing joints and it will form U-shaped foundation trench after excavation.Given that there are some difficulties for foundation trench excavation the foundation trench was divided into different blasting zones and the technology bing pre-splitting blasting for base surface zone with bulk blasting for main zone was adopted to excavate the foundation trench.The application of the blasting technology improves flatness of base surface reduces the explosive volume and achieves better economic benefit. Key words:dams;blasting;trench priming network;residual rate 1工程概况 坝址区岩石风化程度不一,强风化厚度大多为5m 某水库大坝为碾压混凝土重力坝型,坝顶高程左右,微风化岩体中夹有强~弱风化岩体,呈囊状.大 726.300m 建基面高程650.000m 坝高76.3m.大坝岸坡岩石呈严重的破碎状,风化较为严重,岸坡开挖 坝坝顶宽6.5m 长180.5m.坝址处呈“V”字形河深度较大,大坝岸坡开挖后形成“U”形基槽. 谷,属于中低山侵蚀峡谷地形.坝址区地貌复杂,2岸坡U形基槽开挖方法优选 地势高低起伏,高差大.坝区段河道较为顺直,呈2.1岸坡分层开挖高度的确定 北东走向.河谷谷底与两侧山顶高差约150~ 大坝左、右岸岸坡开挖高度大于坝高,约90 200m.河谷高程654.000~656.000m 底宽20~ 多m 设计要求分成10个台阶施工,每层台阶开挖 40m 河床比降约为2%o. 高度一般为8~10m 每个台阶接近相应的平台预留 坝址区山体坡陡,岩石裸露,断裂发育,节理、垂直高度2.0m的保护层. 裂隙纵横交错,岩体呈破碎状.地质调查资料表 分层高度既与设计有关,同时又与建基面爆 明,大坝坝址区的岩石为“中元古界熊耳群许山组 破钻孔倾斜度有关.从施工角度分析,主要是控 流纹斑岩”,河谷缓坡处多为薄层坡积层.坝址区 制爆破钻孔的倾斜率.钻孔孔斜不应超过0.5%, 断裂横切河谷,大多倾向东北方向,最为发育的断 10m深的孔底偏差值为:0.5%x10=5cm 两孔孔 裂走向近东西方向,其次为近南北方向. 底之间距离误差值范围则为:-10cm≤8≤10cm. 因此,从施工角度分析,台阶高度不宜超过10m. [作者简介]杨毅,副主任,副总工程师,高级工程师,国家一级注 2.2岸坡建基面...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年8月下 54 CONSTRUCTION TECHNOLOCY 第42卷第16期 DOI:10. 7672/sgjs2013160054 砌体结构滑移隔震加固技术* 刘军生,曹晓辉,郭丽娟,马鸿瑶,张鹏 (陕西省建筑科学研究院,陕西西安710082) [摘要】滑移隔震技术在我国新建建筑中已得到广泛使用,利用隔震技术对既有建筑进行抗震加固也有一定的应 用。

在砖砌体结构的抗震加固中使用隔震技术可以缩短工期,降低加固恢复费用。

以建筑物滑移隔震技术为基 础,介绍了砌体结构使用滑移隔震技术加固的施工方法,为砌体结构滑移隔震加固提供了参考。

[关键词]加固;隔震;砌体结构;施工技术 [中图分类号]TU352 [文献标识码]A [文章编号]1002-8498(2013)16-0054-03 SlidingIsolationReinforcementTechnology onMasonryStructure Liu Junsheng,CaoXiaohui,GuoLijuan,Ma Hongyao,ZhangPeng (ShaanxiInstitute of Building Research,Xi'an,Shaanxi 710082,China) Abstract :The sliding isolation technique is widely used in new buildings in our country.It is also used in seismic reinforcement for old buildings.It can short construction time,reduce costs of reinforcement and restoration by using isolation technique in seismic reinforcement for masonry structure.On the basis of building slidingisolation,the constructionmethodsofmasonry structure using slidingisolation technology are introduced,and the sliding isolation reinforcement technology on masonry structure can provide a new and effective method for the strengthening of masonry structure. Key words:strengthening;isolation;masonry structure;construction 0引言 点,上支撑梁可采用双夹支撑梁和单托支撑梁2种 采用滑移隔震技术对建筑进行加固,可以减少 形式,如图1所示。

输人上部结构的能量,降低地震对上部结构的破 下支撑梁 结构墙体一 坏,达到提高建筑结构抗震能力的目的。

与传统抗 结构地基一 震加固方法相比,其加固思想从原来的“硬抗”转变 隔震支柱 成为“疏导”,将原来由建筑结构构件塑性变形吸收 a下支撑梁 地震能量,转变为由滑移隔震层隔绝和吸收地震能 原结构墙体 量。

另外,基础滑移隔震加固时,一般仅对建筑结 构基础部分施工,不影响上部结构建筑功能和正常 单托上支撑梁 使用,是一种经济适用的抗震加固方法。

砌体结构滑移隔震加固的施工过程可以分为4 b单托上支撑梁 部分:①上下支撑梁施工;②上下隔震支墩钢筋绑 扎;③滑移隔震支座安装;④上下隔震支墩施工。

原结构墙体 1上下支撑梁施工 双夹上支撑梁 既有建筑物滑移隔震加固的关键技术之一是 滑移支座安放处 下部为上隔震支墩 上下支撑梁的施工。

根据隔震房屋结构的构造特 c双夹上支撑梁 *陕西省建筑科学研究院科研课题:滑移隔震加固既有建筑物施工 图1支撑梁示意 方法研究[(2011)2-175] [作者简介】刘军生,副院长,抗震研究所所长,E-mail:tident@ Fig.1 Support beam [收稿日期】2013-03-09 上下支撑梁的施工应先施工下支撑梁后施工 万方数据
2013 No.16 刘军生等:砌体结构滑移隔震加固技术 55 上支撑梁,且上下支撑梁的标高之差应能满足滑移 2)在其中一段墙体凿洞,洞口高度同单托上支 隔震支座的安装和滑移隔震支墩的施工,宜设置为撑梁高度。

500mm左右。

3)绑扎分段托梁钢筋,并甩出钢筋头。

1.1下支撑梁及隔震支柱施工 4)在设计上支墩处由支撑梁中甩出钢筋头,以 1)将墙体两侧开挖到托梁设计标高以下,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年12月下施工技术 第42卷第24期CONSTRUCTION TECHNOLOCY15 DOI:10. 7672/sgjs2013240015 砌体材料强度非破损检测方法的验证性试验*
郑乔文 (上海市建筑科学研究院(集团)有限公司,上海200032) [摘要]通过试验,对比研究了同盘砂浆钢底模与砖底模试块抗压强度的差异、贯人法检测试块与砌体灰缝砂浆强 度的差异,分析了养护条件、约束条件以及砌筑质量等因素对贯人法检测砂浆强度的影响。

通过试验验证了贯人 法检测砌筑砂浆强度以及回弹法检测烧结普通砖强度的适用性,对适用的测强曲线和检测条件等提出了建议。

[关键词]检测;材料强度;非破损检测;测强曲线;试验 [中图分类号】TU754[文献标识码】A[文章编号]1002-8498(2013)24-0015-05 VerificationExperimentsonNon-destructiveTestfor MasonryMaterialStrength Zheng Qiaowen (Shanghai Research Institute of Building Sciences (Group) Co.,Lid.,Shanghai200032,China) Abstract:Based on experiments, the diference of cube pressive strength between blocks with steel bottom model and brick bottom model was pared. Disparity of mortar strength, which was tested by penetration method,between mortar blocks and mortar joints was discussed.The influence of maintenance condition,constraint condition and laying quality on mortar strength was analyzed. Applicability of the method of mortar penetration and the method of fired brick rebound was verified.The Key words:inspection; material strength; non-destructive test; strength curve; test 砌体材料强度是既有砌体结构检测评估中最加之非破损检测的精度相对较差,其检测精度一直 为关键的参数之一。

新修订的《建筑砂浆基本性能是工程技术人员关心的问题。

试验方法》JGJ/T70-2009为克服不同底模试块本文通过试验,对比研究了同盘砂浆钢底模与 钢底模制作砂浆试块,同时修订了试块抗压强度的与砌体灰缝砂浆强度的差异,分析了养护条件、约 评定方法。

该项修订引起了广大工程技术人员的束条件以及砌筑质量等因素对贯入法检测砂浆强 关注,也引起了一些争议。

贯人法是检测砌体结构1度的影响。

通过试验验证了贯人法检测砌筑砂浆 中砌筑砂浆强度的常用方法之一,我国于2001年颁强度以及回弹法检测烧结普通砖强度的适用性,对 布了行业标准《贯人法检测砌筑砂浆抗压强度技术适用的测强曲线和检测条件等提出了建议。

规程》JGJ/T136-20012,此后一些省市还出台了1试验设计 地方标准3")。

2011年修订颁布的《砌体工程现场试件为烧结普通砖砌筑的墙试件和标准抗压 检测技术标准》GB/T50315-2011首次列人烧结试件。

砌筑砂浆设计强度等级为M1,M2.5,M5, 砖回弹法,它是在总结多个地方标准经验并经试验M7.5,M10共5个等级。

既有建筑的检测评定经验 验证的基础上制订的。

由于贯人法和烧结砖回弹表明,多层砌体结构砌筑砂浆实测强度多集中在 法的非破损特性,深受广大工程技术人员欢迎,应M2.5左右,因此多数试件的砂浆强度是按M2.5设 用很广。

但由于砌体结构材料强度的离散性很大,计。

每片墙的砌筑砂浆分1~5盘搅拌,共计搅拌 32盘砂浆。

烧结普通砖及配制砌筑砂浆的材 国家“十二五”科技支撑计划课题:城市建筑物安全运营保障技术料均为同一批,同一强度等级的砂浆配合比相同。

(2012BAJ07B04) [作者简介]郑乔文,工程师,E-mail:qiaowenzheng@hotmail.试件砌筑时,每搅拌1盘砂浆,分别按《建筑砂 [收稿日期]2013-06-10
万方数据
16施工技术第42卷 浆基本性能试...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年12月上 施工技术 第43卷第23期 CONSTRUCTIONTECHNOLOGY 101 DOI:10. 7672/sgjs2014230101 砂细度模数的分形应用分析* 张少武',冯小伟² [摘要]道路建设用砂在其形成和使用过程中呈现出一系列的分形特征,通过分形理论对砂分形维数的分析,建立 砂细度模数与分形维数之间的相关关系,并在此基础上分析了道路用砂各级颗粒含量与分形维数之间的相关性。

结果表明,0.6mm筛孔上的筛余物为分形维数正负关系的转折点,而0~0.15mm筛孔上的筛余物和1.18~ 2.36mm筛孔上的筛余物对分形维数的增减有较大影响。

[关键词】公路工程;细度模数;分形;相关关系 [中图分类号]U414:TU521.1 【文献标识码]A [文章编号]1002-8498(2014)23-0101-04 ApplicationofFractalGeometryTheorytoStudyon SandFinenessModulus Zhang Shaowu',FengXiaowei² (1.Gansu Provincial Transportation Research Institute Co.,Lid.,Lanzhou,Gansu 730050,China; 2.Gansu ProvincialEngineering Laboratory of Road Materials,Lanzhou,Gansu 730050,China) Abstract;In the process of road construction-sand formation and use,road construction sand presents a series of sub-type features.Through fractal theory,,this paper analyzes the sand fractal dimension,mainly wants to establish the correlation between sand fineness modulus and fractal dimension,based on the relationships,then analyzes the relevance of the road particle content levels sand and fractal dimension. relationship of fractal dimension,and the sieve residue on 0~0.15mm and 1.18~2.36mm mesh has a great impact on the change of fractal dimension. Key words:road construction;fineness modulus;fractals;correlation 目前,分形几何理论已经广泛应用在材料学作用。

科、土木工程学科、信息学科等诸多领域。

对于道1砂的分形维数的计算方法 其进行筛分,通过称量不同筛孔上的筛余物质量来维”)概念,可以用来定量描述分形结构的自相似程 分析其级配构成,并通过计算细度模数来分类砂的 度、离散程度以及破碎程度,其变化通常是连续的。

粗细。

但是这样得到的细度模数在一定程度上只 例如,一条弯曲的、不规则的海岸线的分形维数介 能反映砂的粗细程度,却不能有效反映不同粒径的 于1~2,一块粗糙不平的石料其表面的分形维数在 分布特征。

在道路建设用混合料的细微观分析中, 2~3,分形维数值越高,表明研究对象充满空间的程 通常通过分形维数的概念来分析砂在混合料中的 度越高。

例如,对于水而言,在不考虑表面张力的 分布情况以及对混合料性能的影响,然而分形维数 情况下,它能够完全充满所盛放的容器,因而对于 的求取甚为繁琐,需要进行大量计算,而细度模数 砂这种颗粒分散的材料而言,粒径越细就越能有效 的求取则相对要简单很多。

因此,本文通过建立分 地充满空间,分维数也就越大。

而细度模数反映的 形维数与细度模数之间的关系来简化砂的分形维 是砂的粗细程度,砂越细其细度模数就越小,从而 数求取过程,对砂在工程上的应用提供一定的指导 能够更有效地填充所放的容器。

因此,细度模数与 分形维数之间必定存在相关性,下面即为砂的分形 甘肃省科技计划资助项目(1305TCYA024) 维数的计算方法。

【作者筒介]张少武,高级工程师,所长,E-mail:1004991945@qq.cm [收稿日期]2014-04-14 不同颗粒的粒径组成是砂性能的重要参数,在 万方数据
102 施...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年10月上 施工技术 第42卷第19期 CONSTRUCTIONTECHNOLOCY 103 DOI:10. 7672/sgjs2013190103 砂卵石地层盾构施工振动影响分布规律研究* 张波',马雪梅",曹伍富²,任雪峰 (1.北京城建勘测设计研究院有限责任公司,北京100101;2.北京轨道交通建设管理有限公司,北京100037) 【摘要】盾构机在砂卵石层掘进过程中,刀盘切割砂卵石而产生较大振动,振动传到地表,不仅扰民,而且产生较大 的环境影响。

以北京地铁10号线二期工程某盾构区间为试验段,对盾构施工洞内管片和地表的振动进行现场监 测,了解盾构施工诱发的振动规律和沿地表的传播规律。

结果表明:在砂卵石层中,盾构施工会诱发较大的环境振 动;在洞内的影响距离约为1.5-2倍洞径;刀盘附近地表振动加速度级超出规范要求,地表振动沿垂直施工轴线 方向呈现负指数衰减规律。

振动波在传播过程中,中高频衰减较快,远离刀盘处振动频率主要为30~50Hz。

[关键词】隧道工程;盾构;砂卵石地层;振动;衰减规律;监测 [中图分类号]U455.43[文献标识码]A[文章编号】1002-8498(2013)19-0103-04 Studyon theVibrationDistributionLawofShieldConstructionin Sand Gravel Layer Zhang Bo',MaXuemei',Cao Wufu²,RenXuefeng (1.BeijingUrbanConstructionExploration&Surveying DesignResarchInstitute Co.,Ld.,Bejing100101,China; 2.Bejing MTR Construction Management Co.,Lad.,Bejing 100037,China) Abstract:A greater vibration will be generated due to cutting sand and gravel in the process of shield machine tunneling. The vibration which transmits to surface not only disturbs residents but also makes a greater environment impacting. This paper takes a subway shield zone tunnel of Beijing Metro Line 10 for an example, carries out field tests of vibration of shield segment and ground surface. The propagation laws of environmental vibration are summarized by analysis on test data. The result shows that the vibration caused by shield construction is closed related to the particle size.The vibration influenced distance in the cave will be 1.5 ~2 times of the hole diameter. The surface vibration acceleration level near the cutter-head is beyond the regulatory requirements. The exponential atenuation rules of the surface acceleration will be showed. The high-frequency has a faster attenuation in transmission process. The main frequency is about 30 ~ 50Hz far from cutter-head. Key words:tunnels; shields; sand gravel layer;vibrations; attenuation rules; monitoring 0引言 时,问题显得更加突出[2。

总体来讲,盾构在掘进 盾构法在地铁隧道工程中的应用越来越广过程中切割砂卵石地层而产生的振动影响主要包 泛",随着工程实践的增加,现行的盾构施工与周括以下几个方面。

边环境相互作用关系越来越...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年3月下 8 CONSTRUCTION TECHNOLOGY 第43卷第6期 D01:10.7672/sgjs2014060008 砂卵石地层大直径后压浆钻孔灌注桩施工技术 郭金武,李哲琳,王勇,倪晓荣 (中国新兴建设开发总公司,北京100039) [摘要]人民日报社报刊综合业务楼项目主楼采用后压浆钻孔灌注桩抗压桩,副楼及纯地下车库部分采用筏板基 础,对部分抗浮不足部位采用后压浆钻孔灌注桩抗拔桩.介绍了该项目工程桩设计参数及施工技术要点,水下混 凝土的浇筑技术要点、工程柱桩端后压浆施工技术,最后对单桩进行静载试验.数据充分证明,针对该工程采取的 深基础工程桩施工工艺及各项控制措施合理有效,取得了预期目标,满足工程各项技术要求,效果良好. [关键词]地下工程;桩基础;砂卵石地层;灌注 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2014)06-0008-04 Large-diameter Bored Piles Construction at Sand and Gravel Stratum Guo Jinwu Li Zhelin Wang Yong Ni Xiaorong China Xinxing Construction Derelopment General Co.Beijing 100039 China) Abstract:The bored pression piles construction post grouting under pile)has been conducted in the main building construction of the People's Daily project.Due to the requirement of anti-floating the bored piles construction has also been conducted under some parts of the raft foundation of the skirt building.This paper introduces the essential parameters of pile design and construction the key points of underwater concrete pouring and the technology of post grouting under pile.Finally the result of static loading tests of every pile states that the goal has been achieved and requirements have been met and work well. Key words:underground;piles;sand and gravel stratum;grouting 0引言 层地下室,各建筑部位基础均置于同一基础底板 随着城市建筑物高度不断增加,基础荷载不断 上,并在地下相互连通.主塔楼采用后压浆钢筋混 加大,为增加地基承载力和建筑稳定性,基础桩应 凝土灌注桩. 用越来越广泛,对于超高建筑往往采用大直径、较 主塔楼抗压桩桩身混凝土强度等级为C45 长钢筋混凝土灌注桩,部分基础桩甚至采用桩端、1000mm 桩长26m 桩端持力层为⑧层卵石层,进 桩侧后压浆的形式来提高桩身承载力,基础桩的质 入持力层≥1...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年7月上 施工技术 第40卷第344期 CONSTRUCTION TECHNOLOGY 75 砂卵石地层中钻孔灌注桩成孔控制技术 王俊利,刘会林 (中国铁建十六局集团有限公司,北京100124) [摘要]在砂卵石地层采用钻孔灌注桩成孔难度较大.以北京地铁十号线某盾构始发井围护桩施工为例,对在砂 卵石地层中影响钻孔柱成孔效率和质量的主要原因进行了分析,并针对设备选型和泥浆护壁两方面对成孔质量控 制措施进行了闸述.根据不同的地质条件选择适合的成孔钻具和泥浆参数,保证了成孔质量,提高了施工效率. [关键词]钻孔灌注桩;砂卵石地层:旋挖钻机;短螺旋钻头 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2011)13-0075-02 Pore-forming Control Technology of Bored Pile in Cobble Stratum Wang Junli Liu Huilin (China Railway 16th Bureau Group Co.Ltd.Beijing 100124 China) Abstract:It is difficult for pore-forming with bored pile in cobble stratum.Based on retaining pile construction of shield-construction origination shaft in Beijing Subway line 10 authors make analysis on the main cause of influence on efficiency and quality of pore-forming with bored pile in cobble stratum and expound quality control measures from equipment selection and mud protection.They choose the suitable drilling tool and mud parameters which ensure pore-forming quality and improve construction efficiency. Key words:bored pile;cobble stratum;rotary drilling rig;short screw auger 1工程概况 盾构始发井所处地层由上至下分别为:人工填 北京地铁十号线二期西局站~六里桥站区间1土层、第四系新近沉积层、第四系沉积土,其中第四 号、2号盾构始发井均为单跨3层钢筋混凝土矩形系沉积土中的⑤卵石层(厚10.7m)、⑦卵石层(厚 结构.两始发井结构形式及尺寸完全相同,盾构始8.9m)、⑨卵石层(厚7.8m)、①砾岩层(未见底), 发井内净空尺寸为14.7m×8.7m 基坑开挖深度为 地层中卵石粒径较大,最大粒径40cm 直径>20cm 26.59m 采用钻孔灌注桩钢支撑钢围檩围护结 的颗粒物含量约为70%,工程地质条件差,对钻孔 构,钻孔灌注桩桩径1000mm 桩间距为1400 灌注桩施工影响较大. (1500)mm 桩长为34(35)m 桩底深入结构底板面 2.2水文地质条件 以下8.921m;桩顶设1000mmx800mm冠梁,冠梁 根据区域水文地质资料,本段线路赋存4层地 上设1500mm×200mm挡水墙. 下水...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2017年1月上 112CONSTRUCTIONTECHNOLOGY第46卷第1期 DOI:10.7672/sgjs2017010112 矩形管廊预制顶推施工技术重难点控制 潘学斌,袁梅,李海清,马力中,袁寒黛 (中建城市建设发展有限公司,北京100037) [摘要]结合包头新都市区综合管廊项目工程实例,根据当地砾砂层地质条件及管廊施工不得影响交通的要求,在 矩形管廊施工中采用预制顶推施工技术。

介绍了该技术的控制要点。

工程实践结果表明,矩形管廊暗挖顶推施工 技术切实可行,对上部交通基本无影响,大幅度缩短工期,安全性高,具有良好的社会效益和经济效益。

[关键词】地下工程;综合管廊;预制顶推;砂砾层;土体改良;施工技术 [中图分类号】TU992.24[文献标识码]A[文章编号】1002-8498(2017)01-0112-04 KeyPointsControl ofPrecastJackingConstructionTechnology ofPrefabricatedRectangularPipe Gallery Pan Xuebin,Yuan Mei, Li Haiqing,Ma Lizhong,Yuan Handai (CSCEC City Construction Derelopment Co.,Lud.,Beijing 100037,China) Abstract:Based on the posite pipe gallery engineering practice in Baotou, according to the gravel rectangular pipe gallery,and its control points in construction was introduced.The practice shows that this method hasnoinfluence on traffic,reduces the period,ensures the safety,hasgood socialefficiency and economic benefits. Key words:underground; posite pipe gallery; precast jacking; gravel geology; soil improvement; construction 0引言地质条件下暗挖顶推施工。

随着国家《关于推进城市地下综合管廊建设的1工程概况 包头新都市区项目综合管廊经十二路、经三路 施城市地下管网改造工程等一系列文件的发布,国顶管工程(见图1),截面尺寸为7m(长)×4.3m 内综合管廊的建设进人大发展时期。

作为国家第(高),壁厚50cm,每节管节长1.5m,重42t。

经三路 一批综合管廊试点城市的建设者,通过认真分析国地下综合管廊顶推长度为85.6m,经十二路综合管 内综合管廊施工技术,分析明挖现浇法、预制拼装廊顶推长度为88.5m。

经三路最大顶力为2308t, 法、暗挖法三大主流施工工艺的安全、成本、质量、:经十二路最大顶力为2400t。

本次综合管廊顶推施 绿色施工等多种因素,结合城市道路行驶要求、城工主要在砾砂层中进行(见图2),该砾砂层砂质纯 市绿道系统保护要求、城市主供水管线的保护、管净,级配一般,颗粒不均匀,含圆砾、角砾、漂石、大 廊行进范围的地质条件。

在包头市经三路、经十二孤石;直径变化在1~40cm。

路综合管廊施工时采用暗挖顶推方法进行施工,确 保对城市交通影响最小,在保证施工进度、质量、安 全、绿色施工等前提下,根据地质勘察报告,认真分 析砾石层地质特点,在国内综合管廊建设中首次采 用矩形顶管暗挖顶推技术,顺利完成在砾砂层特殊图1顶管平面 [作者简介]潘学斌,总经理,高级工程师,E-mail:shabbinpan@Fig.1 Pipe jacking plan sina,[收稿日期】2016-10-082工程重难点
1)国内首次在砾砂层采用双仓矩形管廊顶推 万方数据
2017 No. 1潘学斌等:矩形管廊预制顶推施工技术重难点控制113
5)针对本项目大粒径砾砂层中顶推施工,螺旋 输送机的螺杆、筒体内部必须堆有耐磨焊,以减少 其磨损。

3.2砾砂层土体改良 为减少土体与管壁间的摩阻力,提高工程质量 图2砾砂层现状和施工进度,在顶管顶推的同时,向管道外壁压注 Fig.2 The current situation of gravel and sand一定量的润滑泥浆,变固态摩擦为固液态摩擦,以 技术,如何保证顺利顶推,保证工程质量、安全、进达到减小总顶推力的效果。

顶推时压浆孔要及时 度,是本工程...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年3月下 88 CONSTRUCTIONTECHNOLOCY 第44卷第6期 DOI:10. 7672/sgjs2015060088 盘锦体育中心体育场非对称马鞍形索膜结构 整体张拉施工技术 于德国',李光军²,艾永²,王波²,张彬1 (1.盘锦职业技术学院建筑工程分院,辽宁盘锦124010; 2.中国建筑第八工程局有限公司大连分公司,辽宁大连116021) [摘要】盘锦市体育中心体育场索膜结构通过内拉环地面拼装提高拼装精度及拼装效率。

内拉环吊装完毕后,通 过与周围弯顶立柱的相对位置短时高效地完成穹顶主梁的安装及焊接。

在施工过程中形成流水施工,将后续的索 施工合理穿插。

预应力张拉完成后支撑胎架自动卸载,实现快速拆卸。

通过以上方法达到短时高效、经济合理、安 全可行、保质保量地完成弯顶安装施工。

[关键词]体育场;索膜结构;非对称;整体张拉;安装 [中图分类号]TU758.11 [文献标识码】A [文章编号】1002-8498(2015)06-0088-04 OverallTensionConstructionofAsymmetricSaddle Cable-membraneStructuresinPanjinSports CenterStadium Yu Deguo',Li Guangjun²,Ai Yong²,Wang Bo²,Zhang Bin' (1.Architeture andMarine Engineering Department,PanjinVocationl and Techicl Collge,Panjin, Liaoning124010,China;2.Dalian Branch of China Construction Eighth Engineering Division Co.,Lud.,Dalian,Liaoning 116021,China) Abstract:Cable-membrane structures of Panjin Sports Center Stadium was assembled by the pull ring at the ground to improve the efficiency of assembly precision and assembly. After lifting the pull ring is pleted, the installation and welding of the dome main beam is finished short-term and efficiently through considering the relative position of the dome and surrounding uprights. The flow construction is formed during the construction process,the subsequent cable construction interspersed reasonable.Afer the prestressed tension is pleted, the supporting jig automatic unloaded and quick disassembly. The installation and construction of the dome is achieved with the short-term efficient,economical, safe and feasible,quality and quantity advantages by the above method. Key words;stadiums; cable-membrane structures; asymmetric; overalltensioning; installation 1工程概况 叉钢管柱和自上至下共6圈环梁(或环桁架);屋盖 盘锦市体育中心共包括网球馆、综合馆、体育 主索系包括内圈环索1道和径向索(包括144道吊 场、游泳馆等几个单体,其中主场地体育场为第十索、72道脊索和72道谷索);膜面布置在环索和外 二届全运会女子足球比赛场地。

体育场分为东西 围钢框架之间的环形区域,并跨越72道脊索和72 两个看台,索膜结构屋盖体系属于超大跨度空间张 道谷索形成波浪起伏的曲面造型。

通过3层径向索 拉索膜结构,屋盖建筑平面呈椭圆环形,长轴方向 力的调整,可以实现索膜结构非对称马鞍造型的建 约270m,短轴方向约238m,最大高度约57m。

屋盖 筑效果。

体育场结构平...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年5月下 56 CONSTRUCTION TECHNOLOGY 第41卷第365期 瓦屋面防水渗漏原因分析及控制技术 刘文涛 (中铁建设集团有限公司,北京100131) 【摘要]目前瓦屋面工程工后不久,天沟、泛水、雨水汇集处等部位便会出现漆漏水情况.结合某具体工程实例, 分析瓦屋面防水渗漏主要原因,并提出防水渗漏具体控制措施与关健技术.从设计、材料、施工、过程管控等方面 进行综合管理,杜绝任何防水质量惠. 【关键词]防水工程;瓦屋面:渗漏;控制要点 [中图分类号]TU761.11 [文献标识码]A [文章编号]1002-8498(2012)10-0056-03 Leakage Causes and Prevention Technology of Tile Roof Liu Wentao China Raileay Conatruction Group Co.Lad.Bejing 100131 China) Abstract:Leakage happens at the gutter flashing rain gather of some project which is finished before long.Combining with the concrete projects the main waterproof causes of tile roof are analyzed and the control measures and key techniques of preventing leakage are put forward.The prehensive management is applied at the design materials construction process control to eliminate quality diseases for waterproof construction. Key words:waterproof;tile roof;leakage;control points 随着房地产经济的快速发展,为增加建筑的立面.屋面工程工期为9个月,由于工程工期紧,整个 面效果,部分屋面设计成瓦屋面.但不少瓦屋面工瓦屋面施工周期约30d 竣工验收及使用过程中发 程竣工后不久就在天沟、泛水、雨水汇集处等部位 现不少渗漏,其中坡屋面起坡处、6层部分外墙保温 出现渗漏.现结合实例分析瓦屋面渗漏的原因以 内渗漏严重. 及渗漏的控制要点,并提出相应的预控措施. 2瓦屋面防水渗漏原因分析 1工程概况 下面结合工程具体漏部位,进行原因分析. 某住宅小区建筑面积110000m2 共23栋单体2.16层人户雨篷 住宅楼,建筑楼层为6层,层高2.9m 其中10栋住 此处是两个坡屋面及一个平屋面雨水汇集处 宅楼6层设计为双向坡屋面,南侧坡度为60°,北侧 (见图1),现场拆除部分楼梯间墙体砖、坡屋面瓦、 坡度为45°,且存在多个坡屋面交接部位.坡屋面 雨水汇集处防水层,发现防水层下均有不同程度积 构造做法从下至上为:①100mm厚现浇钢筋混凝土 水,部分墙体上未施工防水层,墙体保温层内存在 结构层:②20mm厚1:3水泥砂浆找平层:③1.5mm 潮湿现象,现场滤漏及雨篷、电梯井墙体剔除情况 厚JS(聚合物水泥)防水涂料层:④65mm厚聚苯板, 分析如下. 容量为18kg/m3;⑤25cm×25cmx1.5cm镀锌钢管 1)工期紧张,造成现场工序混乱,部分楼座此 顺水条,中距90...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年8月上 施工技术 第42卷第15期 CONSTRUCTIONTECHNOLOGY 49 DOI:10. 7672/sgjs2013150049 球面棱锥式玻璃幕墙设计与施工技术* 徐晓博",赵倩”,李传辉²,李慧莹!

(1.广州建筑股份有限公司,广东广州510030;2.广州市恒盛建设工程有限公司,广东广州510030) 合工程实际,从设计理念、幕墙造型、节点设计和幕墙安装等方面,全面分析了球面棱锥式玻璃幕墙在设计和施工 中的创新点和技术难点。

三维活动节点使球面棱锥式玻璃幕墙具有三维变形的特点,使球面棱锥式玻璃幕墙变形 和球面网壳主体结构变形相协调,有效消除了主体结构变形引起的附加内力和变形,使幕墙结构处在简单的受力 状态,延长了玻璃幕墙使用寿命和防水维修周期。

[关键词】球面棱锥式玻璃蒋墙;节点;变形;设计;施工 [中图分类号】TU767 [文献标识码】A [文章编号]1002-8498(2013)15-0049-05 Design and Construction Technology of Spherical Pyramid-shaped Glass Curtain Wall Xu Xiaobo',Zhao Qian²,Li Chuanhui²,Li Huiying (1.Guangzhou Municipal Construction Group Co.,Ltd.,Guangzhou,Guangdong 510030, China; 2.Guangzhou Hengsheng Construction Co.,Lad.,Guangzhou,Guangdong 510030,China) Abstract: Pyramid-shaped glass curtain wall is first adopted in Guangzhou Conghua Hot Spring Yangshenggu Liuxi Square Landscaping Project as one of Guangzhou Asian Games Projects. Combined with practical project, the technical difficulties in design and construction are analyzed from design concept,modeling design,joint design and curtain wallinstallation.3D active joint leads to the property of 3D deformations for pyramid-shaped glass curtain wall,which coordinates the deformations between spherical reticulated shell structure and the glass curtain wall.Thus the internal stress which is caused by the 3D deformations of glass curtain wall can be released, the curtain wall is at simple stress state and the useful life and maintenance cycle of the glass are prolonged. Key words:spherical pyramid-shaped glass curtain walls; joints; deformation; design; construction 0引言 (弧)面、球面等不同形式。

其中,球面幕墙结构最 自20世纪80年代初,我国从国外引进建筑幕为复杂,而广州从化温泉养生谷流溪广场景观工程 墙技术以来,在短短的三十几年内,我国的建筑幕采用的球面棱锥幕墙结构在国内尚属首例。

墙技术得到了迅猛发展。

经历了“起步期”(1983一1工程概况 1994年)→“成长期"(1995-2002年)→“可持续发 广州亚运工程之一-广州从化温泉养生谷 展期"(2002年至今)3个阶段。

科技进步和技术创流溪广场工程,主要景观工程有3个半球面建筑幕 新促进了建筑幕增的发展。

目前,我国已成为世界 墙(主体结构为球面网壳结构),分别是咨询展示中 幕墙大国,建筑幕墙技术处于世界领先水平。

心(直径d=36m)、休闲购物中心(d=32m)和接待 建筑幕墙是融建筑技术和建筑艺术为一体的 中心(d=22m)。

外围护结构或装饰结构。

建筑幕墙外形有平...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年4月上 施工技术 第41卷第362期 CONSTRUCTION TECHNOLOGY 21 珊瑚料基层施工技术在某港口工程中的应用 袁求武,关泽潮,文晓雅 (中交四航局第一工程有限公司,广东广州510500) [摘要]根据珊瑚礁岩的矿物成分及物理力学特性,对珊瑚料进行了室内击实试验.结合苏丹港新集装箱码头后 方堆场一期工程项目的工程实践,介绍了振动碾压对珊瑚料浅表层的压实工艺与效果.实践结果表明,珊瑚料作 为浅表层地基填料碾压效果较好,取得了良好的社会经济效益. [关键词]港口工程;地基处理;珊瑚料;击实试验;振动碾压 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2012)07-0021-03 Application of Coral Material Basement in Some Port Engineering Yuan Qiuwu Guan Zechao Wen Xiaoya The First Engineering Company of CCCC Fourth Harbor Engineering Co.Lid.Guangzhou Guangdong 510500 China) Abstract:According to the mineral position and physical and mechanical characteristics of coral mineral reef rock authors have an interior paction test of coral mineral.Based on engineering practice of some engineering in Sudan Port authors introduce paction technology and its effect of vibration rolling on coral mineral surface.Engineering practice shows that effect of vibration rolling with coral mineral is good and has a good social and economical benefit. Key words:port engineering;foundation treatment;coral mineral;paction test;vibration rolling 1工程概况 瑚礁岩和珊瑚碎屑土两类,珊瑚礁岩如按成因又可 苏丹港新集装箱码头后方堆场一期工程位于以分为原生礁岩和次生礁岩2种,它们都属于碳酸 苏丹共和国苏丹港市,码头后方新吹填和原有陆域岩中的1种生物礁灰岩.珊瑚礁岩的矿物成分主要 的地基处理面积达20万m2以上,其中由于A1区是文石和高镁方解石;摩氏硬度为3~5,其化学成 的A101~A104及A3区珊瑚料层下层有软弱下卧分主要是碳酸钙,含量高达90%~97%,在岩土类 层,设计采用3000kNm强夯和1000kNm强夯对别中同属碳酸类土或钙类土.苏丹港新集装箱码 地基进行深层处理,其余区域珊瑚料层下没有软弱 头附近水域的珊瑚礁岩大多数都是由微生物经过 下卧层,只需作浅表层的地基处理(见图1),适宜采 漫长的地质年代进化而生成的,属于化学沉积岩, 用振动碾压进行加固. 根据风化程度不同可分为2类:珊瑚礁石和珊瑚礁 现浇C40钢筋混凝土 砂,颜色呈...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年4月上 34 CONSTRUCTION TECHNOLOCY 第42卷第7期 D0I:10.7672/8gjs2013070034 煤制天然气装置复杂成分填料填方地基强夯处理 吕和蔼,闫续屏 (辽宁大唐国际阜新煤制天然气有限责任公司,辽宁阜新123000) [摘要]煤制天然气装置对地基的变形、稳定性要求严格.针对场地实际情况,采取了相应的整平和夯实方案,并 对分层碾压法和强夯法进行了比较.通过试验,确定了强夯的总体方案,并对特殊部位和冬季施工采取了相应的 处理措施.检测结果表明,各项指标及沉降量均满足规范和设计要求. [关键词]地基;强夯;试验;检测 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2013)07-0034-04 Dynamic Compaction on Foundation with Complicated Fillings for Coal Gas Device Lu Heai Yan Xuping Liaoning Datang International Fuxin Coal-To-SNG Co.Lad.Fuxin Liaoning 123000 China) Abstract:Coal gas device has very strict requirement on the deformation and stability of its foundation. Corresponding leveling and tamping methods were selected according to the site condition and parison was made between lateral rolling method and dynamic paction method.The general scheme of dynamic paction was determined based on test results.Treatment measures were adopted for special locations and winter construction.Detection results show that all indexes and the settlement can meet the design requirements. Key words:foundations;dynamic paction;test;detection 1工程概况 4)现场堆积有120万m3的煤矸石,占用土地、 辽宁大唐国际阜新煤制天然气有限公司建设浪费资源、污染环境.煤矸石有化学性质不稳定和 的日产1200万Nm3煤制项目,厂址位于辽宁省阜 产生自燃等不良作用,对煤化工装置极为不利. 新盆地中部,场区北部为刺蚀丘陵,东部为丘间谷 3施工重点和难点 地.地势大致为西南高、东北低,最大相对高差约 1)工程项目为煤化工装置,工艺复杂,易燃易 为61.5m. 爆,对场地的沉降变形和稳定性要求严格.场地平 2场地工程特点 整时回填土的压实处理方案是保证地基安全稳定、 1)场地地形地貌复杂厂区占地范围分布有1 满足设计使用要求、保证工程工期的关键. 条大冲沟、2条小冲沟,整体地势倾斜,形成11个标 2)本工程占地总面积336.73万m2 总挖方量 高的台阶,填方量大,回填场地形成临空面,如何保 1417.5万m3 总填方量1304...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年1月上 46 CONSTRUCTIONTECHNOLOGY 第45卷第1期 DOI:10.7672/sgjs2016010046 炉渣填埋桩的炉渣特性及施工工法研究 刘娜,呼峰,王选卓,谢云爽² (1.徐州徐工基础工程机械有限公司,江苏徐州221000;2.内蒙古赤峰市宁城县 甸子镇人民政府,内蒙古赤峰024234) [摘要]从环保层面人手,提出了用炼钢炉渣填埋工程桩的概念。

选取了炼钢炉渣和混合炉渣两种试验对象,并分 别介绍了其成分、分析了基本特性,简述了填埋时的施工工法,最后通过实际工程得出了填埋桩的试验数据。

随着 我国对生态环境的重视,这种施工概念必将得到重视并推广。

[关键词]桩;炉渣;填埋桩;试验;施工技术 [中图分类号】TU753.3[文献标识码]A[文章编号】1002-8498(2016)01-0046-03 Research on theCharacteristicsofSlagand Construction Method in Pile-filling Liu Na',Hu Feng',Wang Xuanzhuo',Xie Yunshuang² (1.Xuzhou Xugong Foundation Engineering Machine Co.,Ltd.,Xuzhou,Jiangsu 221000, China;2.The Government of DianziTnngchengCounty,Chjenity,eMngoliaChjengerMngoli2234Chi Abstract:The concept of pile-filling with slag was proposed on environmental protection. This paper chose steelmaking slag and mixing slag for testing,introduced their position and basic characteristics. The construction method was expounded and testing data was got according to the engineering practice. The construction concept should be extended. Key words:piles;slag;pile-filling;tests;construction 0引言 渣再利用奠定了一定的理论基础。

通过炉渣的成 我国钢铁年产量超过10亿t,其中废弃炉渣可分、粒径以及三轴试验结果对炉渣的基本特性进行 占产量的25%~30%,然而再利用的炉渣仅为描述,同时叙述了施工方法及试验结果。

状态。

近年来我国越来越重视环境污染的综合治 制铁过程中产生的钢铁炉渣可分为由高炉炼 理并大力推进环保法,为了保护环境资源也不断呼出的高炉炉渣和由滚筒炉和电气炉炼出的炼钢炉 吁和提倡资源再利用,建立节约型社会等。

其实,渣。

高炉炼钢时,在融化的炉渣中使用高压水流喷 须要经过老化处理以减小膨胀量。

另一方面,如果 炉渣具有固结性,可以作为水泥的原材料使用。

炼 作为桩节填埋材料使用,以前的填埋方法要一边植钢炉渣具有膨胀性,为了抑制其膨胀性,多对其进 桩一边在桩周围填充砂砾和石材,存在很大的噪声行老化处理,本文的试验对象为不做老化处理的炼 和振动问题。

如果采用低噪声、无振动的砂砾填充 钢炉渣和水淬炉渣。

施工方法,砂砾的密度变小、桩节下沉、刚性变差, 水淬炉渣和炼钢炉渣的成分试验和粒度试验 阻力不足。

因此着眼于炼钢炉渣的缺点及其膨胀结果如图1和表1所示。

为了便于参考,在此也把 性,提出了在节型桩周围填充未进行老化处理的炼水泥的成分一起列出。

可以看出两者的成分都与 钢炉渣的施工工法,并分析了该方法使用炉渣的基水泥类似,都是以CaO和SiO2为主要成分。

水淬炉 本性能,得出了填理桩试验的重要数据,为后续炉 渣的Al2O,和MgO含量比水泥多,炼钢炉渣的Fe0 和MgO含量比水泥多,水淬炉渣的粒径多集中 [作者筒介]刘娜,高级工程师,E-mail:xcmghe001@163. 在1mm。

[收稿日期】2015-04-30 万方数据
2016 No.1 刘娜等:炉渣填埋桩的炉渣特性及施工工法研究 47 %100 月以后还要进行压实排水处理。

膨胀性试验的膨 80 60 胀率是在试验对象放置90d以后测定的。

其试验结 量 40 果如表2,3以及图2所示。

20 过 0 通 100 0.1 10 100 表2各炉渣的基本性质 % 微粒直径/mm Table ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年10月上施工技术 第41卷第374期CONSTRUCTIONTECHNOLOGY93
灵山隧洞工程施工进度计划管理研究
高月霄,赵文娟²
[摘要】灵山隧洞属某省南水北调工程中较大较难的隧洞工程之一,是否能够准确估算出施工工期,将对整个南水 北调工程的顺利进行起至关重要的作用。

基于灵山隧道项目施工进度网络图中的关键线路上的关键工作,运用信 息扩散理论对工作时间进行估算,使项目管理人员更准确地测算出灵山隧道的总工期,以便合理编制项目的施工 进度计划。

【关键词]隧洞;南水北调;施工进度;工期;信息扩散理论 [中图分类号]TU722[文献标识码】A[文章编号11002-8498(2012)19-0093-04 Research on Duration Estimation of Lingshan Tunnel Gao Yuexiao' , Zhao Wenjuan² (1. Xi'an China South City Co. , Lid. , Xi'an, Shaanxi 710026, China; 2. Department of Engineering Cost Shaanxi Xigema Engineering Cost Consulting Co., Ltd., Xi'an, Shaanxi 710075,China)
Abstract: Lingshan tunnel is a key engineering of the South-to-North Water Transfer Project, which has many uncertain factors and plex problems in construction. In order to implement the project smoothly, it is worth to research how to establish a scientific and reasonable construction schedule. The paper applied information diffusion theory to the construction progress network diagram so as to estimate main work time and determine the key circuit. Therefore, the project managers can calculate the total duration of Lingshan tunnel engineering more accurately and offer reliable evidence for the follow-up engineerings.
information diffusion theory
1 工程概况横断面采用圆拱直墙式,尺寸为6.3m(宽)×7.5m 灵山隧洞位于汉江以北的中低山区,山高坡(高)。

衬砌材料为混凝土,初期支护根据围岩类型 陡,沿线冲沟发育。

地层有古生代的变质岩及沉积采用喷、网、锚结合的方式,二衬混凝土厚度0.40~ 岩,元古代及古生代的侵人岩。

洞室围岩有黑云母0.50m,混凝土强度等级为C30。

由于隧洞较长,综 斜长片麻岩、二云母石英片岩、结晶灰岩,岩体较完合考虑通风、出碴、工期等施工要求,沿线布置5个 整,围岩以Ⅲ类为主,成洞条件较好。

隧洞进出口施工支洞,为6.8m(宽)×5.1m(高)圆拱直墙式。

边坡岩体完整,整体边坡稳定。

2.1支洞施工 工程区主要构造为断层,大部分与引水洞正支洞开挖采用台阶法,三臂液压凿岩台车钻 交,对洞室稳定影响较小。

其所处的汉江及其支流孔,3m轮胎式装载机配15t自卸汽车至弃碴场。

河道狭窄,两岸山高坡陡,施工场地狭小,施工组织根据本阶段地质资料,各支洞以V类围岩为主,开 及施工布置困难。

挖后即进行支护,一次支护应紧跟掌子面。

在遇到 2灵山隧洞施工严重风化的围岩或破碎带时采用短进尺、超前锚杆 灵山隧洞线路全长为16.94km,由隧洞段、出口或超前灌浆进行加固,必要部位采用钢支护,并及 段和退水洞3部分组成。

隧洞纵比降i=1/3000,时进行挂网喷混凝土。

2.2主洞施工 [收稿日期]2012-03-052.2.1开挖施工 [作者简介]高月霄,工程师,E-mail:gaoyuexiaol@126.经对钻爆法和TBM法施工方案综合比较,本阶
万方数路
94施工技术第41卷
段灵山隧洞洞身段采用钻爆法施工,全洞共布设5金属结构安装以人工为主,机械进行辅助。

门 条施工支洞,其中洞左2...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年9月下 48 CONSTRUCTIONTECHNOLOGY 第40卷第349期 灵山胜境三期梵宫大跨度悬挂 型管桁架综合施工技术 孙晓阳 (中国建筑第八工程局有限公司总承包公司,上海200315) [摘要]针对无锡灵山胜境梵宫钢结构工程大跨度悬挂型预应力钢拉杆结合管桁架等结构特点和施工难点,采用 塔式起重机、胎架、大吨位履带式起重机组合使用的吊装工艺,化整为零、分块拼装、分段吊装,成功解决了施工场 地有限、桁架重、长度长、高空焊接量大、质量难以保证及先吊装后张拉、卸载的间题。

并通过施工过程的严格组织 与实施,确保了工程质量和施工安全。

[关键词】钢结构;弯顶;悬挂型管桁架;预应力;钢拉杆 [中图分类号]TU758.1 [文献标识码】A [文章编号]1002-8498(2011)18-0048-04 Comprehensive ConstructionTechnology ofLarge-spanSuspended Pipe-truss at Vatican Palace in Third-stage Project of Mountain Ling SunXiaoyang (GeneralConractCompanyofChinaConstrutionEighthEnginering DiwisionCo.,Ld.,Shanghai200315,China) Abstract:According to the characteristics and construction dificulties of large-span,suspending, prestressed structure of pipe-truss at the Vatican Palace ofMountain Ling,the posing hoisting process of tower crane,jig,crawler crane are applied.The rules of changing integral to segments,assembly and hoisting with divisions are adopted,which resolve the difficulties of limit construction site,heavy structure,large welding quantities at high altitude,hoisting, tension and unloading. Through the strict organization and application of construction,the quality and safe are ensured. Key words;steel structures; domes; suspended pipe-trusses; prestressed; steel pull rods 1工程概况 为11.5m,环向桁架标高为14,23,29,38.726m。

工 无锡灵山胜境三期工程梵宫建筑位于无锡市滨 程剖面如图1所示。

湖区马山镇灵山风景区内,建筑面积71880m²,是 一个集旅游、会议、观演、宴会、展览和佛教文化活动 等多功能于一体的现代佛教风格建筑,也是江苏省 “十一五”计划的重点工程,同时也是无锡灵山举办 2009年世界佛教论坛的主会场,工程于2009年获 得建筑工程“鲁班奖”。

梵宫建筑的主要结构之一是圣坛钢结构工程, 主体为结构预应力钢拉杆悬挂型管桁架,为半球状 弯顶钢结构,跨度72m。

由51环向桁架、27福径 图1灵山胜境三期梵宫剖面示意 Fig.1Profile of Vatican Palace in Third-stage 向桁架、屋面条及支撑系统组成,通过24根 project of Mountain Ling Φ100mm和12根$120mm钢拉杆与预埋件连接来 稳定整个圣坛。

圣坛最高点标高41.286m,最低点 2工程特点 1)本工程结构形式呈1/2对称径向桁架呈 四边形,由4根主管和斜腹管组成;环向桁架呈三角 [收稿日期]2011-02-01 [作者筒介】孙晓阳,中国建筑第八工程局有限公司总承包公司项目 形,由3根主管和斜腹管组成,呈单向曲线。

总工程师,工程师,上海市浦东新区源深路269号200315,电话: (0523)85686626,E-mailxuanyuanyang@163. 2)构件规格种类多环向、径向桁架均由4种 万方数据
2011 No.349 孙晓阳:灵山胜境三期梵宫大跨度悬挂型管桁架综合施工技术 49 不同直径的钢管组成;擦条规格为H...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年4月上 施工技术 第42卷第7期 CONSTRUCTION TECHNOLOGY 43 D0I:10.7672/8gjs2013070043 潜水钻机成孔垂直度控制技术 樊勇军,张俊红,邵栓增,揭义坚,班永表 (天津市地质基础工程公司,天津300191) [摘要]潜水钻机成孔工艺广泛应用于沿海地区第四系覆盖层的钻孔灌注桩施工中.介绍了潜水钻机的工作机 理.在工程实践中,通过对钻机设备结构改良,对钻机成孔工艺方法改进等措施,使潜水钻机成孔垂直度控制技术 得到了提高,在一些较深基坑钻孔灌注桩工程中得到了成功应用. [关键词]地下工程;桩基础;钻孔灌注桩;潜水钻机;垂直度 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2013)07-0043-02 Verticality Control for Hole-forming by Submersible Drill Fan Yongjun Zhang Junhong Shao Shuanzeng Jie Yijian Ban Yongbiao Tianjin Geology Foundation Engineering Co. Tianjin 300191 China) Abstract:Hole-forming by submersible drill is widely used in bored pile construction in the coastal areas of quaternary overburden.This paper describes the mechanism of submersible drill.Through engineering practice the verticality control for the submersible drill was improved by improving the structure of equipment and refining the hole-forming method.This technology has been successfully applied in several deep foundation excavations with bored piles. Key words:underground;pile;bored pile;submersible drill;verticality 潜水钻机成孔工艺广泛应用于钻孔灌注桩施小车车轮可以自由改变方向,水泵采用3PN泥 工工程中,钻机结构简单,工作效率高,实用性强,浆泵. 成本低,在第四系覆盖层和沿海地区软土地层区域 潜水钻机和钻头连接在一起,潜水钻机上部接 得到了广泛推广应用.然而,正因为钻机结构简单 一节钻杆通过盒箱固定在轨道小车上.在钻进过 轻便,转速快等特点,造成了成孔垂直度偏差控制 程中,通过钻机小车上固定的卷扬提升钻杆,加、卸 难的问题,本文通过对其钻机工作原理解析,在工 钻杆进行钻孔作业. 程实践中通过对钻机部分结构改良,对工艺控制方 2影响成孔垂直度的因素 法改进等措施,有效控制了潜水钻机成孔垂直度问 根据钻机构造及工作原理,这种钻机主要有以 题,可使其在较深基坑施工中得到应用,有显著的 下几个方面影响成孔垂直度. 经济和社会效益,值得类似工程借鉴. 1)钻机导向稳定性差潜水钻机导正系统位 1潜水钻机成孔工作原理 于轨道小车上面,是高1.5m的盒箱,由上下两组导 潜水钻机的工作原理...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年10月上 16 CONSTRUCTION TECHNOLOGY 第45卷第19期 D0I:10.7672/5j52016190016 漫滩地层深基坑稳定性特征机理及支护方案研究* 王永鹏,杨双锁1 2,于洋,刘光宇 (1.太原理工大学矿业工程学院,山西太原030024; 2.重庆大学煤矿灾害动力学与控制国家重点实验室,重庆400030) [摘要]以太原漫滩地区某地铁车站施工为例,研究深基坑支护方案的合理性.采用理论分析与有限元相结合的 方法,考虑基坑开挖的实际步骤,采用FLAC3P对深基坑开挖的全过程进行数值模拟,分析了深基坑地下连续墙的 变形和对周围地表的沉降,得出深基坑采用地下连续墙与内支撑支护形式下基坑变形形式及对周围地表沉降变形 特征,从而验证基坑支护设计方案,对太原地铁车站基坑开挖后续设计及施工方案的优化和改进及变形预测都具 有重要的参考意义. [关键词]深基坑;漫滩地层;地下连续墙;内支撑;沉降;有限元分析 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2016)19-0016-04 Study on the Deep Foundation Excavation Stability Mechanism and Support Scheme in Floodplain Formation Wang Yongpeng' Yang Shuangsuo.2 Yu Yang' Liu Guangyu' (1.College of Mining Technology Taiyuan Unirersity of Technology Taiyuan Shanxi 030024 China; 2.State Key Laboratory of Coal Mine Disaster Dynamics and Control Chongging University Chongging 400030 China) Abstract:Taking a subway station construction in Taiyuan floodplain area as an example the authors study the rationality of supporting scheme of deep foundation excavation.By using the method of theoretical analysis and finite element method the deformation of deep foundation excavation and the deformation characteristics of surrounding ground are analyzed.The deformation and deformation characteristics of foundation exeavation are analyzed.The design scheme is verified and proved to be important for the design of Taiyuan metro station. Key words:deep foundation excavation;floodplain;diaphragm wall;inner support;settlement;finite element analysis 0引言 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)