2013年9月下施工技术 第42卷第18期CONSTRUCTIONTECHNOLOCY5 DOI:10.7672/sgjs2013180005 武汉中心工程柱顶后置架空钢平台设计与施工*
武超,邓伟华,周杰刚,王开强,蒲勇 (中建三局建设工程股份有限公司,湖北武汉430064) [摘要】武汉中心工程中纯地下室区结构柱顶后置架空钢平台作为重型钢构件堆场,从堆场钢平台设计思路的提 出、加固方案设计、结构计算、加固实施等方面详细闹述了武汉中心重型钢构件堆载架空钢平台设计与施工及局部 楼板临时加固技术,旨在提供一种新型重型堆场设计思路。
[关键词]高层建筑;钢结构:平台;构件;堆场 [中图分类号]TU974[文献标识码】A[文章编号]1002-8498(2013)18-0005-04 Design and Construction of Steel Platform at Column Cap in Wuhan Center Project Wu Chao,DengWeihua,Zhou Jiegang,WangKaiqiang,PuYong (China Construction Third Engineering Bureau Co.,Ltd.,Wuhan,Hubei 430064,China) Abstract:The steel platform at column cap is used as heavy steel ponents yard at the basement of Wuhan Center Project. The design and construction of steel platform for the yard of heavy steel ponent and the temporary strengthening technology for local floors are described in detail from the design idea proposing of steelponent yard,strengthening scheme design,structure calculation,strengthening implement. A new design idea of heavy ponent yard is obtained. Key words:tall buildings;steel structures;platform;ponents;yard
过结构承载力,且堆场往往需要跨越沉降后浇带,最大3.5m,竖向分节最长11.5m,单根构件质量为 因此需要对堆场区结构进行加固。
堆场加固可分35~40t。
为永久加固和临时加固。
武汉中心工程塔楼周边塔楼外框巨型柱共16根,最大直径为3m,竖向 为纯地下室区,拟设重型钢构件堆场跨越塔楼与纯分节最长约14m,单节质量约35t;塔楼竖向共设置 地下室区之间的沉降后浇带,采用上述两种加固方5道环带桁架和3道伸臂桁架;外框楼板为钢梁压 法均不能满足堆载要求。
本文详细闸述了武汉中型钢板组合结构。
图1为塔楼结构平面及钢板墙、 心工程利用已有地下室顶板设置架空钢栈桥作为伸臂环带桁架示意。
重型钢构件堆场、并对局部位置进行临时加固的技为保证施工进度,现场需备料,备料总重约 术,旨在提供一种新型的重型堆场设置思路。
2000t。
结合塔楼塔式起重机位置及总平面布置(见 1工程概况图2),在塔楼西北角及南侧分别设置重型钢构件堆 武汉中心工程地上88层,建筑高度438m。
塔场,西北角堆场跨越沉降后浇带。
楼周边为纯地下室区,共4层(局部3层),钢筋混2柱顶后置架空钢平台设计思路 凝土框架结构,柱距8500mm×8500mm,局部2.1设计思路的提出 5 700mm×9450mm。
结合总平面布置,重型构件堆场总面积规划约 塔楼结构形式为巨型柱框架-核心筒-伸臂桁架500m²,根据备料要求并考虑安全富余量,重型构件 体系,核心筒12层以下剪力墙内置单片式钢板,角堆场计算荷载取50kN/m²均布荷载。
*中国建筑股份有限公司科研课题:超高层建筑钢板剪力墙施工技首先考虑结构本体加固,与设计院协商后对重 术研究与应用(CSCEC3B-2012-07)型堆场区结构梁板配筋进行调整,设计院最终提供 [收稿日期】2013-05-15【作者简介】武超,助理工程师,E-mail:768318219@qq.的堆场区楼板荷载值为20kN/m²,远不能满足重型 万方数据
施工技术第42卷 B-11空钢平台,钢平台支撑立柱设置在结构柱上方,局 部跨度过大的区域增加立柱,立柱落...