2014年1月上施工技术 第43卷第1期CONSTRUCTIONTECHNOLOGY53 DOI;10. 7672/sgjs2014010053 某工程超大深基坑地基与基础施工技术 梅晓丽,陈杰,刘伟 (中建一局集团第三建筑有限公司,北京100161) [摘要】以实际工程为例,介绍了该工程地基与基础施工中的重点和难点。
在土方开挖及内支撑施工阶段,通过合 理安排塔式起重机工程,提高了施工效率。
从降水施工、土方开挖与内支撑施工、换撑拆撑施工以及坑中坑施工等 几个方面对施工技术措施进行了详细介绍。
监测结果表明,在深基坑及地下室结构施工过程中,基坑变形、沉降等 均在允许范围内。
[关键词]地下工程;深基坑;基础;内支撑;降水;施工技术 【中图分类号】TU753:【文献标识码】A[文章编号】1002-8498(2014)01-0053-04 Construction Technology of Ground and Foundation for Super-large Deep Foundation Excavation of Some Engineering Mei Xiaoli, Chen Jie,Liu Wei (The Third Construction Co.,Lad.of China Construction First Group, Beijing 100161) Abstract:Based on engineering practice,this paper introduced thekey points and dificulties in ground and foundation construction.In excavation and inner support construction,tower crane engineering was reasonably arranged to improve construction efficiency. Construction technologies were introduced from dewatering,excavation and inner support construction, support exchange and demolition, pits in foundation excavation.Monitoring results showed that it can meet the standard requirement. Key words:underground;deep foundation excavation;foundations;inner supports; dewatering; construction 1工程概况和机械设备需求。
泛海国际SOHO城位于武汉CBD核心区内,是2)本工程潜水含水层的稳定水位埋深为0.5~ 武汉市首个超大型S0H0项目,定位为世界级全新2.6m,承压水头绝对标高为17.000~18.200m(埋 商务办公空间。
本工程为商务核心区内宗地12项深4.48~3.28m)。
2层为赋存于砂土层中的承压 目,建筑面积32.3万m²,地上24.7万m²、地下7.6)水,与长江有一定的水力联系,其水位变化受长江 万m²;其中6号楼高148.9m,3,4,5号楼高99.4m。
水位变化影响,水量较丰富;潜水层与承压含水层 本工程地下室3层,地下室底板面相对标高为连通,基坑开挖面位于含水层内,基坑降水是本工 -15.400m,最深基底相对标高-22.800m,最大挖程的重点。
深21m,基坑总延长650m,基坑东西向185m,南北3)内支撑设计复杂,基坑开挖顺序对支撑(梁 向140m。
基坑总面积约27000m²,基坑内开挖土方板)传力系统要求较高,施工顺序和技术间歇直接 约43万㎡”。
基坑围护体系采用钻孔灌注桩结合外小影响基坑整体稳定性,因此合理安排地下土方开 侧三轴水泥土搅拌桩止水幢幕,竖向设置3道混凝挖、内支撑和地下结构施工工序,对确保基坑安全 土支撑。
地基与基础施工是工程的重、难点。
具有特别重要的意义。
2工程重、难点分析4)内支撑的拆除是影响基础工程工期的关键 1)本工程基坑内支撑和结构施工工程量大,而因素。
内支撑采取爆破的方式拆除,拆除顺序、废 施工工期短,短期内将会产生庞大的劳动力、材料料清理、主体施工的介人、换撑施工等是地下室施 [作者简介]梅晓丽,高级工程师,E-mnil:meixiaoli@163.工阶段的重、难点。
[收稿日期]2013-09-05;[修订日期]2013-11-205)基底坑中坑区域形...