高承压水地区超深基坑突涌分析与处置
王宝德,高海彦,陈学光 (中建八局有限公司天津分公司,天津300452) 【摘要】市内某超深基坑工程电梯坑开挖发生坑底突涌,据此工程案例,首先介绍了基坑周边环境,场地水文地质 概况,基坑开挖深度与承压含水层相对关系,详细阐述坑中坑承压含水层突涌分析、灌注桩桩侧突涌分析、勘探孔 突涌分析,最后得出突涌处置措施,总结得出突涌事故的处理经验。
[关键词]工程质量;突涌;承压水;超深基坑;止水椎幕 [中图分类号]TU755;TV223[文献标识码】A[文章编号]1002-8498(2012)22-0098-03 Analysis and Treatment to GushingofaSuper-deepFoundation ExcavationinHighPressureWater Area WangBaode,GaoHaiyan,ChenXueguang (China Consruction Eighth Enginering Division Co.,Ltd.Tianjin Branch,Tianjin300452,China) Abstract;Gushing occurred in the elevator well excavation of a super-deep foundation excavation project. Using this as an example, this paper firstly introduced the surrounding environment of the foundation excavation,the hydrogeology conditions,and the relative relation between foundation excavation depth andconfined aquifer.Itisthenintroduced indetail the gushingofconfinedaquiferinelevatorfoundation excavation,pile sidefbored pileandprospecting holes.Atlast,the treatment measuresare summarized and experiences concluded.
1工程概况①,④,6层,静止水位埋深1.5m,该含水层厚约为 1.1基坑周边环境概况15m,其下,③层为相对隔水层,层厚9m。
②第一 某超深基坑位于天津市河东区海河东岸,基坑承压含水层为9层,顶板埋深25m,层厚7m。
现场 开挖面积16560m²,开挖深度18.8m,其中电梯并开抽水试验测得该承压含水层水头埋深12m,承压水 挖深度24.65m。
基坑整体支护形式为地下连续墙水头高13m,其下@层为相对隔水层,层厚8m。
③ 加3道钢筋混凝土内支撑,其中电梯井支护形式为第二承压含水层为①层,顶板埋深40m,层厚4m。
高压旋喷桩重力式挡墙。
该基坑周边环境条件复现场抽水试验测得该承压水水头埋深12m,水头高 杂,分布有地铁、建筑物、道路和水体等,对土体位28m,其下2。
层为相对隔水层,层厚6m。
移和沉降要求高。
基坑西侧隔海河东路即是海河1.3基坑开挖深度与承压含水层相对关系 水体,其正常水位高出本坑底12m;东侧为六纬路,1)整体基坑开挖深度18.8m,坑底距第一承压 其下有地铁9号线穿过;南侧隔六经路即是在建的含层顶板6m,基底抗突涌安全系数0.92,不满足规 嘉里中心施工现场;北侧紧邻天津海关绯私大楼,范要求;坑底距第二承压含水层顶板21m,抗突涌安 其地下室配有高精密度通信仪器。
全系数1.5,符合规范要求。
1.2场地水文地质概况2)电梯井基坑开挖深度24.65m,距第一承压含 根据地基土的岩性分层、室内渗透试验结果,水层顶板0.85m,抗突涌安全系数仅为0.13,不满 场地埋深50.0m以上包括1个潜水含水层、2个微足规范要求;坑底距第二承压含水层15.5m,抗突涌 承压含水层及其间相对隔水层:①潜水含水层包括安全系数1.11,符合规范要求,如图1所示。
3)鉴于以上分析,基坑地下承压水控制设计 [收稿日期]2012-08-16时,采用地下连续墙隔断了第一承压含水层,进人 [作者筒介]王宝德,高级工程师,E-mail:wangbaodel23@yeah.net层相对隔水层,而未隔断第二承压含水层。
万方数据
2012 No. 377王宝德等:高承压水地区超深基坑突涌分析与处置99...