2016年9月上 施工技术 第45卷第17期 CONSTRUCTION TECHNOLOCY 79 DOI:10. 7672/sgjs2016170079 连续梁墩顶转体施工精准合龙对中技术研究 陶美祥,江国浩,武智飞,崔伟良,终岩 (中交一公局第一工程有限公司,北京102205) [摘要]连续梁转体施工过程中转体合龙精确对中有多种控制措施,蒙古营印河特大桥通过采用激光投线仪对中 控制技术,可以在无须测量人员上下桥的情况下,实现转体梁的精确对中及姿态调整。
同时在转体过程中,通过采 用传统对中控制校验,验证了该新型控制措施的可行性,同时多种控制措施的结合使用进一步保证转体的对中控 制精度。
[关键词】桥梁工程;转体;合龙;对中;施工技术 [中图分类号]U445.465 【文献标识码]A [文章编号]1002-8498(2016)17-0079-04 StudyonPrecision ClosurePositioninRotationConstruction of Continuous Girder onPier Top Tao Meixiang,Jiang Guohao,WuZhifei,CuiWeiliang,TongYan (No.1EngineeringCo.,Lad.ofFHECofCCCC,Beying102205,China) girder, closure position and attitude adjustment in rotation construction of continuous girder can be pleted without manually operation by position control technology of laser line throwing apparatus in construction of Mongol Camp Indian River Bridge. At the same time,the new control measures are proved to be feasible by traditional control measures in rotation construction, which ensure precision closure position by the bined use of various control measures. Key words:bridges;rotation;closure;alignment;construction 1转体合龙精确对中控制措施 1.1防止梁体超转限位装置 桥梁转体施工工艺与其他传统桥梁施工工艺1.1.1设置防超转限位装置必要性 的最大不同就在于它可以适应桥位处的地形搭设 转体前,根据称重结果计算转体牵引力,配备 支架现场浇筑或采用挂篮悬臂浇筑,然后通过球铰转体设备。
蒙古营印河特大桥墩顶转体采用2套 中断过往车辆,不阻碍线下的正常交通。
转体施工 安装完成后,将预埋好的钢绞线牵引索顺着牵引方 是整个施工过程中技术难度最高、误差控制最严 向绕上转盘后穿过千斤顶,夹紧并开始连续张拉, 格、安全风险最大的施工工序。
形成水平旋转力偶,使整个转体箱梁平稳转动。
根据《高速铁路桥涵工程施工质量验收标准》 采用自动连续液压张拉系统提供桥梁转动牵 TB10752一2010中第10.4.20条规定,转体就位后引力的方式,需要注意,连续梁转体施工段的转动 梁体的顶面高程偏差≤20mm,轴线偏差≤L/6000,方向只能沿牵引力方向进行旋转,如图1所示,其转 以蒙古营印河特大桥为例,连续梁主跨计算跨径为动方向不可逆。
因此,当箱梁转体至设计轴线位置 56m,则转体就位后梁体的轴线偏差≤0.93cm。
单时,不及时停止张拉可能导致梁体超转现象发生, 个长54m的连续梁转体施工段在转体就位后要把这样转体就位后轴线偏差超过规定范围,则需进行 轴线误差控制在如此严格的范围内,必须制定可靠 箱梁轴线位置调整,由于牵引动力方向不可逆,逆 的防超转措施及精确的对中方案。
向转动调整措施将大大浪费物力、人力并延长工期。
1.1.2防超转限位装置设计 [作者筒介]陶美祥,工程师,E-mail:@ 每个转体施工段的边跨梁端设有钢管柱临时 [收稿日期]2016-03-15;[修订日期]2016-04-16 万方数据
80 施工技术 第45卷 2)防超转限位的设置要考虑的因素①连续 梁设计纵轴线位置;②临时支墩位置箱梁横断面尺 转动方向 寸;③配重后连续梁转体施工段标高;④连续梁是 直腹板箱梁还是斜腹板箱梁,如果是斜腹板箱梁还 转体后轴 要考虑腹板的倾斜度及配重后转体...