首页 > 2023 ( 第 437 页)

2016年12月上 施工技术 第45卷第23期 CONSTRUCTION TECHNOLOGY D0I:10.7672/sj52016230007 沈阳宝能环球金融中心超大型巨柱地脚螺栓及 抗剪键在大底板中安装技术 潘春龙,王高飞,赵有平,陈思明 (中建三局集团有限公司东北分公司,辽宁沈阳110000) [摘要]沈阳宝能环球金融中心项目1塔楼为在建东北第一高楼,其结构形式为巨型外框伸臂桁架劲性混凝 土核心筒结构,外框巨柱最大截面为5.2m×3.5m 逐渐收缩至1.8mx1.8m.在巨柱安装过程中,其地脚螺栓必须 精准定位.本工程为保证地脚螺栓精准定位,在施工过程中提前插入,采用非埋人形式,其柱脚预埋安装采用地脚 螺栓进行定位埋设.巨型外框钢柱地脚螺栓埋入筏板基础内,与基础钢筋穿插施工,筏板基础钢柱柱脚通过固定 支撑架锚栓定位. [关键词]高层建筑;钢结构;巨柱;地脚螺栓;抗剪键;底板;安装 [中图分类号]TU758.11 [文献标识码]A [文章编号]1002-8498(2016)23-0007-03 Installation Technology of Anchor Bolt and Shear Connector for Super Giant Column in the Large Base Plate for Shenyang Baoneng Global Financial Center Pan Chunlong Wang Gaofei Zhao Youping Chen Siming Northeast Branch of China Construction Third Engineering Group Co.Lsd. Shenyang Liaoning 110000 China) Abstract:The Tower 1 of Shenyang Baoneng Global Financial Center which is in construction will be the tallest building in the northeast of China whose structure is posed of mega frame outrigger and posite steel concrete core.The maximum section dimension of giant column is 5.2m x 3.5m gradually shrinking to 1.8m x 1.8m.The anchor bolts must be accurately positioned in the installation of giant column.To ensure precise position of anchor bolts and insert them in advance in the construction the project adopts non-submerged anchor bolts which are installed by the position of support structure. The giant steel anchor bolts fixed with reinforcing steel bar are embedded in the foundation. Key words:tall buildings;steel stru...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年7月下 CONSTRUCTION TECHNOLOGY第41卷第369期
沈抚新城“生命之环”三角形桁架 自平衡索具吊装技术
许海峰 (上海市机械施工有限公司,上海200072) [摘要】异形钢结构在施工过程中,存在着起吊、定位、固定难等特点。

沈抚新城”生命之环”主体结构主要为混凝 土基础和三角形变截面钢管析架组成的环状结构体系,分段构件采用现场胎架整体拼装,大型膜带式起重机起吊 回直,并通过相关指施调节至吊装角度,安装到位并固定。

本工程特制的自平衡系统索具很好地解决了构件体型 大、截面异形、重心难确定等问题。

重点介绍了该索具的工作方式及其吊装角度调整。

[关键词]钢结构;桁架:吊装;自平衡索具:施工技术 [中图分类号】TU758.15[文献标识码]A[文章编号】1002-8498(2012)14-0144-03 DevelopmentofaSelf-balancedRiggingin the HoistingoftheCircleofLifeofShen-FuNewTown Xu Haifeng (Shanghai Mechonized Contructioen Co. , Lad. , Shanghai 200072, China) Abstract;Steel struclures with special shapes impose difficulty during construction because they are difficult to hoist, locate and fix. The main structure of the Cirele of Life in Shen-Fu New Town consists of a concrete foundation and a triangle truss with tapered steel tube sections. The ponents for each section were assembled on site,and then hoisted to erection position by crawler crane.At the same time, paxy μadoud pe ue usoq tauo o pasnpe aam Koq q azns ayeu o padope aiam saunseou A self-balsnced riging aystem was developed to solve the problems of hoisting large ponents with special-shaped sections,whose center of cccentricities are difficult to determine.The working principles and the hoisting angle adjustment method for the rigging system are introdueed in detail. Key words steel structures; trusses; hoists; self-balance riging; construction 业区和生态旅游区“一带三区”环环相扣、紧密相 在发展迅速的钢结构安装领域,吊装构件的种连。

结构整体高度达150m,堪称世界第1环。

类越来越庞大而多样化,通常为不规则形体,在安“生命之环”象征永恒与和谐,寓意美满稳定与 装过程中存在着转换工况复杂且吊装工况紫多的生命不息,体现沈抚新城"宜居、宜商、宜业”的生态 特点。

沈抚新城“生命之环”工程通过对一种特殊新城建设理念。

索具的使用,有效地解决了上述问题,做到了一套本工程结构新颖复杂.主体结构主要为混凝土 索具一步到位。

本文详细介绍了该工程施工的实基础和三角形变截面钢管桁架组成的环状结构体 践经验。

系。

结构按外圆直径170m与内圆直径150m的非 1工程概况同心圆放样得出,两圆心间垂直距离为5746mm,结 “生命之环”是沈抚新城的标志性建筑,位于沈构顶标高为153.98m。

工程使用的最大钢管直径 抚新城中心,依水面建,以象征沈抚新城核心区、产1000mm.最大壁厚为50mm,经过考虑将整个结构 [收璃日期]2012-04-15分为TR-1-TR-7总计13个单元。

其中TR-2~TR- [基金项目】上海建工集团股份有限公司科研项目:沈抚新城”生命7需要现场拼装后整体吊装,分段如图1所示。

之环“综合施工技术研究与示范(11JCSF-10)[作者筒介】许海峰,项目副经理,...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2011年3月下 64 CONSTRUCTION TECHNOLOGY 第40卷第337期 汽机平台基座弹簧隔振器释放控制技术 程惠敏,刘钊,吴荣 (中建二局核电建设分公司,广东深圳518034) [摘要]以岭澳二期核电站汽机平台基座弹簧隔振器为例,介绍隔振器释放的过程控制.组成建筑物弹性支承系 统的弹簧隔振器和黏滞阻尼隔振器在工厂根据设计要求预紧好后运至现场安装,而后待隔振基础上设备安装 完成后采用专用液压千斤顶系统进行释放,通过释放过程中针对性调整,达到预定的弹性状态.释放调整是确保 该支撑系统发挥作用的关键. [关键词]汽机平台;隔振器;释放;过程控制 [中图分类号]TU352.1 [文献标识码]A[文章编号]1002-8498(2011)06-0064-03 Release Control of Spring Vibration Isolator on Turbine Platform Cheng Huimin Liu Zhao Wu Rong Nuclear Power Construction Branch China Construction Second Engineering Bureau Shenshen Guangdong 518034 China) Abstract:Based on LingAo Nuclear Power Plant 2nd Phase project the release process control of the spring vibration isolator on turbine platform is introduced.The spring vibration isolator and viscous damper vibration isolator pose the elastic supporting system of buildings.The vibration isolators have been pre-tightening in factory according to design and transported to construction site for installation. Then after all equipments are installed on the isolator it is released with a special hydraulic jacks system.The predetermined elasticity conditions can be matched through targeted adjustment during release.It proves that release adjustment is the key factor for ensuring the support system. Key words:turbine platform;vibration isolator;release;process control 1隔振器概况 汽轮发电机组采用半速机时,针对其低转速、低 频率的特点,在汽轮发电机平台基座处安放弹簧隔 振器可确保基座与平台下的混凝土框架柱分开,形 成弹性基座,使弹性基础的固有频率远离汽轮发电 机组转动运行频率,可以有效阻止振动噪声的传播 和由汽轮发电机引起的频率在20-30Hz间的典型 aTK型弹簧隔报器 振动,并减弱建筑外一般防展沟、防震墙...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年7月上 施工技术 第40卷第344期 CONSTRUCTION TECHNOLOGY 43 江苏沛屯地区预应力管桩单桩竖向承载力研究 张旭光1,李杰1,刘兴杰2,张海芳1 (1.中国矿业大学资源与地球科学学院,江苏徐州221116;2.上海大屯能源股份有限公司,江苏徐州221611) [摘要]现行《建筑桩基技术规范》JGJ94一2008中根据土的物理指标与承载力参数之间的经验关系确定单桩竖向 承载力在沛屯地区应用中发现有较大误差.收集了沛屯地区比较有代表性的1例工程勘察资料及桩基质量检测 报告,从影响桩侧阻力和桩端阻力发挥因素方面分析了误差产生的原因,通过MATLAB编程对收集的资料进行统 计分析,得出黏土、粉土与含砂姜黏土的极限桩侧阻力修正系数和极限柱端阻力修正系数,从而建立了符合该地区 管桩实际承载力的经验计算公式,为这一柱型在该地区实际工程中的应用提供了依据. [关键词]预应力管桩;承载力;桩侧阻力;桩端阻力;修正系数;静载试验 [中图分类号]TU473.11 [文献标识码]A [文章编号]1002-8498(2011)13-0043-04 Research on the Vertical Bearing Capacity of the Single Prestressed Pipe Pile in Peitun Area of Jiangsu Province Zhang Xuguang' Li Jie' Liu Xingjie' Zhang Haifang' (1.The School of Resource and Earth Science China University of Mining and Technology Xuzhou Jiangsu 221116 China: 2.Shanghai Datun Energy Resources Co.Ltd.Xuzhou Jiangsu 221611 China) Abstract:It's inappropriate when applied to Peitun area for the existing Technical Code for Building Pile Foundations JGJ94-2008 in accordance with soil physical indicators and the empirical relationship between the bearing capacity of single pile identified capacity.This thesis concludes uncovers the reason for errors from the impact of side resistance and tip resistance factors based on data including investigation data of 11 projects and reports of pile foundation detection.After the statistics analysis and calculation of collected data with the method of MATLAB programming are made.The authors obtain clay silt and clay with lime concretion ultimate resi...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2015年11月下 62CONSTRUCTIONTECHNOLOGY第44卷第22期 DOI:10. 7672/sgjs2015220062
江苏某大跨度高空钢连廊施工技术
张晓雄,张亚飞 (中亿丰建设集团股份有限公司,江苏苏州215000)
[摘要】江苏师范大学文化创意产业园文化创意大厦钢结构空中连廊位于75m以上高空。

该项目高度高,体量大, 质量要求高。

在结构安装过程中,采取了缆索吊装这一非常规吊装方法,通过科学、合理、可靠的技术论证和有效 的质量控制,成功地施工了该项工程,满足了施工和设计要求。

[关键词]钢结构;连廊;缆索;吊装;主索;垂度;施工技术 [中图分类号]TU758[文献标识码]A[文章编号]1002-8498(2015)22-0062-03 ConstructionTechnology of a Large-span Steel CorridorinHighSky inJiangsu ZhangXiaoxiong,ZhangYafei (Zhongyifeng Construction Group Co.,Ltd.,Suzhou,Jiangsu 215000, China) Abstract;Large-span steel corridor of Culture Creative Building in Culture Creative Industry Park of the Jiangsu Normal University locates at in 75m of high sky.The building has characteristics of high height, mass volume and high quality request. During installation of the building, the non-normal hoisting method of cable hoisting is used. By science,reasonable and reliable technique demonstration and effective quality control,the building is constructed successfully to meet the request of design and construction. Key words:steel structures; corridor; cable;hoists;main cable; dip; construction
1工程概况50kN,根本无法满足主梁的吊装要求。

因此要完成 江苏师范大学文化创意产业园文化创意大厦连廊结构的吊装,只能重新选择吊装方案。

钢结构空中连廊分为上下两层,底层标高75.230m,2.2方案确定 顶层标高80.030m,每层连廊长33.6m,宽14.8m,针对该工程钢结构跨度大、自重大、高度高等 面积约500m²,由5福主梁(H1000×45×16×25)特点并结合施工场地情况,结合以往类似工程的施 及梁间7根次梁(H450×200×8×16)构成(见图工经验和国内大跨度钢结构安装施工的工程实例, 1)。

主梁通过设置于混凝土柱牛腿上的抗震支座进行了多方案的比较分析。

目前国内大高度、大跨 与主体结构连接。

主梁跨度达到14.8m,每福主梁度、大吨位钢构件的非正常安装办法一般可采用拔 质量达到5t。

杆吊装、高空滑移、缆索吊装等方法。

各种吊装方 2方案选择法的特点和优缺点比较如表1所示。

2.1技术难点综合分析该工程的具体情况,结合各种吊装方 受到工程本身特点及现场施工条件的限制,连法的特点和优缺点,并考虑现有的机械设备情况、 廊东侧为5层裙房结构,西侧为大面积地下室顶板,施工工期等要求,我们认为高空滑移虽然最为经济 南北两侧为主体塔楼,四周均无法停放大型吊装设可靠,但仍未能解决构件垂直运输的技术难题;而 备,现场原有的塔式起重机设备,吊装范围内的极拔杆安装并不适用本项目大跨度结构构件的安装, 限吊装承载力仅为15kN,而连廊钢梁单福重达缆索吊装虽然在前期准备和施工工期的合理性上 [作者筒介]张晓雄,副总经理,高级工程师,E-mailzhangxiaoxiong@有局限,但却是最适应本工程特点的吊装方案。

最 zyfchina.终我司确定了缆索吊装这一施工方案。

[收稿日期]2015-08-17
万方数据
2015 No.22张晓雄等:江苏某大跨度高空钢连廊施工技术63
表1多种吊装方法对比 Table 1Comparing of hoisting methods 序号吊装方法特点优点缺点
...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年10月下 施工技术 第45卷第20期 CONSTRUCTION TECHNOLOGY 37 D0I:10.7672/sjs2016200037 江苏大剧院戏剧厅钢屋盖安装分析 路伟伟1,李德2,曹平周2,傅新芝1,吴文平1,王文兴 (1.江苏沪宁钢机股份有限公司,江苏宜兴214231; 2.河海大学土木与交通学院,江苏南京210098) [摘要]大型公共建筑钢结构工程由于跨度大、结构形式复杂、用钢量大等特点而带来一系列施工难题,施工过程 中“路径”与“时间”效应对结构合龙时的受力状态与几何形态影响较大,合理的施工方案在保证施工安全的前提 下应尽量减小结构合龙后由于施工所产生的残余应力.以在建的江苏大剧院戏剧厅钢屋盖施工安装为背景工程, 结合戏剧厅钢屋盖结构特点及现场施工条件,拟定钢屋盖安装方案,采用有限元计算软件MIDAS/GEN进行钢屋盖 施工全过程模拟分析,为戏剧厅钢屋盖施工安装提供技术指导.将理论计算结果同实际监测结果进行对比分析, 考证所建有限元模型及所选计算分析方法的正确性. [关键词]钢结构;吊装;安装;分析;施工方案 [中图分类号]TU391;TU758.11 [文献标识码]A [文章编号]1002-8498(2016)20-0037-04 Analysis of Installation in Steel Roof of Drama Hall in Jiangsu Grand Theater Lu Weiwei' Li De2 Cao Pingzhou? Fu Xinzhi' Wu Wenping' Wang Wenxing (1.Jiangsu Huning Steel Mechanism Co.Lsd. Yixing Jiangsu 214231 China; 2.College of Civil and Transportation Engineering Hohai University Nanjing Jiangsu 210098 China) Abstract:Due to the large span plex structure form high steel consumption and other characteristics there are a series of problems of steel structure projects The effect of‘path’and*time' in the construction process have a great influence on the stress state and geometric shape in closure of the structures.Reasonable construction scheme should minimize the residual stress due to construction after closure of the structures on the premise of the safety of construction.Based on the construction and installation of steel roof in Jiangsu Grand Theater drama hall bining with the structure characteristics and construction conditions of d...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2017年1月下 8CONSTRUCTIONTECHNOLOGY第46卷第2期 DOI:10.7672/sgjs2017020008 江苏大剧院大跨钢结构施工健康监测技术 马强,李昌驭² (1.江苏沪宁钢机股份有限公司,江苏宜兴214231; 2.南京市建筑安装工程质量监督站,江苏南京210000) [摘要]江苏大剧院钢结构工程包括歌剧厅、音乐厅、戏剧厅、综艺厅4个单体钢结构工程。

外罩钢结构形式类似, 均由斜柱、摇摆柱、中环梁、顶环梁以及内凹顶盖的钢拉梁与环梁等主要部分组成。

屋盖跨度大、结构受力复杂,为 验证钢结构施工方案的合理性,确保钢结构施工过程中结构的安全性,对钢结构进行变形和应力、应变监测,监测 结果可作为结构安全与否的重要评估指标。

[关键词]钢结构;变形;应力;应变;监测;施工技术 [中图分类号】TU758.11[文献标识码]A[文章编号]1002-8498(2017)02-0008-03 HealthMonitoringTechnology ofLarge-spanSteel StructureConstructionofJiangsuGrandTheatre Ma Qiang',Li Changyu² (1.Jiangsu Huning Stel Mechanism Co.Lad.,Yixing,Jiangsu 214231,China; 2.NanjingConstructionandInstallationEngineeringQualitySupervisionStation,Nanjing,Jiangsu20000.China) Abstract:The steel structure engineering of Jiangsu Grand Theatre includes opera hall, concert hall, drama hall and arts hall of four monomer steel structure engineerings. The housing steel structures are similar,consisting of inclined column, swinging columns and ring beam,top ring beam and the concave top steel beam ring beam and other major parts. The roof span is large and the structure is plicated. In order to verify the rationality of the steel structure construction scheme and ensure the safety of the structure during the construction of steel structure, the deformation,stress and strain monitoring of the steel structure are conducted,which can be used as an important evaluation index for the structural safety. Key words:steel structures; deformation; stress; strain;monitoring; construction
1工程概况 江苏大剧院是一个集演艺、会议、展示、娱乐等 功能为一体的大型文化综合体,地处长江之滨的南 京河西新城核心区,并位于河西中心区东西向文体 轴线西端。

基地净用地面积共19.6633万m²,总建 筑面积271386m²,建筑高度47.3m。

建筑效果如图1江苏大剧院建筑效果 图1所示。

Fig.1Effect of Jiangsu Grand Theatre 江苏大剧院工程主要包括歌剧厅、音乐厅、戏凝土框架柱顶上,混凝土柱顶设大截面混凝土环梁 剧厅、综艺厅4个单体工程。

其中,4个单体结构类拉结形成的框架体系。

斜柱采用变截面箱形构件, 似,外罩钢结构由斜柱、摇摆柱、中环梁、顶环梁及柱底标高12m(综艺厅为6m)。

部分区域设圆管截 内凹顶盖的钢拉梁与环梁等主要部分组成。

面摇摆柱以支撑斜柱,摇摆柱柱底搁置于下方混凝 斜柱柱底为双向球铰支座,支承于下方钢骨混土框架柱或剪力墙上。

标高27.000m处和顶部弧 [收稿日期]2016-09-20[作者简介]马强,高级工程师,E-mail:maqiang@jshngj.面边缘分别设大截面圆管的...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年7月下 64 CONSTRUCTION TECHNOLOGY 第45卷第14期 D0I:10.7672/8js2016140064 江苏大剧院关节轴承节点支座静力试验研究 马强1,余杰2,张翔宇1 (1.江苏沪宁钢机股份有限公司,江苏宜兴214231; 2.宜兴市万石镇村镇建设管理服务所,江苏宜兴214212) [摘要]江苏大剧院工程钢柱柱脚支座采用关节轴承节点,该节点由铸钢底座、方柱、向心关节轴承、销轴、耳板和 盖板等部件组成.此类节点使用较少,缺乏试验依据和受力机理亦不明确,无明确的计算方法确定其承载力.为 验证设计荷载下的受力安全性,对该节点进行了足尺加载试验和有限元分析,通过试验监测,得到了节点各部件的 应变、位移和应力变化情况. [关键词]钢结构;关节轴承;静力试验;应变;有限元分析 [中图分类号]TU318 [文献标识码]A [文章编号]1002-8498(2016)14-0064-04 Static Experimental Study on Spherical Plain Bearing Joint for Jiangsu Grand Theater Ma Qiang' Yu Jie2 Zhang Xiangyu' (1.Jiangsu Huning Steel Mechanism Co.Ltd.Yixing Jiangsu 214231 China; 2.Rural Construction Management Office Wanshi Yixing Yixing Jiangsu 214212 China) Abstract:A type of spherical plain bearing joint on the base of steel column is adopted in Jiangsu Grand Theater.The joint is posed of a cast steel base square column a radial spherical plain bearing a pin shaft and ear-plates and cover plates.This kind of joint uses less and lacks of experimental basis. The stress mechanism and bearing capacity calculation method are not clear.The full-scale joint loading tests and finite element analysis were carried out in order to verify the safety under the design load.The change of strain stress and displacement in the various part of the joint were obtained from the tests. Key words:steel structures;spherical plain bearing;static experiment;strain;finite element analysis 1试验背景 15000kN.试验节点构造如图2所示. 江苏大剧院钢结构工程跨度大,钢柱形状不规 则,为释放端部弯矩,柱端与支座选用铰接连接. 为实现空间上的铰接,本工程在钢柱端部采...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年11月 64 CONSTRUCTION TECHNOLOGY 第39卷第11期 江苏LNG项目旋挖后注浆挤扩灌注桩施工技术 王国辉,祁建永,张彦鹏 (河北建设察研究院有限公司,河北石家庄050031) [摘要]江苏LG项目储罐基础采用旋挖钻孔后注浆挤扩灌注桩.针对工程施工难点,介绍了聚合物泥浆旋挖钻 孔、三岔双向挤扩施工、桩端后注浆施工的工艺流程、施工方法和质量控制要点.通过本工程的应用效果,说明了 三岔双向挤扩技术和桩端后注浆技术对桩基承载力的影响,以及聚合物泥浆旋挖钻孔技术的快速、环保特性.结 果表明,这3项技术联合应用可有效缩短施工工期、显著提高桩基承载力,降低工程造价. [关键词]钻孔灌注桩;旋挖钻孔;聚合物泥浆;后注浆;挤扩桩 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2010)11-0064-04 Construction Technology of Post-grouting and Extrude-expanding Bored Piles with Rotary Drilling in Jiangsu LNG Project Wang Guohui Qi Jianyong Zhang Yanpeng Hebei Research Institute of Construction and Geotechnical Inrestigation Co.Ltd.Shijiazhuang Hebei 050031 China) Abstract:Post-grouting and extrude-expanding bored pile with rotary drilling technocogy is adopted in tank foundation of Jiangsu LNG projeet.Based on difficulties in construction technical process main quality control points and construction method of rotary drilling with polymer slurry construction of expanded branches and bells by 3-way extruding arms and tip post-grouting are introduced.By the application of the technology influence of expanded branches and bells by 3-way extruding arms and tip post-grouting technology on the pile bearing capacity is described as well as the fast and environmentally friendly features of rotary drilling technology with polymer slurry.The results confirm that bined application of these three techniques ean effeetively short construction duration and significantly improve the bearing capacity o...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年10月下 78 CONSTRUCTIONTECHNOLOGY 第41卷第375期 江宁国家电网玻璃幕墙拉索结构设计与优化 杨浩,罗斌,郭正兴 (东南大学土木工程学院,江苏南京210096) [摘要]南京江宁国家电网玻璃蒋墙采用单层平面索网索结构,拉索为不锈钢材质,与常规玻璃幕墙相比,其具有 索网面积大、变形控制难的特点。

原索网结构由于不锈钢拉索应力松弛大、拉索高空张拉技术难等缺点,故需对其 优化设计。

通过调整索网结构布置、改变索材等,设计了几种优化方案并与原方案进行对比研究,包括索网结构内 力和变形的对比分析,并考虑了结构局部变化对结构性能的影响。

分析研究表明,索材替换对索网拉索的内力和 变形影响不大,而索网支撑布置的变化对索网的结构性能影响较大。

[关键词]钢结构;玻璃幕墙;索网;优化;设计 [中图分类号]TU767.6 [文献标识码】A [文章编号】1002-8498(2012)20-0078-04 Cable Structure Design and Optimization Research ofState Grid Glass Facade in Jiangning Yang Hao,Luo Bin,Guo Zhengxing (School of Civil Engineering, Southeast University,Nanjing,Jiangsu 210096, China) Abstract:The glass curtain wall facade in Jiangning of Nanjing is monolayer plane cable net structure, whose cable is stainless steel cable. Different from conventional facade having been studied, this cable nets. area is larger and deformation control is more difficult. Because the stainless steel cable' s stress relaxation is large and the technology of cable tensioning in aloft is difficult, the optimization design is needed for the cable nets structure. This paper has designed several optimization schemes by changing cable nets structure arrangement, and had contrast studies to the original scheme,including the analysis of internal force and deformation of the cable net structure, and also consider the local structure change that has influence on the performance of the structure. The results show that changing the cable material has low influence on the cable internal force and deformation of the cable net,but the influence is large when the cable net support arrangement is changed. Key words:steel structures; glass curtain wall; cable net; optimization; design 1工程概况 江宁国家电网玻璃幕墙南立面拉索幕墙为一 水平索 单层平面索网结构,拉索边界条件为大刚度支撑的 钢箱梁和钢骨混凝土柱。

拉索幕墙形状为矩形,其 水平三 高度为58.5m,宽度为27m;在幕墙底部的中间,有 角桁架 一高3.7m、宽7m的矩形门洞。

该玻璃幕墙总面积 竖向索 约为1500m²,属于大跨度单层平面索网幕墙结构 体系。

整个幕墙的平面布置如图1所示。

2结构特点 27 000 与传统单层平面索网幕墙受力特征相似,该索 图1拉索幕墙立面布置 [收稿日期]2012-08-14 Fig.1 Facade of cable of curtain wall...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年6月下 施工技术 第43卷第12期 CONSTRUCTION TECHNOLOGY 17 D0I:10.7672/5j52014120017 江坪河大坝趾板可变角度滑模施工技术* 吴远亮,王燕,李元 (武警水电第二总队第四支队,江西南昌330096) [摘要]江坪河大坝趾板混凝土采用可变角度滑模浇筑施工工艺及方法,对比常规滑模和普通模板施工,得出可变 角度滑模施工方法具有简单、经济、高效、安全等特点.详细介绍了可变角度滑模模体设计,具体施工技术及控制 要点.实践表明此滑模技术缩短了施工工期,经济效益良好. [关键词]坝;趾板;混凝土;滑模;施工技术 [中图分类号]TU755.2 [文献标识码]A[文章编号]1002-8498(2014)12-0017-03 Construction of Sliding Formwork with Variable Angle for Toe Slab of Jiangpinghe Dam Wu Yuanliang Wang Yan Li Yuan No.4 Detachment of No.2 Hydropower Force of Armed Police Nanchang Jiangxi 330096 China) Abstract:The construction process and method of sliding formwork with variable angle is used in concrete construction of toe slab of Jiangpinghe Dam.Compared with ordinary sliding formwork and ordinary formwork the sliding formwork has lots of advantages such as simple economic high efficiency and safety.The formwork body design concrete construction technology and control key points of sliding formwork with variable angle are introduced in detail.The result shows that the sliding formwork construction has reduced the construction period and the good economic benefit is obtained. Key words:dam;toe slab;concrete;sliding formwork;construction 1工程概况 2可变角度滑模提出背景 江坪河水电站位于水上游河段,地处湖北省 江坪河水电站大坝趾板由河床段、左右岸坡段 鹤峰县走马镇,为大(1)型一等工程,以发电为主,构成,各段趾板的“翘头”与其水平段夹角均不同, 兼顾防洪,装机2台,总装机容量450MW 多年平均 以及水平段长度、“翘头”上表面坡面长等均不同, 发电量9.64亿kWh.枢纽由混凝土面板堆石坝、 滑模架一次定型设计无法满足段的施工要求. 右岸泄水建筑物、左岸引水发电系统等建筑物组 根据趾板变化的特点,滑模模体采取分节设计加 成.江坪河混凝土面板堆石坝坝顶高程为476.0m 工,现场组装而成,这样一套滑模架可满足全部趾 坝顶宽10.0m 坝顶...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2010年5月 施工技术 第39卷第5期 CONSTRUCTION TECHNOLOGY 91 气循环玻璃幕墙应用技术 李宪锋,刘苏文,孙海涛 (中国矿业大学(徐州)艺术与设计学院,江苏徐州221008) 【摘要]气循环玻璃幕墙作为一种双层的落墙结构,是在普通明框或隐框的幕墙外再增加一层玻璃幕墙,通过幕墙 通风设备的开关可使双层幕墙中间进入或逸出空气,开窗后房间可进行自然通风,幕墙中间的遮阳装置可减少气 候对室内环境的影响,并且不妨碍玻璃幕墙的外观效果.结合工程实例,指出不同结构选型的气循环玻璃幕墙在 实践应用中的技术参数和施工要点. [关键词]幕墙工程;气循环幕墙;两幕原理 [中图分类号]TU317 [文献标识码]A【文章编号]1002-8498(2010)05-0091-02 Application Technology of Gas Cycle Glass Curtain Wall Li Xianfeng Liu Suwen Sun Haitao (Art and Design Institute China of Mining and Technology Xuzhow Jiangsu 221008 China) Abstract:The gas cycle glass curtain wall is made by increasing outer layer on glass curtain wall to form a kind of double-decked curtain wall structure.The air can enter or spill from the space of the double curtain walls through the switch of ventilation so the room can be naturally ventilated after opening the window.The shading devices in the middle of curtain wall can reduce the influence of climate without affecting the appearance.Technical parameters and construction points of gas cycle glass curtain wall are summarized according to actual practice. Key words:curtain wall engineering;gas cycle glass curtain wall;rain screen principle 随着建筑物向高层、高档、多功能、环保节能方向(见图1a). 发展,气循环双层幕墙作为新型建筑外围护结构,在世 界各地得到快速发展.气循环双层幕墙在换气方式上 丁一排风口 可分为两大体系:内通风和外通风.内通风气循环幕 墙的外层为封闭式结构,换气在幕墙的双层空间内进 热理 内事增 行,这种通风方式需要有强制通风系统的配合才能与 外界空气交换,达到最终效果;外通风气循环幕墙是通 热道 进风道 V一进风口 过双层幕墙的进风口和出风口合理组织气流,直接与 外空间形成交换以达到最终效果.中低层建筑气循环 幕墙将幕墙的进风口设在下沉式地下室内,在其中设 封闭式 b开放式 置水幕,当空气通过水幕进入热通道时,水幕将空气中 图1幕墙结构示意 大部分可吸入颗粒物如二氧化硫、...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年10月上 6 CONSTRUCTION TECHNOLOGY 第43卷第19期 D0I:10.7672/sgjs2014190006 气举反循环在天津周大福金融中心超长 钻孔灌注桩施工中的应用 胡志华,邓建,陈博,刘欢,何聪 (中建三局第二建设工程有限责任公司,湖北武汉430074) [摘要]通过与传统工艺相比较,气举反循环工艺以清孔深度大、速度快、清渣彻底的优势,在天津周大福金融中心 超长桩施工中得到了应用,能够显著降低成本、提高效率,取得了良好的经济和社会效益.详细介绍了气举反循环 的工艺原理、工艺特点、施工方法和质量控制要点. [关键词]桩基础;高层建筑;钻孔灌注桩;气举反循环;施工技术 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2014)19-0006-03 Application of Air-lift Reverse Circulation in Super-long Bored Piles Construction in Tianjin Zhoudafu Financial Center Hu Zhihua Deng Jian Chen Bo Liu Huan He Cong The Second Construction Co.Ld.of China Construction Third Engineering Bureau Wuhan Hubei 430074 China) Abstract:Compared with the traditional process air-lift reverse circulation process has been applied based on the advantages of deep clear hole depth fast construction slag removal thoroughly.The technique was applied in super long piles construction which effectively reduced the cost and improved the efficieney achieved good economic and social benefits.This paper introduced the process in detail from principle characteristics construction method and quality control points. Key words:piles;tall buildings;bored piles;air-lift reverse circulation;construction 1工程概况 混合物.孔底沉渣在喷出气体的冲击作用下悬浮 天津周大福金融中心拟建高度530m 地上97 起来,由于管内、外液体的密度差,孔内泥浆、空气、 层,地下4层,建筑面积39万m2.其塔楼桩基采用 沉渣的三相流沿导管向上运行,被排出孔口,进人 桩端、桩侧复式后注浆钻孔灌注桩,共计517根.桩 接渣篮.过滤出沉渣后,过滤后的泥浆又重新进人 基形式为中1000mm钻孔灌注桩,桩身混凝土设计 孔内,反复循环直至孔底沉渣厚度达到规范要求. 强度等级为水下C45.桩机于地面标高成孔,桩底 气举反循环清孔以清孔深度大、速度快、清渣 标高为-98.500~-102.900m. 彻底的优势能够满足超长桩施...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年9月上 施工技术 第40卷第348期 CONSTRUCTION TECHNOLOGY 105 民用建筑机电设备安装中管线布置 综合平衡技术 祝餐 (上海市安装工程有限公司,上海200080) [摘要]随着生产工艺的不断改进和提高,对机电安装工程的具体要求越来越高,为使机电安装工程满足建筑的功 能要求,引入了管线布置综合平衡技术.针对该项技术,闹述了管线布置综合平衡技术的定义,总结了管线布置综 合平衡技术的作用和原则,管线布置综合平衡技术流程图及需细化的工作,并以世博村D地块公寓式酒店为例,详 细介绍了管线布置综合平衡技术的应用情况. [关键词]管线;平衡;机电设备;安装 [中图分类号]TU81 [文献标识码]A [文章编号]1002-8498(2011)17-0105-03 Pipeline Arrangement and Comprehensive Balance Technology with the Installation of Electromechanical Equipment in Civil Building Zhu Yun Shanghai Installation Engineering Co.Lid.Shanghai 200080 China) Abstract:Along with the improvement of production process social requirements for electromechanical installation engineering bee higher and higher.Pipeline arrangement and prehensive balance technology is introduced in order to make electromechanical installation engineering meet demand for buildings.Based on the technology the author introduces the definition of pipeline arrangement and prehensive balance technology the function and principle of pipeline arrangement and prehensive balance technology the flow chart and refinement work of pipeline arrangement and prehensive balance technology.According to style apartment hotel of D block at World Expo Village the application of pipeline arrangement and prehensive balance technology is introduced in detail. Key words:pipelines;balances;electromechanical devices;installation 随着科学技术的发展,生产工艺的不断改进和装工程的施工管理技术,涉及建筑机电工程中通风 提高,机电安装工程也从最简单地满足建筑的使用空调给排水、消防喷淋及消火栓、电气、智能化控 要求,转而满足建筑的功能...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2015年5月上施工技术 第44卷第9期CONSTRUCTION TECHNOLOGY DOI:10. 7672/sgjs2015090033
毛细管网空调末端系统与装饰粉刷层组合饰面施工技术
杨晓华 (浙江宝业建设集团有限公司,浙江绍兴312028)
[摘要]毛细管网空调末端系统将Φ4.3mm×0.8mm塑料毛细管网敷设到室内顶板、墙面的粉刷层内,通过冷、热 水系统的循环,调节室内空气温度。

管网安装采取试压及保压措施,控制管网的渗漏。

石膏粉刷采取涂刮界面剂、 分层抹灰、铺设玻纤网格布及控制毛细管间距等措施,防止粉剧层开裂、空鼓及脱落。

经过实践应用,系统运行良 好,满足设计及使用功能要求。

[关键词】装饰装修;空调末端系统;毛细管网;石膏粉刷层;组合饰面;施工技术 [中图分类号]TU767.7[文献标识码]A[文章编号]1002-8498(2015)09-0033-04 ConstructionTechnologyofOvercoatingComposedofCapillaryNetwork Air-conditionTerminalSystemandPaintingLayer YangXiaohua (Zhejiang Baoye Construction Group Co.,Ld.,Shaoxing,Zhejiang 312028,China) Abstract:Capillary network air-condition terminal system buries plastic capillary network of 4. 3 multiply by 0.8 millimeters in the painting layer of indoor floors and walls.The indoor temperature can be adjusted through the circulation system between hot and cold water.Pressure test and pressure maintaining measures are adopted during installing the plastic capillary network to prevent leakage. Painting adhesion agent, layered plastering, laying fiberglass mesh and keeping distance among the plastic capillary network are used to keep painting layer away from cracking, hollowing and dropping. Practical application shows that this system runs well, and meets the design and functional requirement. Key words:decoration;air-condition terminal system;capillary network;plaster painting layer; bined overcoating; construction 0引言1技术特点 目前,高污染、高能耗对环境的影响已经越来1)节能毛细管网空调末端系统与常规风机 越为人们所重视,作为建筑产品高能耗的空调采暖盘管空调系统相比较,传热方式不同,所需的冷热 系统,其末端装置已从最原始的散热器开发出风机源供回水温度相差10℃,且热传导均匀,可节省能 盘管、地板辐射采暖等系统,但仍然存在着能耗大、源30%以上。

占用空间多、噪声大等缺点。

在综合分析各种空调2)使用安全可靠毛细管网水系统安装有过 技术指标、经济效益的基础上,创新性引进德国滤器,水质洁净,水压试压需保压至装饰结束。

加 CLINA毛细管网空调末端系统,并成功解决了毛细胶石膏和易性好、黏结性能强,网格布防开裂,可有
统既能采暖又能制冷,它应用人体毛细管的原理,3)能效比高,舒适性强与传统散热器和风机 将塑料毛细管网敷设到顶板、墙面的粉刷层内,通盘管系统比较,毛细管网空调系统从建筑物内墙 过冷、热水系统的循环,将能量均匀辐射到房间的面、天棚散热,热交换面积大、温度均匀、能效比高, 各个方位,调节室内空气温度。

且无风系统流动带来的温差、干燥与灰尘,舒适、洁 净、安静。

[作者简介]杨晓华,高级工程师,E-mail:627989442@q.4)施工技术易于掌握,操作便捷塑料毛细管 [收稿日期]2015-02-10网来取粘贴固...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年3月上施工技术 第41卷第360期CONSTRUCTION TECHNOLOGY21
模板工程结构的承载能力计算与变形验算
赵挺生,唐菁菁,周萌 (华中科技大学土木工程与力学学院,湖北武汉430074)
[摘要】新颁布的《混凝土结构工程施工规范》GB50666-2011,在模板工程设计上,与当前工程做法和《建筑施工 扣件式钢管脚手架安全技术规范》JGJ130一2011等相比,有明显变化。

为配合《混凝土结构工程施工规范》 GB50666一2011的实施,以工程实例形式对模板工程的水平模板荷载取值、荷载组合和模板面板及其下的次楞、主 楞和支架计算方法进行系统演示,以期对该规范的应用提供帮助。

[关键词】模板;设计;荷载;荷载组合;变形;计算模式 [中图分类号】TU755.2;TU714[文献标识码]A[文章编号】1002-8498(2012)05-0021-04 CalculationofCarryingCapacityandDeformationforFormwork Zhao Tingsheng,Tang Jingjing,Zhou Meng (School of Civil Engineering&Mechanics,HuazhongUniversity of Science &Technology, Wuhan,Hubei 430074,China) Abstract:Obvious difference is seen in formwork design between the newly issued national code Code for construction of concrele structures GB50666-2011 and current practice,as well as Technical code for safety of steel tubular scaffold with couplers in constructionJGJ130-2011.Therefore,the load values and load binations, calculation of formwork panel and wood sub-purlin, beam, along with upright tube of formwork are introduced in accordance with specifications of the newly issued national code Code for construction ofconcrete structures GB50666-2011. Key words;formwork;design;load;load bination;deformation;calculation model
随着现浇混凝土结构施工的泵送和滑模等新质量与模板工程坍塌事故高发的主要原因。

这些 技术发展,在建筑施工速度大幅提高的同时,现浇原因的背后,是工程建设人员模板工程知识的缺乏。

混凝土施工质量问题和安全问题愈加突出,现浇混模板工程包括模板和支架(或称模板支架)两 凝土结构质量通病多发,模板工程坍塌事故高发。

部分,前者包括模板面板、支撑面板的次楞和主楞 例如,2010年1月3日,昆明新机场在建桥梁,在浇以及对拉螺栓等组件,它直接影响现浇混凝土结构 筑混凝土时发生垮塌事故,造成7人死亡,8人重的外形和表观质量;后者包括模板背侧的支撑架和 伤,26人轻伤;2010年1月12日,安徽芜湖华强文连接件等,它通过前者间接影响现浇混凝土结构的 化科技产业园配送中心建设工地,在混凝土浇筑过外形和表观质量。

模板工程作为现浇混凝土结构 程中发生坍塌事故,造成8人死亡,7人受伤;贵州施工的重要承载结构和施工作业平台,承担着各类 黔南州福泉利森水泥厂工程发生模板工程坍塌事施工作业荷载。

模板工程结构计算错误,施工偏差 故,造成8人死亡,2人受伤;2010年3月14日,贵大,必然导致其承载能力的降低和稳定性不足,进 阳国际会议展览中心工程发生模板工程塌事故,而引发施工安全事故和工程质量问题。

为此,本文 造成9人死亡,19人受伤,等等。

现浇混凝土结构结合新颁布的《混凝土结构工程施工规范》 的质量、安全事故分析表明,模板工程结构设计计GB50666一2011(简称“规范”),介绍与新浇筑混凝 算错误、施工方案不正确、材料质量问题、施工偏差土接触的模板和支架的计算分析。

大、浇筑方式错误等,是造成现浇混凝土结构施工1模板工程结构设计方法 1.1计算荷载与荷载组合 [收稿日期]2012-02-13按照规范中4.3....

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年8月上施工技术 第41卷第370期CONSTRUCTION TECHNOLOCY
模块化低位顶升钢平台模架体系装配式空间 钢桁架平台设计与试验研究 王开强,郭耀杰²,吴延宏",黄爽",刘晓升",刘志茂" (1.中建三局建设工程股份有限公司,湖北武汉430064;2.武汉大学土木建筑工程学院,湖北武汉430072) [摘要】模块化低位顶升钢平台模架体系由多个可周转使用的系统构成,其中的钢平台系统采用装配式空间钢桁 架平台,该平台支点少、布置灵活、承载力大,能在不同的超高层核心简顶模施工中周转使用。

阐述了该平台的基 本组成、传力路径以及可拆卸连接节点设计。

以福州世茂国际中心超高层建筑为例,介绍了该平台的布置流程。

此后,根据该平台的试验分析结果与数值计算结果的对比,进一步阐述了平台的工作性能,同时提出了原设计中的 缺陷与不足,并给出了对应的改造方法。

【关键词]高层建筑;桁架;模板;模块化;结构设计;试验研究 [中图分类号】TU755.2,[文献标识码]A[文章编号]1002-8498(2012)15-0001-06 Design andResearch of AssembledSpatial Steel TrussPlatform of ModularizedLow-positionJackingFormworkSystem Wang Kaiqiang',Guo Yaoje²,Wu Yanhong',Huang Shuang', Liu Xiaosheng',Liu Zhimao' (1.China Construction Third Engineering Bureau Co.,Ltd.,Wuhan,Hubei 430064,China; 2.Cioil Engineeing College of Wuhan Unieersty,Wuhan,Hubei 430072,China) Abstract;Modularized low-position jacking formwork consists of several turnover parts,in which the having fewer supports,allowing flexible installation, and having large loading capacity.These advantages allow it to be repeatedly used in the construction of different tall building cores.This paper introduced the fundamental ponents, load transfer mechanism and reusable nodes. Taking one tall building-Fuzhou Shimao International Financial Center as an example,the installation procedure of the platform was described and numerical analysis results were presented.Comparison of the numerical analysis results to experimental tests further illustrated the performance of the platform and revealed the deficiencies of original design. Improving suggestions were put forward based on the study. Key words: tall buildings; trusses; formwork; modularization; structural design; experiment research 模块化低位顶升钢平台模架体系(简称“模块要组成部分(见图1),也是实现顶模模块化、标准化 化顶模”)是超高层建筑核心筒施工的重大技术突的关键环节。

该平台应可适应不同项目核心筒施 破,该技术施工速度快、劳动力投入小、材料周转容工的需要,可根据核心筒形状进行布置,而桁架则 易、平台的附属功能强大。

鉴于该技术对应模架一选用由模块化单元装配而成。

目前,采用贝雷片为 次性投人过大的问题,中建三局从2009年底开始进标准组件的装配式钢桥被广泛使用,另外,在项目 行模架模块化改造,提高其周转效率,降低该模架施工中,贝雷片也被用来搭设临时平台或栈桥等。

在单个项...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

12CONSTRUCTIONTECHNOLOCY施工技术2014年12月上
第43卷第23期 DOI:10.7672/sgjs2014230012
模块化低位顶升钢平台模架体系安装关键技术 刘威,杜福祥,袁渊,周佳军,方道伟 (中建三局集团有限公司成都分公司,四川成都610041) [摘要]根据重庆国金中心TI塔楼为带有伸臂桁架层的框架-核心筒结构特点,核心筒竖向结构选用模块化低位 顶升钢平台模架体系进行施工,主要从施工组织、操作架搭设、超重构件现场组装焊接、大构件滑移和吊装、悬挑部 位主桁架预上挑安装、主桁架同条件安装、自制"7"字板+千斤顶安装、挂架和滑梁整体吊装等方面介绍了模块化 低位顶升钢平台模架体系安装关键技术。

工程实践表明,该体系具有施工速度快、安全性好、运行平稳、承载量大 :等诸多优点。

[关键词]高层建筑;模板;模块化;钢平台;低位顶升模架体系;安装 [中图分类号]TU755.2[文献标识码]A[文章编号〕1002-8498(2014)23-0012-04 KeyInstallationTechnologyofModularizedLow-positionJacking FormworkSystemwithSteelPlatform LiuWeiDuFuxiang,YuanYuanhou Jiajun,Fang Dawei (Chengdu Branch of China Construction Third Engineering Bureau Co.Ltd.,Chengdu,Sichuan610041,China) Abstract:Based on the frame-tube structure characteristics of T1 tower building with cantilever truss layer for Chongqing Guojin Center,modularized low-position jacking formwork system is used to construct vertical core structure.This paper introduces key installation technology of modularized low-position jacking formwork system with steel platform from several respects,including construction organization, erection of handling frame,field assembly and welding of super heavy ponent, slip and hoisting of large ponent,main truss installation with beforehand upward flexion in cantilever parts,main truss installationunder the same conditioninstallation of 7-shaped slab andjackntegralhoistingofpylon and slip beam. Engineering practice shows that the formwork system has many advantages such as quick construction,good safety,smooth operation,great bearing capacity. Key words:tallbuildings;formwork;modularization;steel platform;low-position jacking formwork system; installation 1工程概况埋件连接,因此施工时需先施工核心筒结构,后施 重庆国金中心项目位于重庆市江北嘴金融核工外框结构。

为保证核心筒施工安全、加快施工进 心区,项目占地面积5.1万㎡²,总建筑面积约64万度,重庆国金中心项目T1塔楼核心筒施工采用模 m²,共有5栋塔楼,其中T1塔楼地上64层,总高度块化低位顶升钢平台模架体系(以下简称“顶模体 为319.5m,集甲级写字楼、高端购物中心、五星级酒系")。

店、高级公寓及休闲设施于一体。

其结构形式为带2重庆国金中心项目顶模体系 有伸臂桁架层的框架-核心筒结构体系,其中核心筒2.1顶模体系施工原理 结构为钢筋混凝土结构,外框部分为钢梁+压型钢模块化低位顶升钢平台模架体系由支撑与顶 板楼板+型钢混凝土柱...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年8月上 施工技术 第41卷第370期 CONSTRUCTION TECHNOLOCY 模块化低位顶升钢平台模架体系在福州世茂 国际中心项目实施关键技术 吴延宏,许立艾,王开强,刘晓升,黄爽,刘志茂 (中建三局建设工程股份有限公司,湖北武汉430064) [摘要】在福州世茂国际中心项目中,模块化低位少支点整体顶升钢平台模架体系首次投人使用。

首先介绍了福 州世茂国际中心项目概况及模块化顶模设计的基本情况,此后重点介绍了该模架在使用中的关键工序;模架的安 装流程及控制要求;模架顶升规划;模架在混凝土泵送、伸臂桁架施工等环节的应对措施;模架的垂直运输方案;模 架的拆除。

这些都为模块化顶模技术的推广和使用奠定了基础,为其施工技术内容的不断完善提供工程依托和实 践积累。

[关键词]高层建筑;模块化;低位顶升模架体系;施工技术 【中图分类号】TU755.2【文献标识码】A [文章编号】1002-8498(2012)15-0007-05 FuzhouShimaoInternationalFinancial CenterProject Wu Yanhong,Xu Liai,Wang Kaiqiang,Liu Xiaosheng,Huang Shuang,Liu Zhimao (China Construction Third Engineering Bureau Co.,Ltd.,Wuhan, Hubei 430064, China) Abstract: The modularized low-position jacking formwork system was put into use for the first time in the Fuzhou Shimao International Financial Center project. The Fuzhou Shimao International Financial Center project wasfirstly introduced as well as modularized low-position jacking formwork system.Then the key operational procedures of this formwork were presented in detail, including installation procedure and control requirement,the planning of formwork jacking process,measures to cope with concrete pumping and outstretched truss construction, vertical transportation and dismantlement. This project has laid a solid foundation for the wide application of modularized low-position jacking formwork system,and provided engineering experience to the improvement of this construction technique. Key words;tall buildings; modularization; low-position jacking formwork system; construction 1工程概况 台模架体系(简称“模块化顶模”),该模架系统由钢 福州世茂国际中心工程用地面积16338m²,总平台系统、支撑与顶升系统、模板系统、挂架及防护 建筑面积167416m²,塔楼部分建筑高度273.88m。

系统4大部分组成。

具有施工速度快,承载力大,运 结构形式为钢管混凝土柱-核心筒结构体系,核心筒行平稳易操作,安全性好等几大优势。

模架的主要 的平面形状整体为八边形,混凝土强度等级为C60组成如图2所示。

(126m以下)及C50(126m以上),结构单层面积为 模块化顶模将竖向结构的模板悬挂在钢平台 1900m²,建筑立面为直线(见图1)。

内核心筒为钢 以下,通过安置在混凝土核心筒上的顶升系统,在 筋混凝土剪力墙结构,核心筒面积为440m²,平面尺 顶升钢平台的同时提升竖向结构模板完成模板施 寸为长×宽=31.5m×15.5m。

工。

油缸一次顶升一个结构层高度,通过支撑钢柱 该项目核心筒施工采用模块化低位顶升钢平 顶升平台,带动模板和挂架整体顶升。

在核心筒内 壁设置预留洞,支撑大梁通过两端的伸缩机构...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年8月上 12CONSTRUCTION TECHNOLOGY第41卷第370期
模块化低位顶升钢平台模架体系中挂架设计与施工
黄爽,吴延宏,王开强,刘志茂,刘晓升 (中建三局建设工程股份有限公司,湖北武汉430064) [摘要】模块化低位顶升钢平台模架体系是近几年出现的新型模架体系施工技术,主要为解决超高层建筑核心筒 竖向结构施工而设计。

以该模架体系在工程项目中的实际需求为出发点,介绍低位顶升钢平台模架体系中的挂架 设计的总体思路和安装使用的关键控制点,为实现挂架体系的标准化、装配化提供依据和参考。

【关键词】高层建筑;低位顶升模架体系;挂架;结构设计;施工技术 [中图分类号】TU755.2[文献标识码]A[文章编号】1002-8498(2012)15-0012-05 Design and Construction of the RackSystem in Modularized Low-positionJackingFormworkSystem Huang Shuang,Wu Yanhong,Wang Kaiqiang,Liu Zhimao,Liu Xiaosheng (China Construction Third Engineering Bureau Co.,Ltd.,Wuhan,Hubei 430064,China) Abstract;Low-position jacking steel platform formwork system is a new formwork construction technique that appeared only in recent years. It is mainly designed for construction of the vertical core wall of tall buildings. Based on the practical application of this formwork system in engineering projects, this paper introduced the overall design concept of hanging rack in low-position jacking steel platform formwork system and the key control points during its installtion. The work in this paper provided references to the standardization and assemblability of rack system. Key words: tall bnildings; low-position jacking formwork system; hanging rack; structural design; construction 随着社会的发展,模架施工技术由最初的滑模系统、挂架与围护系统和模板系统等,钢平台系统 逐步向施工速度更快、安全性更好、文明施工程度位于施工层以上,模板、挂架和安全防护系统悬挂 更高的方向发展,其中模块化低位顶升钢平台模架在钢平台下弦,沿模板悬挂方向设置钢筋预留层、 体系(简称“模块化顶模”)是近几年出现的新的模钢筋绑扎层、模板封闭层、已浇混凝土层4个操作 架体系施工技术,该模架体系成功解决了超高层建层。

施工时,通过移动悬挂模板的滑轮,使模板与 术,具有顶升速度快、封闭性好、承载力大、安全性架平台带动模板和挂架上升,并完成竖向混凝土结 高等优点。

模块化顶模中的挂架与围护系统主要构施工。

模块化顶模典型部位的剖面如图1所示。

为核心筒结构施工提供操作平台、安全通道和安全挂架设计时,首先应考虑挂架满足使用安全的 防护体系。

根据建筑物主要结构形式和结构布置需求,挂架体系的安全主要通过系数安全和措施安 情况,合理布置挂架体系,满足核心筒结构施工的全两种手段保证。

系数安全主要是指挂架体系设 需求。

本文主要介绍挂架体系设计的总体思路和计时计算上的安全系数储备,措施安全主要是指挂 安装使用的关键控制点,为模块化顶模的标准化、:架体系使用过程采取周全的安全保护措施;其次应 装配化提供依据。

考虑钢平台系统至最低一道作业层的高度,满足施, 1挂架布置需求和设计原则工层的高度需求;再次应考虑模板退模空间的需 模块化顶模主要包括钢平台系统、支撑与顶升求,挂架的宽度应既能满足退模空间,又不影响作 业层的施工。

[收稿日期]2012-05-18[基金项目]中建三局建设工程股份有限公司课题(CSCEC3B-2010-35)挂架...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)