2010年5月 施工技术 第39卷第5期 CONSTRUCTION TECHNOLOGY 91 气循环玻璃幕墙应用技术 李宪锋,刘苏文,孙海涛 (中国矿业大学(徐州)艺术与设计学院,江苏徐州221008) 【摘要]气循环玻璃幕墙作为一种双层的落墙结构,是在普通明框或隐框的幕墙外再增加一层玻璃幕墙,通过幕墙 通风设备的开关可使双层幕墙中间进入或逸出空气,开窗后房间可进行自然通风,幕墙中间的遮阳装置可减少气 候对室内环境的影响,并且不妨碍玻璃幕墙的外观效果.结合工程实例,指出不同结构选型的气循环玻璃幕墙在 实践应用中的技术参数和施工要点. [关键词]幕墙工程;气循环幕墙;两幕原理 [中图分类号]TU317 [文献标识码]A【文章编号]1002-8498(2010)05-0091-02 Application Technology of Gas Cycle Glass Curtain Wall Li Xianfeng Liu Suwen Sun Haitao (Art and Design Institute China of Mining and Technology Xuzhow Jiangsu 221008 China) Abstract:The gas cycle glass curtain wall is made by increasing outer layer on glass curtain wall to form a kind of double-decked curtain wall structure.The air can enter or spill from the space of the double curtain walls through the switch of ventilation so the room can be naturally ventilated after opening the window.The shading devices in the middle of curtain wall can reduce the influence of climate without affecting the appearance.Technical parameters and construction points of gas cycle glass curtain wall are summarized according to actual practice. Key words:curtain wall engineering;gas cycle glass curtain wall;rain screen principle 随着建筑物向高层、高档、多功能、环保节能方向(见图1a). 发展,气循环双层幕墙作为新型建筑外围护结构,在世 界各地得到快速发展.气循环双层幕墙在换气方式上 丁一排风口 可分为两大体系:内通风和外通风.内通风气循环幕 墙的外层为封闭式结构,换气在幕墙的双层空间内进 热理 内事增 行,这种通风方式需要有强制通风系统的配合才能与 外界空气交换,达到最终效果;外通风气循环幕墙是通 热道 进风道 V一进风口 过双层幕墙的进风口和出风口合理组织气流,直接与 外空间形成交换以达到最终效果.中低层建筑气循环 幕墙将幕墙的进风口设在下沉式地下室内,在其中设 封闭式 b开放式 置水幕,当空气通过水幕进入热通道时,水幕将空气中 图1幕墙结构示意 大部分可吸入颗粒物如二氧化硫、...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年10月上 6 CONSTRUCTION TECHNOLOGY 第43卷第19期 D0I:10.7672/sgjs2014190006 气举反循环在天津周大福金融中心超长 钻孔灌注桩施工中的应用 胡志华,邓建,陈博,刘欢,何聪 (中建三局第二建设工程有限责任公司,湖北武汉430074) [摘要]通过与传统工艺相比较,气举反循环工艺以清孔深度大、速度快、清渣彻底的优势,在天津周大福金融中心 超长桩施工中得到了应用,能够显著降低成本、提高效率,取得了良好的经济和社会效益.详细介绍了气举反循环 的工艺原理、工艺特点、施工方法和质量控制要点. [关键词]桩基础;高层建筑;钻孔灌注桩;气举反循环;施工技术 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2014)19-0006-03 Application of Air-lift Reverse Circulation in Super-long Bored Piles Construction in Tianjin Zhoudafu Financial Center Hu Zhihua Deng Jian Chen Bo Liu Huan He Cong The Second Construction Co.Ld.of China Construction Third Engineering Bureau Wuhan Hubei 430074 China) Abstract:Compared with the traditional process air-lift reverse circulation process has been applied based on the advantages of deep clear hole depth fast construction slag removal thoroughly.The technique was applied in super long piles construction which effectively reduced the cost and improved the efficieney achieved good economic and social benefits.This paper introduced the process in detail from principle characteristics construction method and quality control points. Key words:piles;tall buildings;bored piles;air-lift reverse circulation;construction 1工程概况 混合物.孔底沉渣在喷出气体的冲击作用下悬浮 天津周大福金融中心拟建高度530m 地上97 起来,由于管内、外液体的密度差,孔内泥浆、空气、 层,地下4层,建筑面积39万m2.其塔楼桩基采用 沉渣的三相流沿导管向上运行,被排出孔口,进人 桩端、桩侧复式后注浆钻孔灌注桩,共计517根.桩 接渣篮.过滤出沉渣后,过滤后的泥浆又重新进人 基形式为中1000mm钻孔灌注桩,桩身混凝土设计 孔内,反复循环直至孔底沉渣厚度达到规范要求. 强度等级为水下C45.桩机于地面标高成孔,桩底 气举反循环清孔以清孔深度大、速度快、清渣 标高为-98.500~-102.900m. 彻底的优势能够满足超长桩施...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年9月上 施工技术 第40卷第348期 CONSTRUCTION TECHNOLOGY 105 民用建筑机电设备安装中管线布置 综合平衡技术 祝餐 (上海市安装工程有限公司,上海200080) [摘要]随着生产工艺的不断改进和提高,对机电安装工程的具体要求越来越高,为使机电安装工程满足建筑的功 能要求,引入了管线布置综合平衡技术.针对该项技术,闹述了管线布置综合平衡技术的定义,总结了管线布置综 合平衡技术的作用和原则,管线布置综合平衡技术流程图及需细化的工作,并以世博村D地块公寓式酒店为例,详 细介绍了管线布置综合平衡技术的应用情况. [关键词]管线;平衡;机电设备;安装 [中图分类号]TU81 [文献标识码]A [文章编号]1002-8498(2011)17-0105-03 Pipeline Arrangement and Comprehensive Balance Technology with the Installation of Electromechanical Equipment in Civil Building Zhu Yun Shanghai Installation Engineering Co.Lid.Shanghai 200080 China) Abstract:Along with the improvement of production process social requirements for electromechanical installation engineering bee higher and higher.Pipeline arrangement and prehensive balance technology is introduced in order to make electromechanical installation engineering meet demand for buildings.Based on the technology the author introduces the definition of pipeline arrangement and prehensive balance technology the function and principle of pipeline arrangement and prehensive balance technology the flow chart and refinement work of pipeline arrangement and prehensive balance technology.According to style apartment hotel of D block at World Expo Village the application of pipeline arrangement and prehensive balance technology is introduced in detail. Key words:pipelines;balances;electromechanical devices;installation 随着科学技术的发展,生产工艺的不断改进和装工程的施工管理技术,涉及建筑机电工程中通风 提高,机电安装工程也从最简单地满足建筑的使用空调给排水、消防喷淋及消火栓、电气、智能化控 要求,转而满足建筑的功能...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2015年5月上施工技术 第44卷第9期CONSTRUCTION TECHNOLOGY DOI:10. 7672/sgjs2015090033
毛细管网空调末端系统与装饰粉刷层组合饰面施工技术
杨晓华 (浙江宝业建设集团有限公司,浙江绍兴312028)
[摘要]毛细管网空调末端系统将Φ4.3mm×0.8mm塑料毛细管网敷设到室内顶板、墙面的粉刷层内,通过冷、热 水系统的循环,调节室内空气温度。

管网安装采取试压及保压措施,控制管网的渗漏。

石膏粉刷采取涂刮界面剂、 分层抹灰、铺设玻纤网格布及控制毛细管间距等措施,防止粉剧层开裂、空鼓及脱落。

经过实践应用,系统运行良 好,满足设计及使用功能要求。

[关键词】装饰装修;空调末端系统;毛细管网;石膏粉刷层;组合饰面;施工技术 [中图分类号]TU767.7[文献标识码]A[文章编号]1002-8498(2015)09-0033-04 ConstructionTechnologyofOvercoatingComposedofCapillaryNetwork Air-conditionTerminalSystemandPaintingLayer YangXiaohua (Zhejiang Baoye Construction Group Co.,Ld.,Shaoxing,Zhejiang 312028,China) Abstract:Capillary network air-condition terminal system buries plastic capillary network of 4. 3 multiply by 0.8 millimeters in the painting layer of indoor floors and walls.The indoor temperature can be adjusted through the circulation system between hot and cold water.Pressure test and pressure maintaining measures are adopted during installing the plastic capillary network to prevent leakage. Painting adhesion agent, layered plastering, laying fiberglass mesh and keeping distance among the plastic capillary network are used to keep painting layer away from cracking, hollowing and dropping. Practical application shows that this system runs well, and meets the design and functional requirement. Key words:decoration;air-condition terminal system;capillary network;plaster painting layer; bined overcoating; construction 0引言1技术特点 目前,高污染、高能耗对环境的影响已经越来1)节能毛细管网空调末端系统与常规风机 越为人们所重视,作为建筑产品高能耗的空调采暖盘管空调系统相比较,传热方式不同,所需的冷热 系统,其末端装置已从最原始的散热器开发出风机源供回水温度相差10℃,且热传导均匀,可节省能 盘管、地板辐射采暖等系统,但仍然存在着能耗大、源30%以上。

占用空间多、噪声大等缺点。

在综合分析各种空调2)使用安全可靠毛细管网水系统安装有过 技术指标、经济效益的基础上,创新性引进德国滤器,水质洁净,水压试压需保压至装饰结束。

加 CLINA毛细管网空调末端系统,并成功解决了毛细胶石膏和易性好、黏结性能强,网格布防开裂,可有
统既能采暖又能制冷,它应用人体毛细管的原理,3)能效比高,舒适性强与传统散热器和风机 将塑料毛细管网敷设到顶板、墙面的粉刷层内,通盘管系统比较,毛细管网空调系统从建筑物内墙 过冷、热水系统的循环,将能量均匀辐射到房间的面、天棚散热,热交换面积大、温度均匀、能效比高, 各个方位,调节室内空气温度。

且无风系统流动带来的温差、干燥与灰尘,舒适、洁 净、安静。

[作者简介]杨晓华,高级工程师,E-mail:627989442@q.4)施工技术易于掌握,操作便捷塑料毛细管 [收稿日期]2015-02-10网来取粘贴固...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年3月上施工技术 第41卷第360期CONSTRUCTION TECHNOLOGY21
模板工程结构的承载能力计算与变形验算
赵挺生,唐菁菁,周萌 (华中科技大学土木工程与力学学院,湖北武汉430074)
[摘要】新颁布的《混凝土结构工程施工规范》GB50666-2011,在模板工程设计上,与当前工程做法和《建筑施工 扣件式钢管脚手架安全技术规范》JGJ130一2011等相比,有明显变化。

为配合《混凝土结构工程施工规范》 GB50666一2011的实施,以工程实例形式对模板工程的水平模板荷载取值、荷载组合和模板面板及其下的次楞、主 楞和支架计算方法进行系统演示,以期对该规范的应用提供帮助。

[关键词】模板;设计;荷载;荷载组合;变形;计算模式 [中图分类号】TU755.2;TU714[文献标识码]A[文章编号】1002-8498(2012)05-0021-04 CalculationofCarryingCapacityandDeformationforFormwork Zhao Tingsheng,Tang Jingjing,Zhou Meng (School of Civil Engineering&Mechanics,HuazhongUniversity of Science &Technology, Wuhan,Hubei 430074,China) Abstract:Obvious difference is seen in formwork design between the newly issued national code Code for construction of concrele structures GB50666-2011 and current practice,as well as Technical code for safety of steel tubular scaffold with couplers in constructionJGJ130-2011.Therefore,the load values and load binations, calculation of formwork panel and wood sub-purlin, beam, along with upright tube of formwork are introduced in accordance with specifications of the newly issued national code Code for construction ofconcrete structures GB50666-2011. Key words;formwork;design;load;load bination;deformation;calculation model
随着现浇混凝土结构施工的泵送和滑模等新质量与模板工程坍塌事故高发的主要原因。

这些 技术发展,在建筑施工速度大幅提高的同时,现浇原因的背后,是工程建设人员模板工程知识的缺乏。

混凝土施工质量问题和安全问题愈加突出,现浇混模板工程包括模板和支架(或称模板支架)两 凝土结构质量通病多发,模板工程坍塌事故高发。

部分,前者包括模板面板、支撑面板的次楞和主楞 例如,2010年1月3日,昆明新机场在建桥梁,在浇以及对拉螺栓等组件,它直接影响现浇混凝土结构 筑混凝土时发生垮塌事故,造成7人死亡,8人重的外形和表观质量;后者包括模板背侧的支撑架和 伤,26人轻伤;2010年1月12日,安徽芜湖华强文连接件等,它通过前者间接影响现浇混凝土结构的 化科技产业园配送中心建设工地,在混凝土浇筑过外形和表观质量。

模板工程作为现浇混凝土结构 程中发生坍塌事故,造成8人死亡,7人受伤;贵州施工的重要承载结构和施工作业平台,承担着各类 黔南州福泉利森水泥厂工程发生模板工程坍塌事施工作业荷载。

模板工程结构计算错误,施工偏差 故,造成8人死亡,2人受伤;2010年3月14日,贵大,必然导致其承载能力的降低和稳定性不足,进 阳国际会议展览中心工程发生模板工程塌事故,而引发施工安全事故和工程质量问题。

为此,本文 造成9人死亡,19人受伤,等等。

现浇混凝土结构结合新颁布的《混凝土结构工程施工规范》 的质量、安全事故分析表明,模板工程结构设计计GB50666一2011(简称“规范”),介绍与新浇筑混凝 算错误、施工方案不正确、材料质量问题、施工偏差土接触的模板和支架的计算分析。

大、浇筑方式错误等,是造成现浇混凝土结构施工1模板工程结构设计方法 1.1计算荷载与荷载组合 [收稿日期]2012-02-13按照规范中4.3....

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年8月上施工技术 第41卷第370期CONSTRUCTION TECHNOLOCY
模块化低位顶升钢平台模架体系装配式空间 钢桁架平台设计与试验研究 王开强,郭耀杰²,吴延宏",黄爽",刘晓升",刘志茂" (1.中建三局建设工程股份有限公司,湖北武汉430064;2.武汉大学土木建筑工程学院,湖北武汉430072) [摘要】模块化低位顶升钢平台模架体系由多个可周转使用的系统构成,其中的钢平台系统采用装配式空间钢桁 架平台,该平台支点少、布置灵活、承载力大,能在不同的超高层核心简顶模施工中周转使用。

阐述了该平台的基 本组成、传力路径以及可拆卸连接节点设计。

以福州世茂国际中心超高层建筑为例,介绍了该平台的布置流程。

此后,根据该平台的试验分析结果与数值计算结果的对比,进一步阐述了平台的工作性能,同时提出了原设计中的 缺陷与不足,并给出了对应的改造方法。

【关键词]高层建筑;桁架;模板;模块化;结构设计;试验研究 [中图分类号】TU755.2,[文献标识码]A[文章编号]1002-8498(2012)15-0001-06 Design andResearch of AssembledSpatial Steel TrussPlatform of ModularizedLow-positionJackingFormworkSystem Wang Kaiqiang',Guo Yaoje²,Wu Yanhong',Huang Shuang', Liu Xiaosheng',Liu Zhimao' (1.China Construction Third Engineering Bureau Co.,Ltd.,Wuhan,Hubei 430064,China; 2.Cioil Engineeing College of Wuhan Unieersty,Wuhan,Hubei 430072,China) Abstract;Modularized low-position jacking formwork consists of several turnover parts,in which the having fewer supports,allowing flexible installation, and having large loading capacity.These advantages allow it to be repeatedly used in the construction of different tall building cores.This paper introduced the fundamental ponents, load transfer mechanism and reusable nodes. Taking one tall building-Fuzhou Shimao International Financial Center as an example,the installation procedure of the platform was described and numerical analysis results were presented.Comparison of the numerical analysis results to experimental tests further illustrated the performance of the platform and revealed the deficiencies of original design. Improving suggestions were put forward based on the study. Key words: tall buildings; trusses; formwork; modularization; structural design; experiment research 模块化低位顶升钢平台模架体系(简称“模块要组成部分(见图1),也是实现顶模模块化、标准化 化顶模”)是超高层建筑核心筒施工的重大技术突的关键环节。

该平台应可适应不同项目核心筒施 破,该技术施工速度快、劳动力投入小、材料周转容工的需要,可根据核心筒形状进行布置,而桁架则 易、平台的附属功能强大。

鉴于该技术对应模架一选用由模块化单元装配而成。

目前,采用贝雷片为 次性投人过大的问题,中建三局从2009年底开始进标准组件的装配式钢桥被广泛使用,另外,在项目 行模架模块化改造,提高其周转效率,降低该模架施工中,贝雷片也被用来搭设临时平台或栈桥等。

在单个项...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

12CONSTRUCTIONTECHNOLOCY施工技术2014年12月上
第43卷第23期 DOI:10.7672/sgjs2014230012
模块化低位顶升钢平台模架体系安装关键技术 刘威,杜福祥,袁渊,周佳军,方道伟 (中建三局集团有限公司成都分公司,四川成都610041) [摘要]根据重庆国金中心TI塔楼为带有伸臂桁架层的框架-核心筒结构特点,核心筒竖向结构选用模块化低位 顶升钢平台模架体系进行施工,主要从施工组织、操作架搭设、超重构件现场组装焊接、大构件滑移和吊装、悬挑部 位主桁架预上挑安装、主桁架同条件安装、自制"7"字板+千斤顶安装、挂架和滑梁整体吊装等方面介绍了模块化 低位顶升钢平台模架体系安装关键技术。

工程实践表明,该体系具有施工速度快、安全性好、运行平稳、承载量大 :等诸多优点。

[关键词]高层建筑;模板;模块化;钢平台;低位顶升模架体系;安装 [中图分类号]TU755.2[文献标识码]A[文章编号〕1002-8498(2014)23-0012-04 KeyInstallationTechnologyofModularizedLow-positionJacking FormworkSystemwithSteelPlatform LiuWeiDuFuxiang,YuanYuanhou Jiajun,Fang Dawei (Chengdu Branch of China Construction Third Engineering Bureau Co.Ltd.,Chengdu,Sichuan610041,China) Abstract:Based on the frame-tube structure characteristics of T1 tower building with cantilever truss layer for Chongqing Guojin Center,modularized low-position jacking formwork system is used to construct vertical core structure.This paper introduces key installation technology of modularized low-position jacking formwork system with steel platform from several respects,including construction organization, erection of handling frame,field assembly and welding of super heavy ponent, slip and hoisting of large ponent,main truss installation with beforehand upward flexion in cantilever parts,main truss installationunder the same conditioninstallation of 7-shaped slab andjackntegralhoistingofpylon and slip beam. Engineering practice shows that the formwork system has many advantages such as quick construction,good safety,smooth operation,great bearing capacity. Key words:tallbuildings;formwork;modularization;steel platform;low-position jacking formwork system; installation 1工程概况埋件连接,因此施工时需先施工核心筒结构,后施 重庆国金中心项目位于重庆市江北嘴金融核工外框结构。

为保证核心筒施工安全、加快施工进 心区,项目占地面积5.1万㎡²,总建筑面积约64万度,重庆国金中心项目T1塔楼核心筒施工采用模 m²,共有5栋塔楼,其中T1塔楼地上64层,总高度块化低位顶升钢平台模架体系(以下简称“顶模体 为319.5m,集甲级写字楼、高端购物中心、五星级酒系")。

店、高级公寓及休闲设施于一体。

其结构形式为带2重庆国金中心项目顶模体系 有伸臂桁架层的框架-核心筒结构体系,其中核心筒2.1顶模体系施工原理 结构为钢筋混凝土结构,外框部分为钢梁+压型钢模块化低位顶升钢平台模架体系由支撑与顶 板楼板+型钢混凝土柱...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年8月上 施工技术 第41卷第370期 CONSTRUCTION TECHNOLOCY 模块化低位顶升钢平台模架体系在福州世茂 国际中心项目实施关键技术 吴延宏,许立艾,王开强,刘晓升,黄爽,刘志茂 (中建三局建设工程股份有限公司,湖北武汉430064) [摘要】在福州世茂国际中心项目中,模块化低位少支点整体顶升钢平台模架体系首次投人使用。

首先介绍了福 州世茂国际中心项目概况及模块化顶模设计的基本情况,此后重点介绍了该模架在使用中的关键工序;模架的安 装流程及控制要求;模架顶升规划;模架在混凝土泵送、伸臂桁架施工等环节的应对措施;模架的垂直运输方案;模 架的拆除。

这些都为模块化顶模技术的推广和使用奠定了基础,为其施工技术内容的不断完善提供工程依托和实 践积累。

[关键词]高层建筑;模块化;低位顶升模架体系;施工技术 【中图分类号】TU755.2【文献标识码】A [文章编号】1002-8498(2012)15-0007-05 FuzhouShimaoInternationalFinancial CenterProject Wu Yanhong,Xu Liai,Wang Kaiqiang,Liu Xiaosheng,Huang Shuang,Liu Zhimao (China Construction Third Engineering Bureau Co.,Ltd.,Wuhan, Hubei 430064, China) Abstract: The modularized low-position jacking formwork system was put into use for the first time in the Fuzhou Shimao International Financial Center project. The Fuzhou Shimao International Financial Center project wasfirstly introduced as well as modularized low-position jacking formwork system.Then the key operational procedures of this formwork were presented in detail, including installation procedure and control requirement,the planning of formwork jacking process,measures to cope with concrete pumping and outstretched truss construction, vertical transportation and dismantlement. This project has laid a solid foundation for the wide application of modularized low-position jacking formwork system,and provided engineering experience to the improvement of this construction technique. Key words;tall buildings; modularization; low-position jacking formwork system; construction 1工程概况 台模架体系(简称“模块化顶模”),该模架系统由钢 福州世茂国际中心工程用地面积16338m²,总平台系统、支撑与顶升系统、模板系统、挂架及防护 建筑面积167416m²,塔楼部分建筑高度273.88m。

系统4大部分组成。

具有施工速度快,承载力大,运 结构形式为钢管混凝土柱-核心筒结构体系,核心筒行平稳易操作,安全性好等几大优势。

模架的主要 的平面形状整体为八边形,混凝土强度等级为C60组成如图2所示。

(126m以下)及C50(126m以上),结构单层面积为 模块化顶模将竖向结构的模板悬挂在钢平台 1900m²,建筑立面为直线(见图1)。

内核心筒为钢 以下,通过安置在混凝土核心筒上的顶升系统,在 筋混凝土剪力墙结构,核心筒面积为440m²,平面尺 顶升钢平台的同时提升竖向结构模板完成模板施 寸为长×宽=31.5m×15.5m。

工。

油缸一次顶升一个结构层高度,通过支撑钢柱 该项目核心筒施工采用模块化低位顶升钢平 顶升平台,带动模板和挂架整体顶升。

在核心筒内 壁设置预留洞,支撑大梁通过两端的伸缩机构...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年8月上 12CONSTRUCTION TECHNOLOGY第41卷第370期
模块化低位顶升钢平台模架体系中挂架设计与施工
黄爽,吴延宏,王开强,刘志茂,刘晓升 (中建三局建设工程股份有限公司,湖北武汉430064) [摘要】模块化低位顶升钢平台模架体系是近几年出现的新型模架体系施工技术,主要为解决超高层建筑核心筒 竖向结构施工而设计。

以该模架体系在工程项目中的实际需求为出发点,介绍低位顶升钢平台模架体系中的挂架 设计的总体思路和安装使用的关键控制点,为实现挂架体系的标准化、装配化提供依据和参考。

【关键词】高层建筑;低位顶升模架体系;挂架;结构设计;施工技术 [中图分类号】TU755.2[文献标识码]A[文章编号】1002-8498(2012)15-0012-05 Design and Construction of the RackSystem in Modularized Low-positionJackingFormworkSystem Huang Shuang,Wu Yanhong,Wang Kaiqiang,Liu Zhimao,Liu Xiaosheng (China Construction Third Engineering Bureau Co.,Ltd.,Wuhan,Hubei 430064,China) Abstract;Low-position jacking steel platform formwork system is a new formwork construction technique that appeared only in recent years. It is mainly designed for construction of the vertical core wall of tall buildings. Based on the practical application of this formwork system in engineering projects, this paper introduced the overall design concept of hanging rack in low-position jacking steel platform formwork system and the key control points during its installtion. The work in this paper provided references to the standardization and assemblability of rack system. Key words: tall bnildings; low-position jacking formwork system; hanging rack; structural design; construction 随着社会的发展,模架施工技术由最初的滑模系统、挂架与围护系统和模板系统等,钢平台系统 逐步向施工速度更快、安全性更好、文明施工程度位于施工层以上,模板、挂架和安全防护系统悬挂 更高的方向发展,其中模块化低位顶升钢平台模架在钢平台下弦,沿模板悬挂方向设置钢筋预留层、 体系(简称“模块化顶模”)是近几年出现的新的模钢筋绑扎层、模板封闭层、已浇混凝土层4个操作 架体系施工技术,该模架体系成功解决了超高层建层。

施工时,通过移动悬挂模板的滑轮,使模板与 术,具有顶升速度快、封闭性好、承载力大、安全性架平台带动模板和挂架上升,并完成竖向混凝土结 高等优点。

模块化顶模中的挂架与围护系统主要构施工。

模块化顶模典型部位的剖面如图1所示。

为核心筒结构施工提供操作平台、安全通道和安全挂架设计时,首先应考虑挂架满足使用安全的 防护体系。

根据建筑物主要结构形式和结构布置需求,挂架体系的安全主要通过系数安全和措施安 情况,合理布置挂架体系,满足核心筒结构施工的全两种手段保证。

系数安全主要是指挂架体系设 需求。

本文主要介绍挂架体系设计的总体思路和计时计算上的安全系数储备,措施安全主要是指挂 安装使用的关键控制点,为模块化顶模的标准化、:架体系使用过程采取周全的安全保护措施;其次应 装配化提供依据。

考虑钢平台系统至最低一道作业层的高度,满足施, 1挂架布置需求和设计原则工层的高度需求;再次应考虑模板退模空间的需 模块化顶模主要包括钢平台系统、支撑与顶升求,挂架的宽度应既能满足退模空间,又不影响作 业层的施工。

[收稿日期]2012-05-18[基金项目]中建三局建设工程股份有限公司课题(CSCEC3B-2010-35)挂架...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年9月下 114 CONSTRUCTIONTECHNOLOGY 第42卷第18期 DOI:10. 7672/sgjs2013180114 楼面行走式塔式起重机施工工艺设计 马小晶',薛刚',孟书斌²,张德欣² (1.内蒙古科技大学建筑与土木工程学院,内蒙古包头014010; 2.北京建工集团北京市机械施工有限公司,北京100045) [摘要】为解决狭小场地下进行大跨、超重钢结构的吊装问题,设计了位于楼面上的行走式塔式起重机施工工艺。

在大型钢结构施工中,可以通过在钢柱上增加牛腿,增加柱间钢梁来支撑行走轨道,使塔式起重机在建筑物内部行 走,完成钢结构吊装作业,解决大型钢结构工程中内部吊装大构件的难题。

对行走式塔式起重机的受力性能进行 分析,指出行走式塔式起重机施工过程中的控制要点,并对行走式塔式起重机的经济性进行分析。

结果表明该施 工工艺设计合理,经济效益明显。

【关键词】建筑机械;行走式塔式起重机;钢结构;安装 [中图分类号】TH213.3 【文献标识码】A [文章编号]1002-8498(2013)18-0114-04 ConstructionProcessDesignofTowerCraneWalkingonFloor Ma Xiaojing'’,Xue Gang',Meng Shubin²,Zhang Dexin² (1.SchoolofArchiteture &CivilEngineering,Inner Mongolia University of Science andTecnology, Baotou,Inner Mongolia 014010,China; 2.Bejing Mechanized Construction Co.,Lud., Beijing Construction Engineering Group Co.,Lud.,Beijing 100045,China) Abstract:In order to solve the hoisting diffculty when constructing a large-span and overweight steel the floors. During the construction of the large-scale steel structure, corbels were added on steel columns and extra steel beams were set up between columns to support the rails for the tower crane so that the tower crane can walk inside the structure to finish the hoisting job.This technology can solve the problems of lifting large structural elements from the inside of a large steel project. This paper analyzes the mechanical behaviour of the walking tower crane, indicates the key points to control during the construction. The economical efficiency of the walking tower crane construction is also analyzed.The results show that the construction technology with walking tower crane was properly designed and generated obvious economic benefits. Key words:construction equipment; walking tower crane;steel structures;installation 随着我国建设事业的不断发展,大跨度空间钢屋盖,新建天津西站的站房屋盖等工程。

本文以长 结构迎来了前所未有的发展机遇。

各种高、大、重、沙北辰三角洲钢结构施工中采用的行走式塔式起 造型奇特的钢结构建筑不断涌现,传统的钢结构安重机为例,对其施工工艺进行分析2]。

装施工工艺已经无法满足作业要求,传统安装设备1工程概况 甚至难以胜任新的吊装任务。

基于此,近年来涌现 长沙市开福区的北辰三角洲西北区(命名A1 出一批新的钢结构施工工艺。

位于楼面上的行走地...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年4月上 22 CONSTRUCTION TECHNOLOGY 第44卷第7期 D0I:10.7672/5js2015070022 楼板浇筑过程中脚手架支撑系统施工监测及数值分析 郭凯,王海,崔爱珍,元立刚 (中国建筑第八工程局有限公司天津分公司,天津300452) [摘要]对天津滨海国际机场扩建交通中心工程地下1层楼板及梁体的混凝土浇筑过程中,脚手架系统的安全状 况进行了研究,运用ANSYS软件对脚手架系统进行了数值模拟,计算得到脚手架系统在施工过程中内力和变形的 变化规律;并对脚手架系统在楼板及梁体混凝土浇筑过程杆件的内力变化进行了实时监测.监测的结果验证了数 值分析模型,同时也对混凝土浇筑过程中脚手架系统的安全状况提供依据. [关键词]脚手架;监测;数值模拟:内力;变形 [中图分类号]TU755.2 [文献标识码]A [文章编号]1002-8498(2015)07-0022-03 Construction Monitoring and Numerical Analysis for the Scaffold Supporting System in Slab Concrete Casting Process Guo Kai Wang Hai Cui Aizhen Qi Ligang Tianjin Branch China Construction Eighth Engineering Division Co.Lid.Tianjin 300452 China) Abstract:In this paper the security situation of scaffold system is studied for the ground floor of the Tianjin Binhai International Airport expansion transportation center project during concrete pouring process.The internal force and deformation for the scaffold system during the construction process can be got by using numerical simulation furthermore the bar's internal forces changes for the scaffold system can be obtained by real-time monitoring.The test results can verify the accuracy of the numerical model and also ean provide the safety condition for the scaffolding system during the conerete pouring process. Key words:scaffolds;monitoring;numerical simulation;internal force;deformation 建筑行业每年由于安全事故丧生的从业人员时,及时做出预警,以保证施工过程的安全. 有数千人之多,直接经济损失逾百亿元.据有关统1工程概况 计,在我国建筑施工系统每年发生的事故中,大约 天津滨海国际机场扩建配套机场交通中心工 有1/3左右直接或间接与架设工具及其使用的问题 程位于天津滨海国...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年1月下 32 CONSTRUCTIONTECHNOLOGY 第43卷第2期 DOI:10.7672/sgj82014020032 椭圆形钢结构弧形钢梁分段吊装拼装技术 孙群伦',林滨滨,傅林波² (1.浙江建设职业技术学院,浙江杭州311231;2.浙江中南建设集团钢结构有限公司,浙江杭州310052) [摘要】某会展中心建筑平面造型近似椭圆形,屋顶结构为近似椭圆体钢结构。

通过介绍椭圆形钢结构弧形钢梁 分段吊装拼装施工特点和难点,详细闸述了弧形钢梁分段吊装拼装施工流程、施工要点、质量控制措施与仿真分析 结果。

实践证明分段吊装拼装技术方法可靠,能够最大限度地减少对施工场地的要求,提高施工质量,减少机械吊 装台班量与难度,节约施工成本。

[关键词]钢结构;弧形钢梁;吊装;拼装;质量控制 [中图分类号]TU758.1 [文献标识码]A [文章编号]1002-8498(2014)02-0032-03 SteelStructureArcSteelBeams Sun Qunlun',Lin Binbin',Fu Linbo² (1.Zhejiang College of Construction,Hangzhou,Zhejang 311231,China; 2.Zhejang Zhongnan Group Steel Structure Co.,Ld.,Hangzhou,Zhejiang 310052,China) Abstract:A conference and exhibition center is oval plan,whose roof is oval steel structure. By analyzing the characteristics and difficulties of segmental hoisting and assembly construction of the oval steel structure arc beam,the arc beam segmental hoisting and assembly construction,construction points, quality control measures and the results of the simulation analysis are described in detail.Practice has proved that the segmental hoisting and assembly technology is reliable,can minimize the construction site requirements,improve the construction quality,reduce the rent amount and difficulty of hoisting machinery and save the construction cost. Key words;steel structures; arc steel beam; hoists; assembly; quality control 1工程概况 柱,其中劲性钢骨规格为口500×500×16,框架柱柱 某会展中心建筑平面造型近似椭圆形,屋顶结底标高为-1.650m,框架柱柱顶的最大标高约为 构为近似椭圆体钢结构(见图1)。

建筑长约114m,27.670m,屋顶结构弧形钢梁最大跨度为54m。

宽89m,屋顶最大高度约30m,建筑面积约2弧形钢梁特点和施工难点 30930m²,上下2个展厅,下层展厅面积约为 1)本会展中心工程结构体系繁杂,空间形状不 5360m²;上层展厅面积约为5472m²。

规则,涉及框架、屋面弦梁、屋面撑杆及外围弧形结 构等,结构体系节点形式多样,工序繁杂。

2)钢结构安装与土建及水电安装穿插施工,涉 及专业施工人员多,组织管理和安全控制难度大, + 高空作业点多面广,施工安全防护难度大。

图1近似椭圆形建筑平面 3)屋顶弧形钢梁最大跨度为54m,上弦杆为弧 Fig.1Approximate oval building plan 形H型钢,规格为H700×550×12×30,现场施工 条件复杂,运输及吊装困难且安装、测量难度较大。

框架结构柱为口800×800的劲性钢骨混凝土 4)屋面主钢梁为弧形钢梁,主钢梁与结构钢柱 间全部为销轴铰接,支撑钢管多。

焊接工作均在冬 [作者简介]孙群伦,工程师,讲师,E-mail:sunqunlun@126. 季进行,低温控制措施的增加使焊接难度加大,结 [收稿日期】2013-03-12 万方数据
2014 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年9月下 施工技术 第46卷第18期 CONSTRUCTION TECHNOLOGY 11 D0I:10.7672/5j52017180011 椭圆形不连续支承弦支穹顶预应力施工技术* 于敬海1 2,冷明1 3,张俊铎4,鲍敏5 (1.天津大学建筑工程学院,天津300072;2.天津大学建筑设计研究院,天津300073; 3.中国电建集团中南勘测设计研究院有限公司,湖南长沙410000;4.天津三建建筑 工程有限公司,天津300171;5.北京市建筑工程研究院有限责任公司,北京100039) [摘要]针对不连续支承椭圆形弦支弯顶结构,通过施工全过程分析,确定了适用于该类结构的分步分级张拉径向 杆的预应力施加方法.根据结构特点,设立了合理的施工张拉控制方法,实现了预应力体系的建立和结构的成型. 对施工过程中的网壳起拱值进行监测,结果表明现场监测值与理论计算值吻合较好.此外,对放样误差进行统计 分析发现,该误差对结构受力状态和最终起拱值影响较小.这说明了以索力控制为主,挠度控制为辅的控制标准 能够满足设计要求. [关键词]钢结构;索结构;预应力;弦支穹顶;施工过程;分级张拉:施工技术 [中图分类号]TU391 [文献标识码]A [文章编号]1002-8498(2017)18-0011-04 Prestressed Construction Technology of Suspendome Structure with Discontinuous Support YU Jinghail.2 LENG Ming'.3 ZHANG Junduo BAO Mins (1.School of Civil Engineering Tianjin University Tianjin 300072 China;2.Architectural Design and Research Institute of Tianjin University Tianjin 300073 China;3.Hydro China Zhongnan Engineering Co. Ld.Changsha Hu'nan 410000 China;4.Tianjin No.3 Construction Engineering Co.Ltd. Tianjin 300171 China;5.Beijing Building Construction Research Institute Co.Ld.Beijing 100039 China) Abstract:A step by step tension method is designed for suspended-dome structure with discontinuous support.A construction control method which is applied to prestressed system and the whole structure is established according to the structure's features.When the tension process pleted the theoretical value pared well with data from experiments.Moreover statistics of the laying out error suggest that its influence on stru...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年7月下第41卷第369期 138CONSTRUCTIONTECHNOLOCY
梅江会展中心钢结构施工中预应力内张拉模拟分析 田娥",戴立先²,吕黄兵²,李毅”,李立新 (1.北京联合大学机电学院,北京100020;2.中建钢构有限公司,广东深圳518040) 【摘要】对天津梅江会展中心屋架预应力结构和网架索结构的同步张拉过程进行模拟分析,分析验证被张控的控 索下料长度以及拉索端部节点的强度是否满足要求,得到每次张拉过程中所需的张拉值及每次张拉完成后主体结 构应力和变形值。

采用该方法模拟预应力索张拉过程,可改善原张拉过程需不断调整张力的施工方法,极大地提 高张拉施工的工作效率,降低施工成本。

在张控施工后表明,张拉后结构的实际值与张拉数值模拟的理论值较接 近,因此本方法在张拉钢结构工程中可行。

[关键词】钢结构;预应力;张拉;模拟分析;变形、 [中图分类号】TU311.41[文献标识码]A[文章编号】1002-8498(2012)14-0138-03 SimulationAnalysis oftheSteel ConstructionPrestressed Tension Tian E', Dai Lixian², LO Huangbing², Li Yi², Li Lixin (1.Mechanical and Electrial School,Bejing Union Uniersty,Bejing 100020, China; 2. China Construction Steel Structure Co.,Lud., Shenzhen, Guangdong 518040, China) Abstract;In order to verify whether the length of tensioning cable and the strength of ending joints meet requirements, the synchronous tensioning processing of roof truss prestressed in Meijing convention and exhibition center was simulated. And each tensioning force and the stress and deformation of main structures after tensioning was gained. This method can improve the original tensioning method which npe uauouaodu ueo pe snon a uuosa a ne ospu cost greatly.After tensioning construction,the results show that the actual values are close to the theoretical ones of simulation analysis,which indicates that this method is feasible for tensioning steel structures, Key words;steel structures; prestressing; tensioning; simulation; deformation 1工程概况 天津梅江会展中心二期钢结构总建筑面积 279698m²,金属屋面约6万m²;其顶层为大跨度悬 挑预应力钢桁架结构和网架结构,在屋架部位共有 6福桁架的上弦穿人拉索。

有24根轴线上弦杆中 穿人7×121拉索,单根拉索长约37m。

拉索材料采 用外包双层PE高强度冷拔镀锌钢丝拉索,抗拉强图1顶层钢结构三维模型 度≥1670MPa,钢索抗拉弹性模量E≥1.9×Fig.13D model of steel structure of the top roof 10"MPa,结构三维效果如图1所示。

拆除,应考虑被张拉的结构经历了不同的受力状 2张拉过程数值模拟重点及难点分析态;②张拉结构拉索的下料长度必须根据节点及结 在对结构的张拉数值模拟过程中,应重点考虑构的工作荷载进行精确模拟,才能控制拉索的长度 以下几点:①预应力张拉过程中,预应力钢结构从和精度,只有拉索制作的精度满足要求,张拉完成 结构的拼装,到预应力张拉完成以及最后支撑架的后的结构才有可能达到设计要求的预应力状态;③ [收稿日期]2011-12-26由于拉索端部节点汇交的杆件比较多,受力大,构 [基金项目]北京联合大学自然科学类校级项目(k201023x):北京造复杂,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年4月下 施工技术 第42卷第8期 CONSTRUCTIONTECHNOLOGY 31 DOI:10.7672/sgjs2013080031 梅县文体中心钢屋盖施工技术及质量控制要点 范良宜 (广州高新工程顾问有限公司,广东广州510665) [摘要】梅州市梅县文体中心钢结构屋面是由肋环形双层网架(主结构)和单层网架(中央附属部分)组成的组合 结构体系。

该钢屋盖结构体系构件复杂、施工难度大、系统检测和施工测量控制难度大。

根据工程特点及难点,从 钢屋盖结构的现场拼装、支撑胎架搭设、网架的高空散装及卸载等方面详细介绍了工程的施工工艺,提出了针对性 的质量控制监理措施。

[关键词]钢结构;屋盖;拼装;胎架;卸载;质量控制 [中图分类号]TU758 [文献标识码】A [文章编号〕1002-8498(2013)08-0031-05 SteelRoofConstructionandKeyQualityControl PointsforMeixian Culture and Sports Center Fan Liangyi (Guangzhou Gaoxin Project Management Co.,Lud.,Guangzhou,Guangdong 510665,China) Abstract:The steel roof of Meixian Culture and Sports Center is a bined structural system,consisting of a rib ring double-layer space truss (the main structure) and a single-layer space truss (central subsidiary parts).The steel roof was featured with plex structural members,which brought difficulties to construction,system detection and construction measurement control.According to the characteristics and challenges of the project, the key construction techniques,including assembly of the steel roof on site, setting of support jig,assembly and unloading of space truss at high altitude are introduced. Corresponding quality control methods are put forward. Key words:steel structures;roofs;assembly; jig;unloading; quality control 1工程概况 梅县文体中心和人民体育场工程是梅州市的 重点工程,即梅州市“四馆一场”工程(见图1)。

“四馆"是指由体育馆(文体中心主要功能,设计观 众席6000座)、博物馆、科学馆、县情展馆组成的集 体育比赛、汇演、展览和办公于一体的综合性场馆 建筑一梅县文体中心。

梅县文体中心占地 9500m²,地下2层,地上4层,总建筑面积 图1文体中心和体育场工程 Fig.1Culture and Sports Center and Stadium engineering 22136m²,总投资1.2亿元,主体结构为钢筋混凝土 结构。

“一场”是指梅县人民体育场,占地3.2万 合结构体系,其直径d=110m,总用钢量为1045t, m²,总投资5000万元,主体结构为钢筋混凝土结 整体钢屋盖中间采用抗压刚性环(外径d=27m、内 构,设计容纳观众2万人。

径d=19m)作为支撑,中央部分采用直径d=17.4m 梅县文体中心钢结构屋面是由肋环形双层网 的圆穹顶单层钢管网架、四周由36福径向辐射钢管 架(主结构)和单层网架(中央附属部分)组成的组 桁架(跨度L=41.5m)与环向稳定桁架组成的空间 网架结构(见图2)。

[作者简介】范良宜,总工程师,高级工程师,国家一级注册建造师, 注册监理工程师,E-mail:460681486@q. 2工程特点及难点分析 [收稿日期]2012-10-22 1)结构体系构件复杂多样,深化设计及质量控 万方数据
32 施工技术 第42卷 刚性环 中央网壳 程中构件变形等因素,结合工程现场的实际情况, 本工程钢屋盖结构施工安装的总体思路是:首先, 在工厂进行散件...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年1月下 施工技术 第42卷第2期 CONSTRUCTION TECHNOLOGY 35 梁式转换层预应力拉杆施工技术* 谢洪阳1,杨欢,李洪泉2 (1.南昌航空大学土木建筑学院,江西南昌330063;2.江西省建工集团有限责任公司,江西南昌330046) [摘要]结合赣州中廷广场项目,提出一种新的转换梁施工技术一一预应力斜拉杆施工法.通过合理设置预应力 斜拉杆,与框架梁柱形成组合结构,共同承担转换梁施工期间的荷载.该技术提高了框架梁施工阶段的承载能力, 减少了转换梁下层的支撑数量,缩短了施工工期. [关键词]梁式转换层;预应力;斜拉杆;支撑;施工技术 [中图分类号]TU731.2;TU375 [文献标识码]A 【文章编号]1002-8498(2013)02-0035-03 Construction of Beam Transfer Floor Using Prestressed Oblique Tensioning Link Xie Hongyang' Yang Huan' Li Hongquan2 (1.School of Civil Engineering and Architecture Nanchang Hangkong University Nanchang Jiangxi 330063 China; 2.Jiangxi Construction Engineering Group Co. Ltd.Nanchang Jiangxi 330046 China) Abstract:In the construction of Zhongting Square in Ganzhou an innovative method was proposed for the construction of beam transfer floor using pre-stressed oblique tensioning link.By properly setting pre- stressed oblique tensioning links which worked together with the concrete frame beams and columns a posite structure was formed to bear the loads of transfer beam during construction.This construction technique improves the bearing capacity of frame beam during the construction period reduces the number of supports required below the beam transfer floor and shortens the construction period. Key words:beam transfer floor;prestressing;oblique tensioning link;supports;construction 1工程概况 内结构转换梁施工一般采用埋设型钢桁架加强模 赣州中廷广场位于赣州市章贡区水南新区长板、层层卸荷一次支模浇筑或分层浇筑叠合成型等 征大道东侧,建筑高度96.2m 建筑面积54682m2 施工方法. 地下2层,地上30层.地下2层至地上6层为框架 1)预埋钢桁架法 剪力墙结构,7~30层为剪力墙结构标准层...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。
资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月下 施工技术 第42卷第14期 CONSTRUCTION TECHNOLOGY 5 D0I:10.7672/sgjs2013140005 桐庐励骏酒店巨型悬挑桁架铸钢节点安全性能研究 周小斐,周观根,沙学勇 (浙江东南网架股份有限公司,浙江杭州311209) [摘要]巨型悬挑桁架常用于对建筑立面有较大变化的建筑结构中.因构造复杂,构件的连接节点常使用铸钢节 点,但国内外目前的设计标准对这类节点并未提供计算公式,因此,试验方法或(和)有限元分析方法常作为检验这 类节点安全性的有效方法.对于桐庐励骏酒店巨型悬挑桁架中的铸钢节点的安全性能,采取了对样本铸钢节点进 行有限元分析与试验相结合的方法进行检验,而对其他节点采取了有限元分析的方法进行验证,该验证方法既能 有效保证铸钢节点的安全,又能节约资金.详细介绍了巨型悬挑结构铸钢节点安全性能的验证过程. [关键词]高层建筑;悬挑桁架;铸钢节点;有限元分析;试验 [中图分类号]TU323.4 [文献标识码]A [文章编号]1002-8498(2013)14-0005-03 Safety Performance Research on the Cast Steel Joint in Giant Cantilever Truss of Tonglu Legendale Hotel Zhou Xiaofei Zhou Guan'gen Sha Xueyong (Zhejiang Southeast Space Frame Co.Ltd.Hangzhou Zhejiang 311209 China) Abstract:Giant cantilever steel truss is often used in the building with long plex facade.Because of the structure plexity cast steel is often used in the connection joints of steel members.Because there is no any calculation formula for the cast steel joints at home and abroad the experiment and FEA are the most effective method in testing this kind of joints.The safety performance of cast steel joints sample in long cantilever steel truss of Legendale Hotel is tested by full scale experiment and FEA method and other joints are tested by FEA method.The verification method not only can guarantee the security of cast steel joint but also is economic.Safety performance research on the cast steel joint in giant cantilever steel truss of Legendale hotel is described in detail in this paper. Key words:tal...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月下 施工技术 第42卷第14期 CONSTRUCTION TECHNOLOGY D0I:10.7672/sgjs2013140001 桐庐励骏酒店巨型悬挑桁架支撑体系卸载关键技术 沙学勇,周观根,周小斐 (浙江东南网架股份有限公司,浙江杭州311209) [摘要]桐庐励骏酒店钢结构工程施工难点在于采用了大跨度巨型悬挑结构,最大悬挑长度达36m 其安装技术对 主体结构整体性影响较大,在安装过程中对悬挑部分的支撑架卸载过程进行了三维仿真分析,并对悬挑结构进行 了卸载过程中结构变形的监测.通过分析和监测,指导本工程的施工安装过程. [关键词]高层建筑;悬挑桁架;有限元分析;支撑架;卸载;监测 [中图分类号]TU731.2 [文献标识码]A[文章编号]1002-8498(2013)14-0001-04 Key Unloading Technology of the Bracing System for Giant Cantilever Truss of Tonglu Legendale Hotel Sha Xueyong Zhou Guan'gen Zhou Xiaofei (Zhejiang Southeast Space Frame Co. Ltd.Hangzhou Zhejiang 311209 China) Abstract:The construction difficulty of Legendale Hotel lies in the long-span giant cantilever truss used for the steel structure engineering.The maximum cantilever length is up to 36m and the installation technology of cantilever has great influence on the main structure integrity.The 3D digital simulation of the unloading process of the cantilever bracing system was conducted during installation and the deformation monitoring of the cantilever was carried out during unloading process.The result of analysis and monitoring is used to guide the construction of this project. Key words:tall buildings cantilever truss;finite element analysis;supports;unloading;monitoring 1工程概况 励骏酒店位于浙江省桐庐县城富春江畔,为桐 庐县标志性建筑.该工程主要由1幢高层酒店宾 馆、2层地下室及其他建筑(东西裙房)组成,总建筑 面积81000m2 总高度为157m 主楼39层,为钢框 架-钢筋混凝土核心筒结构(见图1).主楼大堂入 口的上方设有大悬挑楼层,该悬挑楼层共5层(2F ~7F 建筑标高10.200~35.700m) 最大悬挑长度 36m(见图2),桁架的主要上、下弦杆和斜、竖腹杆 采用焊接箱形截面,次要弦杆采用焊接H型钢或热 轧H型钢,节点区采用64个铸钢件节点.桁架间 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年10月下 86 CONSTRUCTIONTECHNOLOGY 第43卷第20期 DOI:10. 7672/sgjs2014200086 框架结构轻钢加层钢柱脚节点设计与施工 谢冰花,陈道政 (合肥工业大学土木与水利工程学院,安徽合肥230009) [摘要】为了有利于加层结构抗震,保证结构的整体性,新旧结构的连接(即柱脚节点)能否达到设计要求是轻钢加 层工程成败的关键。

结合某建筑物轻钢加层工程的实际情况,针对原框架结构的柱截面偏小、上部钢柱无法安装 的问题,提出了一种新型的柱脚连接形式,详细介绍了该柱脚连接形式的施工流程、构造要求和传力情况,以及与 传统节点形式相比,该柱脚节点的优点。

[关键词】钢结构;加层;柱脚;承载力;抗震性能 [中图分类号]TU323.5;TU758.13 [文献标识码】A:[文章编号]1002-8498(2014)20-0086-03 TheDesign and Construction of ColumnBaseJointofAppendingStory withLightWeightSteelsontheTopofConcreteFrameStructure Xie Binghua,Chen Daozheng (College of Ciil Engineering,HefeiUniversty of Technology,Hefei,Anhui230009,China) Abstract:To facilitate the seismic performance of adding structure and guarantee the integrality of structure,the connection between adding structure and original structure (column base joint)is the key to the project of adding story.Combined with the practical situation of the light weight steel adding storey project of a building,a new style of column base connection form was proposed concentrating on the problem of small column cross-section and being unable to install for original frame structure.A detailed introduction was given to the construction process,structural requirements and transferring way of force of heel connection form. Compared with traditional connection form,advantages of heel connection were also introduced. Key words;steel structures; adding storey; column base; bearing capacity; seismic performance 1工程概况 2010的要求对B段教学楼的基础、梁、板、柱等受力 合肥市解放军电子工程学院教学楼分为A段构件的承载力验算,对不满足承载力要求的构件采 和B段两部分,两栋建筑紧邻并均为钢筋混凝土框取合适的加固措施进行加固。

架结构。

A段为地上7层,首层层高为4.5m,2~72加固设计 首层层高为4.5m,2~4层层高为3.6m,总高度为进行加固和加层计算。

建筑安全等级为二级,抗震 15.3m。

两栋教学楼均建造于20世纪80年代初 设防类别为丙类,结构重要性系数为1.0,混凝土框 期,使用至今已有30年之久,根据建设单位的要求, 架结构抗震等级为三级,上部钢框架的抗震等级为 对B段教学楼进行平面功能改造,并将楼层由4层 四级,地震基本烈度为7度,设计基本地震加速度值 加到7层,使其与A栋教学楼等高。

为0.10g,设计地震分组为第一组,场地类别为二 由于该建筑的建造年代已久,其配筋和抗震构 类。

根据《混凝土结构加固设计规范》GB50367一 造均不能满足现有规范的要求,并且平面功能改造 2006第3.1.7条:①结构加固后的使用年限应由业 和加层导致其结构构件不能满足承载力要求,因 主和设计单位共同商定;②一般情况下,宜按30年 此,必须按现行《建...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)