BS 6349-1-1:2013 海事工程总则 作业规划和设计规范(英文版).pdf

considerations,Design,Figure,informative,ships,国外及港澳台标准
文档页数:119
文档大小:2.29MB
文档格式:pdf
文档分类:国外及港澳台标准
上传会员:
上传日期:
最后更新:

Maritimeworks-

Part1-1:General-Codeofpracticefor planning and designforoperations

..makingexcellence ahabit

Publishing and copyright information

The BSI copyright notice displayed in this document indicates when the document was last issued.

The British Standards Institution 2013

Published by BSI Standards Limited 2013

ISBN 978 0 580 76228 4

ICS 47.020.99

The following BSI references relate to the work on this document: Committee reference CB/502Draft for ment 13/ DC

Publication history

First published as BS 6349-1 April 1984 Second edition as BS 6349-1 July 2000Third (present) edition September 2013

Amendments issued since publication

Contents

ForewordivSection 1:General11 Scope12 Normative references13 Terms definitions symbols and abbreviations 24 Section 2:The maritime environment 12 Environmental considerations 125 Bathymetric and topographic surveys 135.1 Bathymetric surveys Survey control145.3 5.2 Other surveys for seabed or subsurface hazards 19 156 acquisition Meteorological and oceanographic considerations and data6.1 General 20 196.2 Particular considerations for surveys and data analysis 217.1 7 Meteorological effects 25 General 257.2 Precipitation 26 Wind257.4 7.3 Air temperature and humidity 277.5 7.6 Visibility Atmospheric pressure 27 277.7 Solar radiation 288.1 8 Water level effects Water levels 28 298.2 Seiches 298.3 8.4 Surface water run-off 29 Long-term sea level trends9 Currents and water movement3010 Waves 3111.1 11 Water quality 3311.2 Water temperature 33 General 3311.4 11.3 Chemical position 34 3411.5 Pollution Marine life 3512 11.6 Sediment transport 35 3512.1 Assessing the present sediment transport regime36 General 3512.3 Assessing impacts of works on sediment transport 45 12.2Section 3:Safety and operational considerations 4713 Operational considerations for planning and design4713.1 13.2 Facility operating manual 47 General4714 Health and safety 4815 Control of pollution and discharges to the sea4915.1 Vessel's waste 49

15.2 Port wastewater and surface run-off 5016 Port and maritime security5017 Design working life 5018 19 Navigation channels and ship manoeuvring 53 Vessel data5119.1 General 53sse upe as 19.2 Planning and design studies 5319.4 Horizontal channel and manoeuvring area dimensions 6020 20.1 Berths and mooring 66 General6620.2 Mooring and mooring conditions 6921 Operability and weather downtime 7522 Design operating conditions7623 Maintenance 77

Annexes

Annex A (informative) Organizations with a role in coastal activities in theUnited Kingdom 78 Annex B (informative) Metocean data acquisition 80Annex D (informative) Key dimensions of ships for preliminary design Annex C (informative) Sediment transport data acquisition88purposes 89Annex E (informative) Guidance on assessment of acceptable wave conditions for moored vessels101

Bibliography 107

List of figures

Figure 1- PIANC channel depth factors 56 Figure 2- PIANC definition of channel and fairway 61Figure 3 -PIANC definition of elements of channel width 61 Figure 4 - Considerations for layout and separation distances of oil and gastanker berths 68Figure 5- The six degrees of freedom of vessel motion72 Figure D.1 - Dimensions for LNG vessels related to gas capacity 90ses ss Figure D.2 -Dimensions for LPG vessels related to gas capacity 91Figure D.4 Dimensions for liquid bulk carriers and tankers related to DVTFigure D.5 - Dimensions for dry bulk carriers related to DWT 94 (carriers up to 50 000 DWT)93Figure D.6 - Dimensions for dry bulk carriers related to DWT (carriers up to50000 DWT)95Figure D.7 - Dimensions of container ships related to TEU capacity 96Figure D.8- Dimensions of general cargo ships related to DWT97 Figure D.9 - Dimensions of Ro-Ro ferries related to lane length98Figure D.10 - Dimensions of cruise ships related to passenger capacity 99

List of tables

Table 1- Indicative design working life categories for maritime works 51Table 2 Typical planning and design activities for channels and manoeuvringareas according to design stage 54

Table D.1 Approximate values of displacement from nominal ship capacity100Table D.2 - Typical ranges of C.100Table E.2 - Wave climate criteria for small craft considering extreme events 102 Table E.1 Wave criteria from small craft 101Table E.3 Remended maximum velocity limits 1 0oo DWT to 8 000 DWT103Table E.4 Guidance on maximum motion criteria for safe workingTable E.5 Remended maximum motion criteria for safe working conditions conditions 104Table E.6 - Guidance on maximum allowable significant motion amplitude of Ro-Ro vessels104conditions for container ships for (un)loading efficiency of 95% 105Table E.7 - Surge criteria for container ships for (un)loading efficiency of 95%105

Summary of pages

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。
④本站仅收取资料上传人设置的下载费中的一部分分成,用以平摊存储及运营成本。本站仅为用户提供资料分享平台,且会员之间资料免费共享(平台无费用分成),不提供其他经营性业务。
投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)