施工技术2015年11月上 88CONSTRUCTIONTECHNOLOGY第44卷第21期 DOI:10.7672/sgjs2015210088 流砂地层盾构始发土体加固盐水冻结技术研究*
冯欢欢,王助锋 (盾构及据进技术国家重点实验室,河南郑州450001) 【摘要】为有效解决流砂地层条件下的盾构始发端部土体加固问题,以天津海河“共同沟”隧道施工为例,在调研国 内外相关研究文献的基础上,根据盾构始发施工的成功经验,从方案设计、设备选型及重点工序控制等方面,详细 分析了盐水冻结技术在土压平衡盾构始发土体加固中的应用,并针对施工过程中存在的间题,提出了相应的应对 措施。
[关键词]盾构;始发;土体加固;流砂地层;盐水冻结 [中图分类号]U455[文献标识码】A[文章编号]1002-8498(2015)21-0088-04
Shield Lanuching Under Quicksand Stratum FengHuanhuan,WangZhufeng (State Key Laboratory ofShield Machine and BoringTechnology,Zhengzhou,He'nan 450001,China) Abstract:To solve the soil stabilization problem of shield launching under quicksand stratum, the utility tunnel construction in Haihe at Tianjin was used as an example.Based on the investigation and survey of relevant research literature at home and abroad,and successful experiences of EPB TBM launching under quicksand stratum,brine freezing technologyforsoil stabilizationof EPBTBMlaunchingwas analyzed in detail from the aspects of schematic design,equipment selection,key process control and so on.Aiming at solving the problems during EPB TBM launching, some appropriate measures were put forward. Key words:shields;launching; soil stabilization;quicksand stratum;brine freezing technology 盾构始发是隧道施工的一个关键环节,同时也工艺下穿海河隧道工程,设计标准高、施工难度大, 是盾构施工的重要风险源。
当端头井周边地层条其成功建成为连接海河两岸的电力、通信及中水等 件较差时,在盾构进行始发前,必须对开挖面进行各种管线设备提供捷径,也对天津市地铁等基础工 土体加固处理,加固后的土体必须满足强度、变形、程建设提供极其宝贵经验,具有重要的经济、社会 可控性、稳定性和抗渗等方面的要求,常用的土体意义。
海河“共同沟”隧道位于刘庄桥南侧,始发工 加固方法有深层搅拌桩加固、旋喷桩加固、冻结加作井为位于海河西侧,接收并位于海河东侧,隧道 固、注浆加固等。
每种方法有其自身的优缺点和适全长226.5m,其中过海河段长113.3m。
隧道施工 用范围,只有根据土层和周边环境等条件,合理选具有工程施工技术含量高、地质条件差、地面交通 用冻结法施工工艺,才可确保土体加固质量和隧道人流量多、沉降控制要求高、施工风险大等工程 施工安全。
本文根据天津海河“共同沟"隧道盾构难点。
始发土体加固的经验,对盐水冻结技术在盾构始发1.1工程地质条件 端土体加固中的成功应用进行了详细介绍,为今后本工程盾构工作井处地层主要为第四系全新 隧道施工中盾构始发土体加固提供参考。
统(Q)地层,表层人工填土层(Q")主要为杂填土、 1冻结方案选择素填土层,该层成分复杂,厚薄不均,结构松散,变 天津海河共同沟隧道是天津市首次利用盾构化较大。
第一陆相层(Q)主要为粉质黏土、黏土 层,该层厚度变化较大,呈可塑~软塑状态,中等~ (141PZDZX005)*国家高技术研究发展计划(2012AA041801);郑州市重大科技专项高压缩性。
第一海相层(Q)主要为淤泥质土、黏 [作者简介]冯欢欢,硕士,工程师,E-mail:skl_fhh@163.co...