施工技术 2012年8月下 44 CONSTRUCTION TECHNOLOGY 第41卷第371期 海外市政工程图纸设计与管理 宋志平,王力尚,董伟,刘丽州,刘永浩 (中建海外中东有限公司,阿联酋迪拜) [摘要]针对海外市政工程设计施工一体化施工特点,介绍了图纸开工初期的准备工作,在施工深化设计过程中道 路、管线、道路的标志和标识、交通信号灯系统设计以及结构工程施工图设计等分项工程的设计内容、技巧,以及图 纸的申报、发放管理方法.图纸设计与管理工作执行中必须保证准确性,这样才能保证项目按期完工. [关键词]项目管理;市政工程;工程图纸;设计 [中图分类号]TU721.2 [文献标识码]A[文章编号]1002-8498(2012)16-0044-05 Shop Drawing Design and Management of Municipal Project of Overseas Song Zhiping Wang Lishang Dong Wei Liu Lizhou Liu Yonghao China State Construction Engineering Corporation Middle East L.L.C. Dubai UAE) Abstract:With respect to the technical characteristics of design-build method applied in oversea civil and infrastructure project this paper introduced the preparation during the initial phase of shop drawing design and marking of roads pipelines landmarks and signal lamps etc.during the detailed design phase.The design and techniques for sub-system such as construction drawing is also introduced as well as the management of drawing declaration and issuing.Accuracies must be guaranteed during the design and management of shop drawings to insure that the project can be finished on schedule. Key words:project management;municipal project;engineering shop drawing;design 在海外从事市政工程施工技术管理工作,与国准备工作主要有以下几项. 内从事技术工作相比,最大的差别在于加入了设计 1)原地面标高图该图是在测量原始数据基 的职能.这就意味着承包商不仅需要承担施工责 础上形成的一张覆盖全部项目的原地表高程图,这 任,还要承担部分的设计责任.承包商从监理(设 是一张非常重要的施工原始记录图,与土方挖 计方)手里拿到的是合同图纸,用于指导施工还存 填有关的工程计量原始数据以此图为依据. 在一定的差距,需要承包商结合现场的实际情况进 此图的形成过程非常简单,将原始测量数据整 行深化设计,修改成施工图后,申报给监理工程师 理成Excel表格,保留...
海外市政工程图纸设计与管理.pdf