2015年8月下 施工技术 第44卷第16期 CONSTRUCTIONTECHNOLOCY 23 DOI:10.7672/sgjs2015160023 某在役砖混结构小学教学楼加固设计* 贾文峰,张春生,樊济喜,丁亚红 (河南理工大学土木工程学院,河南焦作454000) [摘要]针对某在役砖混结构小学教学楼的破坏特点,参照相关建筑抗震设计规范,采用外加捆绑式构造柱、增设 钢筋网水泥砂浆面层以及楼板端部设置角钢的加固方法对其进行抗震加固设计。

通过对加固方案进行系统计算 分析,该加固方案能有效增强结构的整体性,提高其综合抗震能力,延长使用寿命。

[关键词]加固;砖混结构;抗震;构造柱;钢筋网水泥砂浆;设计 [中图分类号】TU746.3[文献标识码】A【文章编号】1002-8498(2015)16-0023-04 StrengtheningDesignofaBrickStructureofExisting Primary School Building JiaWenfeng,ZhangChunsheng,FanJixi,DingYahong (CollegeofCivil Engineering,He'nanPolytechnicUnitersity,Jiaozuo,He'nan454000,China) Abstract:Based on characteristics of destruction,according to relevant seismic design of building,a brick structure of existing primary school building has been carried on the ways of adding bundled structural column,the mortar surface layer of steel mesh,angle steel on the end of the floor to conduct strengthening design. Through calculation and analysis of the strengthening scheme,the ways can service life of the structure. Key words:strengthening;brick buildings;aseismic; structural column;mesh reinforcement cement mortar; design 20世纪七八十年代,砖混结构因其构造简单、构进行抗震鉴定与加固(。

施工方便、造价低等特点,在我国大部分地区的民1工程概况 用住宅和学校建筑中应用十分广泛。

但组成砖混本工程为河南理工大学附属小学教学楼,4层 结构的基本材料和连接方式决定了其脆性性质、变内廊式砖混结构,楼长93.6m,楼宽20.8m,1~4层 形能力小,导致房屋的抗震性能比较差。

另外,由层高均为3.6m,建筑高度为15.4m,建筑面积 于施工条件限制等原因导致大部分砖混建筑存在4386.38m²。

纵横墙承重,墙厚240mm,楼板为预制 抗震设防标准不足甚至未进行抗震设计等问题。

空心板,该结构设有混凝土梁和圈梁,没有设构造 在自然老化和人为因素影响下,多数早期砖混结构 柱。

该工程抗震设防类别为重点设防类,按7度设 开始出现安全性问题,学校建筑目前已成为抗震性防,8度抗震措施,地震基本加速度为0.15g,计划经 能极为薄弱的最大隐患。

比如墙体出现裂缝、地基过抗震加固后,后续合理使用年限为40年。

产生不均匀沉降、楼板脱落等,特别是近年来发生 2抗震鉴定情况 的汶川大地震、玉树地震,砖混结构毁灭性的破坏 在现场对该建筑进行外观检测,教学楼的梁、 给我们敲响了警钟。

为此我国提升了砖混结构中 板、柱等主要承重构件基本完好,墙体也基本完好, 小学建筑抗震设防标准,并逐步开展对既有砖混结 但个别墙体有面层脱落现象。

原图纸设计,1~4层 为Mu10砖,M5.0混合砂浆砌筑。

经检测,砂浆强 国家自然科学基金():河南省软科学研究 度等级为M2.5。

同时,依据建筑抗震设计规范,利 () 用PKPM软件对原结构进行抗震计算,房屋1~4层 [作者简介]贾文峰,硕士,E-mail:1033646141@ 多个墙肢抗力与效应比值小于0.8,验算结果显示 [收稿日期]2015-03-02 万方数据
24 施工技术 第44卷 建筑各层均存在抗力与荷载效应比(<1)不满足规 造柱相连)与原圈梁形成闭合系统。

范要求的墙段,不满足抗震承载力的要求。

4)新建构造柱应设置基础,埋深与...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年8月下 施工技术 第42卷第16期 CONSTRUCTION TECHNOLOGY 19 D0I:10.7672/sgjs2013160019 某图书馆加固设计与施工 张向东 (河南省建设集团有限公司,河南郑州450002) [摘要]某新建图书馆为5层框架结构,建筑面积13334.85m2 混凝土为现场搅拌,其强度等级达不到设计要求, 为保证使用安全,采取局部拆除返工加大截面法加固和调整使用功能等综合加固方案,对混凝土框架柱、梁、板和 楼梯等构件进行了加固,工程完成后进行了静载实荷试验,并使用探地雷达检测地基缺陷.重点介绍了结构检测、 实荷试验、加固设计和施工等. [关键词]加固;结构试验;设计;施工 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2013)16-0019-04 Reinforcement Design and Construction of a Library Zhang Xiangdong He'nan Province Construction Group Co.Lad.Zhengzhou He'nan 450002 China) Abstract:The gross area of a new library with five-layer frame structure is 13 334.85m2.Its concrete is mixed on the construction site and the strength grade can not meet the design requirement.In order to ensure safety parts of structure are dismantled and reworked.Besides that lots of prehensive reinforcement plans like section increasing method are used to reinforce ponent such as concrete frame column plate stair and so on.The static load test is done in site and ground-penetrating radar is also used to detect the flaws in the foundation after the project is pleted.Structure detection paction test reinforcement design and construction etc.are mainly analyzed in this article which would accumulate experience for the detection and reinforcement of the concrete frame structure and loading test. Key words:strengthening;testing;design;construction 1工程概况 梯等受力构件混凝土强度等级达不到设计要求 某图书馆为新建工程,建筑面积13334.85m2 (C30) 为提高结构承载力,保证使用安全,对混凝土 混凝土框架结构,独立基础,地上5层,标准层层高 框架柱、梁、板和楼梯板等构件进行了加...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年2月 施工技术 第40卷第4期 CONSTRUCTION TECHNOLOCY 67 某国际承包工程汇率风险分析及应对措施 江永建 (中冶集团武汉察研究院有限公司,湖北武汉430080) [摘要]越南某国际承包工程,由于遭受汇率风险,经济损失较大,得出在国际承包工程中,规避汇率风险的重要 性.从项目合问和所处背景,企业自身情况和企业所处外部环境等方面分析了汇率风险发生的原因,及在复杂环 境条件下,企业应该采取的汇率风险应对措施,从而有利地减少或避免汇率浮动给工程带来的损失. [关键词]国际承包工程;汇书风险;应对指施 [中图分类号]TU-920.5;TU-923.48 【文献标识码]A[文章编号]1002-8498(2011)04-0067-02 Analysis of Exchange Rate Risk and Countermeasures for an International Contract Project Jiang Yongjian Wuhan Surveying-geotechnical Research Institute of China Metallurgical Seience and Industry Group Co.Lid.Wuhan Hubei 430080 China) Abstract:Because of the risk of exchange rate the international contract project in Vietnam suffers a great finacial loss so it is important to avoid exchange rate risk in the international contract project.The causes for exchange rate risk are analyzed on the project contract and its background corporation conditions and its external environment.In the plicated circumstances the corporation should make corresponding measures to avoid the exchange rate risk and reduce the loss to a certain degree. Key words:international contract project;exchange rate risk;countermeasure 1工程概况 慢,2008年5月10日,才完成全部工作量的50%, 某工程位于越南人民共和国海防市境内,合同2008年12月9日全部工程完工,2009年1月12日 于2007年6月签订,合同约定主要条款为:①工程进行竣工验收,随后于2009年5月18日完成工程 内容为电厂主厂房施工工程;②承包方式为包工包结算审计,工程结算总价为人民币5280万元. 料,工期6个月,合同总造价为人民币5050万元;③ 工程总收款中,人民币所占部分为25080000 工程款支付比例为:人员、设备进场后10d内支付合元,越南货币所占部分为49286891330越南盾.按 同价10%的备料款,完成全部工作量的50%时,再合同结算汇率,越南货币部分可折算为人民币 支付合同价款的30%,全部工程完工时,支付至合250799...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年7月下 18 CONSTRUCTION TECHNOLOGY 第42卷第14期 D0I:10.7672/sgjs2013140018 某商业综合体大跨度钢结构连廊吊装技术 寿建军,汪洋2,孙占利1,沈伟星1 (1.浙江八达建设集团有限公司,浙江杭州310002; 2.杭州市余杭区土木建筑学会,浙江杭州311100) [摘要]浙江省杭州市某商业综合体结构形式为钢筋混凝土框架结构,2幢综合体之间采用钢桁架连廊连接.该钢 结构连廊具有构件跨度大、桁架高度高、吊装高度高、单福桁架重等特点.通过对比分析分段自承式和高空悬挂式 散装吊装方案的施工流程和力学性能,同时采用有限元软件分析主要受力构件安装应力分布和关键节点处弯矩值 变化情况,最终选用高空悬挂式散装施工方案. [关键词]钢结构;连廊;桁架;吊装 [中图分类号]TU758.1 [文献标识码]A [文章编号]1002-8498(2013)14-0018-04 Large-span Steel Gallery Hoisting Technology for a Business Building Shou Jianjun' Wang Yang? Sun Zhanli' Shen Weixing' (1.Zhejiang Bada Construction Group Co.Ltd.Hangzhou Zhejiang 310002 China; 2.Yuhang District Hangzhou Institute of Civil Engineering and Architecture Hangzhou Zhejiang 311100 China) Abstract:A business building in Hangzhou Zhejiang has two reinforced concrete frame structures which is connected with steel truss gallery.This steel gallery has characteristics of large span high altitude of truss and hoists large weight of single truss and so on.By parison of the construction processing and mechanical performance of segmental self-bearing and suspended assembly at high altitude meanwhile finite element analysis was used on installation stresses of the main ponents and the moments of the key joints and suspended assembly at high altitude was selected. Key words:steel structures;gallery;trusses;hoists 1工程概况 车道路的中间.本商业综合体建筑整体如图1 本工程位于浙江省杭州市余杭区乔司镇,总建 所示. 筑面积181922m2 地上建筑面积136024m2 地下 建筑面积45898m2.本工程由2幢6层的商业综合 体组成,地下2层,分别位于01省道及地铁1号线 两侧.综合体结构形式为钢筋混凝土...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年7月上 施工技术 第45卷第13期 CONSTRUCTION TECHNOLOGY 59 D0I:10.7672/5js2016130059 某商业楼深基坑工程监测与数据分析 杜娅妮 (上海建峰职业技术学院,上海201900) [摘要]探讨监测技术在某商业楼深基坑施工安全性分析中的应用.介绍了基坑监测方案,结合监测结果分析桩 身水平位移及内力、错索轴力、四周建筑物沉降的数据,总结一般变形规律.结果显示,基坑施工的各项指标皆符 合相关规范要求. [关键词]深基坑;支护;位移:沉降;监测 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2016)13-0059-05 Deep Foundation Excavation Monitoring and Data Analysis on a Commercial Building Du Yani Shanghai Jianfeng Vocational and Technical College Shanghai 201900 China) Abstract:This paper discussed on monitoring technology in deep foundation excavation construction of a mercial building in safety analysis applications.Foundation excavation monitoring scheme was introduced based on monitoring and analysis of pile horizontal displacement and internal forces anchor axial force surround building settlement corresponding deformation law were summarized.The results show that the indicators of foundation excavation construction are in pliance with the relevant regulatory requirements. Key words:deep foundation excavation;supports;displacement;settlement;monitoring 1工程概况 2工程地质条件 某工程为改建的商业楼,位于城市核心区,将 基坑包含人工堆积层、新近沉积层、第四纪沉积 原有建筑拆除重建.在保留原有基坑基础上,扩大 层3类岩层,细分为12层.浅层土主要为细砂与粉 基坑面积,开挖面积6010m2 开挖深度27.8m.工 质黏土:10~20m范围分布中砂、卵石及黏质粉土等: 程环境条件复杂,周边管线密集,有排水、排污及供 20~30m范围内分布有细砂、中砂及粉质黏土等. 电、供热等系统.基坑周边实际状况如图1所示. 基坑场地存在3层地下水,如表1所示.基坑 场地上层积水分布不均,水位动态变化复杂,水量 北 商业大厦 西—东 变化大.此层水靠地面降水补给,经蒸发进行耗 南 散,补给动态为渗入-蒸发型.层间水年水位变化范 建筑红线 围1~2m 水位较稳定.此层水经大气降水渗人或 友谊大街 服装城 径流等补给,经径流排出,补给动态属渗入径流型. 基坑 承压水年水位变化范围2~3m 冬季水位相对较高, 过街 ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年4月下 施工技术 第46卷第8期 CONSTRUCTIONTECHNOLOCY 8 DOI:10. 7672/sgjs2017080083 某商业中心高空屋盖大跨度重型钢桁架施工技术 苏铠,张益民,章二龙,雷志强 (中国建筑第二工程局有限公司深圳分公司,广东深圳518048) [摘要]汉国城市商业中心大厦在329.4m高的屋盖设置了45m跨度的重型钢桁架。

钢桁架结构异形、质量大、跨 度大,施工困难。

施工中采用了“标准化格构式支撑胎架、架空式底部分配梁、BIM技术模拟预拼装、应力应变监 测、有限元分析”等施工技术,高效率、高质量地完成了重型钢桁架的安装。

【关键词】高层建筑;安装工程;支撑;胎架;有限元分析;施工技术 [中图分类号】TU758.11 【文献标识码】A [文章编号]1002-8498(2017)08-0083-05 Construction Technology of Large SpanHeavy Steel Truss of a CommercialCenterHighRoof SU Kai,ZHANG Yimin,ZHANG Erlong,LEI Zhiqiang (Shenzhen Branch of China Construction Second Engineering Bureau Co.,Iud.,Shenzhen,Guangdong518048,China) Abstract;The 45m span heavy steel truss was set up in the 329.4m roof of the Hanguo City Commercial Center.The stel truss structure is irregular,the quality is large,and the span is big,so the construction is difficult.In the process of construction, the construction technology of standard lattice type support frame, aerial bottom part beam, BIM simulation preassembly, stress and strain monitoring, and finite element analysis and so on were adopted, the installation of heavy steel truss was pleted with high efficiency and high quality. Key words:tall buildings;installation; supports;frames; finite element analysis; construction 1工程概况 329.400 -塔楼屋盖 1.1建筑概况 汉国城市商业中心大厦位于深圳市福田区,大 60F 厦主要为酒店、商业、写字楼、文体活动设施,建成 后将成为华强北新地标,项目总建筑面积为 45F 163745m²,地上共78层,地下5层,建筑总高度为 避难层和设备间 30F 329.4m,钢结构用量2万t。

该工程在塔楼74层 (标高为301.800m)至78层(标高为329.400m)的 15F 屋盖设置有大跨度重型钢桁架,钢桁架最大跨度为 45m,总重达2200t。

大厦屋盖设计大跨度钢桁架, 地下室 象征着与天际相连,皇冠加冕,如图1所示。

1.2屋盖结构概况 图1建筑示意 Fig.1 Schematic of building 该屋盖造型独特、结构复杂,采用空间异形多 变形面的桁架结构,由上千根定制冷弯焊接方通用 屋盖四周设置大型箱形边梁,屋盖中部由4福主桁 十字节点板组合而成,构件受力复杂,多杆件相交 架和18个次桁架组成,75层仅在核心筒内设置楼 节点的空间坐标位置唯一,该屋盖东西两侧共8根 层板。

立柱支撑,76层的观景平台采用悬挑钢梁,78层的 76层观景平台由核心筒向筒外延伸有大量的 [作者简介]苏铠,助理工程师,E-mail:565236229@q. 悬挑钢梁组成,悬挑长度为10m,悬挑钢梁规格为 【收稿日期]2016-08-11 HN900mm×300mm×16mm×28mm。

万方数据
84 施工技术 第46卷 78层的屋盖东西向长度为45m,南北向长度为 分配梁焊接固定,有效地将屋盖钢桁架上部结构荷 30m。

箱形边梁尺寸为口2000mm×1000mm×载和胎架自身荷载传至塔楼核心筒墙和外框钢柱 50mm,每延米质量为2...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年2月下 施工技术 第43卷第4期 CONSTRUCTION TECHNOLOGY 101 DOI:10. 7672/sgjs2014040101 某商业中心深基坑变形监测与分析* 沙爱敏,吕凡任,邵红才,王晓东² (1.扬州职业大学土木工程系,江苏扬州225009;2.仪征市交通运输局,江苏仪征211400) [摘要]软土地区深基坑开挖一直是岩土工程领域的重点研究内容之一。

为确保基坑施工安全,对深基坑施工变 形监测是信息化施工的重要内容。

以宁波某深基坑工程为例,根据确定的监测方案及取得的数据,对支护结构的 水平位移、深层水平位移、周边土体水平位移和沉降变化规律进行分析。

由监测结果可知,该基坑工程支护结构的 基坑变形控制设计方案合理。

[关键词]深基坑;监测;位移;沉降 [中图分类号】TU433 【文献标识码】A 【文章编号】1002-8498(2014)04-0101-04 Monitoring and Analysis of a Deep Foundation Excavation Sha Aimin',LuFanren',Shao Hongcai',Wang Xiaodong” (1.Department of Civil Engineering,Yangzhou Polyechnic College,Yangzhou,Jiangsu 225009,China; 2.Transportation Bureau of Yizheng,Yizheng,Jiangsu 211400,China ) Abstract;Technology of deep foundation excavation in soft soil area is the one of the key research contents in project fields. In order to insure the safety of the deep foundation excavation, deformation monitoring on deep foundation excavation is an important content of information construction. Taking a deep foundation excavation project in Ningbo as an example,according to the analysis of certain monitoring scheme and the obtained data, the change rules of horizontal displacement,deep horizontal displacement, sedimentation and horizontal displacement of each monitoring point on the surrounding ground surface are analyzed in the excavating process. The monitoring results confirm the deformation control design of the supporting structure is reasonable. Key words;deep foundation excavation; monitoring; displacement; settlement 在软土地区进行深基坑开挖,变形问题受到了细分析,研究了施工过程中基坑的水平变形、周围 越来越多的重视。

由于软土有天然含水量高、压缩地表沉降和水平位移、深层土体水平位移的变化规 性高、抗剪强度低、扰动性大、透水性差、土层分布律等。

复杂、各层土物理力学性能相差比较大等特点,软1工程概况 土地区深基坑的施工往往伴随着极强的环境效应, 该工程位于浙江省宁波市,地下2层,地上4 基坑的开挖势必引起周围土体应力场的变化,可导层,主楼11层,框架结构,总建筑面积约126000m²。

致周围地基土体产生较大的位移和变形,并将导致基坑开挖面积约26000m²,总土方开挖量近28万 周边建筑物、道路、地下管线等重要设施产生不均 m”。

基坑呈不规则四边形,基坑自然地坪标高为- 匀沉降,甚至发生开裂破坏,形成一定的安全隐患。

0.750m,基坑底标高为-11.000m,开挖计算深度为 现场监测是减小基坑风险,验证和修正初始计 11.05~12.35m。

算参数的有效手段,对已有实测数据的分析也可以1.1工程地质及水文地质条件 为类似工程的设计和施工提供参考。

...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年11月上 96 CONSTRUCTION TECHNOLOGY 第43卷第21期 D01:10.7672/sgjs2014210096 某叶式旋转楼梯施工技术 张明禄1,董毅,张峰2,王力尚3 (1.青建集团股份公司,山东青岛266071;2.青岛品城设计装饰工程有限公司,山东青岛266000; 3.中建中东有限责任公司) [摘要]由于涉及造型及功能的需要,旋转楼梯的设计样式多种多样,给施工带来许多不便,如果支模方法不当,有 时构件的误差不符合规范的规定,而且也不符合设计造型等的要求.结合阿尔及利亚某旋转楼梯工程,采用现浇 式整体浇筑旋转楼梯及其固定轴,改变以往旋转楼梯先浇筑固定中轴柱,后将预制楼梯踏步固定在中轴柱的方法, 既能保证旋转楼梯的整体性,又能使旋转楼梯的外观达到预制的效果,经济、美观,符合业主的要求. [关键词]混凝土;旋转楼梯;叶式;周定轴;施工技术 [中图分类号]TU755.2 [文献标识码]A[文章编号]1002-8498(2014)21-0096-03 Construction Technology of Some Leaf Spiral Staircase Zhang Minglu' Dong Yi' Zhang Feng2 Wang Lishang (1.Qingjian Group Co.Lid.Qingdao Shandong 266071 China;2.Qingdao Jingcheng Design and Decoration Co. Ld.Qingdao Shandong 266000 China;3.China State Construction Engineering Corporation Middle East L.L.C.) Abstract:The spiral staircase has many modes because of the need of shape and function so it brings difficulties to construction.If the formwork is supported with improper method the spiral staircase would not meet the requirements of codes and design.Based on some spiral staircase project in Algeria the method pouring the integral spiral stairease and axis is adopted instead of traditional method that pouring the axis column firstly and then fixing the prefabricated stairease.The new method ensures the integrity of spiral staircase and the prefabrication appearance effect with good economic benefits. Key words:concrete;spiral staircase;leaf;axis;construction 1工程概况 行政楼B5段处,共计2个,旋转楼梯从第1层到第 奥兰工学院3000座工程位于阿尔及利亚奥兰2层旋转270°,从第2层到第3层旋转36...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2015年2月上 96 CONSTRUCTION TECHNOLOGY 第44卷第3期 D0I:10.7672/5js2015030096 某发射工位导流槽绳锯切割拆除技术 刘世斌,杜峰峰,张笈玮 (中国人民解放军63926部队,北京100192) [摘要]某发射工位导流槽为地下大体积钢筋混凝土异形结构,拆除时对邻近建筑物的保护要求严格、同步交叉作 业多,拆除难度大,常规的爆破、机械拆除方法难以满足要求.通过试验、分析,对绳锯切割机械进行了改进,研发 了双发动机同步双轴双轮驱动技术、新型平稳高强螺纹收线装置等多项关键技术和装置,成功解决了该技术难题. [关键词]混凝土;导流槽;大体积混凝土;拆除:绳锯 [中图分类号]TU745.4 [文献标识码]A [文章编号]1002-8498(2015)03-0096-04 Wire-saw Dismantlement Technology on a Gasflow-guided Channel of Launching Station Liu Shibin Du Fengfeng Zhang Jiwei The 63926 Troop of Chinese People's Liberation Army Beijing 100192 China) Abstract:Gasflow-guided channel of launching station is an underground special-shaped structure of mass concrete and it is very hard to dismantle because of strict requirement on protection for the nearby buildings and a lot of cross-operation at the same time.Dismantled by regular demolition or machinery is unrealistic.Through experiment and analysis the wire-saw machine is improved.This difficult problem is solved by the research and development of multi key technology and device such as synchronous biaxial wheel drive technology new smoothly high-strength thread taking-up device and so on. Key words:concrete;gasflow-guided channel;mass concrete;demolition;wire-saw 1工程概况 在某航天发射场改造工程中,需要在不完全拆 1800 除发射塔的情况下,对发射塔邻近的导流槽构筑物 12140 台阶 30. 进行拆除.导流槽长45.62m 宽10m 深10.87m 1035010870 为大体积钢筋混凝土结构.导流槽主体结构配筋 260016000 18830 790 25 密度大、强度高,钢筋型号大部分为d25和22,混 a导流槽剂面 凝土强度等级为C35:槽内壁、发射台面均为耐火混 凝土,厚度分别为150 300mm:槽底板、槽壁和顶板 厚度均在2m左右.导流槽边缘距离发射塔(塔体 质量约1...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年11月上 90 CONSTRUCTION TECHNOLOGY 第41卷第376期 某双层独立砖柱砌体结构改造与加固 杨建江,冯天栋 (天津大学建筑工程学院,天津300072) [摘要]天津市某双层独立砖柱砌体房屋因使用功能改变需进行改造,同时对房屋进行抗震加固,使其具有天津地 区7度(0.15g)抗震设防能力.以该建筑为例,介绍砌体房屋加固中的一些结构设计方法,包括对墙体、预制混凝 土梁和独立砖柱的加固措施,以使其具有某些框架的性能.并详细介绍砌体结构加固改造中的施工技术要点和注 意事项. [关键词]加固;改造;抗震设计;砌体结构 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2012)21-0090-04 Strengthening and Renovation of a Double-storey Independent Brick-column Masonry Building Yang Jianjiang Feng Tiandong Department of Civil Engineering Tianjin University Tianjin 300072 China) Abstract:A double-storey independent brick-column masonry building in Tianjin needs renovation due to changes of application.At the same time it needs seismic strengthening against 7degree(0.15g) earthquake.Some strengthening methods are introduced with the example including strengthening of brick walls precast concrete beam and independent brick column.These strengthening measures make the structure more like a frame.Precautions of construction techniques are also emphasized in the paper. Key words:strengthening;reconstruction;seismic design;masonry construction 0前言 建筑外缘加建一楼梯间,顶层有出屋面楼梯间,建 20世纪六七十年代,我国经济技术发展水平筑外侧建有悬挑走廊,设计时未设置圈梁与构造 低,砌体结构因其就地取材容易、人工砌筑灵活、对柱.檐口标高8.8m 首层层高为4.8m 2层层高为 建筑机械设备水平要求不高等优点,成为当时建筑4.0m 顶层出屋面楼梯间高4.0m.楼(屋)面梁为 物的主流结构形式,尤其以砖混结构为主.到现在 预制混凝土梁,楼(屋)面板为预制混凝土四孔板; 这些建筑基本上已经达到或超过结构设计使用年 外墙厚370mm 内部有几道后加的轻质铝合金隔墙 限,同时随着使用功能的改变,业主也对这些建筑 及240mm厚砌体隔墙,砌体隔墙高2200mm.改造 的使用空间提出了新的要求.在这种情况下,对砌 前建筑平面如图1所示. 体结构加固改造的需求越来越大.本文以某独立 砖柱/ D 砖柱砌体房屋为例,介绍砌体房屋加固改造中的一 L1 1...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年4月下 施工技术 第42卷第8期 CONSTRUCTION TECHNOLOGY 107 D0I:10.7672/sgjs2013080107 某厂房高位钢梁高大模板支架方案选择与应用 杨谷波1,卢利利2 (1.上海沪闵建筑设计院有限公司,上海201199;2.江苏兴港建设集团有限公司,江苏苏州215004) [摘要]某厂房结构在标高32.80m和36.80m浇筑混凝土结构,用满堂高大模板支架方案施工费工费时,难度大. 经复核优选,充分利用厂房设计混凝土框架结构主梁和楼层双槽钢梁,在标高24.00m的高位上,搭设高8.80m的 高空钢梁模板支架,顺利完成混凝土工程施工,实现了安全施工、节省钢材、节省人工和提前完工的目标.重点介 绍了高位钢梁高大模板支架整体稳定措施,同时对钢梁强度进行验算,均满足使用要求. [关键词]厂房;脚手架;支承;方案选择;应用 [中图分类号]TU731.2 [文献标识码]A [文章编号]1002-8498(2013)08-0107-03 Scheme Selection and Application of the Steel Beam Support for the Formwork of a Factory at High Altitude Yang Gubo' Lu Lili? (1.Shanghai Humin Architecture Design Co. Ltd.Shanghai 201199 China; 2.Jiangsu Xinggang Construction Group Co. Lid.Suzhou Jiangsu 215004 China) Abstract:In a factory structure it was required to cast concrete at the altitude of 32.8m and 36.8m. Using full high formwork supports means both time and labor waste as well as construction difficulty.By selection of the construction schemes it was decided to make full use of the framed beams and double channel floor steel beams of the factory structure and set up a steel beam formwork support of 8.8m height at the altitude of 24.00m.The concrete construction was successfully finished with the objectives of safe construction material saving labor saving and reduced construction time achieved.The method to ensure the overall stability of the steel beam formwork support at high altitude is introduced in detail. Steel beam strength was also checked and found to meet the design re...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月下 施工技术 第42卷第14期 CONSTRUCTION TECHNOLOGY 73 DOI;10. 7672/sgjs2013140073 某博物馆单双曲面建筑模板设计与施工 魏承祖',陆建飞² (1.浙江国都房产集团有限公司,浙江杭州320000; 2.中天建设集团有限公司,浙江杭州320000) [摘要]通过对单、双曲面建筑模板的深化设计、深化加工和测量策划,有效解决了因平面、单曲面或双曲面相交以 及它们之间的标高变化面产生的非常规部位的施工质量控制难题,达到了良好的设计效果和经济效益。

单双曲面 混凝土构件的截面尺寸、位移偏差、垂直度的控制值均比普通混凝土结构工程困难,重点介绍了其测量控制技术以 及模板安装要点。

[关键词】模板;曲面模板;深化设计;加工;测量控制 [中图分类号】TU755.2 [文献标识码]A [文章编号]1002-8498(2013)14-0073-04 TheDesign and Construction of Formwork in Single-dualCurvedSurfaceofaMuseum Wei Chengzu',Lu Jianfei² (1.Zhejiang Guodu Real Estate Group Co.,Lad.,Hangzhou, Zhejiang 320000,China; 2.Zhongtian Construction Group Co.,Ltd.,Hangzhou,Zhejiang 320000, China) Abstract:The single-dual curved surface construction formwork is used to solve the construction quality control problems caused by intersection of single-dual surface and difference of elevation in unconventional parts.The design development,detailed fabrication and survey plan were used in this construction method. Therefore,the good effect of design and economic benefits were approached.The control for the section sizes,displacement deviation,verticality of single-dual curved surface concrete were more difficult than ordinary concrete. The measurement control technology and key formwork installation points were introduced in detail. Key words;formwork; curved surface formwork; detailed design; processing; measurement control 近年来,单、双曲面混凝土结构在文化艺术中土的效果。

心、博物馆等艺术类建筑出现的越来越多。

龙泉市1单、双曲面建筑模板设计 青瓷博物馆工程位于龙泉市主城区以南,丽龙高速 单、双曲面墙体模板面板采用6mm厚钢板,竖 和建川大道交叉口附近,是城市的门户地带又是规 肋采用[8,间距300mm,横肋采用2根[10,间距 划中青瓷城的核心建筑,外墙设计以曲面体居多, 1200mm,侧边用L80×8与面板铆焊,相临板面用 采用单、双曲面混凝土结构。

建筑通体模仿青瓷的 M16螺栓连接,间隔300mm。

吊环为Φ20钢筋,焊 质感,外型非常象古青瓷堆积而成,曲面造型的叠 接在墙体竖向槽钢龙骨预制孔内。

模板面板以及 合非常美观。

本工程的单、双曲面混凝土结构在施 横竖龙骨弯曲半径提前根据墙体曲面半径计算加 工前,提出了深化设计方案,对单、双曲面结合部 工,加工完毕后组拼加工成大模板。

曲面大模板采 位、异形部位等进行了合理的深化设计,同时严格 用M32穿墙螺栓垂直曲面半径分布,分布间距 确定了加工要点、操作要点、抗浮措施、质量控制要 1200mm。

点等,有效地解决了曲面复杂结构的施工难题,结 曲面模板接缝采用20mm宽企口,外侧采用轻 构一次成型,无需装修,节能环保,达到了清水混凝 钢件加固方法,轻钢件(双[8)提前根据墙体曲面半 径加工。

单曲面墙体模板设计如图1a所示,双曲面...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2011年11月上 44CONSTRUCTIONTECHNOLOCY第40卷第352期
某单层网壳结构制作与安装
陈军,王君木,郑文明 (潮峰钢构集团有限公司,浙江杭州311215)
[摘要】球形单层网壳结构的杆件安装定位难,制作精度要求高,且节点受力较为复杂。

对某单层网壳钢结构的制 作和安装的关键技术进行了介绍,重点探讨了梅花柱的制作工艺和网壳的安装方案。

现场实测表明梅花柱制作和 网壳的安装均满足相关规范的要求。

[关键词]钢结构;网壳;梅花柱;制作;安装 [中图分类号】TU758.1[文献标识码]A[文章编号]1002-8498(2011)21-0044-03 FabricationandInstallationofaSingleLayerSpherical ReticulatedShellStructure Chen Jun,Wang Junmu,Zheng Wenming (Chaofeng Steel Structure Co.,Lad.,Hangzhou,Zhejiang311215,China) Abstract:The installation and positioning ofmembers for single layer spherical reticulated shell structure is dificult, the requirements for fabrication precision are very high,and the mechanical behaviors of latticed structure are introduced.Fabrication process of plum-shaped column and installation scheme of reticulated shell are mainly discussed.Field measurements show that the relevant norms requirements for fabrication of plum-shaped column and installation of reticulated shell are satisfied.And the method in Key words;steel structures; shells;plum-shaped columns;fabrication; installation
1工程概况 本工程位于苏州工业园区独墅湖高教区南侧 湖边,建筑外形为水滴形,如图1所示。

报告大厅位 于水滴形建筑内部,造型生动、自然流畅。

主结构 构件材质均为Q235B,报告厅贝壳屋面结构采用直a工程效果 缝焊接钢管,其余管材用热轧无缝钢管。

钢结构楼 层采用焊接H型钢。

屋顶单层网壳节点采用钢管 直接相贯焊的连接形式,通过下部梅花柱、V形柱进 行支撑。

网壳与V形柱采用销轴连接。

网壳直径 为67.05m,顶标高23.075m。

2工程重难点分析 2.1杆件制作以及安装精度控制 本工程网壳为单层球形结构,空间杆件的方向b内部建筑效果 不同,杆件的安装定位难,制作精度要求严格。

杆图1建筑效果 件节点受力也比较复杂,且为焊接节点,焊接空间Fig.1Architecture effect [收稿日期]2011-07-14狭小,焊缝集中,焊接残余应力集中,焊接变形与焊 [基金项目]浙江省建设科研项目(ZC201041) [作者简介]陈军,潮峰钢构集团有限公司工程师,浙江省杭州市接质量难以控制,因此网壳结构的钢管制作、安装 萧山经济技术开发区北塘路38号311215,电话:,E-难度大。

mail :henry4453@ sina.
万方数据
2011 No.352陈军等:某单层网壳结构制作与安装45 2.2梅花柱的制作钢柱本体部分牛部分 梅花柱造型特异(见图2),内部为Φ600mm×下料清单 20mm的圆管,外侧采用$245mm×16mm的圆管包+下料清单 裹,如何保证梅花柱的制作精度是难点之一。

副管剖切 245×12钢板切制数控切剂
坡口加工 梅花柱组立坡口加工 梅花柱焊接无损检测f
制孔 24512$245×12梅花柱矫正抛丸
245×12 245×12大组立 a平面 b效果整体焊接无损检测 图2梅花柱清磨矫正 Fig.2Plum-shaped column 2.3铸钢件的焊接抛丸除锈 梅花柱树形杆件节点采用铸钢节点,因此存在成品终检 Q235B与铸钢件异种钢间的焊接,如何选择适当的成品发运 焊接工艺,保证焊接质量,是本工程的重点。

图3梅花柱制作工艺流程示意 2.4焊接变形的控制F...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年4月下 施工技术 第43卷第8期 CONSTRUCTION TECHNOLOGY 87 D0I:10.7672/5js2014080087 某医学院透光型软膜天花施工技术 张文丽,陆建飞2,何玺创1 (1.陕西省建筑职工大学,陕西西安710068;2.中天建设集团有限公司,浙江杭州320026) [摘要]软膜天花具有抗菌、防水、防火、安全环保、声光效果好的优点,是一种新型装饰材料.相对传统有机玻璃 吊顶、板材吊顶等,其施工工艺操作简单、创造性强,可以体现良好的室内声光效果和艺术感染气息.全面介绍了 软膜材料的特点、施工技术及操作要点. [关键词]安装;软膜天花;装饰;材料;施工技术 [中图分类号]TU767 [文献标识码]A [文章编号]1002-8498(2014)08-0087-03 Construction for Transparent Membrane Ceiling in a Medical College Zhang Wenli' Lu Jianfei He Xichuang' (1.Architecture Worker's University of Shaanxi Prorince Xi'an Shaanxi 710068 China; 2.Zhongtian Construction Group Co.Ld.Hangzhou Zhejiang 320026 China Abstract:The transparent membrane ceiling has characteristics of antibacterial waterproofing fireproofing safety and environment protection and good sound and light effect which is a kind of new decoration material.Comparing with traditional PMMA ceiling and board ceiling the new ceiling with easy and creative construction can show the good indoor sound and light effect and rich artistic.Authors introduce in detail the characteristics of the transparent membrane construction technologies and the key operating points. Key words:installation;membrane ceiling;decoration;material;construction 1工程概况 3工艺要求及施工流程 某医学院第二附属医院改扩建工程主楼建筑3.1工程装饰要求 高74.45m 周边裙房6层,建筑面积181562.84m2. 本工程护士站需要达到清洁、环保、噪声低、艺 本工程采用了新型装饰材料一软膜天花,主要用 术性强等效果,利用透光型软膜天花不但可以与荧 于主楼大厅及护士站顶部.大厅顶部为方形平面, 光灯、LED灯营造梦幻、无影的室内灯光效果,而且 采用白天蓝天白云、夜间满天星的喷绘型软膜天 可以利用材料本身的防火、防水、抗菌、吸声等特 花;护士站顶部为异形平面,采用透光型软膜天花. 性,据弃板材吊顶或有机玻璃的笨重、多缝等缺点, 2软膜材料特点...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年12月下 CONSTRUCTIONTECHNOLOGY第41卷第379期
某加热炉烟囱深基坑支护难点及对策
唐川 (上海宝冶集团有限公司,上海200941) [摘要]某烟肉基础由2座加热炉烟肉基础组成,土方开挖深度达9.9m。

基础紧邻道路,道路动荷载达600kN,同 时基坑开挖正赶上上海的梅雨季节,基坑开挖过程中对安全十分不利。

针对深基坑支护这一课题,分析了该工程 的关键技术及难点,选择了SMW工法与斜撑结合的方案,实现既不影响深基坑安全,又不影响道路通行的目标。

同时对加热烟肉深基坑施工的难点和对策进行了分析对比。

[关键词】地下工程;深基坑;支护;SMW工法;斜撑 [中图分类号]TU753.1[文献标识码】A[文章编号]1002-8498(2012)24-0030-03 DifficultiesandSolutionsintheDeepFoundation Excavation Retaining for a Heating Furnace Chimney Tang Chuan (Shanghai Baoye Group Co.,Ltd.,Shanghai 200941, China) Abstract:A chimney foundation consists of two heating furnace chimney foundations. The depth of soil excavation reaches about 9.9 meters. The foundation is adjacent to a road with dynamic load of 600kN. And the foundation construction was during the rainy season of Shanghai,which causes extra danger to the excavation. This paper analyzes the key technology and construction difficulties of the engineering. The SMW method was used in bination with bracings, which successfully ensures the excavation safety and avoided any influence to the road traffic. This paper also analyzes the construction difficulties and pares different solutions. Key words:underground;deep foundation excavation; retaining;SMW method;inclined support 特钢炉卷热轧工程加热炉初步设计时,加热炉加热炉烟肉基础的施工。

烟肉基础与加热炉基础相连,基础距离厂区道路较1工程概况 远,后由于工艺变更以及厂区道路位置的变化,使特钢炉卷热轧工程步进式加热炉基础A列外 得烟肉基础挖土深度加深至10m,基础西侧与厂区侧及其烟卤基础西侧紧邻刚施工完毕的东二路,烟 道路东二路紧邻,几乎与人行道路重叠,而该道路肉基础边与东二路最近的距离仅有1.3m(烟肉基础 作为连接南北的主通道,担负者特钢厂区生产用钢已占用人行道大部分位置),如图1所示。

烟肉基 、水运输和其他交通的重要任务,不但不能截断,道础底标高为-9.800m,土方开挖标高达-9.900m, 路承载的动荷载对深基坑的开挖存在着较大的不局部独立柱基基底标高达-10.100m。

在收到该烟 利因素。

施工过程中曾与设计人员多次沟通和讨肉基础图纸时,加热炉基础还未施工,但加热炉基 论,希望能抬高烟囱基础标高,减少施工风险,但均础与主轧线基础一并考虑,采用放坡大开挖的方 不能被采纳。

在这种情况下,寻求一个既不影响深案,位于东二路一侧的基坑考虑水泥搅拌桩重力挡 基坑安全,又不影响道路通行的支护方案,成为放墙支护的方案,该方案已经专家论证审批完毕。

在技术人员面前的一个难题。

经过多种方案的比本烟肉基础由2座加热炉烟肉基础组成,位于 较论证,综合加热炉基础施工总体方案,最后选择主厂房A列线外侧,烟肉基础与加热炉大底板基础 了SMW工法与斜撑结合的方案,通过施工过程中由烟道基础连接,每个烟肉基础面积为10m×10m。

周密细致的安排和管理,最终安全、顺利地完成了东二路路基下面埋设有给排水管道等,东二路作为 [收稿日期]2012-05-20厂区主干道,承担着全厂主要物流...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年3月下 施工技术 第40卷第337期 CONSTRUCTION TECHNOLOGY 47 某办公楼加固改造工程设计与施工 吴剑平 (天地金草田(北京)科技有限公司,北京100013) 【摘要]针对砖混结构的特点,通过建模对某办公楼进行了计算分析.提出了采用钢屋架代替混凝土梁板的做法 以减轻自重,同时增加构造柱圈梁提高结构的抗震性能.介绍了植筋、灌浆料及钢结构的施工工艺,并重点对拆 除施工中的技术方法,预防措施进行了分析.技术方案及施工质量符合规范要求. 【关键词]加固改造:钢屋架:构造柱:圈梁;抗震 [中图分类号]TU746.3 【文献标识码]A【文章编号]1002-8498(2011)06-0047-02 Strengthening Design and Construction Technology of an Office Building Wu Jianping (Tiandi JCT Beijing)Science Technology Co.Lad.Beijing 100013 China) Abstract:Based on characteristics of masonry structure an office building was calculated and analyzed by establishing structure model.The method that replacing conerete beams and slabs with steel roof truss to reduce the structural weight and setting the structural columns and ring beam to improve the seismic performance were proposed.At the same time the construction technology of planting steel bars grouting materials and steel structure were introduced.The demolition technology and preventive measures were analyzed especially.The technology program and construction quality can meet the requirements of codes. Key words:reinforcement;steel roof truss;structural column;ring beam:seismic 1工程概况 某办公楼于20世纪50年代建成,为主体4层、 局部5层的砖混结构,层高3.8m 女儿墙高1.25m 主体结构总高16.35m(见图1),采用前苏联抗震设 计规范进行了7度抗震设防设计.由于受当时经 济、技术、施工条件的限制,建筑本身的使用功能不 正立面 b屋盖布置 能满足办公要求.为了保留其原有历史风貌,决定 图1办公楼示意 Fig.1 The office building 在不破坏建筑外观的情况下进行改造,使4层东西 震加固技术规程》JGJ116一2009和《钢结构设计规 两侧顶层办公室层高增加1m.4层东西两侧办公 范》GB50017一2003为主要依据,以保证原挑檐的 室尺寸为10.8m×11.8m 为井字屋盖,上部为 稳定性为原则进行改造设计...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年11月上 74 CONSTRUCTION TECHNOLOGY 第45卷第21期 D0:10.7672/sgj52016210074 某办公教学综合楼屋面预应力钢结构设计及施工技术 贺锋1,刘峰1,王涛2,卓军 (1.工程兵第四设计研究院,北京100850;2.北京市建筑工程研究院有限责任公司,北京100039) [摘要]以某军事学院办公教学综合楼屋面预应力钢结构工程为背景,结合以往的张弦结构设计理论及实践经验, 系统闸述了在屋面结构体系选择和确定过程中应重点考虑的因素,详细描述了结构整体设计分析及局部节点设计 时计算参数选取、极端工况验算、后处理阶段设计指标控制等关键环节.最后根据预应力钢结构体系的特殊性,归 纳总结了施工过程中的一些关键技术,工程的顺利实施验证了本文观点的合理性与可行性. [关键词]钢结构;预应力;屋面;节点;设计;施工技术 [中图分类号]TU758 [文献标识码]A [文章编号]1002-8498(2016)21-0074-04 Design and Construction Technology of Prestressed Steel Structures for an Official Working and Teaching Complex Building Roof He Feng' Liu Feng' Wang Tao2 Zhuo Jun' (1.The 4th Engineering Design and Research Academy Beijing 100850 China; 2.Beijing Building Construction Research Institute Co.Lad.Beijing 100039 China) Abstract:Taking the project of prestressed steel structures for official working and teaching plex building roof of a military academy as a background bined with the previous design theory and practical experience it expounded the factors that should be considered during the seleetion and determination of the structure systematically and described the principle of designing and analyzing for overall and local joints of the structure calculation of extreme conditions control of design index at post- processing stage etc.Finally according to the particularity of the prestressed steel structure it summed up some key technologies in the construction process.Smooth implementation of the project verified the feasibility of the ide...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2014年7月下 152CONSTRUCTIONTECHNOLOGY第43卷第14期 DOI:10.7672/sgjs2014140152
某剧院钢桁架滑移安装技术
徐刿源 (宁波市镇海区建筑工程安全质量监督站,浙江宁波315200)
[摘要]宁波文化广场项目2号楼(剧院)的观众厅和舞台屋面共有8福钢桁架。

析架端部搁置在剧院屋顶的型钢 混凝土框架梁上,与梁顶的预埋螺栓连接,桁架与桁架间通过次梁连接。

重点介绍了钢桁架分段、现场拼装、提升、 滑移安装、端支座段的安装及焊接等施工工艺。

该施工工艺具有成熟合理、安全性高、工期短、施工成本低等特点。

[关键词]钢结构;桁架;滑移;安装;施工技术 [中图分类号】TU758.11[文献标识码]A[文章编号]1002-8498(2014)14-0152-03 TheSteel TrussSlidingandInstallationTechnology ofaTheatre Xu Shanyuan (Ningbo Zhenhai Area Construction Safety and Quality Supervision Station,Ningbo,Zhejiang 315200,China) Abstract;There were eight steel trusses of the auditorium and stage roofs in the theatre of Ningbo Culture Plaza project.The ending of trusses was set on the steel reinforced concrete beams,which was connected with the embedded bolts, and secondary beams were used between the trusses. The trusses segmentation, assembly on site,lifting,sliding and installation,and the installation and welding of the ending were introduced in detail. This technology has the characteristics of reasonable, safe,short period and low cost. Key words:steel structures; trusses; sliding;installation;construction
1工程概况吊装停机位置,且桁架距地下室边缘的距离太远。

宁波文化广场项目IV标段工程,总建筑面积故不能采取大型起重机直接吊装的方案。

又由于 70458m²,地下1层,地上4层,局部5层,建筑总高单福桁架重,安装高度高,即舞台屋面桁架的最高 度38.3m,工程呈不规则平面。

结构形式为框架结安装标高为36.300m,地下有标高为-15.000m的 构,屋面主要采用钢桁架屋面及自承式钢筋桁架屋深基坑,则其安装绝对高度达到51.300m。

观众厅 面。

2号楼(剧院)的观众厅和舞台屋面共有8钢屋面桁架的最高安装标高为30.130m,地面是阶梯 桁架。

其中观众厅有3桁架(编号为TR1),桁架式观众座椅席。

故也不能采用搭设满堂脚手架高 跨度为33.5m,高为4.7m,单桁架重约37t,安装空拼装的方案。

因此该工程必须采用液压提升、滑 标高为30.130m;舞台有5福桁架(编号为TR2),桁移的安装方案。

架跨度为25m,高为3.52m,单福重约20t,安装标高3施工方法 为36.300m。

3.1施工工艺流程 桁架端部搁置在剧院屋顶的型钢混凝土框架桁架分段制作及运输→现场拼装及检测→平
次梁连接。

桁架位置及结构形式如图1,2所示。

就位固定。

2施工方案选择3.2钢桁架分段 由于钢桁架处于剧院的中间位置,剧院四周的根据钢桁架自身的结构特点,考虑到该工程现 场地条件不好,不能为大型起重机提供可靠的有利场的场地条件及道路运输等情况,将一钢桁架分 成4段在制作车间制作,即桁架两端的端支座各为 [作者简介】徐刻源,高级工程师,国家一级注册建造师,造价工程一段,中间部分桁架平分为2段(见图3)。

师,E-mail:xsyzj@ 21cn.由于在桁架提升时,桁架两端的端支座段还未 [收稿日期】2014-03-19
万方数据
2014 No.14徐刻源:某剧院钢桁架滑移安装技术153
中间段增加临时加固杆件,加固杆件规格为HN500 x200×10×16,材质Q345B(见图3)。
...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年7月下施工技术 第43卷第14期CONSTRUCTIONTECHNOLOGY83 DOI;10. 7672/sgjs2014140083 某体育场施工张拉方案及张拉模拟分析* 朱博莉,马建勋',郭彦林²,张强3 3.河北金环钢结构工程有限公司,河北石家庄050000) [摘要】斜拉结构是一种典型的刚柔组合结构,广泛应用于大跨度体育场馆屋盖结构等公共建筑中。

对于由刚性 屋盖和柔性拉索以及枪杆等组成的斜拉结构而言,预应力施工张拉通常采用逐步张拉成型的施工方法,张拉过程 中预应力的控制、结构力与形的控制以及张拉方案的确定是施工张拉要解决的核心问题。

分析制定张拉施工方案 所应遵循的原则,并以某体育场屋盖结构为例,对拟定的两种张拉顺序和两种张拉阶次进行张拉施工模拟分析,同 时依据数值分析结果评估各种张拉方案的优缺点,为该体育场屋盖钢结构张拉施工方案的最终确定提供依据。

[关键词]体育场;斜拉结构;找力分析;倒拆分析法;张拉;数值模拟 [中图分类号】TU311;TU758[文献标识码]A[文章编号]1002-8498(2014)14-0083-07 ConstructionTensioningScheme andSimulation AnalysisofCable-stayedSteelStructure Zhu Boli',Ma Jianxun',Guo Yanlin²,Zhang Qiang” (1.SchoolofHumanSelements and CivilEngineering,Xi'anJiaotongUniversity,Xi'an,Shaanxi710049,China; 2.Department ofCivilEngineering,Tsinghua University,Bejing100084,China; 3.Hebei Jinhuan Steel Construction Engineering Co.,Lud.,Shijiazhuang,Hebei 050000,China) Abstract:As a structural bination of cables and steel roof,a cable-stayed structure is widely used to the stadium roof in the large span structure of the public buildings.For the cable-stayed structure consisted of rigid steel roof,flexible cables and masts,the cable tensioning has to be carried out during the construction process step by step.In the cable tensioning process, the control of both the cable forces and the structural displacements at key points should be satisfied according to the technical requirements specified by architectural and structural designers.Accordingly,thispaper presents thebasic principles for determining the optimal tensioning scheme and simulation tensioning analysis of cable-stayed structure. As a typical example, the two tensioning sequences and two prestressed grading tensioning schemes are carefully investigated respectively in a stadium.Comparisons between simulation tensioning analytical results for these tensioning schemes are made and the best tensioning scheme was found for this practical engineering construction. Key words:stadiums;cable-stayed structure;force-findin...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年1月下 施工技术 第43卷第2期 CONSTRUCTIONTECHNOLOCY DOI:10.7672/sgjs2014020007 某体育场开合屋盖施工质量预控技术* 王静波,王喆,井谢谢,高亮 (内蒙古兴泰建筑有限贵任公司,内蒙古鄂尔多斯017000) 【摘要】大型场馆开合活动屋面施工中,屋面安装和机械调试是一个特殊的环节,是整个工程的亮点,是工程能否 成功的关键阶段,但是在实际施工中存着各种隐患。

本文所述体育场开合屋盖不但可以开启及闭合以满足全天候 使用要求,还在轨道处设电加热融雪系统以满足北方地区冬季冰雪期间实现正常开闭使用,在北方冬季多冰雪、多 风沙的季节具有很强的实用性。

针对容易出现隐患的部位,提出相应的处理方法。

[关键词]体育场;屋盖;开合屋盖;钢结构;质量控制;施工技术 [中图分类号]TU712.5 【文献标识码]A [文章编号]1002-8498(2014)02-0007-03 ConstructionQualityPre-controllingTechnologyofthe OpeningandClosingRoofofaStadium Wang Jingbo,WangZhe,JingXiexie,GaoLiang (Inner Mongolia Xingtai Construction Co.,Ld.,Erdos,Inner Mongolia017000,China) Abstract: For large venues opening and closing events roof construction, rof installation and missioningofmachineryisaspecial linkand thehighlightofthewhole project,however,it keepsa variety of risks in the actual construction. The retractable roof of the stadium indicated in this paper not only can meet the requirements of all-weather use,still set electrically heated snowmelt system to meet opening and closing normally use in snow weather in the north. In this paper, appropriate treatments are put forward according to the hazards of the site. Key words:stadiums;roofs;retractable roofs; steel structures;quality control;construction 0引言 盖技术提高了体育场的使用效率和使用频率,并节 大型、超大型空间建筑正在凭借其建筑规模巨约了成本。

活动屋盖开闭灵活,在北方冬季多冰 型化、建筑造型多样化、专业技术集成化、建筑功能雪、多风沙的季节具有很强的实用性。

开合屋盖组 人性化而成为国内工程建筑的热点。

大型场馆设 成如图1所示。

有开合屋盖,可以满足全天候使用要求。

但是大型 场馆设计特殊、结构复杂、造型各异、施工难度大, 容易给工程质量留下隐患,特别是在开合活动屋面 施工中容易出现问题。

1工程概况 鄂尔多斯市东胜全民健身活动中心体育场工 程位于铁西区。

体育场占地面积6.26万㎡²,观众 席共有35107座,总建筑面积100451m²,设有开合 屋盖,可以满足全天候使用要求,系我国目前国内 图1开合屋盖组成 规模最大的开闭顶体育场。

该工程采用的开合屋 Fig.1 Composition of the retractable roof 2开合屋盖安装 内蒙古兴泰建筑有限责任公司课题立项项目:钢结构可开启屋盖 施工技术的研究(XTJT20090816-YF-03) 开合屋盖安装工艺流程如图2所示。

[作者筒介]王静波,副总经理,高级工程师,E-mail:jingxie_123@ 2.1卷扬机的吊装与安装 [收稿日期]2013-07-29 卷扬机吊装前,应对卷扬机进行有效防护,防 万方数据
8 施工技术 第43卷 土建及钢结构 机械部分安装精调及整体调试 保温系统等融雪措施,实现了开合屋面体育场馆在 卷扬机房预埋件验收 卷扬机现场拼装 北方冬季冰雪季节的正常开闭功能,克服了冰雪造 下部转向滑轮 卷扬机 品装下部转向滑轮 卷扬机控制 成轨道的卡轨问题,从而确保了开合...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)