2015年8月下施工技术 第44卷第16期CONSTRUCTION TECHNOLOCY111 DOI:10. 7672/sgjs2015160111
恐龙园中心广场拔桩关键技术研究
滕坤,徐汉东,李莉,赵迁,周俊杰 (江苏鼎达建筑新技术有限公司,江苏常州210003)
[摘要]常州市恐龙园中心广场工程桩基础为PHC管桩,后因规划地铁斜穿该区城,需将影响地铁施工的587根管 桩拔除。
针对现场实际情况,总结前人有效经验,自主研发了一套拔桩系统和一套快速施工的施工方法。
结果表 明,该拔桩系统有效地完成了任务,节省了工期。
[关键词】桩基础;地下工程;拔桩;PHC管桩;施工技术 [中图分类号]TU753[文献标识码】A[文章编号]1002-8498(2015)16-0111-03 KeyTechnologyResearch ofPilePullinginthe DinosaurParkCentralPlaza Teng Kun,Xu Handong,Li Li,Zhao Qian,Zhou Junjie (Jiangsu Dingda High-tech Construction Co.,Lud.,Changzhou,Jiangsu 210003,China) Abstract:The pile foundation of the Dinosaur Park Center Plaza is PHC pile. Because the metro is planed to cut through the region,587 piles should be removed that influence the subway construction.For the site actual situation,after summarizing the previous experience effective,the authors research and development a pulling pile system independently and a rapid construction method.The results showed that the pulling pile system plete the task effectively,and reduce the construction period. Key words:piles;underground;pile pulling; PHC pipe pile;construction 随着国民经济的高速发展,科学技术应用突飞迪诺水镇 猛进,建筑行业新材料、新技术发展迅猛,近十几年潭 来,国内、外建筑桩基工程中,预应力技术和高强混龙恐龙谷温泉
主层分界线不食地下车库-2F 凝土工艺结合产物-预应力混凝土预制桩,用量 巨大。
现在,国内年用管桩量超亿米长,遍及工民抽铁规划线地下车库轮感线
九龙仓时代上院基底标高-6.200m汇 建、桥梁、港口、铁路、水利等各土木工程基础应用。
基屁王层为,层砂土区 但是随着城市地下空间的大力开发,尤其是越来越在建需清除桩区域 多的城市开始建设地铁,导致大量已建或在建建筑路路 物的拆除。
这些需拆除的建筑物多为桩基,将对盾EA 构施工产生很大影响,因而需要提前将其拆除。
河路 1工程概况 工程位于常州市新北区恐龙园东南面,原规划图1预应力管桩清除平面示意 方案为恐龙园中心广场,主体为地下2层停车场,地Fig.1Plan of the removed prestressed pipe pile 上5层购物中心及3层办公楼,基础采用PHC管 桩,桩顶位于地面下约10.5m,桩长13~15m,桩径2工程地质条件 0.5m,桩基已施工,且基坑已开挖至桩顶标高,后因根据工程勘察地质报告知场地土层划分为:① 规划方案调整,地铁隧道斜穿过本场地,需对影响填土杂色,松散~稍密,主要由可塑粉质黏土及 地铁隧道开挖的预应力管桩进行清除(见图1)。
建筑垃圾组成,大部分场地内有水泥地坪和少量大 块建筑垃圾;②,淤泥质粉质黏土灰色,流塑,含 [作者简介]腺坤,工程师,E-mail:454288846@qq.有机质,约占5%,切面稍有光滑,干强度及韧性中 [收稿日期]2015-01-26
万方数据
112施工技术第44卷 等,局部夹粉土;②,粉质黏土灰褐色,可塑,切面“钻杆”是钢质套管。
钢质套管的直径比弃桩桩径
土黄褐色,硬塑,含铁锰结核,切面光滑,无摇震合金钎头而成。
实施桩土分离时,将套管中心对准 反应,干强度高,韧性高,见竖向裂缝;③,粉质黏土弃桩中心,在拔桩机动力驱动下,慢慢向下利用泥 黄色,可塑,切...