施工技术 2014年11月上 10 CONSTRUCTION TECHNOLOGY 第43卷第21期 D0I:10.7672/5j52014210010 某风洞消声室结构施工关键技术 李博平,张笈玮,杨辉 (中国人民解放军63926部队,北京100192) [摘要]针对某风洞消声室结构施工中,结构剪力墙较高,墙体垂直度要求高及结构施工前室内大型设备已安装, 无法从地面搭设满堂脚手架作为梁板模板支撑等施工难题,提出了高大剪力墙施工精度控制技术和现浇梁板无地 面支撑可测可控支撑体系施工技术,通过该技术顺利解决了施工难题. [关键词]风洞:混凝土;支撑:剪力墙;精度:施工技术 [中图分类号]TU745.4 [文献标识码]A [文章编号]1002-8498(2014)21-0010-03 Structural Construction Technology of Muffler Room of a Wind Tunnel Li Boping Zhang Jiwei Yang Hui The 63926 Troop of Chinese People's Liberation Army Beijing 100192 China) Abstract:During the construction of the muffler room of a wind tunnel the standard of the squareness for the high shear walls is strict.Full scaffold framing can't be applied to support the mould boards for the beams and plates because of the large-seale equipment installed before the construction.Based on above problems the technologies of the accuracy controlling for the high shear walls and the determinable and controllable framing for the mould boards for the beams and plates were proposed.And the problems are solved. Key words:wind tunnels;concrete;supports;shear walls;accuracy;construction 1工程概况 消声室是某风洞工程的重要组成部分,结构形 式为地上单层钢筋混凝土剪力墙结构(见图1a) 平 面尺寸为30.3m×12.3m 层高23.3m 由于室内无 隔墙,单面剪力墙长30.3m、高23.3m 要求垂直度 偏差≤10mm 剪力墙施工精度控制难度较大.此 外,由于安装工艺的要求,在消声室结构施工前,室 内设备已安装就位(见图1b) 设备直径8.5m 长 a消声室结构施工现场 26.8m 中心标高5.800m 占用了消声室结构内的 场地空间,设备两侧距离剪力墙不足2m(见图1c) 无法从地面搭设满堂脚手架,现浇钢筋混凝土屋面 梁板施工成为难点. 针对以上施工难题,研究提出了大尺寸混凝土 剪力墙施工精度综合控制技术和现浇混凝土梁板 无地面支撑可测可控模板支撑体系. b结构施工前室内 2现浇梁板无地面支撑模板支撑体系 c消声室内部示意 设备...
推荐内容/By 规范库
-
GB/T 12770-2025 机械结构用不锈钢焊接钢管.pdf
-
T/SDHTS 00015-2025 公路跨线桥梁拆除设计与施工技术规程.pdf
-
TB 10123-2025 铁路富水隧道技术规程.pdf
-
DB32/T 5181-2025 装配式混凝土结构减震隔震技术规程.pdf
-
T/CI 412-2024 隧道与地下空间支护结构渗漏智能检测技术规程.pdf
-
T/CECS G-C52-01-2023 公路隧道施工安全隐患排查技术规程.pdf
-
T/CECS 1852-2025 建筑空间结构防火技术规程.pdf
-
DB37/T 5331-2025 工程结构健康监测技术规程.pdf
-
GB 26164.1-2010 电业安全工作规程 第1部分:热力和机械(正式版).pdf
-
T/CSPSTC 133-2024 地铁隧道毛细管换热系统技术规程.pdf
-
DB15/T 2004-2020 预制装配整体式混凝土综合管廊结构技术规程.pdf
-
NB/T 11813-2025 索结构光伏支架技术规程.pdf