2014年7月下 施工技术 第43卷第14期 CONSTRUCTION TECHNOLOGY 115 D0I:10.7672/sgjs2014140115 某大悬挑结构支撑胎架卸载过程分析 陈晓阳 (中铁第四勘察设计院集团有限公司,湖北武汉430063) [摘要]大悬挑结构因其独特的建筑表现形式而越来越广泛地被用于城市的地标性建筑.在其施工的过程中需布 置一定数目的临时支撑胎架以完成悬挑部分的施工,而胎架卸载的过程使整个结构由临时支撑体系和设计结构共 同受力转变为设计结构受力状态.为保证这一转变过程的安全,建立了某大悬挑结构的有限元模型,对胎架卸载 的全过程进行分析计算,最后得出优化的胎架卸载方案. [关键词]悬挑结构;胎架;卸载;有限元分析;优化 [中图分类号]TU311.41;TU758 [文献标识码]A [文章编号]1002-8498(2014)14-0115-05 Analysis on Support Frame Unloading Process of a Large Cantilever Structure Chen Xiaoyang China Railseay Siyuan Survey and Design Group Co.Ltd.Wuhan Hubei 430063 China) Abstract:Large cantilever structure was increasingly widely used in landmark buildings of a city as its unique architectural form.A certain number of temporary support frames were arranged to plete the construction of cantilever part of the structure.The integral working of temporary support frames and design structure was changed into condition of design structure working separately in the process of unloading support frame.To ensure the safety of this transformation process the finite element model of a large cantilever structure was established and the analysis on overall process of the support frame unloading was carried out subsequently and an optimized support frame unloading scheme was obtained finally. Key words:cantilever structure;jig;unloading;finite element analysis;optimization 随着社会财富的快速积累,人们对建筑结构的设置临时支撑胎架,待大悬挑结构整个空间受力体 审美和使用功能提出了更高要求.悬挑结构建筑系形成后对结构卸载.在胎架逐步卸载过程中,整 方案能够很好地将建筑艺术、结构艺术表现出来,个结构由临时支撑体系和设计结构共同受力转变 并能满...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年8月下 98 CONSTRUCTION TECHNOLOGY 第41卷第371期 某大型设备基础环氧砂浆二次浇筑施工技术 张勇 (中原石油勒探局工程建设总公司陕西分公司,河南濮阳45700】) [摘要]大型设备基础找正、找平后采用环氧砂浆二次浇筑,解决了靠传统的微膨胀细石混凝土二次灌注从而导致 混凝土收缩产生裂缝和出现底座下灌浆不实的问题.介绍了设备基础的环氧砂浆施工关键技术及措施,提出原材 料质量、施工质量和环境温度控制措施,详细阐述了环氧砂浆二次浇筑施工过程及其施工中的注意事项. [关键词]砂浆;二次浇筑;设备基础;施工技术 [中图分类号]TU767.4 [文献标识码]A[文章编号]1002-8498(2012)16-0098-03 Secondary Casting of Epoxy Mortar for Some Large Equipment Foundation Zhang Yong (Shaanxi Branch of Zhongyuan Petroleum Exploration Bureau Engineering Construction Corporation Puyang He'nan 457001 China) Abstract:The problems of cracking by concrete shrinkage and pouring paction at equiprnent foundation with traditional slight expansion fine aggregate concrete are solved by two-time casting of epoxy mortar after the concrete leveling and aligning.The construction key techniques and measures of epoxy mortar are introduced.The control measures of material quality construction quality and environmental temperature are put forward.The attentions of secondary casting of epoxy mortar are described in detail. Key words:mortar;secondary casting;equipment foundation;construction 环氧砂浆具有硬度高、耐磨性能好、附着力强、75m厚的环氧树脂砂浆,以达到抗压、抗振、耐腐 耐化学侵蚀、极佳的吸振能力和抗冲击能力、固化蚀的效果.环氧砂浆采用4d连续浇筑,每天浇筑1 时间短等特点,广泛用于安装精度要求高的工业设台,在温度为21℃时快速固化,固化时间为24~ 备基础二次灌浆,且由于灌浆材料具有自流不需振36h 浇筑成型后的环氧砂浆压缩强度应大于 捣、施工无间隙,固化时间短等特点,施工工艺相对 60MPa 弯曲强度在13~32MPa 因此在施工中严格 简单.同时适合人工搅拌、浇筑的各类专用设备和 按施工工艺进行,是保证施工浇筑成功的关键. 工(机)具的研制保证了浇筑工作的连续,大大提高 2施工关键技术及措施 了浇筑效果和质量. 设备基础的环氧砂浆施工浇筑原理是通过一 1工程概况 定配合比的环氧树脂、聚酰胺、乙二胺、二丁酯搅拌 鄂东气田韩城区块...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2012年7月上 32 CONSTRUCTION TECHNOLOCY 第41卷第368期 某大型设备基础沉井施工技术 夏培,何云飞,章激新 (浙江东南网架股份有限公司,浙江杭州311209) 水土激积,施工周期短,经济效益明显。

介绍了有底预留孔洞抽排泥砂的设计标准,抽排泥砂的混浆泵设备布置原 则,以及沉降现察分析和出现的问题及对策。

实践证明,达到了均匀下沉的预期效果。

【关键词]地下工程;设备基础:沉井;抽排泥砂法;沉降 【中图分类号】TU753[文献标识码】A[文章编号】1002-8498(2012)13-0032-04 Open Caisson Construction Technologyfor theFoundation Excavation ofLargeEquipment Xia Pei, He Yunfei, Zhang Qixin (Zhejiang Southeast Space Frame Company, Hangzhou, Zhejiang 311209 ,China) Abstraet;According to the site condition and soil characteristic, a special open caisson scheme was adopted, where sediment was drained by preformed holes at the bottom. During the construction, no soil deposit was observed and the construction period was shortened, which showed significant economic benefits.This paper described the design standard,pump layout principles for the sediment drainage method. Setlement observation results were also analyzed and solutions were proposed for mon problems. The practice shows that the expectled effect of uniform subsidence was achieved. Key words:underground; equipment; foundations; open caisson; drainage sediment method; setlement 1工程概况 组成,基坑底部持力层为砂质粉土夹粉砂,地基承 本工程位于杭州市萧山区,为一镀锌线设备基 载力为180kN。

按照工程地质勘察报告,沉井穿越 础基坑,在已建好的门式刚架厂房内部,两侧分别的地质剖面为:①素填土和淤填土,层厚0.3~ 毗邻刚架柱和砖混附房,钢柱基础为预应力管桩独 3.6m,层底标高5.160~0.930m,工程力学性质较 立基础,采用预应力混凝土薄壁管桩,桩径500mm, 差,土质结构较松散,为不良土层;②砂质粉土,层 单桩竖向承载力特征值为1000kN,桩端持力层为 厚0.9~5.6m,层底标高0.370~-8.420m,含水量 粉砂层,桩端进人持力层>1000mm,桩的有效长度 30.6%,竖向渗透系数4.3×10cm/s,水平渗透系 为13m。

沉井结构尺寸为12.6mx24m,壁厚 数4.8×10cm/s,工程力学性质一般,强度较低, 800mm,沉井高10.3m,分3次浇筑,下节高度 压缩性中等,可作为一般轻型建筑物的天然地基浅 1.8m,上节高度7.5m,后浇带高1m,底板厚 基础持力层;③砂质粉土夹粉砂,层厚0.6~4.7m, 1300mm,分2次浇筑,一次浇筑层厚800mm,下沉 层底标高-8.850~-4.840m,含水量27.0%,竖向 到位浇筑500mm厚二次浇筑层,下沉时混凝土强度 渗透系数8.8×10cm/s,水平渗透系数1.0× 达到设计强度的100%,混凝土强度等级为C35,抗 10cm/s,强度较低,压缩性中等,工程力学性质较 渗等级为P8。

于2011年1月20日开始沉井结构 好,可作为一般性建筑物的短桩基础持力层。

制作,4月14日开始下沉,4月22日下沉到位。

场地处于低纬度,属东南亚季风湿润气候,春 2地质状况分析 季3~6月为梅雨季,气候潮湿多雨,夏季7~9月为 据地质报告显示,土质主要由粉质黏土和粉砂 台风雨季,气候炎热,暴雨量大,强降水对基坑开挖 [收稿日期]2012-02-28 影响较大。

...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2017年7月下 施工技术 第46卷第14期 CONSTRUCTION TECHNOLOGY 79 D0I:10.7672/5j52017140079 某大型美术馆钢结构施工关键技术 成继红,刘明路,何月峰,韩向科,张建生,王馥琴 (中国二十冶集团有限公司,上海201999) [摘要]大同市御东新区美术馆钢结构工程,为空间管桁架结构,形状复杂.主体由4个异形三角锥体相切而成, 高度、跨度大.施工时采用了“异地原位拼装、计算机控制一次整体同步滑移到位”的施工技术.通过施工过程仿 真分析验证了该施工技术的可行性,对钢结构进行了拼装过程状态、同步及不同步滑移状态、卸载等施工状态进行 了分析.同时在施工过程中进行了施工实时监测,为结构的安全施工提供了保障. [关键词]钢结构;桁架;滑移;仿真分析;监测;施工技术 [中图分类号]TU391 [文献标识码]A [文章编号]1002-8498(2017)14-0079-04 Key Technology of Steel Structure Construction of a Large Art Gallery CHENG Jihong LIU Minglu HE Yuefeng HAN Xiangke ZHANG Jiansheng WANG Fuqin China MCC20 Group Co.Ltd.Shanghai 201999 China) Abstract:Datong Yudong Art Gallery project is located in Datong city Shanxi province with the plexity of roof shape and space pipe truss structure.The main body consists of four irregular tangent triangle cones especially great height and big span.During the construction the technology of 'assembly in different place according to design coordinate then sliding to the design place synchronously through puter control'was used.The feasibility of construction technology was verified through the analysis of construction process simulation and the steel structure of the assembling process synchronous and asynchronous state sliding state the unloading construction state were analyzed.At the same time the construction of real-time monitoring was conducted in the construction process which provide the guarantee for the safety of construction structure. Key words:steel structures;trusses...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年8月上 30 CONSTRUCTION TECHNOLOGY 第45卷第15期 D0I:10.7672/8js2016150030 某大型游乐项目楼承板施工技术 田俊年 (上海宝冶集团有限公司,上海200941) [摘要]对某大型主题乐明目世界园区多数单体楼承板施工进行深化设计,命绍组令楼屋面及柔性屋面楼承板 施工的安装要点.南了博承板密装时栓打焊接施工工艺.工程实践表明,施工前做好克分的技术准能够提高 棒承板施工放率、遵兔返工并有效提高楼承板的施工质量. [并键词]楼承板;组舍楼板:栓打;深化设计;施工技术 [中图分类号]TU758.11 [交献标识码]A[交章编号]1002-8498(2016)15-0030-04 Application of Floor Deck Construction on a Large Recreational Facility Project Tian Junnian (Shanghai Baoye Group Co.Ld.Shanghai 200941 China) Abstract:Floor deck construction detailed design is introduced for Tomorrowland park in a large theme park.The construction key points of posite floor roof and flexible roof floor are indicated as well as the stud welding technology.The practice shows that full technical preparation will be able to improve work efficiency avoid rework and effectively improve the quality of the construction of the floor deck. Key words:floor deck;posite slab;stud;detailed design;construction 1工程概况 桂承板深化图纸须表达以下要点:①须准确无 某大型主题乐明日世界国区32创极速光轮误地标注出详细的边界尺寸,消除错误的边界线; 摩托和303超级盒子单体(以下简称302及303单②明确楼承板的铺设方向及搭接方式;③确定洞口 体)项目组含楼面及屋面采用1.2mm厚3W型板,定位及加固方式;④满足栓打的间距及容装要求; 用直径19mm、长110mm、间距305mm的栓钉进行⑤细化收边板的安装及与钢柱的连接节点.其中 熔焊团定;除组合楼屋面外还有部分柔性屋面,柔楼承板边界线及预留洞口位置、大小的确定为最主 性屋面主要采用1.5mm厚B-36型楼承板,用射打要向题. 与钢梁进行连接,每肋1颗射打,间距152mm. 1)设计图纸中没有明确的边界线且边界线存 承板镀锌量均为275g/m2 基本屈服强度≥300MPa 在诸多错误,可通过三维模型进行综含建模,查找 最大施工活荷载为1.0kPa.楼承板具有以下优点:楼板与楼体及其他构件的关系,对有疑向的边界线 ①可代替模板,省去全部或部分模板支撑;②减少 与设计师进行协调,最终确定楼承板的边界线. 混凝土用量,减轻结构永久荷载;③克分发压型 2)然建筑图纸中已对楼、屋面上的预留洞口 钢板良好的抗拉强度和延伸性能,与混凝土的结合 明确...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年8月上 34 CONSTRUCTION TECHNOLOGY 第45卷第15期 D0I:10.7672/8js2016150034 某大型游乐项目地下防水施工技术 周松 (上海宝冶集团有限公司,上海200941) [摘要]介绍某大型游乐项目地下结构采用预辅防水卷材及自粘防水卷材施工技木,包括基层处理、卷材辅贴、细 部处理技术等.在达到防水要求的同时,减少了施工流程,节省费用、缩短工期.实践表明,该技术取得了良好的 效果. [并键词]防水工程:防水卷材;预;奢鸳:施工技术 [中图分类号]TU761.11 [交献标识码]A[交章编号]1002-8498(2016)15-0034-04 Underground Waterproof Construction Technology of a Large Recreational Facility Zhou Song Shanghai Baoye Group Co.Lad.Shanghai 200941 China) Abstract:The underground structure of a large recreational facility constructed by pre-laying waterproofing coiled material and self-adhesive waterproof coil is introduced.In reaching the waterproof requirement at the same time the construction process is omitted the cost is saved and the the construction period is shorten.Practice shows that the technology reaches good effects. Key words:waterproofing;waterproof coiled material;pre-laying;casing pipe;construction 1工程概况 防水卷材上进行下一步工序施工,节省了成本和工 上海某大型主题乐因项目明日世界区工程总期;②与混凝土形成永久有机结合,防止水分海入 建筑面积23700m2 分为302创极速光轮摩托、303超防水卷材和结构之向的间障;③不叠基底展位移的 级盒子、301喷气背包飞行器、300A步行天桥、307舞影响.预铺防水卷材节点与常规防水卷材节点对 台、308天幕、354西区餐厅、355西区卫生尚皮室外场比如图1所示. 地9个单位工程,其中302 303 301 307 354 355下 1.5厚附加层 附加层 YILADI 部结构均为独立基础,防水等级为一级. 谢/基层处剂 砖胎膜 2防水材料 砖胎膜 防水卷林 水泥砂浆袜灰保护层一 基础结构承台采用砖胎膜,部分地梁采用木 S 模.经过防水深化设计,项目最终选用PV100预铺 1.2厚PVI00 预铺防水卷材 1.5厚附加 式高分子自粘胶膜防水卷材(砖胎膜部位)和 100厚C15基础垫层 YTL-A 防水卷材-一 素土实一 基层处理剂 100厚C15基础垫层一1附加层 YTLTM-VX交叉层压膜自粘防水卷材(木横部位). 素土有实一 2.1PV100预铺式高分子自粘胶膜防水卷材 a预铺防水卷材节点 b常规防水卷材节点 PV100预铺式高分子首粘胶膜防水卷材包括1 图1预铺防水卷材节点与常规防水卷材节点对地 层...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年8月上 施工技术 第45卷第15期 CONSTRUCTION TECHNOLOGY D0I:10.7672/8js2016150001 某大型游乐项目ETFE膜结构安装技术 潘润军 (上海宝冶集团有限公司,上海200941) [摘要]EFE作为一种新型建材料,具有轻展高强、耐久性好及良好的保温、隔热性能,是绿色环供材科.针对 上海某大型主题乐园明世界区308单体屋面ETFE膜结构施工,介了该膜结构施工难点及解决措施,重点南 述了天華ETFE膜结构施工流程及主施工工艺. [并键词]钢结构;传构;ETFE:枕;景性支其平台:容装 [中图分类号]TU353[交献识码]A[交章编]1002-8498(2016)15-0001-05 ETFE Membrane Structure Installation Technology in a Large Recreational Facility Pan Runjun Shanghai Baoye Group Co.Ld.Shanghai 200941 China Abstract:As a new type of building material ETFE has the characteristics of light weight high strength good durability good heat preservation and heat insulation and is a kind of green environmental protection material.In Shanghai a large theme park Tomorrowland No.308 Project roof ETFE membrane structure construction difficulty on the membrane structure and the measures to solve are introduced.The canopy ETFE membrane structure construction process and main construction process are explained. Key words:steel structures;membrane structures;ETFE;air pillow;flexible support platform;installation ETFE作为一种新型的建筑材料,具有轻质高着在上层圆钢管表面.天華膜结构曲72块ETFE 强、耐久性好、高透光性、高自洁性、高吸声性、难气枕组成,最大气枕长约70m 宽3m 面积约 燃、高耐腐性和良好的保温、隔热性能,且自身可200m2;最小气枕长约8m 面积约为20m2.附属构 回收再利用,是缘色环保材料,耐用年限达3年以件有柔性支撑平台、转接件,铝型材、铝芯、胶条、铝 上,透光率达95%,可在-100~180℃范围正常使压盖、充气管及充气设番等.天暴结构如图1所示. 用,且满足B1级防火标准.基于以上性能,ETFE 在出现后仅十几年时尚就在世界范围内得到了大 量应用,广泛用于展览建筑、大型商业设施、体育设 施、大型智能温室等工程. 1工程概况 a天幕钢结构 b天幕膜结构 上海菜大型主题乐园明日世界国延308单体天 图1天莱缘构示意 幕钢结构采用空间双层钢网壳膜结构体系,主要由 Fig.1 Canopy structure 圆管支搏斜柱、双层网壳屋面、网壳边...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年1月上 施工技术 第42卷第1期 CONSTRUCTION TECHNOLOGY 65 某大型深基坑逆作法施工技术 朱锦峰 (中冶天工上海十三冶建设有限公司,上海200941) [摘要]以上海市中山医院综合楼深基坑工程为例,介绍了逆作法施工技术在该工程中的应用.详细介绍了地下 连续墙的垂直度控制、防止槽壁坍塌和渗漏技术,一柱一桩的垂直度控制技术,基坑降水,土方开挖,相关节点构造 施工技术以及施工监测等关键技术.监测结果表明,基坑和周边建筑处于稳定状态,达到了预期效果. [关键词]地下工程;深基坑;逆作法;地下连续墙;垂直度;监测;施工技术 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2013)01-0065-06 Top-down Method in Large-scale Deep Foundation Excavation Zhu Jinfeng CMTCC Shanghai Shisanye Construction Co.Ltd.Shanghai 200941 China) Abstract:This paper introduces the top-down method in the deep foundation excavation of Shanghai Zhongshan Hospital Building.The key technologies are introduced in detail including verticality control of diaphragm walls prevention of slot wall collapse and leakage verticality control of one column with one pile foundation excavation dewatering earth excavation joints construction and monitoring.Monitoring results show that the foundation excavation and surrounding buildings were stable as expected. Key words:underground;deep foundation excavation;top-down method;diaphragm wall;verticality; monitoring;construction 1工程概况 P8 厚度分为1.0m和1.3m2种,属于大体积混凝 某工程位于上海市徐汇区斜土路1591号地块,土;地下2层设过街通廊,与枫林路对面已有建筑相 南邻斜土路,北靠清真路,东侧为小木桥路,西面为连,通廊使用顶管法施工. 枫林路.本工程项目占地面积40777m2 总建筑面2围护结构 积178028m2.其中,地下建筑面积66000m2 地下 本工程基坑规模巨大,整个基坑长约214m 宽 室局部设人防工程,其建筑面积为25888m2 本工约65m 占地面积22260m2 地下室3层,埋深最深 程长年的地下水位为室内地坪下1.200m. 为17.800m 属一级基坑.本工程自然地坪相对标 本工程地下3层,地下室为框架剪力墙结构和高为-0.650m 基坑普遍区域底板面标高为 框架结构,钻孔灌注桩基础,地下室开挖深度14.9 -14.300m. ~15.2m 局部落低1.5~2.6m.地下室采用逆作 整个基坑外...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2010年10月 施工技术 第39卷第10期 CONSTRUCTION TECHNOLOGY 27 某大型摩天轮施工模拟分析 贾宝荣 (上海市机械工有限公司,上海200072) [要]用ANSYS10.0对某大型摩天轮钢传梅施工全过程进膜拟分析,主要内容色括:A形支架及轮独系统提升 力的确定、提升塔容结柏设计和整体穆定分析、轮保梨过程计算、轮银装辅助柠折除皮轮释索张招过程 计算.施工全过程模拟计算按预定的祛工方分步实施,并在确保结构施王容全性的同时,对施工方意进行优 化,为施工助设施的设计摄供可靠的数据. [芙键词]摩天轮构:提升塔架:施工模拟:辅架拆除 [中分类号]TU394:TU745 [支献杭识]A [支章编每]1002-8498(2010)10-0027-04 Construction Simulation of a Great Ferris Wheel Jia Baorong Shanghai Mechanized Construction Co.Ltd.Shanghai 200072 China) Abstract:The eonstruetion simulation of a great ferris wheel is calculated by ANSYS 10.0.The simulation includes 5 parts:the calculation of lifting force of A-shape frame and spindle systems the lifting tower design and overall stabilization analysis the calculation of rim erection course the simulation of course about assistant truss dismantling and spoke cable stretching.The whole course simulations are carried through step by step according to the established construction plan.In this course the construction plan is optimized and eredible data is received for the design of assistant establishments. The ferris wheel will be the biggest one in the world when pleted.Technieal methods and detail numerical data are provided for the construction of the great wheel. Key words:great wheel system:lifting tower:construction simulation:assistant truss dismantling 1工程概况 208m 轿厢(48个) 禁大型摩天轮慧高度为208m 建成后将是世界上 轮缘 最大的摩天轮.摩天轮的转动轮盘采用柔性预应力钢 轮索(48个 轴心和轴套 10825m 体系,由隔射状布置的拉索和轮强组成,轮慈采用三 角形新面的管粉架,通过48根立替布里的轮辐索与轮 斜拉索(2X4) A架柱 毂上索盘相连,形成一个平衡...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年4月下 46 CONSTRUCTION TECHNOLOGY 第43卷第8期 D0I:10.7672/5js2014080046 某大型工业厂房钢大门施工技术 刘建明1 2 (1.西安建筑科技大学土木工程学院,陕西西安710055;2.陕西建工集团第二建筑工程有限公司,陕西宝鸡721000) [摘要]西安飞机工业(集团)有限公司369号飞机总装厂房大门为长258.10m、高20m的通长钢大门,大门由8大 扇门板组成(每一大扇由2个小扇连接而成),每扇门重40,大门共重3201,采用地面组装成型后用起重机械提升 安装的方法,重点介绍了钢大门构造、钢大门制作安装工艺和钢大门制作安装的质量控制措施. [关键词]钢结构;钢大门;组装;吊装 [中图分类号]TU758.11 [文献标识码]A [文章编号]1002-8498(2014)08-0046-03 Construction Techniques for the Steel Gate of a Factory Building Liu Jianming.2 (1.School of Ciril Engineering Xi'an Unirersity of Architecture Technology Xi'an Shaanxi 710055 China; 2.Shaanxi Construction Group of the Second Engineering Lid.Baoji Shaanxi 721000 China) Abstract:In the No.369 airport assembly factory in AVIC Xi'an Aireraft Industry (Group)Company Ltd. the steel gate is 258.10m long and 20m tall which is made up of 8 big steel door panels two small door leaves consist of one big panel.Each panel is 40 ton weigh so the steel gate is total 320 ton weight. The 8 door panels of the steel gate are all lifted and installed after assembled on the ground.The gate's structure manufacture assembling and installation as well as the controlling methods are mainly introduced in the paper. Key words:steel structures;steel gates;assembly;hoists 1工程概况 西安飞机工业(集团)有限公司369号飞机总 装厂房工程为单层厂房,总建筑面积26966m2 横 向跨度77.8m 纵向长260m.立柱为矩形钢筋混凝 土柱,屋盖结构为3层斜放四角锥网架,厂房东、西 面外墙为外挂银灰色金属三明治板,北面外墙为外 挂中灰色平钢板.厂房南立面大门洞口尺寸为 图1厂房南立面钢大门 Fig.1 Big steel door in the south facade of the workshop 258.10m×20m(LxH) 大门由8大扇(16小扇,每 一大扇由2个小扇...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年4月 74 CONSTRUCTION TECHNOLOGY 第39卷第4期 某大型工业厂房屋面PVC防水施工技术 刘建明 (陕西建工集团第二建筑工程有限公司,陕西宝鸡721000) [摘要]通过某飞机总装厂房工程20976m2屋面防水层施工实例,介绍了轻型屋面系统PVC卷材防水层的施工准 备、施工操作工艺流程、质量保证措施和施工注意事项,保证了屋面施工质量.指出PVC卷材铺贴前需进行预铺; 卷材铺贴好后,在长边一侧用塑料铺固件与保温层和结构层连接圆定;PVC卷材搭接缝采用热风焊接方式.同时 给出了女儿墙根部和落水口处防水节点做法. [关键词]屋面防水;PVC卷材;施工技术 [中图分类号]TU765 [文献标识码]A[文章编号]1002-8498(2010)04-0074-02 Construction Technology of PVC Waterproof for Roof in Some Large Industrial Building Liu Jianming The Second Engineering Co.Lad.of Shaansi Construction Engineering Group Co.Baoji Shaansi 721000 China) Abstract:Taking construction of waterproof for roof in some large industrial building with area 20 976m2 for example the construction preparation construction technology process quality assuring measures and attention points of construction for PVC coiled material waterproof layer are introduced which guarantee the construction quality of roof.It is indicated that pre-pavement should be done for PVC coiled material the coiled material should be fixed with insulation layer and structural layer after pavement and connection joint of PVC coiled material is treated by hot blast welding.Furthermore waterproof joints practices for parapet root and water dropping opening are put forward. Key words:roof waterproof;PVC coiled material;construction technology 1工程概况 焊接施工 一PVC卷材防水层 120厚岩棉保温板 西安飞机工业(集团)有限公司369号飞机总装厂前要对自动焊 0.3厚隔气层 0.8V125型压型钢板 房工程为单层厂房,总建筑面积26966m2 横向跨度接机和手持式 保通板垫片 件 热风焊 77.8m 纵向长度260m 屋面总面积20976m2.屋盖结焊枪进行检 构为三层斜放四角锥网架,屋面采用H型钢主榛...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年2月上 施工技术 第45卷第3期 CONSTRUCTIONTECHNOLOCY 63 DOI:10. 7672/sgjs2016030063 某大型地下车库变形缝渗漏综合治理技术 韩兵康,李明 (同济大学建筑工程系,上海200092) [摘要】地下结构上浮、变形缝渗漏等问题在地下工程中时有发生。

地下室底板不均匀上浮、坡道滑移等原因会造 成变形缝两侧出现高差、变形缝宽度变大、止水带断裂,导致变形缝处渗漏,在治理过程中存在很大困难。

结合某 大型地下室变形缝渗漏治理,引进新型变形缝堵漏技术,同时对变形缝宽度进行缩缝修复,采用“自上而下"钢管注 浆桩抗浮锚杆控制上浮,取得了比较好的治理效果。

[关键词】地下工程;车库;变形缝;堵漏;压密注浆;膨胀密实法 [中图分类号】TU761.1*1 [文献标识码】A [文章编号]1002-8498(2016)03-0063-05 ComprehensiveLeakageTreatmentsofDeformation Joints in an Underground Garage Han Bingkang, Li Ming (Department of Structural Engineering,TongjiUniversity,Shanghai 200092,China) Abstract:The floating basement and the leakage of deformation joints in underground garage appear occasionally. The heights differing in the two sides of movement joint are caused by the basement' s floating and the channel slippage.It is dificult to treat the leakage of the deformation joint. Combined with the leakage treatment of a basement’s deformation joint, the performances and application of some new techniques are selected,the‘from top to down’anti-floating anchor rods of steel grouting piles is introduced to prevent the basement floor from floating. Key words:underground; garage; deformation joints; leak stopping; paction grouting; inflation- densified method 1工程概况 板和沥青麻丝。

变形缝处渗漏情况非常严重,有大 本案例地下室属于上海市某住宅小区一期地 面积积水,局部有涌水现象。

现场检测发现变形缝 下车库,分6个区,总建筑面积为8959.9m²。

建筑耐 曾出现过渗漏,当时采用“堵漏灵”缝内止水并钻孔 久年限为50年,耐火等级一级,防水等级一级。

注浆,此方法虽能止漏,但没有解决根本问题,造成 地下室设计标高±0.000,相当于绝对标高变形缝渗漏久治不愈。

4.700m。

1,2,3区室内地坪设计标高-4.600m,顶2渗漏原因 板面结构设计标高-1.250m。

4,5,6区地坪设计标 本案例中地下室变形缝有多处渗漏,局部出现 高-4.300m,顶板面结构设计标高-0.950m。

1,2, 涌水,渗漏情况严重。

确定治理方案时,不能简单 3区与4,5,6区间存在高差,素混凝土找坡。

地下 采用堵漏的方法,需要因地制宜,根据变形缝的位 室底板厚450mm,下部为桩基础。

地下水埋 置、功能和构造等对渗漏原因进行深人分析。

深0.5m。

一期1,2,3区与4,5,6区底板的变形缝长 本案例修复的地下室变形缝为一期1,2,3区与 17m,宽40mm。

现场检测发现变形缝一侧因底板抗 4,5,6区,一期通往二期通道口的变形缝,原变形缝 浮桩抵抗力不足,底板不均匀上浮,导致中埋式止 防水采用中埋式止水带,缝内依次填充聚乙烯泡沫 水带变形过大失效。

原变形缝修复仅仅达到止漏 的目的,未解决底板上浮问题,导致变形缝常治 [作者简介】韩兵康,副教授,硕士生导师,E-mail:hbk1239@ sina. 常漏。

[收稿日期】2015-04-13 一期至二期通道宽7.8m,高2.5m,顶板上部覆 万方...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2016年8月下 48 CONSTRUCTION TECHNOLOGY 第45卷第16期 D01:10.7672/gjs2016160048 某大型地下室结构上浮拱起工程事故分析与处理 贾益纲,费逸2,吴光字,王惠宾,欧阳斌3,袁志军 (1.南大学设升研究院,江西南330029;2.同济大学土本工程学院,上海200092; 3.江五方建就设计有限公司,江西精州341000) [描要]根据上浮拱起数对菜地下室所遇最高水位进行了数值推算,并结含场地地质条件、施工情况和结构裂缝 性状等进行了地下室结构拱起和裂健原因分析;研究衬论了两种抗浮处理方略,并通过空间结构弹塑性简化分析 确定了整体抗浮和结构加处理方. [关键词]地下室;上浮拱起:翠继;弹塑性分析;抗浮;加 [中图分类马]TU746.3 [交献标识弱]A[支章编号]1002-8498(2016)16-0048-05 Analysis and Processing on Up-floating Arch Accident of a Basement Structure Jia Yigang' Fei Yi Wu Guangyu' Wang Huibin' Ouyang Bin Yuan Zhijun (1.Insititute of Design and Research Nanchang Unirersity Nanchang Jiangxi 330029 China; 2.College of Civil Engineering Tongji University Shanghai 200092 China: 3.WuFang Architectural Design(Jiangxi)Co. Lud.Ganzhou Jiangxi 341000 China) Abstract:According to the floating arch data the highest water level of basement is studied by numerical calculation in this text and bining with geological conditions construction and characters of cracks the arching of basement structure and crack reason is analyzed.The two kinds of anti-floating treatment strategy are discussed and through the simplified analysis of spatial elastic-plastic structure the program of structure reinforeement and the overall anti-floating are determined. Key words:basement floating arch;cracks;elastic-plastic analysis;anti-floating;reinforcement 地下水作用及地下室抗浮已是建筑工程界常 本文针对某大型地下室结构上浮事故,在空间 遇的技术问题.加果地质勘察建议的地下室抗浮结构弹塑性有限元分析的基础上,进行原因分析、 水位取值不含理、设计不周、施工不当或使用不善,受损构件析与加固处理,探讨地下室抗浮事故分 都可能发生地下室上...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2013年2月上 施工技术 第42卷第3期 CONSTRUCTION TECHNOLOGY 37 D0I:10.7672/sgjs2013030037 某大型公共场馆抽柱改造工程设计与施工* 李果,袁珊珊,杜健民 (中国矿业大学江苏省土木工程环境灾变与结构可靠性重点实验室,江苏徐州221116) [摘要]为满足某大型公共场馆的使用要求,需要对位于中轴线上的3根钢筋混凝土柱进行拆除,此举将使大梁的 最大跨度从12m增大到24m.在考虑结构整体性能以及抗展性能的基础上,综合采取了增设支点柱、增大断面加 固梁和粘贴碳纤维布的改造方案,同时采取了先改造加固后拆除柱的施工方案.施工安全监测结果表明:柱拆除 后,梁、柱的应力进行了重分配,结构的整体挠度变形很小,结构的改造和加固是安全的. [关键词]改造工程;抽柱;加固;设计;施工 [中图分类号]TU746.3 [文献标识码]A [文章编号]1002-8498(2013)03-0037-04 Design and Construction of Column-removed Retrofit Project for Some Large Public Building Li Guo Yuan Shanshan Du Jianmin Jiangsu Key Laboratory of Environmental Impact and Structural Safety in Engineering of China University of Mining Technology Xushou Jiangsu 221116 China Abstract:To satisfy the function requirements of a large public building three reinforced concrete columns on the central axis need to be removed which caused the largest span of transverse beams to increase from 12m to 24m.Considering the structural integrity and seismic resistance a retrofitting scheme was adopted which included providing additional supporting columns enlarging beams section and strengthening with carbon fiber sheets.During the construction all the retrofitting and strengthening work were finished before the columns were removed.The construction safety monitoring shows that stress redistribution occurred to the columns and beams after columns removal.The overall deflection of structure was subjected to little change which indicates that the retrofitted structure is safe. Key...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2016年8月上 施工技术 第45卷第15期 CONSTRUCTION TECHNOLOGY 17 D0I:10.7672/8js2016150017 某大型主题乐园喷气背包飞行器游艺设备安装技术 易云枝 (上海宝冶集团有限公司,上海200941) [摘要]针对某大型主题乐因明日世界国31单体工程台地面积小、工程量大、吊装梅件种类繁多、施工工期紧 殊等工程难点,详细介绍了流项目的菜工艺及操作要点.作为自控旋转飞机类的大型游艺设鲁,可为其他大型 游乐设施安装提供参考. [并键词]装工程:游艺设;喷背包飞行器;施工技术 [中图分类号]TU74[交献标识码]A[文章编号]1002-8498(2016)15-0017-05 Installation Technology of Jet Packs Recreational Facility in a Large Theme Park Yi Yunzhi Shanghai Baoye Group Co.Ld.Shanghai 200941 China) Abstract:A series of installation process and operating points of a recreational facility of jet packs in Tomorrowland park of a large theme park are introduced with the problems of construction field small large volume hoisting members plicated and construction time limited.As a large recreational facility automatic control rotary aircraft it can provide reference for other large recreation facilities installation. Key words:installation;recreational facility;jet packs;construction 1工程概况 上海菜大型主题乐园明日世界国区301单体项 目喷气背包飞行器属于自控旋转飞机类的大型露 天游艺设.该设径16m 高约9m;由基础立 柱支撑转动中心,转动中心上安装有8组座舱旋转 系统,主臂末端容装有吊舱臂,每个主臂上装有运 动油缸,油红可使吊舱臂上下转动,游客坐在座椅 上随设备预设程序在旋转中加速和减速(见图1). 2工程难点 该工程地面积小,工程量大,吊装构件种类 繁多,施工工期紧张,施工工序复杂,必须合理安排 平面布置、选用吊装设备,才能使施工经济、合理、 有序地进行.根据各设备的质量,结合喷气背包飞 行器吊装平面图中的作业半经(26m) 确定用下 列起重设备:200tQY200K型汽季式起重机1台,主 图1喷气背包真行器游艺设备示意 要用于柱、旋转底座组含件等的容装;70tQY70K型 Fig.1 Jet packs entertainment equipment 汽车式起重机1台,主要用于固定中心容装;25t QY25K型汽季式起重机1台,主要用于驱动装置安 求.工程场区总体布盟、施工区域划分如图2所示. 3喷气背包飞行器设备安装 装.经校验,各起重设叠满足吊装半径及工况要 安装流程为:化学栓安装一→主轴承吊装→中 [作老4]易云桂,助理工程师,E-mail:9879644...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

2014年11月上 施工技术 第43卷第21期 CONSTRUCTION TECHNOLOGY 49 D0I:10.7672/5js2014210049 某大型LNG储罐预应力施工模拟分析* 李振宝1,林树潮,王冬雁2,谢利红3,吴树勤3,韦永斌2,廖娟2 (1.北京工业大学工程抗震与结构诊治北京市重点实验室,北京100124;2.中国建筑股份有限公司技术中心, 北京101300;3.中建电力建设有限公司,广东深圳518034) [摘要]储罐外罐是确保LG储罐安全的关键设施,预应力筋施工过程是建立结构受力体系的重要环节,研究其建 立过程对LNG储罐具有重要意义.以某大型LNG储罐为背景,选用大型通用有限元软件ANSYS建立有限元实体 模型,分析了LNG储罐在预应力筋施工过程中罐体的变形、应力状态以及预应力筋应力状态,验证了LNG储罐罐 体在预应力施工过程中受力性能良好并在控制范围内. [关键词]LNG储罐;预应力:施工技术;有限元分析 [中图分类号]TU359 [文献标识码]A [文章编号]1002-8498(2014)21-0049-05 Construction Analysis on Prestressing of Some Large LNG Storage Tank Li Zhenbao Lin Shuchao Wang Dongyan2 Xie Lihong Wu Shuqin Wei Yongbin2 Liao Juan㎡ (1.Beijing Key Laboratory of Earthquake Engineering and Structural Retrofit Beijing University of Technology Beijing 100124 China;2.China State Construction Engineering Co.Ltd.Technical Center Beijing 101300 China; 3.China Construction Electric Power Construction Co.Ltd.Shenzhen Guangdong 518034 China) Abstract:The outer tank is the key facility to ensure the safety in the LNG storage tank prestressed tendon construction process is an important part for establishing structure system so it is of great significance to study the establishing process.Based on some LNG storage tank this paper chooses a large general finite element software ANSYS and establishes the finite element solid model analyzes the concrete stress state storage tank deformation and prestressed tendon stress state which proves good mechanieal performance and the stress is under control duri...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2010年3月 66 CONSTRUCTION TECHNOLOGY 第39卷第3期 某多层工业厂房楼板振动测试与分析 杜锐 (山西四建集团有限公司,山西大原030012) [摘要]介绍机器振动引起某厂房结构的楼板振动的测试结果,得到动力设各的扰力、频率、现有隔振支座的工作 情况以及楼板强迫振动的响应特点.结果表明,楼板振动仅在振动筛所在的轴线内较大,在水平方向振动衰减较 快而振动在竖直方向有放大的趋势.基于现场测试结果,利用ANSYS有限元软件对4种不同工况下楼板的简谐强 迫振动进行了计算机仿真分析,得到各标高层楼盖结构的振动和传递规律,结合测试结果对楼板振动原因进行了 分析. [关键词]工业厂房;楼板振动;模态分析;有限元分析 [中围分类号]TU311.3 [文献标识码]A 【文章编号]1002-8498(2010)03-0066-04 Vibration Test and Analysis About Some Multi-story Factory Building Floor Du Rui (China Shanxi Sjian Group Co.Lad.Taiyuan Shanxi 030012 China) Abstract:In this article the author shows vibration test results of some factory building floor induced by apparatus vibration.The test obtains disturbing force and frequency of power equipment working conditions of the existing isolation bearing and response of floor vibration.The test results are as follow: floor swing is larger in axis of vibrating screen;the vibration amplitude is damped quickly in horizontal direction and is amplified in vertical direction.According to the test results puter simulations of simple harmonic vibration are carried out corresponding to four vibration cases with ANSYS software. Through parison and analysis the vibration transmitting orderline and characters at each floor and in the vertical direction have been gotten. Key words:factory building;floor vibration model analysis;finite element analysis 振动问题在现代工业生产中普遍存在,振动设构楼板及梁、柱之间的传递及放大规律,特对该结构进 备在运行过程中对厂房产生持续激励,有可能诱发厂行了现场楼板振动测试,以评估该结构楼板的振动量 房结构或构件的强迫共振.如果处理不当,结构振动级及其对结构和工人健康的...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2013年5月上 86 CONSTRUCTION TECHNOLOGY 第42卷第9期 D01:10.7672/sgjs2013090086 某外墙组合保温技术在新农村住宅中的应用* 杜书廷 (许昌学院土木工程学院,河南许昌461000) [摘要]以膨胀玻化微珠保温砂浆和淤泥烧结保温砖为材料,构建了外墙内保温、墙体构造自保温、外保温共同作 用的三组合外墙保温技术.结合某新农村住宅工程,分析了其构造做法、材料选用及施工要点,并对其使用效果进 行了分析和总结.实施结果表明:该组合保温技术构造合理,保温效果好,安全性高,施工方便,绿色环保. [关键词]建筑节能;保温;住宅工程;玻化微珠保温砂浆 [中图分类号]TU55.1 [文献标识码]A [文章编号]1002-8498(2013)09-0086-04 Application of Outer-wall Combination Thermal Insulation Technology in Some New Rural Residence Du Shuting (School of Civil Engineering Xuchang University Xuchang He'nan 461000 China) Abstract:Using expanded and vitrified microsphere insulation mortar and busted slit bricks as the main material a bined three-layer thermal insulation technology was established for external walls which consists of the inner surface insulation layer constructional wall insulation layer and external surface insulation layer.Using a new rural residential project as an example the construction details material selection and construction methods were analyzed.The application effect was also analyzed and summarized.It is shown that the bined thermal insulation technology has many advantages such as proper structural detailing good insulation effect high safety level simple construction and environmental protection. Key words:building energy-saving:insulation residential projects;vitrified microsphere insulation mortar 本文在内外组合保温的基础上,通过提高墙体色面砖,上部楼层外墙外饰面为灰色涂料,卫生间 构造自身保温性能,构建了外墙外保温、自保温、内 和厨房内饰面为白色面砖,其他房间外墙内饰面为 保温共同作用的三组合保温系统,并以某新型农村 白色涂料.本工程外墙采用了以无机轻质保温砂 住宅工程为例,对其技术构造、材料选用等问题进 浆和淤泥烧结保温砖为主要材料的三组合保温 行分析. 构造. 1工程概况 2外墙三组合保温构造 本工程为某新型农村社区住宅楼,总建筑面积 2.1外墙保温构造 2244.48m2 共5层,1层为层高2.5m的储藏室,2 该工程三组合外墙保温构造如图1所示(其中 层以上为层高3m的居住空间,主要檐口高度 一般房间外墙构造如图1a所示,厨房、卫生间外墙 15.2m 砖混结构,耐火等级为二级,抗震设防烈度 构造如图1b所示,储藏室外墙构造如图1c所示). 为7度;外墙厚均为240mm 外窗为塑钢中空玻璃 构造层次由内至外依次为①240mm厚淤泥烧结保 窗,建筑体形系数为0.36;储藏室外墙外饰面为灰 温砖墙;②8~10mm厚1:3水泥砂浆找平层;③2~ 3mm厚界面砂浆;④钢丝网铺栓;⑤膨胀玻化微 2012年度河南省重点科技攻关项目(122102310398):2013年度许 昌市科技攻关计划项目(3008) 珠轻质砂浆保温层,内保温层为20mm厚,外保温层 [作者简介]杜书廷,副教授,E-mail:dst_xiao@1...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术2012年2月下 44CONSTRUCTION TECHNOLOCY第41卷第359期
某复杂SRC核心筒结构施工节点深化设计
李晓润,王海龙,李伟男,吴昌栋,陈卫海 (中冶建筑研究总院有限公司,北京100088)
[摘要]钢骨混凝土(SRC)结构结合了钢结构和混凝土结构的优点,在高层建筑框架结构体系中广泛应用。

结合 实际工程,从节点处刚接和铰接方式选择、剪力墙与SRC柱的节点构造及SRC暗柱与暗梁节点构造等方面,介绍 了其对结构施工的影响。

进一步阐述了钢骨柱的制作流程和施工要点,以及施工中可能出现的问题和采取的相应 措施。

[关键词】核心筒:混凝土;SRC节点:施工技术 [中围分类号]TU755[文献标识码】A[文章编号]1002-8498(2012)04-0044-03 JointDetailedDesignofSomeComplexSRCCoreTubeStructure Li Xiaorun,Wang Hailong,Li Weinan,Wu Changdong,Chen Weihai (China Metallurgical Buildings ResearchInstitute Co.,Ld.,Bejing100088,China) Abstract:Steel reinforced concrete (SRC)structure bines the advantages of steel structure and concrete structure,which is applied widely in high-rise frame structures. Combined with the actual project,the influence of joint .connection choice,joint structure of shear wall and SRC column,joint of SRC concealed column and concealed beams on the construction are researched. The making process and construction key points of SRC column are described,and the problems could be happened and
Key words;core tube; concrete; SRC joint; construction
钢骨混凝土结构就是将钢骨以及纵筋、箍筋和节点构造等方面,介绍其对结构施工的影响。

混凝土一起按一定的方式组合,为达到整体受力而1工程概况 设计的一种结构,简称SRC。

该结构具有刚度大、承.北京某写字楼工程,地上47层,地下2层,屋面 载力高、延性好等优越的力学性能。

标高178.970m。

核心筒结构分为一高一矮两个核心 核心筒结构指中央的核心筒与外围框架形成筒,其间通过框架梁及框架柱连接,其中较矮的核心 一个外框内筒结构,该结构一般以钢筋混凝土浇筒至43层,且两核心筒仅在31层以下在剪力墙中布 筑。

此种结构十分有利于结构受力,并具有极优越置SRC端柱或暗柱,并在对应位置设置SRC暗梁。

的抗震性能,是国际上超高层建筑广泛采用的主流钢材强度等级为Q345B,混凝土强度等级为C40。

结构形式。

同时,这种结构的优越性还在于可争取该建筑造型独特,形式优美,但同时也给结构 尽量宽散的使用空间,使各种辅助服务性空间向平工程师带来许多麻烦,SRC构件相交的节点由于钢 面的中央集中,使主功能空间占据最佳的采光位骨和纵向钢筋较多,穿筋多有不便,施工难度增大。

置,并达到视线良好、内部交通便捷的效果。

将SRC2节点连接方式选择 技术与核心筒结构进行组合,是超高层建筑发展的结构横向与纵向构件的连接节点大致可以分 大势所趋。

为两种:连梁与剪力墙节点和SRC暗梁与暗柱节 本文结合实际工程,从节点处刚接和铰接的处点。

对于上述节点连接刚性有如下两点建议,并经 理、剪力墙与SRC柱的节点构造及SRC暗柱与暗梁验算可行。

2.1连梁与剪力墙节点 [收稿日期]2011-08-25在风荷载和地震荷载作用下,墙肢产生弯曲变 【作者筒介]李晓润,中冶建筑研究总院有限公司高级工程师,北京形,使连梁产生转角,从而使连梁产生内力。

同时 市海淀区西土城路33号3号楼1103100088,电话:(010)连梁端部的弯矩、剪力和轴力又反过来减少了墙肢 ,E-mail lixiaorun2000@ ina
万方数据
2012 No.359李晓润等:某复杂SRC核心筒结构施工节点深化设计4...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

施工技术 2014年1月上 104 CONSTRUCTION TECHNOLOGY 第43卷第1期 D0I:10.7672/8gjs2014010104 某堆场真空联合堆载预压技术研究* 张永宏,汤丽军2,吴方华3,王文宇4,李明东 (1.淮海工学院土木工程学院,江苏连云港222005;2.中交一航局第二工程有限公司,山东青岛266071; 3 锦宸集团有限公司,江苏南京210037;4.中国化学工程南京岩土工程公司,江苏南京210044) [摘要]连云港金港湾国际物流园区建于沿海软土地区,运货车辆荷载大,对堆场的强度要求高.为探寻在软土中 修建经济合理的堆场施工方案,对③区采用“真空堆载”的方法对堆场软土地基进行处理,结果表明,该方法更有 利于加固地基的稳定,提高土性较为明显,经济合理. [关键词]地基;软土;堆场;真空联合堆载预压;施工技术 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2014)01-0104-05 Study of Vacuum-surcharge Preloading Technique in Soft Soil of Some Yard Project Zhang Yonghong' Tang Lijun2 Wu Fanghua Wang Wenyu' Li Mingdong' (1.College of Civil Engineering Huaihai Institute of Technology Lianyungang Jiangsu 222005 China: 2.No.2 Engineering Co.Ltd.of CCCC First Harbor Engineering Co. Lid.Qingdao Shandong 266071 China; 3.Jinchen Group Co.Ltd.Nanjing Jiangsu 210037 China:4.China Chemical Engineering Nanjing Geotechnical Engineering Corporation Nanjing Jiangsu 210044 China) Abstract:Lianyungang Jingangwan international logistics park is constructed in the coastal soft soil the freight trafficloads is large so the requirement of the yard is high.Vacuum-surcharge preloading technology was adopted for the soft soil foundation treatment.Engineering practice shows that this technology was more useful for foundations stability and it improved soil parameters and obtained good economic effect. Key words:foundations;soft soil;yards;vacuum-surcharge preloading;construction 1工程概况 由表1中数据可知,场地软土含水率高、压缩性 江苏金港湾国际物流园区建于连云港市沿海 高、渗透性低且埋藏深厚,如果不处理在荷载作用...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)