首页 > 2023 ( 第 446 页)

施工技术 2012年11月上 90 CONSTRUCTION TECHNOLOGY 第41卷第376期 某双层独立砖柱砌体结构改造与加固 杨建江,冯天栋 (天津大学建筑工程学院,天津300072) [摘要]天津市某双层独立砖柱砌体房屋因使用功能改变需进行改造,同时对房屋进行抗震加固,使其具有天津地 区7度(0.15g)抗震设防能力.以该建筑为例,介绍砌体房屋加固中的一些结构设计方法,包括对墙体、预制混凝 土梁和独立砖柱的加固措施,以使其具有某些框架的性能.并详细介绍砌体结构加固改造中的施工技术要点和注 意事项. [关键词]加固;改造;抗震设计;砌体结构 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2012)21-0090-04 Strengthening and Renovation of a Double-storey Independent Brick-column Masonry Building Yang Jianjiang Feng Tiandong Department of Civil Engineering Tianjin University Tianjin 300072 China) Abstract:A double-storey independent brick-column masonry building in Tianjin needs renovation due to changes of application.At the same time it needs seismic strengthening against 7degree(0.15g) earthquake.Some strengthening methods are introduced with the example including strengthening of brick walls precast concrete beam and independent brick column.These strengthening measures make the structure more like a frame.Precautions of construction techniques are also emphasized in the paper. Key words:strengthening;reconstruction;seismic design;masonry construction 0前言 建筑外缘加建一楼梯间,顶层有出屋面楼梯间,建 20世纪六七十年代,我国经济技术发展水平筑外侧建有悬挑走廊,设计时未设置圈梁与构造 低,砌体结构因其就地取材容易、人工砌筑灵活、对柱.檐口标高8.8m 首层层高为4.8m 2层层高为 建筑机械设备水平要求不高等优点,成为当时建筑4.0m 顶层出屋面楼梯间高4.0m.楼(屋)面梁为 物的主流结构形式,尤其以砖混结构为主.到现在 预制混凝土梁,楼(屋)面板为预制混凝土四孔板; 这些建筑基本上已经达到或超过结构设计使用年 外墙厚370mm 内部有几道后加的轻质铝合金隔墙 限,同时随着使用功能的改变,业主也对这些建筑 及240mm厚砌体隔墙,砌体隔墙高2200mm.改造 的使用空间提出了新的要求.在这种情况下,对砌 前建筑平面如图1所示. 体结构加固改造的需求越来越大.本文以某独立 砖柱/ D 砖柱砌体房屋为例,介绍砌体房屋加固改造中的一 L1 1...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年4月下 施工技术 第42卷第8期 CONSTRUCTION TECHNOLOGY 107 D0I:10.7672/sgjs2013080107 某厂房高位钢梁高大模板支架方案选择与应用 杨谷波1,卢利利2 (1.上海沪闵建筑设计院有限公司,上海201199;2.江苏兴港建设集团有限公司,江苏苏州215004) [摘要]某厂房结构在标高32.80m和36.80m浇筑混凝土结构,用满堂高大模板支架方案施工费工费时,难度大. 经复核优选,充分利用厂房设计混凝土框架结构主梁和楼层双槽钢梁,在标高24.00m的高位上,搭设高8.80m的 高空钢梁模板支架,顺利完成混凝土工程施工,实现了安全施工、节省钢材、节省人工和提前完工的目标.重点介 绍了高位钢梁高大模板支架整体稳定措施,同时对钢梁强度进行验算,均满足使用要求. [关键词]厂房;脚手架;支承;方案选择;应用 [中图分类号]TU731.2 [文献标识码]A [文章编号]1002-8498(2013)08-0107-03 Scheme Selection and Application of the Steel Beam Support for the Formwork of a Factory at High Altitude Yang Gubo' Lu Lili? (1.Shanghai Humin Architecture Design Co. Ltd.Shanghai 201199 China; 2.Jiangsu Xinggang Construction Group Co. Lid.Suzhou Jiangsu 215004 China) Abstract:In a factory structure it was required to cast concrete at the altitude of 32.8m and 36.8m. Using full high formwork supports means both time and labor waste as well as construction difficulty.By selection of the construction schemes it was decided to make full use of the framed beams and double channel floor steel beams of the factory structure and set up a steel beam formwork support of 8.8m height at the altitude of 24.00m.The concrete construction was successfully finished with the objectives of safe construction material saving labor saving and reduced construction time achieved.The method to ensure the overall stability of the steel beam formwork support at high altitude is introduced in detail. Steel beam strength was also checked and found to meet the design re...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年7月下 施工技术 第42卷第14期 CONSTRUCTION TECHNOLOGY 73 DOI;10. 7672/sgjs2013140073 某博物馆单双曲面建筑模板设计与施工 魏承祖',陆建飞² (1.浙江国都房产集团有限公司,浙江杭州320000; 2.中天建设集团有限公司,浙江杭州320000) [摘要]通过对单、双曲面建筑模板的深化设计、深化加工和测量策划,有效解决了因平面、单曲面或双曲面相交以 及它们之间的标高变化面产生的非常规部位的施工质量控制难题,达到了良好的设计效果和经济效益。

单双曲面 混凝土构件的截面尺寸、位移偏差、垂直度的控制值均比普通混凝土结构工程困难,重点介绍了其测量控制技术以 及模板安装要点。

[关键词】模板;曲面模板;深化设计;加工;测量控制 [中图分类号】TU755.2 [文献标识码]A [文章编号]1002-8498(2013)14-0073-04 TheDesign and Construction of Formwork in Single-dualCurvedSurfaceofaMuseum Wei Chengzu',Lu Jianfei² (1.Zhejiang Guodu Real Estate Group Co.,Lad.,Hangzhou, Zhejiang 320000,China; 2.Zhongtian Construction Group Co.,Ltd.,Hangzhou,Zhejiang 320000, China) Abstract:The single-dual curved surface construction formwork is used to solve the construction quality control problems caused by intersection of single-dual surface and difference of elevation in unconventional parts.The design development,detailed fabrication and survey plan were used in this construction method. Therefore,the good effect of design and economic benefits were approached.The control for the section sizes,displacement deviation,verticality of single-dual curved surface concrete were more difficult than ordinary concrete. The measurement control technology and key formwork installation points were introduced in detail. Key words;formwork; curved surface formwork; detailed design; processing; measurement control 近年来,单、双曲面混凝土结构在文化艺术中土的效果。

心、博物馆等艺术类建筑出现的越来越多。

龙泉市1单、双曲面建筑模板设计 青瓷博物馆工程位于龙泉市主城区以南,丽龙高速 单、双曲面墙体模板面板采用6mm厚钢板,竖 和建川大道交叉口附近,是城市的门户地带又是规 肋采用[8,间距300mm,横肋采用2根[10,间距 划中青瓷城的核心建筑,外墙设计以曲面体居多, 1200mm,侧边用L80×8与面板铆焊,相临板面用 采用单、双曲面混凝土结构。

建筑通体模仿青瓷的 M16螺栓连接,间隔300mm。

吊环为Φ20钢筋,焊 质感,外型非常象古青瓷堆积而成,曲面造型的叠 接在墙体竖向槽钢龙骨预制孔内。

模板面板以及 合非常美观。

本工程的单、双曲面混凝土结构在施 横竖龙骨弯曲半径提前根据墙体曲面半径计算加 工前,提出了深化设计方案,对单、双曲面结合部 工,加工完毕后组拼加工成大模板。

曲面大模板采 位、异形部位等进行了合理的深化设计,同时严格 用M32穿墙螺栓垂直曲面半径分布,分布间距 确定了加工要点、操作要点、抗浮措施、质量控制要 1200mm。

点等,有效地解决了曲面复杂结构的施工难题,结 曲面模板接缝采用20mm宽企口,外侧采用轻 构一次成型,无需装修,节能环保,达到了清水混凝 钢件加固方法,轻钢件(双[8)提前根据墙体曲面半 径加工。

单曲面墙体模板设计如图1a所示,双曲面...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2011年11月上 44CONSTRUCTIONTECHNOLOCY第40卷第352期
某单层网壳结构制作与安装
陈军,王君木,郑文明 (潮峰钢构集团有限公司,浙江杭州311215)
[摘要】球形单层网壳结构的杆件安装定位难,制作精度要求高,且节点受力较为复杂。

对某单层网壳钢结构的制 作和安装的关键技术进行了介绍,重点探讨了梅花柱的制作工艺和网壳的安装方案。

现场实测表明梅花柱制作和 网壳的安装均满足相关规范的要求。

[关键词]钢结构;网壳;梅花柱;制作;安装 [中图分类号】TU758.1[文献标识码]A[文章编号]1002-8498(2011)21-0044-03 FabricationandInstallationofaSingleLayerSpherical ReticulatedShellStructure Chen Jun,Wang Junmu,Zheng Wenming (Chaofeng Steel Structure Co.,Lad.,Hangzhou,Zhejiang311215,China) Abstract:The installation and positioning ofmembers for single layer spherical reticulated shell structure is dificult, the requirements for fabrication precision are very high,and the mechanical behaviors of latticed structure are introduced.Fabrication process of plum-shaped column and installation scheme of reticulated shell are mainly discussed.Field measurements show that the relevant norms requirements for fabrication of plum-shaped column and installation of reticulated shell are satisfied.And the method in Key words;steel structures; shells;plum-shaped columns;fabrication; installation
1工程概况 本工程位于苏州工业园区独墅湖高教区南侧 湖边,建筑外形为水滴形,如图1所示。

报告大厅位 于水滴形建筑内部,造型生动、自然流畅。

主结构 构件材质均为Q235B,报告厅贝壳屋面结构采用直a工程效果 缝焊接钢管,其余管材用热轧无缝钢管。

钢结构楼 层采用焊接H型钢。

屋顶单层网壳节点采用钢管 直接相贯焊的连接形式,通过下部梅花柱、V形柱进 行支撑。

网壳与V形柱采用销轴连接。

网壳直径 为67.05m,顶标高23.075m。

2工程重难点分析 2.1杆件制作以及安装精度控制 本工程网壳为单层球形结构,空间杆件的方向b内部建筑效果 不同,杆件的安装定位难,制作精度要求严格。

杆图1建筑效果 件节点受力也比较复杂,且为焊接节点,焊接空间Fig.1Architecture effect [收稿日期]2011-07-14狭小,焊缝集中,焊接残余应力集中,焊接变形与焊 [基金项目]浙江省建设科研项目(ZC201041) [作者简介]陈军,潮峰钢构集团有限公司工程师,浙江省杭州市接质量难以控制,因此网壳结构的钢管制作、安装 萧山经济技术开发区北塘路38号311215,电话:,E-难度大。

mail :henry4453@ sina.
万方数据
2011 No.352陈军等:某单层网壳结构制作与安装45 2.2梅花柱的制作钢柱本体部分牛部分 梅花柱造型特异(见图2),内部为Φ600mm×下料清单 20mm的圆管,外侧采用$245mm×16mm的圆管包+下料清单 裹,如何保证梅花柱的制作精度是难点之一。

副管剖切 245×12钢板切制数控切剂
坡口加工 梅花柱组立坡口加工 梅花柱焊接无损检测f
制孔 24512$245×12梅花柱矫正抛丸
245×12 245×12大组立 a平面 b效果整体焊接无损检测 图2梅花柱清磨矫正 Fig.2Plum-shaped column 2.3铸钢件的焊接抛丸除锈 梅花柱树形杆件节点采用铸钢节点,因此存在成品终检 Q235B与铸钢件异种钢间的焊接,如何选择适当的成品发运 焊接工艺,保证焊接质量,是本工程的重点。

图3梅花柱制作工艺流程示意 2.4焊接变形的控制F...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年4月下 施工技术 第43卷第8期 CONSTRUCTION TECHNOLOGY 87 D0I:10.7672/5js2014080087 某医学院透光型软膜天花施工技术 张文丽,陆建飞2,何玺创1 (1.陕西省建筑职工大学,陕西西安710068;2.中天建设集团有限公司,浙江杭州320026) [摘要]软膜天花具有抗菌、防水、防火、安全环保、声光效果好的优点,是一种新型装饰材料.相对传统有机玻璃 吊顶、板材吊顶等,其施工工艺操作简单、创造性强,可以体现良好的室内声光效果和艺术感染气息.全面介绍了 软膜材料的特点、施工技术及操作要点. [关键词]安装;软膜天花;装饰;材料;施工技术 [中图分类号]TU767 [文献标识码]A [文章编号]1002-8498(2014)08-0087-03 Construction for Transparent Membrane Ceiling in a Medical College Zhang Wenli' Lu Jianfei He Xichuang' (1.Architecture Worker's University of Shaanxi Prorince Xi'an Shaanxi 710068 China; 2.Zhongtian Construction Group Co.Ld.Hangzhou Zhejiang 320026 China Abstract:The transparent membrane ceiling has characteristics of antibacterial waterproofing fireproofing safety and environment protection and good sound and light effect which is a kind of new decoration material.Comparing with traditional PMMA ceiling and board ceiling the new ceiling with easy and creative construction can show the good indoor sound and light effect and rich artistic.Authors introduce in detail the characteristics of the transparent membrane construction technologies and the key operating points. Key words:installation;membrane ceiling;decoration;material;construction 1工程概况 3工艺要求及施工流程 某医学院第二附属医院改扩建工程主楼建筑3.1工程装饰要求 高74.45m 周边裙房6层,建筑面积181562.84m2. 本工程护士站需要达到清洁、环保、噪声低、艺 本工程采用了新型装饰材料一软膜天花,主要用 术性强等效果,利用透光型软膜天花不但可以与荧 于主楼大厅及护士站顶部.大厅顶部为方形平面, 光灯、LED灯营造梦幻、无影的室内灯光效果,而且 采用白天蓝天白云、夜间满天星的喷绘型软膜天 可以利用材料本身的防火、防水、抗菌、吸声等特 花;护士站顶部为异形平面,采用透光型软膜天花. 性,据弃板材吊顶或有机玻璃的笨重、多缝等缺点, 2软膜材料特点...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年12月下 CONSTRUCTIONTECHNOLOGY第41卷第379期
某加热炉烟囱深基坑支护难点及对策
唐川 (上海宝冶集团有限公司,上海200941) [摘要]某烟肉基础由2座加热炉烟肉基础组成,土方开挖深度达9.9m。

基础紧邻道路,道路动荷载达600kN,同 时基坑开挖正赶上上海的梅雨季节,基坑开挖过程中对安全十分不利。

针对深基坑支护这一课题,分析了该工程 的关键技术及难点,选择了SMW工法与斜撑结合的方案,实现既不影响深基坑安全,又不影响道路通行的目标。

同时对加热烟肉深基坑施工的难点和对策进行了分析对比。

[关键词】地下工程;深基坑;支护;SMW工法;斜撑 [中图分类号]TU753.1[文献标识码】A[文章编号]1002-8498(2012)24-0030-03 DifficultiesandSolutionsintheDeepFoundation Excavation Retaining for a Heating Furnace Chimney Tang Chuan (Shanghai Baoye Group Co.,Ltd.,Shanghai 200941, China) Abstract:A chimney foundation consists of two heating furnace chimney foundations. The depth of soil excavation reaches about 9.9 meters. The foundation is adjacent to a road with dynamic load of 600kN. And the foundation construction was during the rainy season of Shanghai,which causes extra danger to the excavation. This paper analyzes the key technology and construction difficulties of the engineering. The SMW method was used in bination with bracings, which successfully ensures the excavation safety and avoided any influence to the road traffic. This paper also analyzes the construction difficulties and pares different solutions. Key words:underground;deep foundation excavation; retaining;SMW method;inclined support 特钢炉卷热轧工程加热炉初步设计时,加热炉加热炉烟肉基础的施工。

烟肉基础与加热炉基础相连,基础距离厂区道路较1工程概况 远,后由于工艺变更以及厂区道路位置的变化,使特钢炉卷热轧工程步进式加热炉基础A列外 得烟肉基础挖土深度加深至10m,基础西侧与厂区侧及其烟卤基础西侧紧邻刚施工完毕的东二路,烟 道路东二路紧邻,几乎与人行道路重叠,而该道路肉基础边与东二路最近的距离仅有1.3m(烟肉基础 作为连接南北的主通道,担负者特钢厂区生产用钢已占用人行道大部分位置),如图1所示。

烟肉基 、水运输和其他交通的重要任务,不但不能截断,道础底标高为-9.800m,土方开挖标高达-9.900m, 路承载的动荷载对深基坑的开挖存在着较大的不局部独立柱基基底标高达-10.100m。

在收到该烟 利因素。

施工过程中曾与设计人员多次沟通和讨肉基础图纸时,加热炉基础还未施工,但加热炉基 论,希望能抬高烟囱基础标高,减少施工风险,但均础与主轧线基础一并考虑,采用放坡大开挖的方 不能被采纳。

在这种情况下,寻求一个既不影响深案,位于东二路一侧的基坑考虑水泥搅拌桩重力挡 基坑安全,又不影响道路通行的支护方案,成为放墙支护的方案,该方案已经专家论证审批完毕。

在技术人员面前的一个难题。

经过多种方案的比本烟肉基础由2座加热炉烟肉基础组成,位于 较论证,综合加热炉基础施工总体方案,最后选择主厂房A列线外侧,烟肉基础与加热炉大底板基础 了SMW工法与斜撑结合的方案,通过施工过程中由烟道基础连接,每个烟肉基础面积为10m×10m。

周密细致的安排和管理,最终安全、顺利地完成了东二路路基下面埋设有给排水管道等,东二路作为 [收稿日期]2012-05-20厂区主干道,承担着全厂主要物流...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年3月下 施工技术 第40卷第337期 CONSTRUCTION TECHNOLOGY 47 某办公楼加固改造工程设计与施工 吴剑平 (天地金草田(北京)科技有限公司,北京100013) 【摘要]针对砖混结构的特点,通过建模对某办公楼进行了计算分析.提出了采用钢屋架代替混凝土梁板的做法 以减轻自重,同时增加构造柱圈梁提高结构的抗震性能.介绍了植筋、灌浆料及钢结构的施工工艺,并重点对拆 除施工中的技术方法,预防措施进行了分析.技术方案及施工质量符合规范要求. 【关键词]加固改造:钢屋架:构造柱:圈梁;抗震 [中图分类号]TU746.3 【文献标识码]A【文章编号]1002-8498(2011)06-0047-02 Strengthening Design and Construction Technology of an Office Building Wu Jianping (Tiandi JCT Beijing)Science Technology Co.Lad.Beijing 100013 China) Abstract:Based on characteristics of masonry structure an office building was calculated and analyzed by establishing structure model.The method that replacing conerete beams and slabs with steel roof truss to reduce the structural weight and setting the structural columns and ring beam to improve the seismic performance were proposed.At the same time the construction technology of planting steel bars grouting materials and steel structure were introduced.The demolition technology and preventive measures were analyzed especially.The technology program and construction quality can meet the requirements of codes. Key words:reinforcement;steel roof truss;structural column;ring beam:seismic 1工程概况 某办公楼于20世纪50年代建成,为主体4层、 局部5层的砖混结构,层高3.8m 女儿墙高1.25m 主体结构总高16.35m(见图1),采用前苏联抗震设 计规范进行了7度抗震设防设计.由于受当时经 济、技术、施工条件的限制,建筑本身的使用功能不 正立面 b屋盖布置 能满足办公要求.为了保留其原有历史风貌,决定 图1办公楼示意 Fig.1 The office building 在不破坏建筑外观的情况下进行改造,使4层东西 震加固技术规程》JGJ116一2009和《钢结构设计规 两侧顶层办公室层高增加1m.4层东西两侧办公 范》GB50017一2003为主要依据,以保证原挑檐的 室尺寸为10.8m×11.8m 为井字屋盖,上部为 稳定性为原则进行改造设计...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年11月上 74 CONSTRUCTION TECHNOLOGY 第45卷第21期 D0:10.7672/sgj52016210074 某办公教学综合楼屋面预应力钢结构设计及施工技术 贺锋1,刘峰1,王涛2,卓军 (1.工程兵第四设计研究院,北京100850;2.北京市建筑工程研究院有限责任公司,北京100039) [摘要]以某军事学院办公教学综合楼屋面预应力钢结构工程为背景,结合以往的张弦结构设计理论及实践经验, 系统闸述了在屋面结构体系选择和确定过程中应重点考虑的因素,详细描述了结构整体设计分析及局部节点设计 时计算参数选取、极端工况验算、后处理阶段设计指标控制等关键环节.最后根据预应力钢结构体系的特殊性,归 纳总结了施工过程中的一些关键技术,工程的顺利实施验证了本文观点的合理性与可行性. [关键词]钢结构;预应力;屋面;节点;设计;施工技术 [中图分类号]TU758 [文献标识码]A [文章编号]1002-8498(2016)21-0074-04 Design and Construction Technology of Prestressed Steel Structures for an Official Working and Teaching Complex Building Roof He Feng' Liu Feng' Wang Tao2 Zhuo Jun' (1.The 4th Engineering Design and Research Academy Beijing 100850 China; 2.Beijing Building Construction Research Institute Co.Lad.Beijing 100039 China) Abstract:Taking the project of prestressed steel structures for official working and teaching plex building roof of a military academy as a background bined with the previous design theory and practical experience it expounded the factors that should be considered during the seleetion and determination of the structure systematically and described the principle of designing and analyzing for overall and local joints of the structure calculation of extreme conditions control of design index at post- processing stage etc.Finally according to the particularity of the prestressed steel structure it summed up some key technologies in the construction process.Smooth implementation of the project verified the feasibility of the ide...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2014年7月下 152CONSTRUCTIONTECHNOLOGY第43卷第14期 DOI:10.7672/sgjs2014140152
某剧院钢桁架滑移安装技术
徐刿源 (宁波市镇海区建筑工程安全质量监督站,浙江宁波315200)
[摘要]宁波文化广场项目2号楼(剧院)的观众厅和舞台屋面共有8福钢桁架。

析架端部搁置在剧院屋顶的型钢 混凝土框架梁上,与梁顶的预埋螺栓连接,桁架与桁架间通过次梁连接。

重点介绍了钢桁架分段、现场拼装、提升、 滑移安装、端支座段的安装及焊接等施工工艺。

该施工工艺具有成熟合理、安全性高、工期短、施工成本低等特点。

[关键词]钢结构;桁架;滑移;安装;施工技术 [中图分类号】TU758.11[文献标识码]A[文章编号]1002-8498(2014)14-0152-03 TheSteel TrussSlidingandInstallationTechnology ofaTheatre Xu Shanyuan (Ningbo Zhenhai Area Construction Safety and Quality Supervision Station,Ningbo,Zhejiang 315200,China) Abstract;There were eight steel trusses of the auditorium and stage roofs in the theatre of Ningbo Culture Plaza project.The ending of trusses was set on the steel reinforced concrete beams,which was connected with the embedded bolts, and secondary beams were used between the trusses. The trusses segmentation, assembly on site,lifting,sliding and installation,and the installation and welding of the ending were introduced in detail. This technology has the characteristics of reasonable, safe,short period and low cost. Key words:steel structures; trusses; sliding;installation;construction
1工程概况吊装停机位置,且桁架距地下室边缘的距离太远。

宁波文化广场项目IV标段工程,总建筑面积故不能采取大型起重机直接吊装的方案。

又由于 70458m²,地下1层,地上4层,局部5层,建筑总高单福桁架重,安装高度高,即舞台屋面桁架的最高 度38.3m,工程呈不规则平面。

结构形式为框架结安装标高为36.300m,地下有标高为-15.000m的 构,屋面主要采用钢桁架屋面及自承式钢筋桁架屋深基坑,则其安装绝对高度达到51.300m。

观众厅 面。

2号楼(剧院)的观众厅和舞台屋面共有8钢屋面桁架的最高安装标高为30.130m,地面是阶梯 桁架。

其中观众厅有3桁架(编号为TR1),桁架式观众座椅席。

故也不能采用搭设满堂脚手架高 跨度为33.5m,高为4.7m,单桁架重约37t,安装空拼装的方案。

因此该工程必须采用液压提升、滑 标高为30.130m;舞台有5福桁架(编号为TR2),桁移的安装方案。

架跨度为25m,高为3.52m,单福重约20t,安装标高3施工方法 为36.300m。

3.1施工工艺流程 桁架端部搁置在剧院屋顶的型钢混凝土框架桁架分段制作及运输→现场拼装及检测→平
次梁连接。

桁架位置及结构形式如图1,2所示。

就位固定。

2施工方案选择3.2钢桁架分段 由于钢桁架处于剧院的中间位置,剧院四周的根据钢桁架自身的结构特点,考虑到该工程现 场地条件不好,不能为大型起重机提供可靠的有利场的场地条件及道路运输等情况,将一钢桁架分 成4段在制作车间制作,即桁架两端的端支座各为 [作者简介】徐刻源,高级工程师,国家一级注册建造师,造价工程一段,中间部分桁架平分为2段(见图3)。

师,E-mail:xsyzj@ 21cn.由于在桁架提升时,桁架两端的端支座段还未 [收稿日期】2014-03-19
万方数据
2014 No.14徐刻源:某剧院钢桁架滑移安装技术153
中间段增加临时加固杆件,加固杆件规格为HN500 x200×10×16,材质Q345B(见图3)。
...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年7月下施工技术 第43卷第14期CONSTRUCTIONTECHNOLOGY83 DOI;10. 7672/sgjs2014140083 某体育场施工张拉方案及张拉模拟分析* 朱博莉,马建勋',郭彦林²,张强3 3.河北金环钢结构工程有限公司,河北石家庄050000) [摘要】斜拉结构是一种典型的刚柔组合结构,广泛应用于大跨度体育场馆屋盖结构等公共建筑中。

对于由刚性 屋盖和柔性拉索以及枪杆等组成的斜拉结构而言,预应力施工张拉通常采用逐步张拉成型的施工方法,张拉过程 中预应力的控制、结构力与形的控制以及张拉方案的确定是施工张拉要解决的核心问题。

分析制定张拉施工方案 所应遵循的原则,并以某体育场屋盖结构为例,对拟定的两种张拉顺序和两种张拉阶次进行张拉施工模拟分析,同 时依据数值分析结果评估各种张拉方案的优缺点,为该体育场屋盖钢结构张拉施工方案的最终确定提供依据。

[关键词]体育场;斜拉结构;找力分析;倒拆分析法;张拉;数值模拟 [中图分类号】TU311;TU758[文献标识码]A[文章编号]1002-8498(2014)14-0083-07 ConstructionTensioningScheme andSimulation AnalysisofCable-stayedSteelStructure Zhu Boli',Ma Jianxun',Guo Yanlin²,Zhang Qiang” (1.SchoolofHumanSelements and CivilEngineering,Xi'anJiaotongUniversity,Xi'an,Shaanxi710049,China; 2.Department ofCivilEngineering,Tsinghua University,Bejing100084,China; 3.Hebei Jinhuan Steel Construction Engineering Co.,Lud.,Shijiazhuang,Hebei 050000,China) Abstract:As a structural bination of cables and steel roof,a cable-stayed structure is widely used to the stadium roof in the large span structure of the public buildings.For the cable-stayed structure consisted of rigid steel roof,flexible cables and masts,the cable tensioning has to be carried out during the construction process step by step.In the cable tensioning process, the control of both the cable forces and the structural displacements at key points should be satisfied according to the technical requirements specified by architectural and structural designers.Accordingly,thispaper presents thebasic principles for determining the optimal tensioning scheme and simulation tensioning analysis of cable-stayed structure. As a typical example, the two tensioning sequences and two prestressed grading tensioning schemes are carefully investigated respectively in a stadium.Comparisons between simulation tensioning analytical results for these tensioning schemes are made and the best tensioning scheme was found for this practical engineering construction. Key words:stadiums;cable-stayed structure;force-findin...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年1月下 施工技术 第43卷第2期 CONSTRUCTIONTECHNOLOCY DOI:10.7672/sgjs2014020007 某体育场开合屋盖施工质量预控技术* 王静波,王喆,井谢谢,高亮 (内蒙古兴泰建筑有限贵任公司,内蒙古鄂尔多斯017000) 【摘要】大型场馆开合活动屋面施工中,屋面安装和机械调试是一个特殊的环节,是整个工程的亮点,是工程能否 成功的关键阶段,但是在实际施工中存着各种隐患。

本文所述体育场开合屋盖不但可以开启及闭合以满足全天候 使用要求,还在轨道处设电加热融雪系统以满足北方地区冬季冰雪期间实现正常开闭使用,在北方冬季多冰雪、多 风沙的季节具有很强的实用性。

针对容易出现隐患的部位,提出相应的处理方法。

[关键词]体育场;屋盖;开合屋盖;钢结构;质量控制;施工技术 [中图分类号]TU712.5 【文献标识码]A [文章编号]1002-8498(2014)02-0007-03 ConstructionQualityPre-controllingTechnologyofthe OpeningandClosingRoofofaStadium Wang Jingbo,WangZhe,JingXiexie,GaoLiang (Inner Mongolia Xingtai Construction Co.,Ld.,Erdos,Inner Mongolia017000,China) Abstract: For large venues opening and closing events roof construction, rof installation and missioningofmachineryisaspecial linkand thehighlightofthewhole project,however,it keepsa variety of risks in the actual construction. The retractable roof of the stadium indicated in this paper not only can meet the requirements of all-weather use,still set electrically heated snowmelt system to meet opening and closing normally use in snow weather in the north. In this paper, appropriate treatments are put forward according to the hazards of the site. Key words:stadiums;roofs;retractable roofs; steel structures;quality control;construction 0引言 盖技术提高了体育场的使用效率和使用频率,并节 大型、超大型空间建筑正在凭借其建筑规模巨约了成本。

活动屋盖开闭灵活,在北方冬季多冰 型化、建筑造型多样化、专业技术集成化、建筑功能雪、多风沙的季节具有很强的实用性。

开合屋盖组 人性化而成为国内工程建筑的热点。

大型场馆设 成如图1所示。

有开合屋盖,可以满足全天候使用要求。

但是大型 场馆设计特殊、结构复杂、造型各异、施工难度大, 容易给工程质量留下隐患,特别是在开合活动屋面 施工中容易出现问题。

1工程概况 鄂尔多斯市东胜全民健身活动中心体育场工 程位于铁西区。

体育场占地面积6.26万㎡²,观众 席共有35107座,总建筑面积100451m²,设有开合 屋盖,可以满足全天候使用要求,系我国目前国内 图1开合屋盖组成 规模最大的开闭顶体育场。

该工程采用的开合屋 Fig.1 Composition of the retractable roof 2开合屋盖安装 内蒙古兴泰建筑有限责任公司课题立项项目:钢结构可开启屋盖 施工技术的研究(XTJT20090816-YF-03) 开合屋盖安装工艺流程如图2所示。

[作者筒介]王静波,副总经理,高级工程师,E-mail:jingxie_123@ 2.1卷扬机的吊装与安装 [收稿日期]2013-07-29 卷扬机吊装前,应对卷扬机进行有效防护,防 万方数据
8 施工技术 第43卷 土建及钢结构 机械部分安装精调及整体调试 保温系统等融雪措施,实现了开合屋面体育场馆在 卷扬机房预埋件验收 卷扬机现场拼装 北方冬季冰雪季节的正常开闭功能,克服了冰雪造 下部转向滑轮 卷扬机 品装下部转向滑轮 卷扬机控制 成轨道的卡轨问题,从而确保了开合...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年1月下 10 CONSTRUCTION TECHNOLOGY 第43卷第2期 D0I:10.7672/8gjs2014020010 某体育场巨拱结构高空倾斜偏转提升技术* 郅栓明,张永军,颜琳婷,杨凯 (内蒙古兴秦建筑有限责任公司,内蒙古鄂尔多斯017000) [摘要]鄂尔多斯市东胜全民健身活动中心体育场巨拱结构受力体系复杂,施工难度大.由于受运输和整体吊装 因素限制,重点介绍了巨拱的高空倾斜偏转提升施工工艺和安装方法,以及采取的质量控制措施以满足施工要求, 该技术节能、环保且能降低成本. [关键调]体育场;拱结构;高空倾斜;偏转;提升;施工技术 [中图分类号]TU758.1”[文献标识码]A [文章编号]1002-8498(2014)02-0010-04 Arch Structure Lifting Technology to Enhance the Aerial Oblique Deflection of a Stadium Zhi Shuanming Zhang Yongjun Yan Linting Yang Kai Inner Mongolia Xingtai Construction Co.Ltd.Erdos Inner Mongolia 017000 China) Abstract:For large stadium giant arch structure the stress system is extremely plex and it is difficult for construction.Due to transportation and the overall lifting constraints the arch structure lifting technology to enhance the aerial oblique deflection and installation methods were introduced in detail as well as the quality control measures.This technology was energy-saving environmental and could save cost. Key words:stadiums;arch structure;aerial oblique;deflection;lifting;construction 1工程概况 用起重机进行吊装高空焊接.中间3个单元采用地 鄂尔多斯市东胜全民健身活动中心体育场造面焊接拼装,组拼完成后用液压同步提升进行吊装 型新颖、气势宏大,其主要受力构件巨拱顶面标高提升(长180m 重1600t).将其提升到设计高度后 为129m 跨度330m 总质量2600t 拱与垂直面角进行倾斜偏转至设计要求的6.1°,再与两个边单元 度呈6.1°.本工程首次将桥梁工程中的索拱结构进行空中拼接合龙及预留后装杆件的安装.此种 巧妙地应用到建筑工程中,且拱与地面垂线倾斜方法将有效地降低安装施工难度,节约成本,且质 6.1°,受力体系极其复杂,施工难度较大.由于受运量、安全和工期均能有效保证.此方案经过多次组 输和整体吊装因素限制,只能采取工厂加工现场拼织专家论证,且实施后效果良好,通过认真总结,形 装.若采用常规的分件高空散装方案,需在现场搭成本施工技术. 设大量的高空脚手架,高空组装,焊接难度大,而且2工程特点与难点 存在较大的质量安全风险.大量脚手架的搭设...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年2月上 76 CONSTRUCTION TECHNOLOGY 第45卷第3期 DOI:10. 7672/sgjs2016030076 某住宅楼工程内外墙体渗漏原因剖析 李守才,梅佐云,宋晓光,潘晶晶 (山东省建筑科学研究院,山东济南250031) [摘要]通过对某工程外墙和内墙渗漏处现场鉴定检测分析,发现外窗框与洞口之间缝隙填充处理不当以及外框 与窗台间密封胶施工不规范是导致外墙渗漏的主要原因。

卫生间防水层在门洞口处的构造不合理是导致卫生间 附近内墙泅水的主要原因。

最后给出了详细的修复方法,解决了渗漏问题。

[关键词】防水工程;住宅;渗漏;鉴定;内外墙;处理 [中图分类号]TU761.1°1 [文献标识码]A [文章编号]1002-8498(2016)03-0076-03 LeakageReasonsAnalysisoftheResidentialBuilding InteriorandExteriorWalls Li Shoucai,Mei Zuoyun,Song Xiaoguang,Pan Jingjing (Shandong Academy of Building Research,Ji'nan,Shandong 250031,China) Abstract:Through the analysis and appraisal of leakage in internal and exterior walls of a residential building, it is found that the main reason leading to the walls leakage is the wrong way to treat the seam between window frame and openings,and also the wrong way construction of gasket cement.The toilet waterproof layer at the door opening structure unreasonable is the main reason leading to the toilet near the inner wall of seeping water.Finally,a detailed repair method is presented to solve the leakage problem. Key words:waterproofing;residence;leakage;appraisal;interior and exterior walls; treatment 1工程概况 主要分布在窗洞口四周墙体处,内墙渗漏主要集中 某住宅楼为5层砌体结构,建于2011年;设计 在卫生间门洞口两侧墙体和卫生间门洞口南侧卧 使用年限50年,抗震设防烈度7度。

承重墙体采用 室墙体。

其中,客厅南侧飘窗四周墙体渗漏相对较 煤研石多孔砖砌筑,外墙山墙为370mm厚,南北纵 严重,个别卫生间门洞口两侧墙体泅水、潮湿现象 墙为240mm厚,内墙为240mm厚。

外窗采用塑钢 也较为严重。

部分现场典型渗漏情况如图1所示。

窗。

该楼房投人使用1年后发现外墙和内墙均存在 不同程度的渗漏、泅水现象,已经严重影响使用。

为查找墙体渗漏原因,对墙体渗漏处进行了现场检 测鉴定。

2现场检测 a卫生间门洞两侧 b卫生间门洞两侧墙体 根据现场实际情况,对该工程的墙体渗漏情况 墙体湘水、泛黄 装饰层脱落、墙面潮湿 进行详细检测,主要内容包括墙体渗漏情况调查、 外窗淋水试验和剔凿后渗漏检测等。

2.1墙体渗漏情况 该工程部分墙体存在渗漏、泅水、泛黄现象,墙 体表面存在空鼓、开裂、脱落现象。

外墙渗漏情况 c窗下墙皮起鼓、剥落, d窗侧墙皮发黑、发霉, 有黄色水渍 有渗漏痕迹 [作者简介]李守才,高级工程师,E-mail:987136802@ 图1现场典型渗漏情况 [收稿日期]2015-05-16 Fig.1 Leakage phenomena 万方数据
2016 No.3 李守才等:某住宅楼工程内外墙体渗漏原因剖析 77 2.2外窗淋水试验 3鉴定分析 现场选取渗漏严重的一户客厅飘窗及该窗周 3.1外墙渗漏鉴定分析 围墙体进行淋水试验,并利用热成像仪对窗墙渗漏 1)现场剔凿检测发现,窗框与洞口之间间隙普 情况进行观测。

淋水试验渗漏情况如下:西侧固定 遍较小,窗框与洞口之间基本没有发泡胶,形成空 扇窗框与窗洞口墙体间的密封胶开裂进水,快速渗 腔,不符合规范《塑料门窗工程技术规程》JGJ103 漏至室内;飘窗右下角玻璃胶条...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年2月上施工技术 第42卷第3期CONSTRUCTION TECHNOLOGY41 DOI:10.7672/sgjs2013030041
某住宅建筑爆炸后承重构件置换与加固
杨志刚',李晓霞² (1.山东理工大学建筑工程学院,山东淄博255012;2.淄博职业学院,山东淄博255012)
[摘要]某5层砖混结构住宅由于发生煤气爆炸致使结构发生局部破坏,爆炸造成房间内承重墙体鼓闪裂缝变形, 预制板断裂和承重梁下挠开裂。

根据现场鉴定进行结构加固设计和施工处理,通过采用置换方式把预制空心板改 为槽钢加现浇混凝土板,把原梁凿除后置换为同截面的现浇梁,消除了爆炸对主体结构的影响,保证了该住宅楼的 安全性。

[关键词]加固;爆炸;砖混结构;置换;设计;施工 [中图分类号]TU746.3[文献标识码】A[文章编号]1002-8498(2013)03-0041-03 Replacement and Strengthening for Supporting Members in SomeResidentialBuildingAfterExplosion Yang Zhigang',Li Xiaoxia² (1.School of Architecture Engineering,Shandong Unirersty ofTecnology,Zibo,Shandong 255012,China; 2.ZiboVocational Institute,Zibo,Shandong 255012,China) Abstract:A five-storey brick-concrete residential building was subjected to local failure due to gas explosion.As a result of the explosion, the load bearing wall had bulged deflection and cracks, some precast slabs collapsed and load bearing beams deflected with cracks. Based on site investigation, the retrofitting design andreconstruction were performed. Specifically,the precast slabs were replaced by channel steel with cast-in-situ concrete slab.The original beam was removed and replaced by cast-in-situ concrete beam of the same cross-section.The retrofitting work eliminated the influence of gas explosion on the main structure and ensured the safety of the residential building. Key words:strengthening;explosion;brick-concrete structure;replacement; design;construction
1工程概况室内破坏情况如图1所示。

淄博市某住宅楼为1998年建成的砖混结构住②④7 宅,共5层(带半地下室),建筑面积1735m²,7度抗27002 9502 6001 800 震设防,砌体结构材料为MU10机制砖和M5.0混 合砂浆,结构内的圈梁、构造柱、过梁、花篮梁均为操跨中出现宽裂缝, 现浇,混凝土强度等级为C20,钢筋强度等级为Ⅱ出现明显下绕变形 级,楼板主要为预制空心板。

008 2010年11月,该住宅楼1-201室因管道液化气出现横裂缝 泄露发生爆炸事故,造成1-201室、1-101室两户房C 屋结构构件严重损坏,尤其是1层顶板出现了严重楼橱房间顶概上为爆炸点楼板裂缝宽 断裂和坍塌,1层客厅顶部花篮梁产生下挠,跨中出新裂,塌陷1500长裂缝0.1宽 现横向拉伸裂缝,卧室承重墙体出现鼓闪裂缝变裂缝宽2,长3过梁裂缝0.8宽B 形,由爆炸引起的火灾使得部分墙体脱落。

1-101栏板破坏
3 [作者简介]杨志刚,讲师,国家一级注册结构工程师,E-mail:sdlgyzg③ @126.图11层结构破坏示意 [收稿日期]2012-07-22Fig.1Structure failure of first floor 万方数据
42施工技术第42卷 2现场鉴定结论及分析于出现...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2012年3月下施工技术 第41卷第361期CONSTRUCTION TECHNOLOGY55
某住宅工程地下结构墙体钢塑模板施工技术
王卫东,范明,吴庆来,左康 (北京城建五建设工程有限公司,北京100029) [摘要]某住宅小区工程地下结构墙体采用钢塑模板代替小钢模。

分别对钢塑模板、GP70组合钢模板、散拼散装 木模板3种方案进行综合对比分析,确定选择钢塑模板施工。

对模板材料、设计、施工工艺进行详细介绍,施工效 果良好。

混凝土垂直度、平整度、截面尺寸均满足质量验收要求。

[关键词]模板;住宅;地下结构;墙;钢塑模板;螺栓;施工技术 [中图分类号】TU755.2[文献标识码】A[文章编号】1002-8498(2012)06-0055-03 Plastics-steelFormworkConstructionforSome UndergroundWall ofHousing Wang Weidong,Fan Ming,Wu Qinglai,ZuoKang (The Fifth Urban Consruction Engineering Company of Bejing,Beijing 100029,China) Abstract;Plastics-steel formwork is used instead of small steel formwork for some underground wall of housing. The plastics-steel formwork, GP70 posite steel formwork and bulk wood formwork are pared synthetically to assure the plastics-steel formwork. The formwork materials, design and construction process are introduced in detail,and the effect is excellent.The verticality, smoothness and section size can meet quality acceptance requirement. Key words: formwork; housing; underground structures; walls; plastics-steel formwork; bolts; construction 1工程概况组合钢模板水平拼缝多,易缺棱掉角,混凝土观 某住宅小区总建筑面积97818m²,为现浇剪力感质量一般。

质量较重,运输及拆装模板困难,劳 墙结构。

地下2层,地上5~18层。

1~4号楼地下动强度高。

拆模后需对板面清理、刷脱模剂,占用 室层高为3.85m,地上层高2.9m;5,7,9号楼地下塔式起重机吊次多。

可长期周转使用,不易破损, 层高3.7m,地上层高2.8m。

墙厚为200,250,综合成本较低。

③散拼散装(木模板)水平拼缝 300mm,地下墙体展开面积20500m²。

较多,易曲翘不平,飞边凸肋,混凝土观感质量好。

2模板选择质量轻,易运输,拆装方便,施工难度小,前期拼装 地下室墙体模板选择时,分别对钢塑模板、时间长,板面需清理后刷脱模剂,占用塔式起重机 GP70组合钢模板、散拼散装木模板3种模板方案进吊次少。

周转次数少(4次),木材使用量较大,不环 行综合对比:①钢塑模板按墙体高度定尺加工模保。

综合成本较高。

板,无水平模板拼缝;表面平整度、垂直度及截面尺综合以上3种方案对比,本工程地下室墙体模 寸满足规范要求,混凝土观感质量好。

不粘模,易板最终选择钢塑模板方案施工。

清灰,质量轻,不变形,支撑操作方便,一拼而成。

3钢塑模板材料介绍 不需脱模剂,混凝土凝固后,模板与混凝土自动分1)墙体钢塑模板平模宽度主要规格为:100, 离,脱模容易,占用塔式起重机吊次少。

周转次数150,200,250,300,350,400,450,500,550,600mm。

多(20次)、能二次回收利用。

钢塑模板厂家100%高度根据工程墙体实际浇注高度定尺加工(见图 置换,符合国家环保政策,综合成本较低。

②GP701a)。

[收稿日期]2011-12-062)阴角、阳角模板可根据实际施工要求定尺加 [作者简介]王卫东,北京城建五建设工程有限公司总工程师,高级工(见图1b,1c)。

工程师,北京市朝阳区安苑东里三区十号100029,电话:(010)3)板缝拼接专用卡子如图1d所示。

,E-mail wwd514@ 126. ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年1月下 74 CONSTRUCTIONTECHNOLOGY 第43卷第2期 DOI:10. 7672/sgjs2014020074 某住宅小区逆作法内衬墙工具式模板支撑体系 王慧全,张利强,于成君,贾芳萍 (山西六建集团有限公司,山西太原030024) [摘要】近年来逆作法在深基坑施工中已被广泛应用,地下连续墙成为逆作法基坑支护的主要方法,但往往为了保 证地下连续墙兼作主体地下室结构,连续墙内侧均做内衬墙,内衬墙模板支撑体系的普通施工方法为钢管脚手架 整体搭拆。

本施工技术通过钢管三角架组拼成的整体移动式支撑体系,完善了内衬墙模板支撑体系的施工方法, 使内衬墙模板支撑变得简单、实用、稳固。

[关键词]模板;支撑;逆作法;内衬墙;施工技术 [中图分类号】TU731.2 [文献标识码]A [文章编号]1002-8498(2014)02-0074-02 Tool Formwork Support Systemfor theInverseMethod LiningWall inaResidentialArea Wang Huiquan,Zhang Liqiang,Yu Chengjun,Jia Fangping (Shanxi Six Construction Group Co.,Ld.,Taiyuan,Shanxi 030024,China) Abstract;In recent years,inverse method has been widely used in the construction of deep foundation excavation.In order to make diaphragm wall as basement structure, lining wall is used inside the diaphragm wall,whose traditional construction is integral assembly and dismantling of the steel tube scaffold. In this paper,a construction technique which applies steel tube tripod to assemble into integral movable supports is put forward. This technique improves the construction of lining wall, and makes the construction easy,practical and stable. Key words:formwork;supports;inverse method;lining wall;construction 1工程概况 某住宅小区工程,地下4层车库,地上在南、西、 北周边凹字形布置了3栋33层高层住宅楼,分别为 A,B,C座,3栋高层住宅楼中央为地上3层商场(见 图1)。

地下4层车库占地面积21000m²,基坑开挖 深度15.35m。

该小区东西宽约123m,南北长约 185m,场地内地下均为车库,车库共有4层,采用逆 作法施工。

从2010年11月开始施工第1段内衬 图1某住宅小区效果 墙,至2012年8月全部内衬墙施工完毕,期间共加 Fig.1A residential area 工本模板支撑体系6套,周转使用13次左右后更换 3施工技术及操作要点 面板,再继续使用。

混凝土浇筑后,成型效果良好。

3.1工艺流程 2施工特点 连续墙凿毛一连续墙清洗→浇灌孔、透气孔清 1)工具式三角支撑架,整体移动。

理→喷涂水泥基渗透结晶防水材料→钢筋绑扎→ 2)搭拆操作简单、容易施工。

内衬墙模板及支撑体系施工→混凝土浇筑。

3)周转灵活,节约时效。

3.2操作要点 4)降低成本,加快施工进度。

3.2.1连续墙凿毛 [作者筒介]王慧全,高级工程师,E-mail:1015894821@qq. 用小锤或子将连续墙凿毛,要求平整度在 [收稿日期】2013-03-19 2cm以内,表面无泥块和泥浆。

万方数据
2014 No.2 王慧全等:某住宅小区逆作法内衬墙工具式模板支撑体系 75 3.2.2连续墙清洗 模板及支撑体系规格、间距、型号等均应经计算 连续墙凿毛后,需将连续墙表面清理干净,必确定。

要时用高压水枪冲洗表面,去除面上残留杂物。

如 3)内衬墙模板制作 因连续墙平整度不够,内衬墙圈梁支模时,用毛毡、 根据内衬墙施工段制作相应的模板面板,次龙 聚苯板堵缝。

骨采用50mm×100mm木方,间距300mm,次龙骨外 3.2....

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年9月上 施工技术 第45卷第17期 CONSTRUCTION TECHNOLOGY 127 D0I:10.7672/sgjs2016170127 某会展中心高大模板支撑体系设计与施工* 刘如兵,钱军,金浩2 (1.泰州职业技术学院建筑工程学院,江苏秦州225300;2.中国江苏国际经济技术合作 集团有限公司,江苏南京210008) [摘要]中国医药城会展交易中心二期工程有多处属于高大模板支撑.结合该工程实际情况,借鉴类似工程过往 模板坍塌事故的经验教训,设计出符合工程实际的受力方案,对主要受力构件进行全面验算,并采用有限元进行分 析,采取切实可行的技术措施,加强施工全过程的安全管理,确保了施工安全,并提高了工程质量. [关键词]模板;扣件式钢管支撑;设计;有限元分析;施工技术 [中图分类号]TU755.2 [文献标识码]A [文章编号]1002-8498(2016)17-0127-04 Design and Construction of High and Large Formwork Support System of Some Conference and Exhibition Center Liu Rubing' Qian Jun' Jin Hao2 (1.School of Architecture and Civil Engineering Taizhou Polytechnic College Taizhou Jiangsu 225300 China;2.China Jiangsu International Economic and Technical Cooperation Group Co.Ltd.Nanjing Jiangsu 210008 China) Abstract:High and large formwork support system is used in Phase II project of China Medical City Exhibition Trading Center in bination with the practical situation of the project based on the experience of similar project formworks collapse with the design in accordance with the engineering practice the prehensive calculation of main stress ponents the finite element analysis method is used the feasible technical measures strengthen the construction of the whole process of safety management ensure the construction safety improve engineering quality. Key words:formwork;fastener-style steel pipe supporting frame;design;finite element analysis;construction 随着建筑技术的不断发展,多功能、大空间、大1工程概况及施工特点分析 跨度的混凝土结构体系越来越多,其模板支撑体系 中国医药城(泰州)会展交易中心二...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年5月上 60 CONSTRUCTION TECHNOLOGY 第41壮第364期 某仿古建筑病害原因分析及应对措施 欧阳甘霖 (青岛静力工程有限公司,山东青毒266071) [摘要]某居住性仿古建筑基础持力层为新近素填土,经机械分层碾压形成.因雨水侵人产生不均匀沉降和候斜. 条形基础断裂100多处,西院地下室南北向倾斜达7.06%,西配房东西向最大倾斜达16.2%,挡土墙候斜8- 10mm/2-3d 并在墙体中部、南部、北部分别出现1-2mm竖向通长裂缝:建筑处于危险状态中.通过坑式静压钢 管柱终止住房部分的沉降并实施纠偏,通过自进式错杆结合水平压力注浆实施松散素填土的固结增强及挡土墙加 固.对地下室采取从底板附带上部建筑整体顶升方式纠偏,达到了结构无损坏、底板防水层未破损的效果. [关键词】加固;仿古建筑;不均匀沉降;倾斜;顶升;纠倾 [中图分类号]TU746.1 [文献标识码]A [文章编号]1002-8498(2012)09-0060-03 Disease Analysis and Treatment Measures of a Antique Building Ouyang Ganlin The Qingdao Static Engineering Co. Lad.Qingdao Shandong 266071 China) Abstract:The foundation of some residence antique building sits on the newly plain fill soil formed by layered paction.Differential settlement and tilt of the building occur due to rainwater intrusion. Fracture in the foundation is more than 100 of strip north-south inclination of basement in the west yard is up to 7.06%% east-west inclination of the west auxiliary is up to 16.2%o tilt speed of retaining walls is about 8~10mm/2~3d and 1 ~2mm width vertieal cracks occur along the middle south and north wall.The building is dangerous.The building stops settlement and is deviation rectified by pit pressure steel pipe pile.The newly plain soil is consolidated and the retaining wall is enhanced by automatic anchor pole and horizontal pressure grouting.The basement and upper structure are rectified deviation by integral jack-up method from the bottom plate which make structure and waterproofing of boltom...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2011年4月下 施工技术 第40卷第339期 CONSTRUCTION TECHNOLOGY 93 某京沪高铁软土路基PHC管桩桩网结构施工技术 谢大伟,陈利民 (上海铁路局南京桥工段,江苏南京210015) [摘要]PHC管桩桩网结构由加筋土、复合操垫层和桩土加固区三部分组成,对其加固机理进行研究.通过PHC 管柱桩网结构在京沪高铁路基工程中的应用,对PHC管桩桩网结构处理软土地基的施工工艺、质量控制要点及注 意事项、加固处理效果进行了详细述.实践证明,PH管桩桩网加固的复合地基具有良好的承载能力,地基沉降 满足要求,取得良好效果. [关键词]京泸高铁:PHC管桩桩网;软基处理;加固效果 [中图分类号]TU755.3;U443.15 [文献标识码]A[文章编号]1002-8498(2010)11-0093-03 Construction Technology of PHC Tube Pile-net Structure in Soft Soil Foundation Treatment of Beijing-Shanghai High-speed Railway Xie Dawei Chen Limin Nanjing Bridge Section of Shanghai Railway Bureau Nanjing Jiangsu 210015 China) Abstract:PHC tube pile-net structure consists of reinforced earth posite cushion and pile-soil reinforcement area.The reinforcement mechanism of PHC tube pile-net structure is researched.Based on Beijing-Shanghai high-speed railway construction technology quality control points and attention factors of PHC tube pile-net structure are introduced as well as reinforcement effect.It proves that good bearing capacity of posite foundation is gained by reinforcing with PHC tube pile-net structure and the settlement of foundation is controlled in allowable range.Furthermore good reinforcement effect of the posite foundation in high-speed railway can be gained. Key words:Beijing-Shanghai high-speed railway:PHC tube pile-net;soft soil foundation treatment; reinforcement effect 软土、松软土在我国沿海、沿湖、沿河等地带有 外加装 广泛分布,而长三角、珠三角和环渤海地区普遍分布 受 有湖相、海相及近海冲洪积软弱土层,其面积广、厚 度大、工程性质差,给我国这些地区正如火如茶大规 土 模建设的高速铁路、客运专线带来了严重...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年3月下施工技术 第45卷第6期CONSTRUCTIONTECHNOLOGY63 DOI:10. 7672/sgjs2016060063
某主题乐园项目信息化建模实施流程设计分析
乔堃 (上海浦东建筑设计研究院有限公司,上海201204)
[摘要】针对某大型主题乐园施工图深化设计的复杂性,通过建立多专业充分综合协调BIM模型,进而由模型生成 各专业深化图,实现高效、精确的深化设计。

在对施工总承包合同关于BIM模型要求、细度等级、审核进行分析的 基础上,对信息化建模实施流程进行模型建立、总包内部、外部协作3个层面的设计,对各层面实施流程的重要阶 段进行分析。

结果表明,流程设计提高了信息化模型的制作效率和质量,确保了深化设计进度和质量。

[关键词]主题乐园;信息化;建模;充分协调模型;实施 [中图分类号]TU17[文献标识码]A[文章编号]1002-8498(2016)06-0063-05 Implementing Process Design and Analysis of Informatization ModelinginaLargeThemeParkProject QiaoKun (Shanghai Pudong Architectural Design and Research Institute Co.,Lad.,Shanghai 201204,China) Abstract:In view of plexity of construction drawing detailed design for alarge theme park construction,multi-specialty fully coordinated models have been erected,which generates construction drawing of every specialty directly,and realizes the effcient and accurate way of detailed design.Based on analyzing to model requirement,level of detail and review in general contract, the implementing process of information modeling has been designed by three levels including model creating,coordination among main contractor team and owner design team.The crucial stage of every level process has been
quality,ensures design schedule and quality. Key words:theme park;information;modeling;fully coordinated model;implements
1合同要求模型者(施工总承包方)需内部复核3D模 上海某项目为大型国际化游乐演艺项目,其施型的准确性,确保模型无碰撞,且能够准确体现后 工总承包全过程必然面临众多挑战。

为确保项目期现场工作。

全过程有序高效地实施,全面深度应用BIM技术进1.2模型深度 行施工图深化设计和施工总承包全过程管理,充分3D模型应能体现构件的实际尺寸并包含 发挥BIM的功能和优势。

本项目BIM深化设计实正确的坡度(在条件受限的情况下,可将水管坡度 施主要依据合同文件和指令、工程信函和回复、IFC调整为水专业能接受的最小坡度,即1%,但调整后 (工业基础类别)图纸和设计变更、技术规格书以及的水管需采用特殊标识以助于水专业后期核查)。

现行设计施工国标规范。

在合同文件雇主要求的3D模型应体现相关系统。

一般来说,任何
义、工作程序、项目建立及整合、沟通协调机制、更试和相关协调。

除解决碰撞问题外,3D模型还应考 新与维护。

合同中未明确的内容通过工程信函的虑其他相关要求,例如:管线结构预留洞的开洞标 形式要求管理方予以澄清。

准,开洞墙体的防水节点以及根据规范要求复核电 1.1模型要求气套管与其他系统的间距。

3D模型还应表达
场地设计(进/出线)与单体的连接点,以便于单体 [作者简介]乔垫,硕士,工程师,E-mail:nmshqk@126.与场地设计的协调。

综合管线模型可根据平面、楼 [收稿日期】2015-06-10
万方数据
64施工技术第45卷 层、层级有效地体现各系统之间的关系。

同时,模建...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)