灵山隧洞工程施工进度计划管理研究
高月霄,赵文娟²
[摘要】灵山隧洞属某省南水北调工程中较大较难的隧洞工程之一,是否能够准确估算出施工工期,将对整个南水 北调工程的顺利进行起至关重要的作用。
基于灵山隧道项目施工进度网络图中的关键线路上的关键工作,运用信 息扩散理论对工作时间进行估算,使项目管理人员更准确地测算出灵山隧道的总工期,以便合理编制项目的施工 进度计划。
【关键词]隧洞;南水北调;施工进度;工期;信息扩散理论 [中图分类号]TU722[文献标识码】A[文章编号11002-8498(2012)19-0093-04 Research on Duration Estimation of Lingshan Tunnel Gao Yuexiao' , Zhao Wenjuan² (1. Xi'an China South City Co. , Lid. , Xi'an, Shaanxi 710026, China; 2. Department of Engineering Cost Shaanxi Xigema Engineering Cost Consulting Co., Ltd., Xi'an, Shaanxi 710075,China)
Abstract: Lingshan tunnel is a key engineering of the South-to-North Water Transfer Project, which has many uncertain factors and plex problems in construction. In order to implement the project smoothly, it is worth to research how to establish a scientific and reasonable construction schedule. The paper applied information diffusion theory to the construction progress network diagram so as to estimate main work time and determine the key circuit. Therefore, the project managers can calculate the total duration of Lingshan tunnel engineering more accurately and offer reliable evidence for the follow-up engineerings.
information diffusion theory
1 工程概况横断面采用圆拱直墙式,尺寸为6.3m(宽)×7.5m 灵山隧洞位于汉江以北的中低山区,山高坡(高)。
衬砌材料为混凝土,初期支护根据围岩类型 陡,沿线冲沟发育。
地层有古生代的变质岩及沉积采用喷、网、锚结合的方式,二衬混凝土厚度0.40~ 岩,元古代及古生代的侵人岩。
洞室围岩有黑云母0.50m,混凝土强度等级为C30。
由于隧洞较长,综 斜长片麻岩、二云母石英片岩、结晶灰岩,岩体较完合考虑通风、出碴、工期等施工要求,沿线布置5个 整,围岩以Ⅲ类为主,成洞条件较好。
隧洞进出口施工支洞,为6.8m(宽)×5.1m(高)圆拱直墙式。
边坡岩体完整,整体边坡稳定。
2.1支洞施工 工程区主要构造为断层,大部分与引水洞正支洞开挖采用台阶法,三臂液压凿岩台车钻 交,对洞室稳定影响较小。
其所处的汉江及其支流孔,3m轮胎式装载机配15t自卸汽车至弃碴场。
河道狭窄,两岸山高坡陡,施工场地狭小,施工组织根据本阶段地质资料,各支洞以V类围岩为主,开 及施工布置困难。
挖后即进行支护,一次支护应紧跟掌子面。
在遇到 2灵山隧洞施工严重风化的围岩或破碎带时采用短进尺、超前锚杆 灵山隧洞线路全长为16.94km,由隧洞段、出口或超前灌浆进行加固,必要部位采用钢支护,并及 段和退水洞3部分组成。
隧洞纵比降i=1/3000,时进行挂网喷混凝土。
2.2主洞施工 [收稿日期]2012-03-052.2.1开挖施工 [作者简介]高月霄,工程师,E-mail:gaoyuexiaol@126.经对钻爆法和TBM法施工方案综合比较,本阶
万方数路
94施工技术第41卷
段灵山隧洞洞身段采用钻爆法施工,全洞共布设5金属结构安装以人工为主,机械进行辅助。
门 条施工支洞,其中洞左2...