施工技术 2016年5月下 14 CONSTRUCTION TECHNOLOGY 第45卷第10期 D0I:10.7672/8js2016100014 昆明南站大型十字转圆钢柱抗震转换 节点分析及施工技术* 韩锋 (中铁建设集团有限公司,北京100131) [摘要]云南为地震多发地区,昆明南站高架候车层梁柱节点由下部大型十字型钢骨转换为圆钢柱,经过有限元分 析及三维M设计,在十字下节柱和圆管型上节柱之间连接一个中空的转换节点,节点外围有钢筋混凝土环梁包 裹.这种结构的转换节点不仅截面过渡性好,而且应力集中现象不明显,结构设计能满足现行国家和铁路规范9 度抗震的要求.另外,对工程中的施工难点及关键施工技术进行了研究,并采取了针对性的解决措施,取得了良好 的效果. [关键词]钢骨柱;抗震;转换节点;环梁;有限元分析;施工技术 [中图分类号]TU745.4 [文献标识码]A [文章编号]1002-8498(2016)10-0014-04 Analysis and Construction of Seismic Transfer Joints in Large Cross to Circle Steel Column in South Kunming Station Han Feng (China Railway Construction Group Co.Ltd.Beijing 100131 China) Abstract:Yunnan province is an earthquake prone area.The beam-column at the waiting layer in the South Kunming Station is a large cross to circle steel column which is connected by the hollow transfer joint in the bottom cross column and the top cirele column.The outer of the joint is enveloped by reinforcement conerete.This transfer joint not only has smooth transitional character but also has little concentrated stress.The joint structure can meet the requirement for nine degree earthquake in the related standards.In addition the construction difficulties and key construction technologies are researched and some solutions are put forward which gains good effect. Key words:steel reinforced column;seismic;transfer joint;ring beam;finite element method;construction 0引言 通设施为一体的特大型综合交通枢纽.总建筑面 昆明南站主体结构采用型钢混凝土组合结构,积334736.5m2 站房长438.25m 东西向宽226m. 高架候车厅以下为型钢混凝土组合结构的方形柱,抗震设防烈度8度,按9度设防...
推荐内容/By 规范库
-
整体平移与隔震加固工程的托换构造设计与施工.pdf
-
GB/T 42558.3-2024 高原用换流站电气设备抗震技术 第3部分:减隔震设计规范.pdf
-
GB/T 42558.2-2024 高原用换流站电气设备抗震技术 第2部分:抗震设计规范.pdf
-
孙亮、邱骏伟等-广州南站发现广场抗震性能分析与设计.pdf
-
姚永革-昆明小厂村超限高层建筑剪力墙结构抗震设计.pdf
-
钢结构新型抗震节点的设计理论及其应用 王燕著.pdf
-
新型预制装配框架节点抗震性能研究.pdf
-
新型装配式密柱结构体系设计及应用.pdf
-
新型装配式不对称混合连接节点试验研究.pdf
-
安徽省中小学校舍抗震鉴定与加固若干问题探讨.pdf
-
大跨度转换钢桁架预压施工与监测技术.pdf
-
大连国际会议中心关键施工技术.pdf