2012年5月上 施工技术 第41卷第364期 CONSTRUCTION TECHNOLOCY 57 既有建筑综合纠倾法设计与施工 王建平,朱思响,李品先 (西安建筑科技大学土木工程学院,陕面西安710055) 【摘要]通过某7层住宅楼的加固纠偏工程实践,综合应用钢筋混凝土托换桩加固和掏土浸水纠偏方法来对倾斜 的房屋进行纠偏.在纠偏过程中,对上部结构裂缝和地基沉降进行了观测,发现该住宅楼经处理后,倾斜量由最大 的125mm减小到10mm 最终倾斜率为0.39%,符合国家规范要求. [关健铜]加周:托换桩:房屋纠偏:浅层指土法:浸水法 [中图分类号]TU746.3 [文献标识码]A【文章编号]1002-8498(2012)09-005703 Design and Construction of Integrated Deviation Correction of Existing Building Wang Jianping Zhu Sixiang Li Pinxian (School of Civil Engineering Xi'an University of Architecture and Technology Xi'an Shaanxi 710055 China) Abstract:According to a 7-story residential building reinforcement correcting engineering prehensive application of reinforced concrete underpinning pile and dig soil soaking method of correcting is adopted. In the correction process the superstructure cracks and foundation settlement are monitored.The monitoring result shows that the deviation amount is reduced from the maximum of125mmto10mm the deviation ratio is about 0.39% which satisfies the requirement of national code. Key words:strengthening:underpinning piles;building deviation correction the method of drawing out earth;the method of soaking in water 近年来,由于地基处理不当或房屋使用等过程室.基础形式为钢筋混凝土条形基础,基底埋深 中的不合理因素造成地基不均匀沉降进而导致既 -2.75m.地基处理采用整片3:7灰土换填法,换 有建筑倾斜的事故不少.特别是我国西北部处于填厚度为2000mm.该楼主体完工后,发生不均匀 湿陷性黄土地区,常因排水不畅、地下管网渗水等沉降,整体倾斜,建筑物平面布置如图1所示.为查 原因造成地基不均匀下沉,使既有建筑倾斜.本文 明楼房倾斜现状,建设单位于2010-08-15对该楼倾 结合工程实例,研究了托换桩加固与掏土浸水综合 斜量进行了现场测量,结果如表1所示. 纠倾法在实际工程中的应用. 6 对建筑物的纠偏,常用方法主要有迫降法和顶 升法.迫降法就是人为增大建筑物沉降小的一侧...
推荐内容/By 规范库
-
近现代重要史迹及代表性建筑冲刺手册.pdf
-
综合法在某商住楼中的纠偏加固.pdf
-
建筑地基沉降控制与工程实例 邱明兵.pdf
-
GB55003-2021《建筑与市政地基基础通用规范》废止的现行工程建设标准相关强制性条文.docx
-
DB32/T 4398-2022 建筑物掏土纠偏技术标准.pdf
-
承压砂土地层桩洞法施工动态效应及其控制研究.pdf
-
大面积吹填砂施工沉降预测分析与研究.pdf
-
地基沉陷导致房屋局部损坏的检测及加固处理.pdf
-
复杂造型建筑结构设计优化与施工.pdf
-
锦纶会馆整体组合移位设计与施工.pdf
-
软土地层深基坑隆起变形规律及其对周围建筑物的影响.pdf
-
软土地基堆载预压沉降特性及智能化预测研究-.pdf