2012年3月下 施工技术 第41卷第361期 CONSTRUCTION TECHNOLOGY 91 现浇双向密肋楼盖早拆模板支撑体系设计与施工 吴书义,王胜,刘汉进,王磊 (青建集团股份公司,山东青岛266071) [摘要]结合青岛创业中心工程工期紧、质量要求高、密肋楼盖体量大的结构特点,设计了一种密肋楼盖早拆模板 支撑体系.该体系中模板选用定型塑料模壳,模板支撑采用扣件式钢管支撑架及早拆支撑头相结合的早拆模板支 撑系统.介绍了该模板支撑体系的支设和拆除要点.工程实践证明,该模板支撑体系具有缩短工期、降低成本、保 证质量等良好的技术经济效果. 【关键词]脚手架;双向密肋楼盖;支撑体系;塑料模壳;早拆;设计;施工 [中图分类号]TU731.2;TU755.2 [文献标识码]A [文章编号]1002-8498(2012)06-0091-03 Design and Construction of Early-dismantling Formwork Support System for Cast-in-situ Bidirectional Ribbed Slab Floor Wu Shuyi Wang Sheng Liu Hanjin Wang Lei Qingjian Group Co.Ld.Qingdao Shandong 266071 China) Abstract:Combined with the structural characteristics of Qingdao high-tech zone innovation center project which are short period high quality requirement and large ribbed slab floor a kind of early- dismantling formwork support system for ribbed slab floor is designed.The set-shaped plastic shuttering formwork and the fastener pipe support frame with a early-dismantling support joint are bined as the early-dismantling formwork support system.Meanwhile the key points of setting and dismantling of the formwork support system are introduced.Engineering practice shows that the system has a better technical and economical effects of shortening construction period reducing costs and insuring quality. Key words:scaffolds;bidirectional ribbed slab floor;supports;plastic shuttering;early-dismantling: design;construction 现浇混凝土双向密肋楼盖是适用于大空间、大岛,建筑面积104035m2 本工程地下2层,地上利用 跨度的公共建筑、多层厂房和仓库等建筑的新型楼 防震缝将结构分成6个独立的结构单元...
推荐内容/By 规范库
-
台式模板早拆体系在昆山龙飞光电厂房中的应用.pdf
-
中建 密肋梁楼盖(模壳)施工方案.zip
-
T/CECS 1616-2024 装配整体式双向密肋空心叠合楼盖技术规程.pdf
-
10.密肋楼盖板施工方案.doc
-
005 密肋楼板模壳的安装与拆除工艺.doc
-
09 密肋楼板模壳的安装与拆除分项工程质量管理.doc
-
早拆模板施工技术及新型水平模板支撑系统应用.pdf
-
现浇地下工程多孔箱形结构模板支架选型与应用.pdf
-
超高大跨度空心无梁楼盖支撑架承载能力监测研究.pdf
-
超厚大跨度XPS块体内模现浇空心楼盖施工技术.pdf
-
高效低耗水平模架支撑体系承载力研究.pdf
-
网梁楼盖在某工程中的应用.pdf