Construction Control for Earth andRock-FillDams

ENGINEERMANUAL

AVAILABILITY

Copies of this and other U.S. Army Corps of Engineerspublications are available from National Technical InformationService 5285 Port Royal Road Springfield VA 22161. Phone (703)487-4650.

Government agencies can order directlyu from the U.S. ArmyCorps of Engineers Publications Depot 2803 52nd Avenue Hyattsville MD 20781-1102. Phone (301)436-2065. U.S. Army Corps of Engineers personnel should use Engineer Form0-1687.

UPDATES

For a list of all U.S. Army Corps of Engineers publications andtheir most recent publication dates refer to Engineer Pamphlet25-1-1 Index of Publications Forms and Reports.

U.S.Army Corps of Engineers DEPARTMENTOFTHEARMY Washington DC 20314-1000

No.1110-2-1911 Manual

CONSTRUCTIONCONTROLFOREARTHANDROCK-FILLDAMS Engineering andDesign

1. Purpose. The purpose of this manual is to present principles and methods for construction control of earth and rock-fill dams.

responsibility for construction of earth and rock-fill dams. 2. Applicability. This manual applies to all Corps of Engineers divisions and districts having

those aspects that pertain to safe and satisfactory performance. sp pe jo toodsu pe uo o op e si en s gu

FORTHE COMMANDER:

Colonel Corps of Engineers ROBERT H. GRIFFINChief of Staff

No. 1110-2-1911 Manual

Chapte1

References 1-1 1-1General Considerations 1-2 1-1

Chapte2

Field Organizatioand Responsibility

Resident Inspection Force 2-1 2-1Field Laboratory Asstance by Higher Echelon 2-2 2-3 2-4 2-3Records and Reports 2-4 2-4

Chapte3

Treatment Foundatioard Abutment

General . 3-1 3-1Clearing Grubbing Stripping and Cleaning 3-2 3-1Seepage Control 3-3 3-3Dewatering and Drainage of Treatment of Unfavorable Conditions 3-4 3-6Excavated Areas 3-5 3-10

Chapte4

Borrav Areas ard Quarries

Section 1Earth FilIExcavation Handling and Hauling Equipment 4-1 4-1

U.S Army CorpsofEngineers DEPARTMENTOFTHEARMY WashingtqrDC20314-1000

CONSTRUCTIONCONTROLFOREARTHANDROCK-FILLDAMS EngineerigardDesign

Tabb of Contents

Chapte5

Construction Earth-Fil ard Rock-Fill

EM 1110-2-1911

30 September 1995

Paragraph Page

Borrow Area Operation 4-2 4-5

Section IIQuarries and Rock Excvation General . 4-3 4-8Equipment 4-4 4-8Obtaining Specified Rock Fill Test Quarries 4-5 4-6 4-10 4-9

Final Condition of Borrow Areas Section IIQuarries nd Spoil AreasBorrow Areas Quarries 4-8 4-7 4-11 4-11Spoil or Waste Areas 4-9 4-11

Fill Processing and Compaction Section IEquipmentHeavy Compaction Equipment Hand-Operated Compaction Equipment 5-1 5-2 5-1 5-1Spreading and Processing Equipment 5-3 5-1

Section IITest FillsRock Test Fills Earth Test Fills 5-4 5-5 5-1 5-5

Subject

Impervious and Semipervious FillCompaction Fundamentals Definitions 5-6 5-7 5-6 5-5Compaction Specifications 5-8 5-6Field Control Testing and Sampling Simple Control Procedures 5-9 5-10 5-7 5-8Operations in Adverse Weather 5-11 5-15Compaction in Confined Areas 5-12 5-16

Section IVPervious Fill Definition 5-13 5-17Material Gradations Compaction Equipment 5-14 5-18 5-17Water Content Control 5-16 5-15 5-18Lift Thicknesses and Number of Passes or Coverages 5-17 5-18Density Requirements 5-18 5-19Construction Control Test Results and Actions to be Taken 5-19 5-20 5-20 5-19

Rock Fill Section VGeneral 5-21 5-21Hard Rock Soft Rock 5-22 5-23 5-21 5-22

Semipacted Earth FillsUses 5-25 5-24 5-22 5-22Construction Control Specifications 5-26 5-22

Sequence of Placement andMeasurement of Quantities Schedule of Construction 5-27 5-22Placement Sequence 5-28 5-22Measurement of Quantities 5-29 5-23

Section VIISlope Protection Areas to be Protected 5-30 5-23Upstream Slope Protection 5-31 5-23Downstream Slope Protection 5-32 5-25

Chapte6

MiscellanecaConstruction

Features

Chapte7

Record ard Reports

References Appendi A

Appendi B

Method of Relatig Field DensityData to Desirel or SpecifiedValues

Appendi C

Fiel CompactieContrbFormsard Supplemeritanstructions

Appendi D

Instructiosfor Preparig PeriodicSummarieof Fiel Compaction ContrbData on Earh andRock-FI Dams

Appendi E

Descriptio ard Use of InstrumentsDurirg Earh ard Rock-Fil Dam Construction

Index

River Diversion 6-1 6-1Stage Construction 6-2 -9Surface Drainage Facilities Service Bridge Pier Foundations 6-3 6-4 -9 -9Instrumentation 6-5 -9Haul Roads Maintenance Roads and Public Roads 9-9 -9

Daily Reports 7-1 7-2 7-1 7-1Instrumentation Observations Compaction Control Reports 7-3 7-1Final Construction Report Construction Foundation Report 7-4 7-5 7-6 7-6

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)