施工技术 2013年9月下 114 CONSTRUCTIONTECHNOLOGY 第42卷第18期 DOI:10. 7672/sgjs2013180114 楼面行走式塔式起重机施工工艺设计 马小晶',薛刚',孟书斌²,张德欣² (1.内蒙古科技大学建筑与土木工程学院,内蒙古包头014010; 2.北京建工集团北京市机械施工有限公司,北京100045) [摘要】为解决狭小场地下进行大跨、超重钢结构的吊装问题,设计了位于楼面上的行走式塔式起重机施工工艺。

在大型钢结构施工中,可以通过在钢柱上增加牛腿,增加柱间钢梁来支撑行走轨道,使塔式起重机在建筑物内部行 走,完成钢结构吊装作业,解决大型钢结构工程中内部吊装大构件的难题。

对行走式塔式起重机的受力性能进行 分析,指出行走式塔式起重机施工过程中的控制要点,并对行走式塔式起重机的经济性进行分析。

结果表明该施 工工艺设计合理,经济效益明显。

【关键词】建筑机械;行走式塔式起重机;钢结构;安装 [中图分类号】TH213.3 【文献标识码】A [文章编号]1002-8498(2013)18-0114-04 ConstructionProcessDesignofTowerCraneWalkingonFloor Ma Xiaojing'’,Xue Gang',Meng Shubin²,Zhang Dexin² (1.SchoolofArchiteture &CivilEngineering,Inner Mongolia University of Science andTecnology, Baotou,Inner Mongolia 014010,China; 2.Bejing Mechanized Construction Co.,Lud., Beijing Construction Engineering Group Co.,Lud.,Beijing 100045,China) Abstract:In order to solve the hoisting diffculty when constructing a large-span and overweight steel the floors. During the construction of the large-scale steel structure, corbels were added on steel columns and extra steel beams were set up between columns to support the rails for the tower crane so that the tower crane can walk inside the structure to finish the hoisting job.This technology can solve the problems of lifting large structural elements from the inside of a large steel project. This paper analyzes the mechanical behaviour of the walking tower crane, indicates the key points to control during the construction. The economical efficiency of the walking tower crane construction is also analyzed.The results show that the construction technology with walking tower crane was properly designed and generated obvious economic benefits. Key words:construction equipment; walking tower crane;steel structures;installation 随着我国建设事业的不断发展,大跨度空间钢屋盖,新建天津西站的站房屋盖等工程。

本文以长 结构迎来了前所未有的发展机遇。

各种高、大、重、沙北辰三角洲钢结构施工中采用的行走式塔式起 造型奇特的钢结构建筑不断涌现,传统的钢结构安重机为例,对其施工工艺进行分析2]。

装施工工艺已经无法满足作业要求,传统安装设备1工程概况 甚至难以胜任新的吊装任务。

基于此,近年来涌现 长沙市开福区的北辰三角洲西北区(命名A1 出一批新的钢结构施工工艺。

位于楼面上的行走地...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年4月上 22 CONSTRUCTION TECHNOLOGY 第44卷第7期 D0I:10.7672/5js2015070022 楼板浇筑过程中脚手架支撑系统施工监测及数值分析 郭凯,王海,崔爱珍,元立刚 (中国建筑第八工程局有限公司天津分公司,天津300452) [摘要]对天津滨海国际机场扩建交通中心工程地下1层楼板及梁体的混凝土浇筑过程中,脚手架系统的安全状 况进行了研究,运用ANSYS软件对脚手架系统进行了数值模拟,计算得到脚手架系统在施工过程中内力和变形的 变化规律;并对脚手架系统在楼板及梁体混凝土浇筑过程杆件的内力变化进行了实时监测.监测的结果验证了数 值分析模型,同时也对混凝土浇筑过程中脚手架系统的安全状况提供依据. [关键词]脚手架;监测;数值模拟:内力;变形 [中图分类号]TU755.2 [文献标识码]A [文章编号]1002-8498(2015)07-0022-03 Construction Monitoring and Numerical Analysis for the Scaffold Supporting System in Slab Concrete Casting Process Guo Kai Wang Hai Cui Aizhen Qi Ligang Tianjin Branch China Construction Eighth Engineering Division Co.Lid.Tianjin 300452 China) Abstract:In this paper the security situation of scaffold system is studied for the ground floor of the Tianjin Binhai International Airport expansion transportation center project during concrete pouring process.The internal force and deformation for the scaffold system during the construction process can be got by using numerical simulation furthermore the bar's internal forces changes for the scaffold system can be obtained by real-time monitoring.The test results can verify the accuracy of the numerical model and also ean provide the safety condition for the scaffolding system during the conerete pouring process. Key words:scaffolds;monitoring;numerical simulation;internal force;deformation 建筑行业每年由于安全事故丧生的从业人员时,及时做出预警,以保证施工过程的安全. 有数千人之多,直接经济损失逾百亿元.据有关统1工程概况 计,在我国建筑施工系统每年发生的事故中,大约 天津滨海国际机场扩建配套机场交通中心工 有1/3左右直接或间接与架设工具及其使用的问题 程位于天津滨海国...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年1月下 32 CONSTRUCTIONTECHNOLOGY 第43卷第2期 DOI:10.7672/sgj82014020032 椭圆形钢结构弧形钢梁分段吊装拼装技术 孙群伦',林滨滨,傅林波² (1.浙江建设职业技术学院,浙江杭州311231;2.浙江中南建设集团钢结构有限公司,浙江杭州310052) [摘要】某会展中心建筑平面造型近似椭圆形,屋顶结构为近似椭圆体钢结构。

通过介绍椭圆形钢结构弧形钢梁 分段吊装拼装施工特点和难点,详细闸述了弧形钢梁分段吊装拼装施工流程、施工要点、质量控制措施与仿真分析 结果。

实践证明分段吊装拼装技术方法可靠,能够最大限度地减少对施工场地的要求,提高施工质量,减少机械吊 装台班量与难度,节约施工成本。

[关键词]钢结构;弧形钢梁;吊装;拼装;质量控制 [中图分类号]TU758.1 [文献标识码]A [文章编号]1002-8498(2014)02-0032-03 SteelStructureArcSteelBeams Sun Qunlun',Lin Binbin',Fu Linbo² (1.Zhejiang College of Construction,Hangzhou,Zhejang 311231,China; 2.Zhejang Zhongnan Group Steel Structure Co.,Ld.,Hangzhou,Zhejiang 310052,China) Abstract:A conference and exhibition center is oval plan,whose roof is oval steel structure. By analyzing the characteristics and difficulties of segmental hoisting and assembly construction of the oval steel structure arc beam,the arc beam segmental hoisting and assembly construction,construction points, quality control measures and the results of the simulation analysis are described in detail.Practice has proved that the segmental hoisting and assembly technology is reliable,can minimize the construction site requirements,improve the construction quality,reduce the rent amount and difficulty of hoisting machinery and save the construction cost. Key words;steel structures; arc steel beam; hoists; assembly; quality control 1工程概况 柱,其中劲性钢骨规格为口500×500×16,框架柱柱 某会展中心建筑平面造型近似椭圆形,屋顶结底标高为-1.650m,框架柱柱顶的最大标高约为 构为近似椭圆体钢结构(见图1)。

建筑长约114m,27.670m,屋顶结构弧形钢梁最大跨度为54m。

宽89m,屋顶最大高度约30m,建筑面积约2弧形钢梁特点和施工难点 30930m²,上下2个展厅,下层展厅面积约为 1)本会展中心工程结构体系繁杂,空间形状不 5360m²;上层展厅面积约为5472m²。

规则,涉及框架、屋面弦梁、屋面撑杆及外围弧形结 构等,结构体系节点形式多样,工序繁杂。

2)钢结构安装与土建及水电安装穿插施工,涉 及专业施工人员多,组织管理和安全控制难度大, + 高空作业点多面广,施工安全防护难度大。

图1近似椭圆形建筑平面 3)屋顶弧形钢梁最大跨度为54m,上弦杆为弧 Fig.1Approximate oval building plan 形H型钢,规格为H700×550×12×30,现场施工 条件复杂,运输及吊装困难且安装、测量难度较大。

框架结构柱为口800×800的劲性钢骨混凝土 4)屋面主钢梁为弧形钢梁,主钢梁与结构钢柱 间全部为销轴铰接,支撑钢管多。

焊接工作均在冬 [作者简介]孙群伦,工程师,讲师,E-mail:sunqunlun@126. 季进行,低温控制措施的增加使焊接难度加大,结 [收稿日期】2013-03-12 万方数据
2014 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年9月下 施工技术 第46卷第18期 CONSTRUCTION TECHNOLOGY 11 D0I:10.7672/5j52017180011 椭圆形不连续支承弦支穹顶预应力施工技术* 于敬海1 2,冷明1 3,张俊铎4,鲍敏5 (1.天津大学建筑工程学院,天津300072;2.天津大学建筑设计研究院,天津300073; 3.中国电建集团中南勘测设计研究院有限公司,湖南长沙410000;4.天津三建建筑 工程有限公司,天津300171;5.北京市建筑工程研究院有限责任公司,北京100039) [摘要]针对不连续支承椭圆形弦支弯顶结构,通过施工全过程分析,确定了适用于该类结构的分步分级张拉径向 杆的预应力施加方法.根据结构特点,设立了合理的施工张拉控制方法,实现了预应力体系的建立和结构的成型. 对施工过程中的网壳起拱值进行监测,结果表明现场监测值与理论计算值吻合较好.此外,对放样误差进行统计 分析发现,该误差对结构受力状态和最终起拱值影响较小.这说明了以索力控制为主,挠度控制为辅的控制标准 能够满足设计要求. [关键词]钢结构;索结构;预应力;弦支穹顶;施工过程;分级张拉:施工技术 [中图分类号]TU391 [文献标识码]A [文章编号]1002-8498(2017)18-0011-04 Prestressed Construction Technology of Suspendome Structure with Discontinuous Support YU Jinghail.2 LENG Ming'.3 ZHANG Junduo BAO Mins (1.School of Civil Engineering Tianjin University Tianjin 300072 China;2.Architectural Design and Research Institute of Tianjin University Tianjin 300073 China;3.Hydro China Zhongnan Engineering Co. Ld.Changsha Hu'nan 410000 China;4.Tianjin No.3 Construction Engineering Co.Ltd. Tianjin 300171 China;5.Beijing Building Construction Research Institute Co.Ld.Beijing 100039 China) Abstract:A step by step tension method is designed for suspended-dome structure with discontinuous support.A construction control method which is applied to prestressed system and the whole structure is established according to the structure's features.When the tension process pleted the theoretical value pared well with data from experiments.Moreover statistics of the laying out error suggest that its influence on stru...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年7月下第41卷第369期 138CONSTRUCTIONTECHNOLOCY
梅江会展中心钢结构施工中预应力内张拉模拟分析 田娥",戴立先²,吕黄兵²,李毅”,李立新 (1.北京联合大学机电学院,北京100020;2.中建钢构有限公司,广东深圳518040) 【摘要】对天津梅江会展中心屋架预应力结构和网架索结构的同步张拉过程进行模拟分析,分析验证被张控的控 索下料长度以及拉索端部节点的强度是否满足要求,得到每次张拉过程中所需的张拉值及每次张拉完成后主体结 构应力和变形值。

采用该方法模拟预应力索张拉过程,可改善原张拉过程需不断调整张力的施工方法,极大地提 高张拉施工的工作效率,降低施工成本。

在张控施工后表明,张拉后结构的实际值与张拉数值模拟的理论值较接 近,因此本方法在张拉钢结构工程中可行。

[关键词】钢结构;预应力;张拉;模拟分析;变形、 [中图分类号】TU311.41[文献标识码]A[文章编号】1002-8498(2012)14-0138-03 SimulationAnalysis oftheSteel ConstructionPrestressed Tension Tian E', Dai Lixian², LO Huangbing², Li Yi², Li Lixin (1.Mechanical and Electrial School,Bejing Union Uniersty,Bejing 100020, China; 2. China Construction Steel Structure Co.,Lud., Shenzhen, Guangdong 518040, China) Abstract;In order to verify whether the length of tensioning cable and the strength of ending joints meet requirements, the synchronous tensioning processing of roof truss prestressed in Meijing convention and exhibition center was simulated. And each tensioning force and the stress and deformation of main structures after tensioning was gained. This method can improve the original tensioning method which npe uauouaodu ueo pe snon a uuosa a ne ospu cost greatly.After tensioning construction,the results show that the actual values are close to the theoretical ones of simulation analysis,which indicates that this method is feasible for tensioning steel structures, Key words;steel structures; prestressing; tensioning; simulation; deformation 1工程概况 天津梅江会展中心二期钢结构总建筑面积 279698m²,金属屋面约6万m²;其顶层为大跨度悬 挑预应力钢桁架结构和网架结构,在屋架部位共有 6福桁架的上弦穿人拉索。

有24根轴线上弦杆中 穿人7×121拉索,单根拉索长约37m。

拉索材料采 用外包双层PE高强度冷拔镀锌钢丝拉索,抗拉强图1顶层钢结构三维模型 度≥1670MPa,钢索抗拉弹性模量E≥1.9×Fig.13D model of steel structure of the top roof 10"MPa,结构三维效果如图1所示。

拆除,应考虑被张拉的结构经历了不同的受力状 2张拉过程数值模拟重点及难点分析态;②张拉结构拉索的下料长度必须根据节点及结 在对结构的张拉数值模拟过程中,应重点考虑构的工作荷载进行精确模拟,才能控制拉索的长度 以下几点:①预应力张拉过程中,预应力钢结构从和精度,只有拉索制作的精度满足要求,张拉完成 结构的拼装,到预应力张拉完成以及最后支撑架的后的结构才有可能达到设计要求的预应力状态;③ [收稿日期]2011-12-26由于拉索端部节点汇交的杆件比较多,受力大,构 [基金项目]北京联合大学自然科学类校级项目(k201023x):北京造复杂,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年4月下 施工技术 第42卷第8期 CONSTRUCTIONTECHNOLOGY 31 DOI:10.7672/sgjs2013080031 梅县文体中心钢屋盖施工技术及质量控制要点 范良宜 (广州高新工程顾问有限公司,广东广州510665) [摘要】梅州市梅县文体中心钢结构屋面是由肋环形双层网架(主结构)和单层网架(中央附属部分)组成的组合 结构体系。

该钢屋盖结构体系构件复杂、施工难度大、系统检测和施工测量控制难度大。

根据工程特点及难点,从 钢屋盖结构的现场拼装、支撑胎架搭设、网架的高空散装及卸载等方面详细介绍了工程的施工工艺,提出了针对性 的质量控制监理措施。

[关键词]钢结构;屋盖;拼装;胎架;卸载;质量控制 [中图分类号]TU758 [文献标识码】A [文章编号〕1002-8498(2013)08-0031-05 SteelRoofConstructionandKeyQualityControl PointsforMeixian Culture and Sports Center Fan Liangyi (Guangzhou Gaoxin Project Management Co.,Lud.,Guangzhou,Guangdong 510665,China) Abstract:The steel roof of Meixian Culture and Sports Center is a bined structural system,consisting of a rib ring double-layer space truss (the main structure) and a single-layer space truss (central subsidiary parts).The steel roof was featured with plex structural members,which brought difficulties to construction,system detection and construction measurement control.According to the characteristics and challenges of the project, the key construction techniques,including assembly of the steel roof on site, setting of support jig,assembly and unloading of space truss at high altitude are introduced. Corresponding quality control methods are put forward. Key words:steel structures;roofs;assembly; jig;unloading; quality control 1工程概况 梅县文体中心和人民体育场工程是梅州市的 重点工程,即梅州市“四馆一场”工程(见图1)。

“四馆"是指由体育馆(文体中心主要功能,设计观 众席6000座)、博物馆、科学馆、县情展馆组成的集 体育比赛、汇演、展览和办公于一体的综合性场馆 建筑一梅县文体中心。

梅县文体中心占地 9500m²,地下2层,地上4层,总建筑面积 图1文体中心和体育场工程 Fig.1Culture and Sports Center and Stadium engineering 22136m²,总投资1.2亿元,主体结构为钢筋混凝土 结构。

“一场”是指梅县人民体育场,占地3.2万 合结构体系,其直径d=110m,总用钢量为1045t, m²,总投资5000万元,主体结构为钢筋混凝土结 整体钢屋盖中间采用抗压刚性环(外径d=27m、内 构,设计容纳观众2万人。

径d=19m)作为支撑,中央部分采用直径d=17.4m 梅县文体中心钢结构屋面是由肋环形双层网 的圆穹顶单层钢管网架、四周由36福径向辐射钢管 架(主结构)和单层网架(中央附属部分)组成的组 桁架(跨度L=41.5m)与环向稳定桁架组成的空间 网架结构(见图2)。

[作者简介】范良宜,总工程师,高级工程师,国家一级注册建造师, 注册监理工程师,E-mail:460681486@q. 2工程特点及难点分析 [收稿日期]2012-10-22 1)结构体系构件复杂多样,深化设计及质量控 万方数据
32 施工技术 第42卷 刚性环 中央网壳 程中构件变形等因素,结合工程现场的实际情况, 本工程钢屋盖结构施工安装的总体思路是:首先, 在工厂进行散件...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年1月下 施工技术 第42卷第2期 CONSTRUCTION TECHNOLOGY 35 梁式转换层预应力拉杆施工技术* 谢洪阳1,杨欢,李洪泉2 (1.南昌航空大学土木建筑学院,江西南昌330063;2.江西省建工集团有限责任公司,江西南昌330046) [摘要]结合赣州中廷广场项目,提出一种新的转换梁施工技术一一预应力斜拉杆施工法.通过合理设置预应力 斜拉杆,与框架梁柱形成组合结构,共同承担转换梁施工期间的荷载.该技术提高了框架梁施工阶段的承载能力, 减少了转换梁下层的支撑数量,缩短了施工工期. [关键词]梁式转换层;预应力;斜拉杆;支撑;施工技术 [中图分类号]TU731.2;TU375 [文献标识码]A 【文章编号]1002-8498(2013)02-0035-03 Construction of Beam Transfer Floor Using Prestressed Oblique Tensioning Link Xie Hongyang' Yang Huan' Li Hongquan2 (1.School of Civil Engineering and Architecture Nanchang Hangkong University Nanchang Jiangxi 330063 China; 2.Jiangxi Construction Engineering Group Co. Ltd.Nanchang Jiangxi 330046 China) Abstract:In the construction of Zhongting Square in Ganzhou an innovative method was proposed for the construction of beam transfer floor using pre-stressed oblique tensioning link.By properly setting pre- stressed oblique tensioning links which worked together with the concrete frame beams and columns a posite structure was formed to bear the loads of transfer beam during construction.This construction technique improves the bearing capacity of frame beam during the construction period reduces the number of supports required below the beam transfer floor and shortens the construction period. Key words:beam transfer floor;prestressing;oblique tensioning link;supports;construction 1工程概况 内结构转换梁施工一般采用埋设型钢桁架加强模 赣州中廷广场位于赣州市章贡区水南新区长板、层层卸荷一次支模浇筑或分层浇筑叠合成型等 征大道东侧,建筑高度96.2m 建筑面积54682m2 施工方法. 地下2层,地上30层.地下2层至地上6层为框架 1)预埋钢桁架法 剪力墙结构,7~30层为剪力墙结构标准层...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。
资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月下 施工技术 第42卷第14期 CONSTRUCTION TECHNOLOGY 5 D0I:10.7672/sgjs2013140005 桐庐励骏酒店巨型悬挑桁架铸钢节点安全性能研究 周小斐,周观根,沙学勇 (浙江东南网架股份有限公司,浙江杭州311209) [摘要]巨型悬挑桁架常用于对建筑立面有较大变化的建筑结构中.因构造复杂,构件的连接节点常使用铸钢节 点,但国内外目前的设计标准对这类节点并未提供计算公式,因此,试验方法或(和)有限元分析方法常作为检验这 类节点安全性的有效方法.对于桐庐励骏酒店巨型悬挑桁架中的铸钢节点的安全性能,采取了对样本铸钢节点进 行有限元分析与试验相结合的方法进行检验,而对其他节点采取了有限元分析的方法进行验证,该验证方法既能 有效保证铸钢节点的安全,又能节约资金.详细介绍了巨型悬挑结构铸钢节点安全性能的验证过程. [关键词]高层建筑;悬挑桁架;铸钢节点;有限元分析;试验 [中图分类号]TU323.4 [文献标识码]A [文章编号]1002-8498(2013)14-0005-03 Safety Performance Research on the Cast Steel Joint in Giant Cantilever Truss of Tonglu Legendale Hotel Zhou Xiaofei Zhou Guan'gen Sha Xueyong (Zhejiang Southeast Space Frame Co.Ltd.Hangzhou Zhejiang 311209 China) Abstract:Giant cantilever steel truss is often used in the building with long plex facade.Because of the structure plexity cast steel is often used in the connection joints of steel members.Because there is no any calculation formula for the cast steel joints at home and abroad the experiment and FEA are the most effective method in testing this kind of joints.The safety performance of cast steel joints sample in long cantilever steel truss of Legendale Hotel is tested by full scale experiment and FEA method and other joints are tested by FEA method.The verification method not only can guarantee the security of cast steel joint but also is economic.Safety performance research on the cast steel joint in giant cantilever steel truss of Legendale hotel is described in detail in this paper. Key words:tal...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月下 施工技术 第42卷第14期 CONSTRUCTION TECHNOLOGY D0I:10.7672/sgjs2013140001 桐庐励骏酒店巨型悬挑桁架支撑体系卸载关键技术 沙学勇,周观根,周小斐 (浙江东南网架股份有限公司,浙江杭州311209) [摘要]桐庐励骏酒店钢结构工程施工难点在于采用了大跨度巨型悬挑结构,最大悬挑长度达36m 其安装技术对 主体结构整体性影响较大,在安装过程中对悬挑部分的支撑架卸载过程进行了三维仿真分析,并对悬挑结构进行 了卸载过程中结构变形的监测.通过分析和监测,指导本工程的施工安装过程. [关键词]高层建筑;悬挑桁架;有限元分析;支撑架;卸载;监测 [中图分类号]TU731.2 [文献标识码]A[文章编号]1002-8498(2013)14-0001-04 Key Unloading Technology of the Bracing System for Giant Cantilever Truss of Tonglu Legendale Hotel Sha Xueyong Zhou Guan'gen Zhou Xiaofei (Zhejiang Southeast Space Frame Co. Ltd.Hangzhou Zhejiang 311209 China) Abstract:The construction difficulty of Legendale Hotel lies in the long-span giant cantilever truss used for the steel structure engineering.The maximum cantilever length is up to 36m and the installation technology of cantilever has great influence on the main structure integrity.The 3D digital simulation of the unloading process of the cantilever bracing system was conducted during installation and the deformation monitoring of the cantilever was carried out during unloading process.The result of analysis and monitoring is used to guide the construction of this project. Key words:tall buildings cantilever truss;finite element analysis;supports;unloading;monitoring 1工程概况 励骏酒店位于浙江省桐庐县城富春江畔,为桐 庐县标志性建筑.该工程主要由1幢高层酒店宾 馆、2层地下室及其他建筑(东西裙房)组成,总建筑 面积81000m2 总高度为157m 主楼39层,为钢框 架-钢筋混凝土核心筒结构(见图1).主楼大堂入 口的上方设有大悬挑楼层,该悬挑楼层共5层(2F ~7F 建筑标高10.200~35.700m) 最大悬挑长度 36m(见图2),桁架的主要上、下弦杆和斜、竖腹杆 采用焊接箱形截面,次要弦杆采用焊接H型钢或热 轧H型钢,节点区采用64个铸钢件节点.桁架间 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年10月下 86 CONSTRUCTIONTECHNOLOGY 第43卷第20期 DOI:10. 7672/sgjs2014200086 框架结构轻钢加层钢柱脚节点设计与施工 谢冰花,陈道政 (合肥工业大学土木与水利工程学院,安徽合肥230009) [摘要】为了有利于加层结构抗震,保证结构的整体性,新旧结构的连接(即柱脚节点)能否达到设计要求是轻钢加 层工程成败的关键。

结合某建筑物轻钢加层工程的实际情况,针对原框架结构的柱截面偏小、上部钢柱无法安装 的问题,提出了一种新型的柱脚连接形式,详细介绍了该柱脚连接形式的施工流程、构造要求和传力情况,以及与 传统节点形式相比,该柱脚节点的优点。

[关键词】钢结构;加层;柱脚;承载力;抗震性能 [中图分类号]TU323.5;TU758.13 [文献标识码】A:[文章编号]1002-8498(2014)20-0086-03 TheDesign and Construction of ColumnBaseJointofAppendingStory withLightWeightSteelsontheTopofConcreteFrameStructure Xie Binghua,Chen Daozheng (College of Ciil Engineering,HefeiUniversty of Technology,Hefei,Anhui230009,China) Abstract:To facilitate the seismic performance of adding structure and guarantee the integrality of structure,the connection between adding structure and original structure (column base joint)is the key to the project of adding story.Combined with the practical situation of the light weight steel adding storey project of a building,a new style of column base connection form was proposed concentrating on the problem of small column cross-section and being unable to install for original frame structure.A detailed introduction was given to the construction process,structural requirements and transferring way of force of heel connection form. Compared with traditional connection form,advantages of heel connection were also introduced. Key words;steel structures; adding storey; column base; bearing capacity; seismic performance 1工程概况 2010的要求对B段教学楼的基础、梁、板、柱等受力 合肥市解放军电子工程学院教学楼分为A段构件的承载力验算,对不满足承载力要求的构件采 和B段两部分,两栋建筑紧邻并均为钢筋混凝土框取合适的加固措施进行加固。

架结构。

A段为地上7层,首层层高为4.5m,2~72加固设计 首层层高为4.5m,2~4层层高为3.6m,总高度为进行加固和加层计算。

建筑安全等级为二级,抗震 15.3m。

两栋教学楼均建造于20世纪80年代初 设防类别为丙类,结构重要性系数为1.0,混凝土框 期,使用至今已有30年之久,根据建设单位的要求, 架结构抗震等级为三级,上部钢框架的抗震等级为 对B段教学楼进行平面功能改造,并将楼层由4层 四级,地震基本烈度为7度,设计基本地震加速度值 加到7层,使其与A栋教学楼等高。

为0.10g,设计地震分组为第一组,场地类别为二 由于该建筑的建造年代已久,其配筋和抗震构 类。

根据《混凝土结构加固设计规范》GB50367一 造均不能满足现有规范的要求,并且平面功能改造 2006第3.1.7条:①结构加固后的使用年限应由业 和加层导致其结构构件不能满足承载力要求,因 主和设计单位共同商定;②一般情况下,宜按30年 此,必须按现行《建...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2010年2月 施工技术 第39卷第2期 CONSTRUCTION TECHNOLOGY 67 格宾网挡墙在某堤防工程中的应用 范光华,贾刚2,张进3 (1.四川省水利电力工程局,四川都江堰611830; 2.重庆市弘禹水利咨询有限公司,重庆401147; 3.中国煤炭经济技术合作总公司西南路桥,重庆401046) [滴要]重庆市巴南区长江防洪护岸综合整治二期工程(外河坪段)采用格宾网挡墙进行滨江路堤防支护.格宾网 挡墙具有适应性强、透水能力强、结构整体性强、施工方便易组合、耐久性好、造价低等特点.针对格宾网挡墙施工 难点,介绍格宾网挡墙制作技术、施工工艺流程以及施工过程中组装控制质量管理.并对格宾网挡墙的面板出现 受压鼓出等特殊情况处理进行了探导.结果表明,工程质量满足设计、规范要求. [关键词]格宾网挡墙;堤防;施工技术 [中围分类号]U416.1 [文献标识码]A[文章编号]1002-8498(2010)02-0067-03 Application of Gabion Retaining Wall in Some Dike Fan Guanghua' Jia Gang? Zhang Jin' (1.Water Conservaney and Hydroelectricity Engineering Bureau of Sichuan Province Dujiangyan Sichuan 611830 China; 2.Chongging Hongyu Water Resources Consulting Co. Lid.Chongging 401147 China; 3.Coal Economic and Technical Cooperation Corporation Southwest Road and Bridge in China Chongging 401046 China) Abstract:Gabion retaining wall is taken to support dike of Binjiang Road in No.2 engineering with Waiheping section of Yangzi River floodwater and revetment in Chongqing.There are characteristics in Gabion retaining wall including good adaptability high permeability good structural integrity convenient construction good durability and low cost.Based on construction difficulties of Gabion retaining wall fabrication construction flow and control quality management are introduced during the process of construction.Besides special accidents of Gabion retaining wall are outlined such as the panel is pressed to bloat.The results show that engineering quality can meet demands of desig...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年2月上 82 CONSTRUCTION TECHNOLOGY 第45卷第3期 D0I:10.7672/8gjs2016030082 柔性防水施工在钢楼承板组合轻质屋面工程中的应用* 郑光升,杨凯,王志凌,井谢谢 (内蒙古兴泰建设集团有限公司,内蒙古鄂尔多斯017010) [摘要]将常用于重型屋面的柔性卷材防水与轻质屋面基层结合,既保证了屋面的防水效果又减小了屋面自重. 利用机械固定及热风焊接技术固定柔性卷材与轻质屋面基层,保证了卷材与基层连接的牢固性和接缝处的防水 性,解决了常规轻质屋面采用刚性防水在屋面造型处及突出物处的漏水问题以及因为混凝土屋面自重较大难以实 现大跨度场馆结构要求的问题. [关键词]防水工程;屋面工程;柔性防水;大跨度结构;轻型钢屋架;钢楼承板 [中图分类号]TU761.1*1 [文献标识码]A [文章编号]1002-8498(2016)03-0082-03 Construction Technology of Flexible Waterproof in Composite Light-weight Roof of a Large-span Steel Building Zheng Guangsheng Yang Kai Wang Zhiling Jing Xiexie Inner Mongolia Xingtai Construction Group Co.Ld.Erdos Inner Mongolia 017010 China) Abstract:Combining the flexible waterproofing material with the light-weigh roof the waterproof effect is insured and the weight of the roof is reduced.Mechanical fastening and hot air welding technology are used to fix flexible waterproof material and light-weight roofing ensuring the stability and superior waterproof performance.The use of rigid waterproof roof and prominent in the water leakage problem as well as the use of flexible waterproof layer for concrete roof weight is solved to meet the requirements of large-span structures. Key words:waterproofing;roofs;flexible waterproof;large-span structures;light-weight roof truss; steel floors 1工程概况 板上铺设无纺布隔离层;最后铺设聚酯纤维内增强 本工程为乌兰察布市体育馆,位于乌兰察布 型PVC防水卷材,卷材用自攻螺钉及套筒固定在钢 市集宁新区,占地约10000m2 看台座位3300个, 楼承板上,然后将钉孔处利用卷材搭接接头覆盖, 可容纳4个标准羽毛球比赛场地或1个标准篮球 卷材的搭接采用热风焊接方式,焊缝强度、保证年 比赛场地.本馆为全封闭式,屋顶高14m 屋盖为 限与母材的性...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2014年4月上 110CONSTRUCTIONTECHNOLOGY第43卷第7期 DOI:10. 7672/sgjs2014070110 柔性钢梁大跨顶推关键技术研究*
马重刚,谢小飞,雷夏林 (中建三局建设工程股份有限公司工程总承包公司,湖北武汉430070) [摘要】武汉江汉六桥主桥为钢混组合梁的自锚式悬索桥,钢梁为双边主梁,采用顶推法施工,最大顶推跨径为 90m。

施工中结合钢梁结构形式与顶推设备特点,优化临时措施及增设背撑结构以减小最大顶推跨径时导梁前端 挠度,调整各临时支点高程保证梁段拼装线型和导梁无措施上墩。

工程结果表明,各项指标精度均满足设计要求。

[关键词]桥梁工程;钢梁;顶推技术;背撑结构;模拟分析 【中图分类号】U445.462【文献标识码】A[文章编号】1002-8498(2014)07-0110-04 ResearchonLarge-spanIncrementalLaunchingTechnology ofFlexibleSteelGirder Ma Zhonggang,Xie Xiaofei,Lei Xialin (General Construction Company of CCTEB,Wuhan,Hubei 430070,China) Abstract;The main bridge of the Sixth Hanjiang River bridge in Wuhan is a self-anchored suspension bridge with a steel and concrete bination girder which using incremental launching method. The largest span of incremental launching is 90 meters. Considering the girder structure and incremental launching device characterisics,which optimizing temporary measures and adding back support structure to reduce the deflection of guiding beam in maximum incremental launching span.Adjusting the temporary support elevation beam assembly line and ensure none measures to guiding beam. Engineering practice shows that it can meet the requirement of the design. Key words:bridges; steel girder; incremental launching technology;back support structure; simulations 顶推法是指在桥台的后方设置施工场地,将梁武汉江汉六桥是武汉市首座自锚式悬索桥,跨、 体在桥头施工场地逐段浇筑或拼装,用千斤顶纵向径布置为110m+252m+110m=452m,两侧增设 顶推,使梁体借助滑道或滑块,逐段或整段向前顶48m+57m压重跨,主桥钢梁总重达7000t。

其中2× 推,就位后落梁的施工方法。

顶推法具有桥梁节段(48+57+16.5)m采用预应力混凝土箱梁结构,其 固定在一个场地预制,可不中断交通或通航等特余均采用边主梁形式的钢-混凝土结合梁。

主梁采 点。

顶推法广泛适用于深谷和宽深河道上的桥梁、用边主梁形式的钢-混凝土结合梁,桥梁中心线处梁 高架桥以及等曲率曲线桥建设,混凝土箱梁及钢箱高3.56m,全宽(包括风嘴)42.8m,设有双向2.3% 梁均可采用逐段拼装并顶推施工。

的横坡,主梁布置如图1所示。

武汉江汉六桥主梁为三跨双边主梁的钢混结2顶推方案确定 构主梁,钢结构主梁采用平面框架体系,为不影响2.1顶推平台地址选择 汉江通航,钢梁采用顶推法施工,江中设置3组临时武汉江汉六桥采用一跨过江形式,2个主塔布 墩,为满足通航需求,临时墩最大间距为90m。

对于置在防洪大堤旁,汉口侧塔柱局防洪挡墙约140m, 这种柔性钢梁结构采用顶推法施工且顶推跨径达汉阳侧塔柱距离防洪大堤约50m。

汉阳侧堤内施工 90m,其技术要求高、施工难度大。

作业区域条件较差,而汉口侧施工作业区域较为良 1工程概况好,对比分析如图2所示。

图2a中,场地经过平整后,高程为+26.000m, *中建三局课题:大跨度柔性钢梁顶推...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年12月上 施工技术 第43卷第23期 CONSTRUCTION TECHNOLOGY 47 D01:10.7672/8gjs2014230047 柔性支架设计方法与应用研究* 孙九春12 (1.同济大学土木工程学院,上海200092;2.腾达建设集团股份有限公司,上海200122) [摘要]支架作为一种重要的临时支撑结构,形式日趋多样,但是相关的研究、规范主要针对满布式钢管支架,而对 于梁式支架尚缺乏相应的设计与计算方法.为此首先提出基于支架力学特点的分类方法,创建了柔性支架设计荷 载的分类与组合方法.在此基础上,基于现浇结构与柔性支架的受力特点,提出复合受力结构的概念,建立了基于 刚性支撑的柔性支架计算方法.结果表明,该方法较传统方法更科学合理,结构本身的安全度受到应有重视. [关键词]桥梁工程;支撑;复合结构;现浇混凝土 [中图分类号]U445;TU311.4 [文献标识码]A [文章编号]1002-8498(2014)23-0047-08 Study on Design Method and Application of Flexible Supports Sun Jiuchun'.2 (1.College of Civil Engineering Tongji University Shanghai 200092 China: 2.Tengda Construction Group Co.Lad. Shanghai 200122 China) Abstract:As an important temporary support structure support system has different forms.However relevant researches and standards are mainly focused on full space steel tube supports.Appropriate design and calculation methods for beam-type supports are rarely reported.To solve this problem this paper firstly puts forward a classification method based on the mechanical characters of supports then classification and bination method of design load of flexible supports is established.On this basis based on the mechanical characters of cast-in-situ structure and flexible supports the concept of bined-force structure is proposed.And the calculation method of flexible supports based on rigid support is established.The results show that the proposed method is more rational than traditional method.The safety of structures gets enough attention it d...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年6月 72 CONSTRUCTION TECHNOLOGY 第39卷第6期 某高大模板钢管支撑体系设计与施工管理 何礼生,邓斌 (武警水电第二总队五支队,江苏常州213031) [摘要]南马海立电器有限公司新建铁芯车间果用大跨度单层结构厂房,属于超高、超跨度的大型混凝土结构工 程.参照相关设计和施工规范,提出高支架搭设方法.同时,对基础、立杆、水平杆等构件进行构造处理,对支撑钢 管、扣件和立杆进行稳定计算.通过采取施工各阶段的技术安全管理措施,保证了施工安全,提前完成施工任务. [关键词]混凝土工程;高大模板;设计;施工管理 [中图分类号]TU731.2 [文献标识码]A [文章编号]1002-8498(2010)06-0072-03 Design and Construction Management of Supporting System in Some Tall Steel-tube Formwork He Lisheng Deng Bin (No.5 Detachment No.2 Hydropower Force of Armed Police Changshou Jiangsu 213031 China) Abstract:The large-span single-layer factory is adopted to new-built steel core workshop in Nanchang Haili Electric Co.Ltd.which belongs to super-tall and super-span concrete structure.Based on the corresponding design and construction codes the installation method about tall formworks is put forward. Furthermore the structure of foundation vertical bar horizontal bar and so on are designed.The stability calculation of supporting steel-tube fasteners and vertical bar is carried out.The construction safety is ensured by selecting technological safe measures at different stages in construction.The construction is pleted in advance. Key words:concrete engineering;tall formwork design;construction management 当前,建筑施工中模板支撑体系出现失稳、坍塌等 事故,并经常导致群体性伤亡事故.如何提高模板支 撑体系特别是高大模板支撑体系的安全可靠性,是建 筑行业杜绝安全事故发生的一个重要课题. 1工程概况 南吕海立电器有限公司新建厂房铁芯车间为大跨 度单层结构厂房,屋面标高为15.0~16.44m 总高为 ×8-18 540 17.2m 平面尺寸为114m×96m(见图1),跨度为24m 0 梁底标高为12.4m 梁截面尺寸:主梁高1200mm 宽为 图1结构平面示意(单位:m) 400mm 次梁250mm 宽为4...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年12月上 施工技术 第42卷第23期 CONSTRUCTIONTECHNOLOGY 49 DOI:10. 7672/sgjs2013230049 某高填方路基加宽施工技术 崔昌洪',刘武松²,田世宽2 (1.北京科技大学土木与环境工程学院,北京100083;2.中交一公局第四工程有限公司,广西南宁530031) [摘要]新建高速公路与原有高速公路网连接,将带来更多新、老路基加宽、拼宽带处理问题,特别是在西南地区山 岭重丘地带,更多的新老路基加宽、拼宽位于高填方段内。

详细介绍了高填方路堤新、旧路基施工方法,包括高填 方路基加宽段高边坡稳定性计算,高填方路基加宽段施工存在的问题分析,高填方路基加宽段施工技术处理方案, 有效保证了新、旧路基结合部位的工程质量。

[关键词]公路工程;路基;高填方路基;盲沟;施工技术 [中图分类号]U416.16 【文献标识码】A [文章编号]1002-8498(2013)23-0049-04 WideningConstructionTechnologyofSomeHighFillSubgrade Cui Changhong',Liu Wusong²,Tian Shikuan² (1.Civiland Environmental Engineering School,Universty ofScience andTechnology Beijing,Beijing100083,China; 2.TheFourthEngineering Co.,Ld.ofCCCCFirsHighway Engineeing Co.,Ld.,Nanning,Guangxi530031,China) Abstract;The connection of new and old expressway network causes widening of new and old subgrade, treatment problemof widening strip,in particular,inmountainous heavyhilly area of southwest China, widening strip of more new and old subgrade is located in high fill subgrade section. The authors introduce construction method of new and old high fill subgrade,including stability calculation of high slope,problem analysis in construction,construction scheme for widening section of high fill subgrade, which ensure engineering quality in the binding site of new and old high fill subgrade. Key words:road construction;subgrade;high fill subgrade;blind drain;construction 1工程概况 渝泸高速斑竹林互通 路基B匝道路基 斑竹林枢纽互通立交位于重庆市三环高速公 路永川双石一江津塘河段终点,为半定向T形枢纽 YLK45+814.780 互通,B,C匝道上跨渝泸高速公路。

BK1+110.000° 3 由于B匝道下道出口段路基设计路线位于原 渝泸高速公路高填方路基边坡上,故需对B匝道 70.790 (BK0+813.500-BK1+451.016段)与渝泸 图1新、老路基加宽设计断面 (YLK45+650.000-YLK45+900.000段)原高填方 Fig.1 Design section for new and old 路基作加宽处理(见图1)。

subgrade widening 2工程地质、水文概况 为透水性差的粉质黏土。

基岩主要为中风化砂质 由于渝泸高速公路施工扰动后,岩层较破碎, 泥岩夹部分砂岩和泥岩,裂隙较发育,岩体较完整, 并且裸露基岩多为第四系土层覆盖,下伏基岩为侏 砂质泥岩和泥岩为相对隔水层,地下水较为丰富。

罗系上统遂宁组泥岩或砂岩和砂质泥岩互层。

B匝 3高填方路基加宽段高边坡稳定计算 道新加宽路基位于3条冲沟交汇处,其地下水主要 3.1参数取值 为第四系孔隙水和基岩裂隙水,以坡面流的形式向 根据现场试验和查路桥施工计算手册得:土的 斜坡临空面或冲沟排泄。

场地土体厚度变化较大, 重度y=19kN/m²,黏聚力c=6kPa...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年11月上 10 CONSTRUCTION TECHNOLOGY 第43卷第21期 D0I:10.7672/5j52014210010 某风洞消声室结构施工关键技术 李博平,张笈玮,杨辉 (中国人民解放军63926部队,北京100192) [摘要]针对某风洞消声室结构施工中,结构剪力墙较高,墙体垂直度要求高及结构施工前室内大型设备已安装, 无法从地面搭设满堂脚手架作为梁板模板支撑等施工难题,提出了高大剪力墙施工精度控制技术和现浇梁板无地 面支撑可测可控支撑体系施工技术,通过该技术顺利解决了施工难题. [关键词]风洞:混凝土;支撑:剪力墙;精度:施工技术 [中图分类号]TU745.4 [文献标识码]A [文章编号]1002-8498(2014)21-0010-03 Structural Construction Technology of Muffler Room of a Wind Tunnel Li Boping Zhang Jiwei Yang Hui The 63926 Troop of Chinese People's Liberation Army Beijing 100192 China) Abstract:During the construction of the muffler room of a wind tunnel the standard of the squareness for the high shear walls is strict.Full scaffold framing can't be applied to support the mould boards for the beams and plates because of the large-seale equipment installed before the construction.Based on above problems the technologies of the accuracy controlling for the high shear walls and the determinable and controllable framing for the mould boards for the beams and plates were proposed.And the problems are solved. Key words:wind tunnels;concrete;supports;shear walls;accuracy;construction 1工程概况 消声室是某风洞工程的重要组成部分,结构形 式为地上单层钢筋混凝土剪力墙结构(见图1a) 平 面尺寸为30.3m×12.3m 层高23.3m 由于室内无 隔墙,单面剪力墙长30.3m、高23.3m 要求垂直度 偏差≤10mm 剪力墙施工精度控制难度较大.此 外,由于安装工艺的要求,在消声室结构施工前,室 内设备已安装就位(见图1b) 设备直径8.5m 长 a消声室结构施工现场 26.8m 中心标高5.800m 占用了消声室结构内的 场地空间,设备两侧距离剪力墙不足2m(见图1c) 无法从地面搭设满堂脚手架,现浇钢筋混凝土屋面 梁板施工成为难点. 针对以上施工难题,研究提出了大尺寸混凝土 剪力墙施工精度综合控制技术和现浇混凝土梁板 无地面支撑可测可控模板支撑体系. b结构施工前室内 2现浇梁板无地面支撑模板支撑体系 c消声室内部示意 设备...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年6月上 施工技术 第40卷第342期 CONSTRUCTION TECHNOLOGY 75 某预应力空心板梁模板改进工艺 刘仁衫 (汕头港港口工程质量监督站,广东汕头515041) [摘要]预应力空心板梁桥由于受力明确,构造简单,易于标准化预制生产及施工,是国内桥梁应用最为广泛的桥 型之一.针对桥梁预应力空心板梁的施工难点,对芯模、侧模板固定、端头模板、预埋钢板、板底三角工艺进行了 改进,拓展了芯模的固定和组合技术,改进了侧模板和端头模板的固定方法,改变了预埋钢板、板底三角的施工 思路.结果表明:改进工艺可以减少材料损耗,节约材料成本,大幅提高构件的外观质量. 【关键词]空心板梁:工艺改进:芯模:端头模板:预埋钢板;三角 [中图分类号]TU755.2 [文献标识码]A[文章编号]1002-8498(2011)11-0075-03 Technical Improvement of Prestressed Hollow Slab Beam Formwork Liu Renshan Shantou Port Engineering Quality Supersision Station Shantou Guangdong 515041.China) Abstract:Because of clear stress and simple structure of prestressed hollow slab beam bridge it is easy for standard prefabricated production and construction and it is one of the most widely used bridges in domestic.According to the construction difficulties of prestressed hollow slab beam the technologies of core formwork side formwork fixing ending formwork embedded steel plate and bottom triangle wedge are improved.The fixing and bination technology of core formwork is expanded the fixing methods for side formwork and ending formwork are advanced as well as that the construction idea for embedded steel plate and bottom triangle wedge is changed.The results show that the advanced technologies can reduce material consumption save material cost and improve appearance quality of the ponent. Key words:hollow slab beam;technology improvement;core formwork;ending formwork;embedded steel plate;triangle wedge 1工程概况 390 870 60250 温州市城区防洪堤三期二阶段工程为Ⅱ级堤防 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年8月下 92 CONSTRUCTION TECHNOLOGY 第41卷第371期 某预应力工程施工技术难点与对策 付奕 (上海城市管理职业技术学院,上海200231) [摘要]以浦东空港物流仓储作业区预应力工程为例,阐述了预应力工程在实际施工中遇到的施工难点和实际的 技术处理方法,重点介绍了预应力筋的分段布置、预应力筋张拉端的设置、张拉端临时辅助孔的留设、与其他工序 的搭接与配合等.实践表明,该施工工艺在工程质量、施工进度或工程成本方面,均取得了良好的效果. [关键词]混凝土;预应力;张拉端设置;施工方案 [中图分类号]TU757.3 [文献标识码]A[文章编号]1002-8498(2012)16-0092-03 Technical Difficulties and Countermeasures of Construction of Prestressed Concrete in Some Project : Fu Yi (Shanghai Technical College of Urban M&nagement Shanghai200231 China) Abstract:Based on the prestressed concrete construction of Pudong Airport Logistics warehouse project construction difficulties encountered in the actual construction and effective technical measures for prestressed concrete are illustrated.Several aspects are introduced in detail including the segmented layout of the prestressing tendons the tension set of side the tension side temporary auxiliary holes leaving in the lap and cooperation with other processes.The result shows that the construction process has a good effect on construction quality control period and cost control. Key words:concrete;prestressing;tension side arrangemenl;construction;scheme 1工程概况 ① 133600 125000 浦东空港物流仓储作业区仓储建设项目建筑 A区 B区 面积为14万m2 高23.65m 为钢筋混凝土框架结 构.楼层为3层,由仓储区和行车区组成.楼层标 后浇带 6 周浇带 00 高分别为:仓储区6.95 13.95m 行车区5.65, 12.65m 屋面为钢结构.分A B C和盘道区4个部 分(见图1).仓库区主要柱网尺寸为11m×11m 行 变形缝 车区主要柱网尺寸为16m×11m. C区 2预应力设计 盘道区 00999 预应力筋采用1860级钢绞线(即《预应力混凝 土用钢绞线》GB/T5224一2003中高强低松弛钢绞 图1工程平面 线),框架梁采用有黏结预应力技术,井字次梁采用 Fig.1 Project plan...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)