2012年3月上施工技术 第41卷第360期CONSTRUCTION TECHNOLOGY21
模板工程结构的承载能力计算与变形验算
赵挺生,唐菁菁,周萌 (华中科技大学土木工程与力学学院,湖北武汉430074)
[摘要】新颁布的《混凝土结构工程施工规范》GB50666-2011,在模板工程设计上,与当前工程做法和《建筑施工 扣件式钢管脚手架安全技术规范》JGJ130一2011等相比,有明显变化。
为配合《混凝土结构工程施工规范》 GB50666一2011的实施,以工程实例形式对模板工程的水平模板荷载取值、荷载组合和模板面板及其下的次楞、主 楞和支架计算方法进行系统演示,以期对该规范的应用提供帮助。
[关键词】模板;设计;荷载;荷载组合;变形;计算模式 [中图分类号】TU755.2;TU714[文献标识码]A[文章编号】1002-8498(2012)05-0021-04 CalculationofCarryingCapacityandDeformationforFormwork Zhao Tingsheng,Tang Jingjing,Zhou Meng (School of Civil Engineering&Mechanics,HuazhongUniversity of Science &Technology, Wuhan,Hubei 430074,China) Abstract:Obvious difference is seen in formwork design between the newly issued national code Code for construction of concrele structures GB50666-2011 and current practice,as well as Technical code for safety of steel tubular scaffold with couplers in constructionJGJ130-2011.Therefore,the load values and load binations, calculation of formwork panel and wood sub-purlin, beam, along with upright tube of formwork are introduced in accordance with specifications of the newly issued national code Code for construction ofconcrete structures GB50666-2011. Key words;formwork;design;load;load bination;deformation;calculation model
随着现浇混凝土结构施工的泵送和滑模等新质量与模板工程坍塌事故高发的主要原因。
这些 技术发展,在建筑施工速度大幅提高的同时,现浇原因的背后,是工程建设人员模板工程知识的缺乏。
混凝土施工质量问题和安全问题愈加突出,现浇混模板工程包括模板和支架(或称模板支架)两 凝土结构质量通病多发,模板工程坍塌事故高发。
部分,前者包括模板面板、支撑面板的次楞和主楞 例如,2010年1月3日,昆明新机场在建桥梁,在浇以及对拉螺栓等组件,它直接影响现浇混凝土结构 筑混凝土时发生垮塌事故,造成7人死亡,8人重的外形和表观质量;后者包括模板背侧的支撑架和 伤,26人轻伤;2010年1月12日,安徽芜湖华强文连接件等,它通过前者间接影响现浇混凝土结构的 化科技产业园配送中心建设工地,在混凝土浇筑过外形和表观质量。
模板工程作为现浇混凝土结构 程中发生坍塌事故,造成8人死亡,7人受伤;贵州施工的重要承载结构和施工作业平台,承担着各类 黔南州福泉利森水泥厂工程发生模板工程坍塌事施工作业荷载。
模板工程结构计算错误,施工偏差 故,造成8人死亡,2人受伤;2010年3月14日,贵大,必然导致其承载能力的降低和稳定性不足,进 阳国际会议展览中心工程发生模板工程塌事故,而引发施工安全事故和工程质量问题。
为此,本文 造成9人死亡,19人受伤,等等。
现浇混凝土结构结合新颁布的《混凝土结构工程施工规范》 的质量、安全事故分析表明,模板工程结构设计计GB50666一2011(简称“规范”),介绍与新浇筑混凝 算错误、施工方案不正确、材料质量问题、施工偏差土接触的模板和支架的计算分析。
大、浇筑方式错误等,是造成现浇混凝土结构施工1模板工程结构设计方法 1.1计算荷载与荷载组合 [收稿日期]2012-02-13按照规范中4.3....