首页 > 2023 > 10月 ( 第 212 页)

施工技术 2016年5月下 60 CONSTRUCTION TECHNOLOGY 第45卷第10期 D0I:10.7672/8js2016100060 生态建筑腔体被动式通风策略分析 李晓丹,李文婧 (中国矿业大学(北京)力学与建筑工程学院,北京100083) [摘要]生态建筑具有有机整体性,所以,被动式通风效果的充分发挥,在整体设计上应关注建筑位置、朝向、形状 等:在表皮设计上应关注外墙形式及导风构件等;在室内设计上,对应空气在建筑腔体中循环流动的研究及应用. 本文在建筑室内空间环境的研究问题上,将室内空间作为具有有机整体性的建筑腔体考虑,以被动式通风主要作 用原理为分类依据,结合典型案例,对以热压、风压为主要驱动力的腔体内部整体通风策略予以梳理研究. [关键词]生态建筑;建筑腔体;被动式通风 [中图分类号]TU834.3 [文献标识码]A [文章编号]1002-8498(2016)10-0060-06 Ecological Building Chamber Passive Ventilation Strategic Analysis Li Xiaodan Li Wenjing (School of Mechanics Civil Engineering China University of Mining and Technology Beijing 100083 China) Abstract:The ecological building is an organic integrity.To bring the passive ventilation inside the building into full play we should not only focus on the location orientations and shape in terms of overall design the exterior forms and ventilation in terms of surface design but also the research and application of air cireulating flow in building chamber.In this paper the research of architectural interior space environment uses the main passive ventilation principle with the thermal pressures and wind pressures as the main driving force by regarding the interior space as an organic whole and the theory of passive ventilation main function as classification basis. Key words:ecological building;building chamber;passive ventilation 0引言 劣是由于缺少充足的通风.在相对温和气候下, 在空前的能源压力、生态压力和社会压力下,生态建筑可以通过腔体内部被动式通风应对该问 未来建筑活动遵循生态原则是必然趋势.生态建 题.即通过合理组织室内空间结构引导空气流动, 筑理论认为建筑同生物一样,与外界进行有机的能 将随季节变化的自然通风与少量经过调节(加...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年9月下 124 CONSTRUCTION TECHNOLOGY 第45卷第18期 D0I:10.7672/8js2016180124 生土地坛窑腰嵌梁加固技术研究 赵红垒12,童丽萍1,刘瑞晓3 (1.郑州大学土木工程学院,河南郑州450001;2.河南工程学院土木工程学院, 河南郑州451191:3.河南省朝阳建设计有限公司,河南郑州450000) [描]为探讨衬生土地窑的裂缝拉利技术,研究了多种裂缝的发生与发展机理,提出利有富裂缝的腰嵌梁加团 体系,并采用数值横拟方法分析腰嵌梁加团体系的有敢性,结果表明:使用该技术后可减小窑室进深方向的位移 0~2mm 有故按制了室的横向裂健,同时束了纵向裂健的进一步开展:同时还南迷了腰梁加固体系施工 要点. [关键词]地忧窑;健控制;腰我梁;值模拟:施工工艺 [中图分类号]TU746.3 [交献标识]A[支章编号]1002-8498(2016)18-0124-04 Research on the Embedded Beam Reinforcement of Underground Immature Soil Cave Dwellings Zhao Honglei.2 Tong Liping' Liu Ruixiao (1.School of Civil Engineering Zhengzhou University Zhengzhou He'nan 450001 China; 2.School of Cizil Engineering He'nan University of Engineering Zhengzhou He'nan 451191 China; 3.He'nan Zhaoyang Architecture Design Co.Ld.Zhengzhou He'nan 450000 China) Abstract:In order to investigate its crack control technology the occurrence and development mechanism of several cracks are studied and embedded beam reinforcement system to curb harmful cracks is proposed and its effectiveness with numerical simulation is analyzed.The result showed that it could reduce displacement along depth direction of the kiln chamber 0~2mm effectively control its transverse cracks and constrain further development of longitudinal cracks at the same time.The article also described the main points about embedded beam reinforcement system construction. Key words:underground cave dwelling;cracking control;embedded beam;simulation;construction 0引 术的有故性. 生土地坑窑宋绍兴九年(1139年)就有交...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年1月上 42 CONSTRUCTION TECHNOLOGY 第45卷第1期 D0I:10.7672/sgjs2016010042 特殊地质条件下锚碇地下连续墙施工技术 韩胜利,陈国祥 (中铁大桥局集团一公司,河南郑州450053) [摘要]宜昌庙嘴长江大桥西坝锚碗位于长江中心岛上,其基础设计采用圆形地下连续墙方案.西坝岛覆盖层较 厚,地质情况复杂,对地下连续墙施工影响较大.在卵石加漂石层中施工地下连续墙可借鉴经验不多,如何在此种 复杂地质条件下成槽是施工成功的关键.该项目通过采用多种工艺,克服了复杂地质的难题,保证了地下连续墙 顺利施工. [关键词]桥梁工程;地下连续墙;锚碳;施工技术 [中图分类号]U443.24 [文献标识码]A[文章编号]1002-8498(2016)01-0042-04 Construction Technology of Diaphragm Wall Under Special Geological Anchorage Han Shengli Chen Guoxiang The lst Engineering Co.Ltd.China Railway Major Bridge Engineering Group Co.Ltd.Zhengzhou He'nan 450053 China) Abstract:Diaphragm wall was adopted in foundation design in some project and its geological condition is plex.Trench forming is important for construction with less experience of diaphragm wall construction in gravel and erratic boulder layer.This paper introduced the construction technology in the project which solved the problems successfully and ensured the construction smoothly. Key words:bridges;diaphragms;anchorage;construction 1工程概况 般2~10cm 较大的17-30cm 卵石含量65%~ 宜昌市庙嘴长江大桥为主跨838m的单跨悬索95%;夹漂石其粒径一般为20-50cm 含量一般 桥,主缆边跨跨度分别为250m和215m.全桥设25%~15%.卵石夹漂石地层成槽易塌孔,成槽质量 根主缆,横向间距为26m 吊索与主缆在一个竖直平差.中风化细砂岩泥钙质胶结,岩体较完整,承载 面内,主桥立面布置如图1所示.吊索顺桥向标准力较高,天然抗压强度平均值为31MPa 为地下连续 间距为16m 主塔最近的吊索距主塔中心线19.0m 墙的持力层.地质柱状图如图2所示. 跨中最短吊索长度≥4m.大桥主跨矢跨比采用2地下连续墙施工 1/10 主缆中跨矢高83.8m 跨中主缆中心高程为2.1槽段划分 84.000m 塔顶处主缆中心线理论交点高 圆形地下连续墙轴线直径为58.8m 周长 程169.000m. 184.73m 共划分37个槽段,I期槽段18个,Ⅱ期槽 西坝侧锚碇位于西坝中下游,地下连续墙总长 段17个,I IV期槽段各1个.槽段为折线形,槽 184.5m 深24.3m 厚1.2m ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年8月下 施工技术、 第41卷第371期 CONSTRUCTION TECHNOLOCY 115 特殊地质条件下超长钢板桩插打施工技术 汤劲松,朱延翰2 (1.石家庄铁道大学土木工程学院,河北石家庄050043; 2.中铁十五局集团有限公司,河南洛阳471013) [摘要]以新建阜阳至六安铁路颖河特大桥深水基础30长的拉森Ⅳ型钢板桩围堰施工实践为例,探讨了穿越硬 塑粉质黏土层的超长钢板桩快速插打施工技术.实践表明,采用内部焊接工字钢的加强型钢板桩,通过原位反复 插打和小型机械引孔施工措施,解决了硬塑粉质黏土层中超长拉森Ⅳ型钢板桩的插打施工难题. [关键词]地下工程;桩;粉质黏土;超长钢板桩;插打施工;施工技术 [中图分类号]TU753.3[文献标识码]A [文章编号]1002-8498(2012)16-0115-03 Piling Construction of Super-long Steel Sheet Pile Under Special Geological Condition Tang Jinsong' Zhu Yanhan2 (1.School of Civil Engineering Shijiazhuang Tiedao University Shijiazhuang Hebei 050043 China; 2.China Railway 15th Bureau Group Co.Lid.Luoyang He'nan 471013 China) Abstraet:Taking 30m Larsen IV steel sheet pile cofferdam construction practice of deepwater foundation at Ying River bridge of Fuyang-Liu’an railway as a example the rapidly construction technology of super-long steel sheet pile passing through hard plastic silty clay layer is discussed.It is showed from eonstruction practice that piling construction problems of super-long Larsen IV steel sheet pile passing through hard plastic silty clay layer can be solved using measures by reinforced type steel sheet pile welding internal I-beam repeatedly piling in situ and drilling construction using minitype machine. Key words:underground;piles;silty clay;super-long steel sheet pile;piling construction;construction 钢板桩的插打施工质量影响到围堰结构的安在穿越硬塑粉质黏土层的施工过程中,由于硬塑粉 全和稳定,也影响到结构的防水效果,在整个钢板质黏土的侧摩阻力较大,其插打施工更为困难.本 桩围堰施工过程中占有重要地位.目前,关于钢板文以新建阜阳至六安铁路颍河特大桥深水基础30m 桩围堰施工技术的...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年12月上 62 CONSTRUCTION TECHNOLOGY 第45卷第23期 D01:10.7672/sgjs2016230062 特殊地质条件下盾构机脱困技术研究* 贾璐12.3,温法庆4,刘圣勇4,皮膺海3 (1.华中科技大学土木工程与力学学院,湖北武汉430074;2.南京栖霞建设股份有限公司,江苏南京210037; 3.南昌大学建筑工程学院,江西南昌330031;4.中铁十八局集团有限公司,天津300222) [摘要]盾构在复杂地质条件下较长时间停机后的脱困,常常受到诸多不利因素的影响,以自身能力实现脱困,可 避免借助外力辅助盾构脱困带来的影响.以某盾构施工项目为研究对象,通过理论计算得出盾构脱困所需的最小 总推力,分析了刀盘、前中盾以及尾盾的被困因素,提出了该项目特殊地质条件下依据盾构机自身能力脱困的技术 措施.建立了脱困操作流程及脱困判定标准并成功实施达到了安全可靠又不伤害设备的脱困目的. [关键词]隧道工程;盾构;地层加固;脱困:辅助措施 [中图分类号]U455.43 [文献标识码]A [文章编号]1002-8498(2016)23-0062-05 Shield's Jamming Release Technology Under Special Geological Conditions Jia Lu.2.3 Wen Faqing Liu Shengyongt Pi Yinghai (1.School of Ciril Engineering Mechanics Huazhong Unirersity of Science Technology Wuhan Hubei 430074 China; 2.Nanjing Chixia Development Co.Ltd.Nanjing Jiangsu 210037 China;3.School of Ciuil Engineering and Architecture Nanchang Unirersity Nanchang Jiangxi 330031 China;4.China Railuay 18 Bureau Group Co. Lad.Tianjin 300222 China) Abstract:This paper is based on a shield construction project.With the result of the minimum total thrust needed to get rid of shield's jamming which is calculated by theory firstly it analyzes the trapped factor of cutter head and the front middle and end of the shield.Secondly the research puts forward a technical measure based on the ability to release these troubles which are applied under the special geological conditions of the project.The operating flow and judgement standard of shield's jamming release is established and implemente...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年4月F 24 CONSTRUCTION TECHNOLOGY 第42卷第8期 D01:10.7672/sgjs2013080024 沈阳桃仙国际机场T3航站楼钢 屋盖安装关键技术 高继领,杨建民,万家福 (江苏沪宁钢机股份有限公司,江苏宣兴214231) [摘要]沈阳桃仙国际机场T3航站楼屋面为钢管桁架结构.经过方案比选,确定采用现场设置临时支撑空侧桁 架分块与陆侧悬挑桁架吊装屋面桁架分块弧线滑移高空嵌补的钢屋盖结构安装方法.并对滑移轨道、滑移支 架、拼装平台的设置及下部混凝土结构加固措施进行了详细介绍. [关键词]钢结构;屋盖;安装;滑移;支架 [中图分类号]TU758.1 [文献标识码]A [文章编号]1002-8498(2013)08-0024-03 Key Technology of the Steel Roof Installation of Shenyang Taoxian International Airport T3 Terminal Gao Jiling Yang Jianmin Wan Jiafu (Jiangsu Huning Steel Mechanism Co.Ld. Yixing Jiangsu 214231 China) Abstract:The roof of Shenyang Taoxian International Airport T3 terminal is steel tube truss structure.By selection of the construction schemes the steel roof installation method was assured which was setting temporary supports on site plus dividing truss on the airside and hoisting cantilever truss on the landside plus arc sliding of the truss division plus plement at high altitude.Meanwhile the setting of the sliding track sliding supports assembly platform and the strengthening methods of upper concrete were introduced in detail. Key words:steel structures;roofs;installation;sliding;supports 1工程概况 1)由于大厅钢屋盖东西宽151m 覆盖于标高为 沈阳桃仙国际机场T3航站楼建筑平面呈“U”8.700m楼层上,陆侧悬挑24m 覆盖于高架通道上, 形布置,建筑主体地下2层,地上2层,由主楼大厅且桁架质量较重,若采用大型履带式起重机直接吊 C及两侧A B指廊、连廊组成,总建筑面积约为24装,则吊装工作半径极大(跨中分段安装工作半径 万m2.航站楼屋面为钢管桁架结构,由4道伸缩缝达到68m) 对吊装方法和吊装机械提出了较高 将屋面结构分为5个结构单元,4道伸缩缝的位置 要求. 与下部混凝土缝对应,外形投影尺寸长约950m 宽 2)大厅桁架的陆侧端桁架最大悬挑达24m 跨 275m 最大高度36m 总用钢量约8760t. 中最大跨度达65m 且跨中为“v”字形支撑结构,需 中央大厅...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年2月下 施工技术 第46卷第4期 CONSTRUCTION TECHNOLOGY 75 D0I:10.7672/sgj2017040075 沈阳文化艺术中心工程非常态无序空间钻石 体玻璃幕墙安装定位技术 董清崇,杨宏友,齐晓力,陈红旗 (中国建筑一局(集团)有限公司东北公司,辽宁沈阳110016) [摘要]沈阳文化艺术中心工程主体结构,主要由2个不规则的空间结构竖向叠在一起的钢筋混凝土空间结构体 系及“悬挑悬挂”BRPC缓粘结预应力的复杂三维空间混凝土结构体系组成.外部钢结构为大跨度非常态无序 空间网壳结构.屋面幕墙为三维空间三角形多面体组成钻石体玻璃幕墙结构.介绍在非常态无序空间钻石体玻 璃幕墙定位安装技术中,重点推行的数字化测量控制和模拟技术,将数字化测量控制和模拟技术贯穿于整个项目 的实施阶段. [关键词]玻璃幕墙;安装;非常态无序空间结构;计算模拟;定位;测量 [中图分类号]TU758.1 [文献标识码]A [文章编号]1002-8498(2017)04-0075-04 Location and Installation Technology of Diamond Glass Curtain Wall in the Very State of Disorder Space in Shenyang Culture and Art Center Dong Qingchong Yang Hongyou Qi Xiaoli Chen Hongqi Northeast Company China Construction First Building(Group)Co.Ltd.Shenyang Liaoning 110016 China) Abstract:The main structure of the Culture and Art Center Project in Shenyang mainly is made up of two irregular spatial reinforced concrete structures of vertical laminated together and hanging pick and suspension plex three-dimensional space BRPC slow bonded prestressed concrete structure system. The external steel structure is a large span and very state disordered space lattice shell structure.The roof curtain wall is posed of three dimensional triangular polyhedron diamond body glass curtain wall structures.The authors mainly introduce the digital measurement and control and simulation technology used in the very state spatial disorder diamond glass curtain wall positioning installation technology. Key words:glass curtain;installation;disorde...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年8月上 10 CONSTRUCTION TECHNOLOGY 第43卷第15期 D01:10.7672/sgjs2014150010 沈阳惠生新城项目装配式构件关键技术 张建国,张超,于奇 (亚泰集团沈阳现代建筑工业有限公司,辽宁沈阳110136) [摘要]沈阳惠生新城公租房项目1~30号楼采用装配式剪力墙结构,为目前国内采用装配整体式剪力墙体系工 程量较大的项目之一,其预制构件设计、生产、运输、安装、验收等较困难.结合该项目,介绍了装配整体式结构拆 分设计、构件生产、选用及安装质量控制要点. [关键词]装配式建筑;设计;生产工艺:模具;质量控制 [中图分类号]TU758.12 [文献标识码]A [文章编号]1002-8498(2014)15-0010-06 Key Technology of Prefabricated Members in Shenyang Huisheng New City Project Zhang Jianguo Zhang Chao Yu Qi (Yatai Group Shenyang Modern Building Industry Co.Ld.Shenyang Liaoning 110136 China) Abstract:Prefabricated shear wall structure is adopted in Shenyang Huisheng New City project which is the prefabricated shear wall structures with large amount of engineering quantity in China.So the design production transportation installation and acceptance of its prefabricated members are difficult.Based on the project the keys for split design of prefabricated structure member production selection and installation quality control are introduced. Key words:prefabricated;design;production;moulding;quality control 沈阳市从政府项目入手扩展应用领域.按照和休息平台板、电梯间以及局部出屋面电梯及装饰 强制推进和引导激励相结合的原则,首先从政府投架为全部现浇结构. 资的保障房项目入手,通过实践,在不断完善技术 惠生公共租赁住房工程标准层为一梯八户(4 和管理体系的基础上,以政策引导房地产项目应用 个A户型、2个B户型、1个C户型、1个D户型)拆 现代建筑产业化技术.惠生公租房项目就是在政 分成20块外墙板、18块内墙板、22块叠合板、6块 策引导下应运而生.本文将介绍惠生项目装配式 PCF板、2块楼梯板、10块空调板. 构件设计制作及安装质量控制要点,以期为类似工 模具数量依据惠生项目的施工建设工期进行 程提供借鉴. 排班,每天按照生产3层楼的产量进行模具采购, 1工程概况 模具总数量为246套,其中,外墙板62套、内墙板 本工程为沈阳市产业化公共租赁住房工程,项 54套、叠合板66套、楼梯板6套、PCF板18套、空 目名称为惠生新城(公租房)1~30号楼;位于沈阳 调板30套以及...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年8月上 施工技术 第40卷第346期 CONSTRUCTION TECHNOLOGY 21 沈阳市府恒隆广场大截面厚钢板十字形钢柱制作技术 陈晓冬,邵新宇,汪晓阳,何培洋 (中建钢构有限公司,广东深圳518040) [摘要]沈阳市府恒隆广场钢结构工程中钢柱最大截面为十字形2200mm×1200mm×90mm×90mm 材质 Q345GJC 最大分节重为单体60,要求全熔透焊接,一级焊缝.钢柱要求施工技术含量高,焊接量大,易变形.通过 进行二次深化设计,制定合理的制作工艺,再通过严格的质量控制,采取化整为零的制作方法,成功地完成了钢柱 制作. [关键词]钢结构;钢柱;焊接;制作 [中图分类号]TU758.16 [文献标识码]A [文章编号]1002-8498(2011)15-0021-03 Prefabrication of Large Section Cross-shape Steel Column with Thickness Plate in Shenyang Hengrong Square Cheng Xiaodong Shao Xinyu Wang Xiaoyang He Peiyang (China Construction Steel Structure Co.Lad.Shenzhen Guangdong 518040 China) Abstract:The maximum section of cross-shape steel column in Shenyang Hengrong Square is 2 200mm x 1 200mm x 90mm x 90mm and the material is Q345GJC steel the maximum segment's weight is about 60 tons.The steel column is welded in full penetration and welding grade I.It is high for the steel column's construction quality.By the second detailed deep design rational prefabrication technique and severe quality control measures the steel column is prefabricated successfully with the prefabrication method of dividing whole into parts. Key words:steel structure;steel column;welding;prefabrication 1工程概况 沈阳市府恒隆广场办公楼采用型钢混凝土框 架-核心筒结构体系,地下4层,地上68层,68层以 上为皇冠结构,造型独特新颖,顶部标高为 350.600m 工程总用钢量约5.5万t 由核心筒内的 33根钢柱及外框筒的20根型钢混凝土钢柱组成, 最大截面为2200mmx1200mm×90mm×90mm 钢 板最小厚度40mm 最大板厚90mm 单体质量最大 为60t 40mm≤板厚t≤60mm采用Q345-Z15钢材; 60mm≤板厚t≤80mm采用Q345-Z25钢材;80mm< 图1办公楼钢柱效果 板厚t采用Q345-Z35钢材.大截面厚钢板十字形 Fig.1 The effect of steel column o...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年1月下 施工技术 第46卷第2期 CONSTRUCTION TECHNOLOGY 21 D0I:10.7672/5gjs2017020021 沈阳市府恒隆广场办公楼屋顶皇冠玻璃幕 墙钢结构设计* 柳超1,郑飞2 (1 中国建筑东北设计研究院有限公司,辽宁沈阳110006:2.杭萧钢构股份有限公司,浙江杭州310003) [摘要]采用MIDAS对皇冠及幕墙结构进行整体设计及分析,验算幕墙钢结构的承载力;采用ABAQUS对幕墙龙 骨主要关键节点进行有限元分析.分析表明,皇冠结构及幕墙钢结构构件的应力、变形及整体稳定性均满足相应 规范要求,确保了关键节点的安全性.本工程钢结构施工达到了预期目的,取得了良好的经济效益和社会效益,并 为今后类似项目的设计、施工提供有益参考. [关键词]钢结构;皇冠;幕墙;节点;设计 [中图分类号]TU391 [文献标识码]A [文章编号]1002-8498(2017)02-0021-03 Steel Structure Design of Crown Glass Curtain Wall of Shenyang Shifu Henglong Plaza Office Building Roof Liu Chao' Zheng Fei2 (1.Northeast Architectural Design Research Institute Co.Lad.Shenyang Liaoning 110006 China; 2.Zhejiang Hangxiao Steel Structure Co.Ltd.Hangzhou Zhejiang 310003 China) Abstract:The overall design and analysis of crown and curtain wall structure were carried out by MIDAS and the bearing capacity of the steel structure was checked by ABAQUS.The analysis shows that the stress deformation and the overall stability of the crown structure and curtain wall steel structure meet the requirements of the relevant specifications and ensure the safety of the key nodes.Steel structure construction of this project has achieved the expected purpose and has achieved good economic and social benefits and provides a useful reference for the design and construction of similar projects in the future. Key words:steel structures;crown;curtain wall;joints;design 1工程概况 297.525m 西南、东北2个角高度相同(L7) 标高为 沈阳市府恒隆广场办公楼采用了框架-核心筒结330.055m.整体切面成“梭形”,局部10层依次递 构体系,地下4层,地上68层,建筑高度35...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年6月上 施工技术 第45卷第11期 CONSTRUCTION TECHNOLOGY 65 D0I:10.7672/8js2016110065 沈阳地区明挖车站主要影响因素及其施工新方法* 邢民1,崔磊2,王述红,朴金德2 (1.东北大学资源与土木工程学院,辽宁沈阳110819;2.中铁一局集团有限公司,陕西西安710054) [摘要]沈阳城区土层大多数以砂土层为主,地质条件相对较好,地铁车站大多采用明挖施工,重点分析了明挖施 工众多地质和工程影响因素中的显著性因素.结合沈阳地铁9号线沈苏西路车站明挖施工,分析了该车站各影响 因素,提出采用双侧台阶施工方法,该施工方法可以加快土方开挖施工速度,有利于基坑侧壁的支护,减小基坑两 侧的变形和蠕变. [关键词]地铁:明挖车站;影响因素;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2016)11-0065-04 The Main Influence Factors of Open-cut Station and the New Construction Method in Shenyang Area Xing Min' Cui Lei2 Wang Shuhong' Piao Jinde2 (1.School of Resources and Civil Engineering Northeastern University Shenyang Liaoning 110819 China; 2.China Railway First Group Co.Ltd.Xi'an Shaanxi 710054 China) Abstract:The soil layer is mainly sandy soil layer in Shenyang City geological conditions are relatively good open-cut construction in subway station needs consider geological factors and engineering factors. Based on the open-cut construction of Shensuxilu station in Shenyang Subway Line 9 this paper analyzes various factors of the station and puts forward bilateral step method.The method can speed up the rate of soil excavation and construction which is beneficial to support of the foundation excavation sidewalls reduce the deformation and ereep on foundation excavation on both sides. Key words:subways;open-cut stations influencing factors;construction 0引言 沈苏西路车站位于浑河站街与浑南西路交叉 随着沈阳城市的扩建、经济的发展和人口数量的路口西侧.该车站的东北角是1栋7层住宅,车 的提升,沈阳地铁的建设工程项目也逐渐增多,地 站的西北角是1个220kV高压铁塔,车站上方横跨 铁车站是地铁建设的...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年1月 86 CONSTRUCTION TECHNOLOGY 第39卷第1期 沈阳东北世贸广场深井井点降水施工技术 张永林 (北京怀建集团有限公司,北京101400) 【摘要]沈阳东北世贸广场设3层地下室,主楼采用钢筋混凝土筏板基础、辅楼采用带有反梁的钢筋混凝土筏板基 础、裙楼采用独立柱基加防水板.基坑面积大,开挖深度较深,降水强度大,采用深井井点降水方案.介绍了井点 布置、挖泥浆池、钻孔、井管安装、排水管网铺设、降水等主要施工工艺,指出降水施工中的注意事项,并制定应急预 案.实践证明,该方案可确保基坑及周边建筑物安全. [关键词]基础工程;深井井点降水;施工工艺;应急预案 [中图分类号]TU753.66 [文献标识码]A[文章编号]1002-8498(2010)01-0086-04 Construction Technology of Deep-well Point Dewatering in Shenyang Northeast World Trade Square Zhang Yonglin Beijing Huaijian Group Co.Lid.Beijing 101400 China) Abstract:Shenyang Northeast World Trade Square has three-layer basement.Reinforced concrete raft foundation is designed for its main building and raft.foundation with upstanding beams is designed for affiliated building as well as individual footing with waterproof plate designed for podium.Because the foundation excavation has characteristics of large area deep excavation and large dewatering intensity deep-well point dewatering technology is adopted.Main construction technologies are introduced such as arrangement of well points excavation of mud pool drilling of holes installation of dewatering pipe-net and dewatering.Furthermore attention points during construction are proposed.It proves that the scheme can ensure the safety of foundation excavation and surrounding buildings. Key words:foundation engineering:deep-well point dewatering construction technology;emergency plan 随着城市建设中的高层及超高层建筑越来越多,局部-19.45m 采用59m×59m、厚4m的大体积钢筋 建筑深基坑地下降水控制的要求越来越高,降水规模混凝土筏板基础.辅楼基底标高为-1...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2010年2月 施工技术 第39卷第2期 CONSTRUCTION TECHNOLOGY 93 沈阳东北世贸广场塔式起重机的选用 张永林,张喜 (北京怀建集团有限公司,北京101400) [摘要]沈阳东北世贸广场超高层结构工程施工中,塔式起重机是大型机械设备.通过对市场的调查及结合本工 程实际情况,制定了塔式起重机安装、拆除方案及各项安全管理措施,闸述了塔式起重机,特别是内爬式塔式起重 机的平面布置、型号选择、安装、爬升及拆除,使其安全运行,确保超高层结构工程的顺利施工. [关键词]沈阳东北世贸广场;高层建筑;内爬塔式起重机;安装;爬升;拆除 [中图分类号]TH2 [文献标识码]A[文章编号]1002-8498(2010)02-0093-03 Selection of Tower Crane in Shenyang Northeast World Trade Plaza Zhang Yonglin Zhang Xi (Beijing Huajian Group Co.Ltd.Beijing 101400 China) Abstract:During the construction of super high-rise structure in Shenyang Northeast World Trade Plaza the tower crane is a kind of large-scale mechanical device.Based on the market survey and actual situation the plans of installation and demolition for the tower crane and safety control measures are made.Besides the plane layout model choice installation climbing and demolition of the tower crane are elaborated especially the inner-crawling tower crane.Safety operating of the tower crane can guarantee the smoothy construction of the super high-rise structure. Key words:Shenyang Northeast World Trade Plaza;high-rise building;inner-crawling tower crane; installation;climbing;demolition 1工程概况 心筒组成,58~63层内简为钢筋混凝土核心筒及四周 沈阳东北世贸广场(见图1)位于沈阳市北站经济为轻钢组成的混合结构. 开发区,占地面积约3万m2 总建筑面积35万m2 其 中主楼建筑面积为12.39万m3.本工程由1栋260m 高的63层主楼、2栋100m高的27层辅楼和35m高的 7层裙房组成. 由于建筑施工条件复杂多变,主要从以下方面考 虑:建筑物体形、结构和平面配置;建筑层数、层高、基 础标高及建筑总高度;建筑工程实物量、材料设各搬运 量;构件制品、单个构件重量、安装位置及其形状;工 期、施工节奏、施工流水段的划分及施工进度安排;建 筑基础及周围施工环境条件;本地区供应条件;本单位 的资金情况以及对经济效益的要求等. 图1沈阳东北世贸广场示意 工程主...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年12月上 118 CONSTRUCTION TECHNOLOGY 第43卷第23期 D0I:10.7672/sgjs2014230118 污染地层泥水平衡盾构施工关键技术* 杨志勇,江玉生,雷军2,安宏斌2 (1 中国矿业大学(北京)力学与建筑工程学院,北京100083;2.中铁十二局集团第二工程有限公司,山西太原030032) [摘要]以北京地铁7号线08标百子湾站一化工路站区间隧道穿越污染地层为工程背景,根据土层和地下水污染情 况,基于泥水平衡盾构施工的特点,对现有泥水平衡盾构进行了创新性改造,采用加强型盾尾刷、卡箍式泥水管路连 接方式,在隧道内布置有害气体吸附装置和监测仪,增强了盾构在污染地层中的适应性.并在施工过程中及时进行 二次补浆、采用改良装置封闭洞门和加强洞内通风等施工措施,有效避免施工人员接触污染物,确保了人员安全. [关键词]地铁;污染地层;盾构;泥水平衡盾构;施工技术 [中图分类号]U455.43 [文献标识码]A [文章编号]1002-8498(2014)23-0118-03 Key Construction Technology of Slurry Balance Shield in Pollutant Stratum Yang Zhiyong' Jiang Yusheng' Lei Jun2 An Hongbin (1.School of Mechanies and Civil Engineering China University of Mining Technology Beijing 100083 China: 2.The 2nd Engineering Co.Lid.of the 12th Bureau Group of China Railway Taiyuan Shanxi 030032 China) Abstract:Based on the interval tunnel between Baiziwan and Huagong Road in Beijing Metro Line 7 Lot 8 according to soil and groundwater pollution conditions based on the characteristics of slurry balance shield construction the authors creatively transformed existing slurry balance shield adopted enhanced shield tail brush and the connection mode of clamp slurry pipeline and fixed absorption device of harmful gas and monitoring instrument in tunnels which strengthened the adaptability of shields in pollutant stratum.And during construction the methods of making the second fill pulp timely adopting improved device closure portal and strengthening tunnel ventilation effectively avoided the workers t...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

提问日期:2023-10-12 23:19:25

提问网友:Ice


请问下这种怎么套定额,特别是砸扁预埋这块;然后对应班组的需要怎么组价,大概是多少一个

解答网友:zhangy


套用钢爬梯的子目,也可以套用铁件的子目。

施工技术 2016年2月下 82 CONSTRUCTION TECHNOLOGY 第45卷第4期 D0I:10.7672/sgjs2016040082 施工阶段非线性分析在万象城钢结构卸载中的应用* 戚豹,康文梅2,叶军3 (1.江苏建筑职业技术学院,江苏徐州221116;2.徐州市新型结构应用技术工程技术研究中心, 江苏徐州221116;3.深圳市金鑫钢结构建筑安装工程有限公司,广东深圳518034) [摘要]依据无锡太湖新城万象城项目钢结构安装方法——分块吊装高空组拼方法,同时根据支撑卸载点多、分布 范围大等施工阶段实际情况出发,从钢结构支撑卸载过程的构件应力、位移分析和支撑反力分析入手,运用大型有 限元软件进行施工阶段非线性分析,详细对比计算分析了大跨度异形空间钢结构屋面支撑的卸载顺序和卸载步 骤,分析了分阶段卸载的原则和具体的卸载步骤,为钢结构支撑架的选型及设计提供了依据. [关键词]钢结构;非线性分析;支撑架;卸载;应用 [中图分类号]TU765 [文献标识码]A [文章编号]1002-8498(2016)04-0082-04 Application of Construction Nonlinear Analysis in Unloading of Mixc Mall Steel Structure Qi Bao' Kang Wenmei? Ye Jun' (1.Jiangsu Institute of Architectural Technology Xuzhou Jiangsu 221116 China;2.Xuzhou New Structure Application Technology Research Center Xuzhou Jiangsu 221116 China; 3.Shenzhen Jinxin Steel Structure Construction Engineering Co.Ltd.Shenzhen Guangdong 518034 China) Abstract:According to the block lifting and high altitude assembling construction method of Taihu New Town Mixc Mall Steel Structure and the wide-spread of unloading points this paper does construction stage nonlinear analysis stress ratio analysis displacement analysis and reaction force analysis.The authors pared the calculation results with each other in detail and does analysis of large-span special- shaped spatial steel structure unloading sequence and unloading steps and analyzed the principle and specific procedure of unloading.The result provides the basis for the structure form selection and design of the load-bearing f...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年1月下 28 CONSTRUCTION TECHNOLOGY 第41卷第357期 施工控制在大跨空间桁架中的应用 李鑫奎,伍小平,夏飞 (上海建工集团股份有限公司,上海200431) [摘要]青岛大剧院钢屋盖为大跨空间钢桁架结构体系,跨度达78.4m 屋面造型对桁架变形要求极高.为解决钢 桁架施工过程中挠度及内力不易控制的难题,把全过程仿真分析、施工监测以及自适应控制理论应用到大跨空间 桁架的施工过程中,实现空间桁架的施工控制.实践表明,空间桁架的施工控制既可以使结构内力和标高与设计 值较好地吻合,又可以确保施工过程的安全. [关键词]钢结构;桁架;屋盖;仿真模拟;监测;施工控制 [中图分类号]TU758.11 [文献标识码]A [文章编号]1002-8498(2012)02-0028-03 Application of Construction Control in Large-span Space Truss Li Xinkui Wu Xiaoping Xia Fei (Shanghai Construction Group Co.Ltd. Shanghai 200431 China) Abstract:The steel roof of Qingdao Grand Theatre is large-span space truss structure and the truss span is 78.4m.The roof molding has high requirements to deformation.Simulation analysis of whole process construction monitoring and self-adaptive control theory are applied to large-span space truss construction in order to solve the problem of deflection and internal force control in construction of steel truss.The results show that construction of space truss not only makes level and internal force meeting the design value of roof but also ensures the safety of the construction process. Key words:steel structures;trusses;roofs;simulation monitoring;construction control 施工控制最早起源并应用于大跨度桥梁的施桁架外包装饰铝板组成,钢桁架主体结构为x向主 工,已经形成了比较成熟的控制理论和方法.仿真 构件间距8.4m y向主构件间距8m的井字形空间 模拟技术的应用为施工控制的发展提供了良好的 钢桁架,主桁架采用箱形和工字形两种截面,次桁 平台,通过模拟分析得到每个施工阶段结构的内力 架由角钢拼接而成.结构整体采用Q345钢材.桁 和位移,经过开环控制、闭环控制、自适应等控制理 架最大长度122m 横跨4个建筑单体,最大跨度达 论的调整确定施工控制参数.目前大跨空间桁架 到78.4m 最大悬挑外伸为16.8m 整个钢桁架投影 结构形式发展非常迅速,大跨空间结构具有多次超 面积达...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年8月上施工技术 第42卷第15期CONSTRUCTIONTECHNOLOGY109 DO1:10. 7672/sgjs2013150109
施工安全的可视化技术及应用
李峰,王居林',张颖² (1.山西建筑职业技术学院土木工程系,山西太原030006;2.中国建筑业协会建筑安全分会,北京100835) [摘要】由于施工资源(人员、设备、材料)的数据十分庞大,对其收集、分析以至进行可视化操作较为复杂。

近年 来,随着远程数据传感器和智能数据处理技术的发展,在建筑施工中出现了一些数据可视化工具。

本文从3个案 例出发,分析建筑工程施工现场收集、记录数据与可视化管理的方法,提出了从实时定位传感器到实时数据可视化 平台之间数据流传递的框架。

结果表明:施工现场操作可以实现实时可视化,有利于建筑工程的科学管理,同时也 极大可能避免事故的发生。

[关键词]施工安全;可视化技术;三维建模;影像传感器 【中图分类号】TU19【文献标识码】A[文章编号]1002-8498(2013)15-0109-04 VisualizationTechnologyfor ConstructionSafetyandItsApplications Li Feng',Wang Julin', Zhang Ying² (1.Civil Engineering Department,Shanxi Architectural College,Taiyuan, Shanxi 030006, China; 2.Construction Safety Branch of China Construction Industry Association,Bejing100835,China) Abstract;Data to field operations of construction resources including personnel,equipment and materials is vast, so the collecting, analyzing and visualization operating are difficult. With developments in remote data sensing and intelligent data processing supplement, some visualization tools in construction are produced. Based on three cases, data collecting and recording as well as visualization management method are analyzed. A novel framework is presented that explains the method of streaming data from real-time positioning sensors to a real-time data visualization platform. The results demonstrate that field operations can be automatically monitored and visualized in real time, thus offering benefits to scientific management of construction projects and avoid accidents. Key words:construction safety;visualization technology; 3D modeling;image sensors
0引言出决策时,这无疑成为一个很大的障碍。

由于虚拟 传统上,建设项目的参与者通过纸质文件或口现实技术能给使用者强烈的现场感,已经被成功地 头进行信息交流和沟通。

在信息传递过程中,因为应用在建筑设计和施工中[1*》。

在虚拟现实环境 信息的不足或模糊,项目参与者并不总是能够迅速中,人们也能更好地理解复杂的施工过程,同时,动 做出正确的决定。

在施工期间,为了更及时、更准态资源数据的跟踪和可视化也能促进施工人员的 确地做出决策,项目的参与者需要在视觉上理解建安全行为。

筑活动信息。

这对施工现场可视化技术的应用提本文主要研究分析施工安全和现场活动监控 出要求。

关键技术,实时收集处理施工资源数据,并使之可 目前,诸如人员、设备、材料等重要的建筑场地视化,提出实时的可视化框架,通过3个案例验证其 信息主要是通过人工监控和记录。

这种工作需要可行性和适用...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年8月上 98 CONSTRUCTION TECHNOLOGY 第43卷第15期 D0I:10.7672/sgjs2014150098 施工企业工程成本控制关键风险因子识别* 孙莉 (上海建峰职业技术学院,上海201900) [摘要]工程成本控制的前期工作之一是识别影响成本控制的关键风险因子,常涉及专家对风险因子的定性评价, 然而此评价带有一定程度的模糊性和随机性.为此,提出一种基于李克特量表、正态云发生器和德尔菲法的综合 评价方法,在文献回顾得到施工企业工程成本控制风险因子和问卷调查得到专家对各风险因子定性评价的基础 上,展开对关键风险因子的识别,以逐步可视化控制专家对于风险因子定性评价的模糊性和随机性.结果可以简 单直观地识别出3个关键风险因子:项目管理经验、工人技术水平、各方沟通和协调. [关键词]项目管理:施工企业;成本控制;风险 [中图分类号]TU714 [文献标识码]A [文章编号]1002-8498(2014)15-0098-04 Identification for Key Risk Sub-factors of Project Cost Control in Construction Enterprises Sun Li Shanghai Jianfeng Vocational and Technical College Shanghai 201900 China) Abstract:Identifying key risk sub-factors affecting cost control is one of the preliminary work during project cost control which often involving experts qualitative evaluation with a certain degree of fuzziness and randomness to risk sub-factors.Focusing on the problem a prehensive evaluation method based on Likert scale normal cloud generator and Delphi method was proposed.On the basis of acquired project cost control risk sub-factors in construction enterprises through literature review and experts qualitative evaluation to each risk sub-factors by questionnaire method this paper identifies key risk sub- factors and gradually controls the fuzziness and randomness of qualitative evaluation derived from specialists evaluation to the key degree of risk sub-factors visually.Consequently three key risk sub- factors were simply and intuitively identified including project mana...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)