某工程转换梁临时传力柱设计与施工
林守忠,李剑宏 (中天建设集团第五建设公司,陕西西安710065)
[摘要]钢管扣件式脚手架由于搭设方便容易控制,在施工中大量应用。
针对转换梁被后浇带断开、梁下柱子取 消、上部结构施工荷载对转换梁极不利的情况,利用临时传力柱来支撑转换梁,改善转换梁受力和传递施工荷载, 施工安全可靠,方便节约。
重点介绍了转换梁、各层及屋面支模架及传力支架设计。
[关键词】钢筋混凝土;框架;转换梁;脚手架;传力柱;设计;施工 [中图分类号】TU756.41[文献标识码】A[文章编号】1002-8498(2014)02-0101-03 Designand Construction of theTemporaryTransmission Column of TransferBeamofaEngineering Lin Shouzhong,Li Jianhong (The Fifh Construction Co.of Zhongtian Construction Group Co.,Ltd.,Xi'an,Shanxi710065,China) Abstract;Fastener-style steel pipe is widely used because of faster and easier control for construction. When the beam and slab was intercepted by post-cast strip, supporting column was cancelled, construction loading was extremely disadvantage to structure supporting capacity,temporary column was set up to transfer construction loading.It is more convenient,faster and efficient. The design and construction for supporting and transmission support of transfer beam, every layer floor and roofs were introduced in detail. Key words:reinforced concrete;frame;transfer beam;scaffolds;transmission column; design;construction 随着建筑功能要求的复杂化,出现越来越多各 类超重结构,给施工设计带来难度。
超重支模架本后绕带- 身并不复杂,往往由于作为支模架立杆基础的楼层 承载能力有限,施工荷载的传力体系设计更复杂。
转换梁 分析结构受力特点和施工荷载传递路线,借用已有 结构,增设合理的临时构件,能够更科学有效解决 问题。
1工程概况 某大酒店工程裙楼4层,框架结构。
由于底层图12层和屋面超重梁部位结构平面示意 大堂空间的需要,1层在轴交,轴处的框架柱Fig.1 Layout plan of overweight beam 取消;2层转换梁尺寸700mm×1600mm,跨度location on floor 2 and roof 16.2m,5轴2层以上的框架柱生根于转换梁;4层转换梁被后浇带切分为净长10.05m和4.35m 功能为大宴会厅,5轴框架柱全部取消;屋面梁尺的两段悬挑结构,3,4层结构由于转换梁上框架柱 寸600mm×1300mm,跨度16.2m。
裙房与主楼间和后浇带的存在,无法形成完整承载体系,施工荷 有A型后浇带,结构示意如图1,2所示。
载大部分以集中力的形式传给转换梁,对该梁极 2施工难点不利。
[收稿日期]2013-03-28[作者简介]林守忠,高级工程师,E-mail:1139450012@qq.按照设计要求和施工进度安排,后浇带在转换 梁施工完成后10个月左右才能浇筑,若该部位的支
万方数据
102施工技术第43卷
屋面屋面梁结构的施工荷载,增设传力柱后的竖向传力支架布 4层置如图4所示,转换梁附近也无需图4所示的传力 3层支架。
支撑系统大大简化,且传力更直接可靠。
2层屋面屋面梁钢管格构柱 1层转换梁后浇带4层
3层 B1层2层转换梁 B2层1层传力柱 ④③6 图2超重结构部位剖面示意B1层 Fig.2Profile of overweight beam B...