施工技术 2010年7月 84 CONSTRUCTION TECHNOLOGY 第39卷第7期 保温墙模复合剪力墙施工技术研究 朱民伟,李珠,刘元珍,张婷 (太原理工大学建筑与土木工程学院,山西太原030024) [摘要]作为新型保温承重一体化建筑结构体系,保温墙模复合剪力墙体系的施工工艺研究是其推广应用中的关 键问题.结合体系实验楼施工,对其施工技术进行研究.提出了新型体系的施工工艺,总结了其施工要点,并对施 工质量及验收问题进行了探讨.实验楼施工实践表明该施工技术具有技术可行性及经济合理性,有助于增强建筑 保温性能、加快施工进度、降低工程总造价. [关键词]保温;复合剪力墙;施工工艺;造价 [中围分类号]TU755.9 [文献标识码]A[文章编号]1002-8498(2010)07-0084-04 Research on Construction Technology of Composite Shear Wall Structure with Thermal Insulation Formwork Zhu Minwei Li Zhu Liu Yuanzhen Zhang Ting (College of Architecture and Civil Engineering Taiyuan University of Technology Taiyuan Shanxi 030024 China) Abstract:The posite shear wall structure with thermal insulation formwork is a kind of new architecture structure characterized by load-bearing and thermal insulation and the research on the construction technology of this structure is crucial to its promotion and application.Combined with the engineering practice of a pilot building the authors developed a new construction technology and summarized the main points in the process of construction.Meanwhile the related issues about construction quality and acceptance check were also discussed.The case of the pilot building demonstrated the technical feasibility and economic rationality of the technique which will help to enhance the insulation accelerate the constructional process and reduce the construction cost. Key words:thermal insulation;posite shear wall;construction technology;construction cost 保温墙模复合剪力墙体系是一种结合我国房建筑...
保温墙模复合剪力墙施工技术研究.pdf