英文版 GB 50268-2008 给水排水管道工程施工及验收规范.pdf

2008,GB50268,pdf,予以,出版,地址,排水管道,给予,英文版,译本,建筑工程
文档页数:367
文档大小:24.07MB
文档格式:pdf
文档分类:建筑工程
上传会员:
上传日期:
最后更新:

Announcement of HousingandUrban-RuralDevelopment of the People'sRepublic of China
No.132
Announcement of Publishing the National Standard of "Codefor Construction and Acceptance ofWater and Sewerage Pipeline Works" “Code for Construction and Acceptance of Water and Sewerage Pipeline Works”" has been approved as a national standard with a serial number of GB 50268 2008, and will be implemented on May 1,2009. Therein Articles 1. 0.3, 3. 1. 9,3. 1. 15, 3. 2. 8, 9. 1. 10 and 9. 1. 11 are pulsory provisions and must be enforced strictly. The origi- nal “Code for Construction and Acceptance of Water and Sewerage Pipeline Works” GB 50268-97 and “Standard for Quality Inspection of Urban Drainage Pipe and Channel Work" CJJ 3-90 shall be abolished simultaneously. Authorized by the Research Institute of Standards and Norms-Ministry of Housing and Urban-Rural Development, this Code is published and distributed by China Archi- tecture &. Building Press.
Ministry of Housing and Urban-Rural Development of the People’s Republic of China October15,2008
Foreword
According to the requirement of Document JIAN BIAO [2004] No. 67 issued by Ministry of Construction-“Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2004", this Code is revised on the basis of “Code for Construction and Acceptance of Water and Sewerage Pipeline Works” GB 50268-97 by Beijing Municipal Engineering Group Co. , Ltd. with all relevant organi- zations together. In the revision process, the drafting group made in-depth investigation and study and special seminar, summarized practical experience on pipeline works construction and quality acceptance for water and sewerage in all parts of China, adhered on guidelines of acceptance-assessment separation,intensified acceptance,perfect means and process control”, referred to relevant codes from home and abroad, and solicited for opinions widely from organizations all concerned in multiple ways, and finally finalized the revi- sion by examination The main contents of this Code are as follows: general provisions, terms, basic re- quirements, earthwork and foundation treatment, major structure of pipeline for trench installation,major structure of pipeline for trenchless installation, major structure of immersed pipeline and bridging pipeline construction, subsidiary struetures of pipeline, function test and Appendix of pipeline. The provisions printed in bold type are pulsory ones and must be enforced strictly. Ministry of Housing and Urban-Rural Development is in charge of the administra- tion and the explanation of the pulsory provisions for this Code and Beijing Munici- pal Engineering Group Co. , Ltd. is in charge of the explanation of the specific technical contents. For the purpose of improving the Code quality, all relevant organizations are kindly requested to sum up and accumulate your experiences in actual practices during the process of implementing this Code. The relevant opinions and advice, whenever nec- essary. can be posted or passed on to Beijing Municipal Engineering Group Co., Ltd. (address: Sanhuqiao Rd. No. 6, Haidian District, Beijing, 100044, China; E-mail: kjb @ bmec. cn) for further reference in revision. Chief Development Organization, Participating Development Organizations and Chief Drafting Staff of this Code:
Chief Development Organization: Beijing Municipal Engineering Group Co., Ltd. Participating Development Organizations; Public Utility Substation of Shanghai Construction Engineering Quality Moni- toring Station Beijing Urban Drainage Group Co., Ltd. Tianjin Municipal & Highway Administration Bureau Beijing Tap Water Design Company Tianjin Waterworks Group Co. , Ltd. Beijing Municipal Work Administration Department Beijing No. 4 Municipal Construction Engineering Co. , Ltd. Shanghai No. 2 Municipal Work Co., Ltd. Beijing Institute of Civil Work and Architecture Guangdong University of Technology Chongqing University Xian Municipal Work Design &. Research Institute Wuhan Water Authority Wuhan Municipal Water &. Wastewater Work Design Institute Co., Ltd. Xinxing Ductile Iron Pipes Co. , Ltd. Chief Drafting Staffs: Jiao Yongda Su Yaojun Wang Hongchen Yu Qingjun Li Qiang Zheng Jinyu Cao Honglin Li Junqi Yue Xiuping Wang Heping Cai Da Yuan Guanjie Zhang Qin Wang Jinliang Liu Yanlin You Qingcheng Ge Jinke Sun Lianyuan Li Shaohai Liu Qing
Contents
1General Provisions(1) 2Terms 3Basic Requirements(5) 3.1 Basic Requirements for Construction(5) 3.2 Basic Requirements for the Quality Acceptance .(8) 4Earthwork and Foundation Treatment(12) 4.1General Requirements 4.2(Construction Dewatering and Drainage(13) 4.3Trench Excavation and Support 4.4Foundation Treatment(19) 4.5Trench Backfill(20) 4.6Acceptance Quality Level .........(24) 5Major Structures for Pipeline with Trench Installation 5.1General Requirements(29) 5.2Pipeline Foundation 5.3Steel Pipe Installation(34) 5.4Anticorrosion Inside and Outside the Steel Pipe(39) 5.5Ductile...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。
投稿会员:鲁班-99
我的头像规范收藏家

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)